Beruflich Dokumente
Kultur Dokumente
htm
Operation Breakdown:
Operation Machine Operation Description Skill Difficulty Individual Total Pcs/Hr Required Required Balance SPI Attachment Remarks
Sequence Type Level SMV SMV Machine Man Capacity/HR
1 Manual Match all cut parts. . . Helper 0 0.451 0.451 133.04 0 1 133.04 N/A Box N/A
2 Fusing Attach lining at front placket & collar. . . Helper 0 0.451 0.451 133.04 0 1 133.04 N/A N/A N/A
3 1N/2T/PM Make collar . . . Operator 0 0.72 0.720 83.33 1 1 83.33 11/12 T.Pattern DB-9
PTN
4 1N/2T/PM Trim, reverse & top stitch to collar. . . Operator 0 0.58 0.580 103.45 1 1 103.45 11/12 1/4 " Guide DB-9
5 1N/2T/PM Servicing collar lower side . Rolling front placket Operator 0 0.29 0.27 0.560 107.14 1 1 107.14 11/12 Knife DB-9
Knife edge (2X). .
6 1N/2T/BAS Attach front placket. . . Operator 0 0.48 0.480 125.00 1 1 125 11/12 Pattern DP-11
7 1N/2T/PM Top stitch to placket edge (left side). Trim front Operator 0 0.2 0.231 0.431 139.21 1 1 139.21 11/12 Guide DB-9
placket middle. .
8 1N/2T/PM Tack placket notch (left & right side). . . Operator 0 0.46 0.460 130.43 1 1 130.43 11/12 N/A DB-9
9 2N/4T/OL Join shoulder (left & right side). . . Operator 0 0.46 0.460 130.43 1 1 130.43 13/14 Guide DC-9
10 1N/2T/PM Tack collar with placket notch position (left & right Operator 0 0.46 0.460 130.43 1 1 130.43 11/12 N/A DB-9
side). . .
11 2N/4T/OL Join collar with body. . . Operator 0 0.58 0.580 103.45 1 1 103.45 13/14 Guide DC-9
12 1N/2T/FL Attach piping at collar & trim. . . Operator 0 0.3 0.300 200.00 1 1 200 13/14 Folder UY-9
FOL
13 1N/2T/PM Close placket (left side ). Top stitch to placket edge Operator 0 0.46 0.2 0.660 90.91 2 2 181.82 11/12 1/16 " guide DB-9
(right side ). .
14 1N/2T/PM Top stitch to Collar. Tack placket box edge (left & Operator 0 0.46 0.5 1.420 42.25 2 2 84.5 11/12 1/4" guide DB-9
right side). Make placket box . 0.46
15 1N/2T/PM Tack label at extra cloth . Tack elastic at extra cloth. Operator 0 0.181 0.268 0.449 133.63 1 1 133.63 11/12 N/A DB-9
.
16 1N/2T/PM Mark back neck label position & top stitch to collar Operator 0 0.46 0.460 130.43 1 1 130.43 11/12 Pattern DB-9
label extra cloth. . .
17 2N/4T/OL Attach sleeve with body (left & right side). . . Operator 0 0.69 0.690 86.96 1 1 86.96 13/14 Guide DC-9
18 2N/4T/OL Join side seam with label extra cloth(left & right Operator 0 0.769 0.14 0.909 66.01 2 2 132.02 13/14 Guide DC-9
side). Over lock placket edge. .
19 1N/2T/PM Tack placket edge security. Tack extra cloth with Operator 0 0.291 0.181 0.472 127.12 1 1 127.12 11/12 N/A DB-9
label. .
20 2N/3T/FL Hemming bottom & trim thread. . . Operator 0 0.46 0.460 130.43 1 1 130.43 13/14 Guide UY-9
21 2N/3T/FL Hemming sleeve & trim thread (left & right side). . . Operator 0 0.75 0.750 80.00 1 1 80 13/14 Guide UY-9
22 1N/2T/BH Holing placket at button position (2x). Mark placket Operator 0 0.28 0.19 0.751 79.89 1 1 79.89 100/120 Paper DP-11
button attach position (2x). Attach button placket 0.281 Pattern
with label(2x).
Total 12.954 23 25 23
Comments
1 of 2 22/04/2018, 4:59 PM
BOL Details file:///C:/Users/mostafa.kamal/Desktop/BOL Details.htm
Technical IE: Mahbubur Production IE: Technical Team: Production Team: 5 1N/2T/PM 1 1/4 " Guide 1
Rahman/A.Momin _________________ _________________ _________________
6 1N/2T/PM 2 1/4" guide 2
7 1N/2T/PM 1 Guide 1
8 1N/2T/PM 4 N/A 4
9 1N/2T/PM 1 Pattern 1
10 1N/2T/PM 1 Knife 1
Knife
11 1N/2T/PM 1 T.Pattern 1
PTN
12 2N/3T/FL 2 Guide 2
13 2N/4T/OL 5 Guide 5
Total 23 23
2 of 2 22/04/2018, 4:59 PM