CE 200L
Short-Form Lab Report
Report No: 1
Please staple this cover sheet to the report in the designated place at the upper left corner only.
Please do not use a folder.
CE 200L
Report No 1
– 1/3 –
American Concrete Institute (ACI) Method of
Portland Cement Concrete (PCC) Mix Design
Item No Item to be Looked Up or Computed Result of Look Up or Computation
Item
No 8 9
Item Volume/cu yd of PCC
Weight/cu yd of PCC
(to the nearest hundredth of a cu ft)
PCC (to the nearest hundredth of a lb)
(Air spaces among aggregate particles excluded)
Constituent Weight Calculations Wt. (lb) Volume Calculations Vol. (ft3)
– 2/3 –
Item 10: Weights of materials, to the nearest lb, required for one cu yd of PCC, based upon actual field moisture
conditions of the aggregates
Constituent Weight Computation Weight (lb)
605
a PC
Notes
1. Before proceeding to Item 8, ascertain that your answers are correct for Items 1 through 7. Even a
small careless mistake in looking up the items in the table will lead to grave errors in Items 8, 9,
and 10.
2. You must round off computed figures for Items 1 through 9 to the nearest hundredth, and
for Item 10 weights to the nearest lb following the convention outlined in ASTM E 29.
Failure to follow this rounding off convention will cause loss of points.
– 3/3 –