Check Items

Cabinet Placement
Cabinet Fixing
Mains power connection
Connection with Grounding
Crimping of Lugs & insulations
fixing of power modules
fixing of monitoring module
Battery installation
Battery Connection
Temperature sensor Installation
Alarm cable connections
Labeling
Site cleaning
Requirements OK NOT OK
must placed according to the apparoved drawing.
All bolts must properly tightened after levelling.
All bolts must properly tightened with correct polarity.
Cabinet Grounding, ECB connected to main grounding point.
All lugs must properly crimped & securely insulated.
must properly inserted the rectifier modules.
must properly inserted the monitoring module.
Battery rack or cabinet & cells must properly fixed.
must Properly connected with correct polarity & with recommended torque.
Should keep between Battery cells & other end should connect to proper place.
Alarms should extend to correct points.
All cables must be labeled according to the standards.
Site should clean at the completion of installation.