Sie sind auf Seite 1von 2

Amaravati Development Corporation Limited

ANNEXURE II
Minimum Depth from Ground Level, horizontal and vertical spacing requirements between
utilities
Utility Minimum Horizontal Spacing (m) Vertical Spacing (m)
Vertical depth
from ground
level
Water Waste Reuse Storm Power Power Power Gas ICT Water Waste Reuse Storm Power Power Power Gas ICT
(m)
supply water Drain 220KV 33KV 415V supply Water Water Drain 220KV 33KV 415V

Water 0.6 0.3 0.2


supply

Waste 1 3 0.5 0.2 0.2


Water

Reuse 1 0.6 0.5 0.5 0.2 0.2 0.2


Water

Storm - 0.6 0.5 0.5 0.5 0.2 0.2 0.2 0.2


Drain

Power 1.2 0.6 0.5 0.5 0.5 0.2 0.2 0.2 0.2 0.2 0.2
220KV

Power 1.05 0.3 0.3 0.3 0.3 0.2 0.25 0.2 0.2 0.2 0.2 0.2 0.2
33KV
Power 0.75 0.3 0.3 0.3 0.3 0.2 0.15 0.1 0.2 0.2 0.2 0.2 0.2 0.15 0.1
415V

Gas 1 0.6 0.5 0.5 0.5 1 0.3 0.3 0.15 0.4 0.4 0.4 0.4 0.5 0.3 0.3 0.6

ICT (Optical 0.75 0.6 0.5 0.5 0.5 0.5 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.2 0.2 0.2 0.2
Fibre)

362
Amaravati Development Corporation Limited

ANNEXURE III
S. No Utility Water supply Sewerage Reuse Storm Power Power 33KV Power 415V Gas ICT
220KV
1 Water supply minor size pipe has to
bend
2 Sewerage Water supply line has to Merge / Pumping
bend main line has to
bend
3 Reuse reuse pipe has to bend Reuse pipe has to minor size
bend pipe has to
bend
4 Storm Drain Water supply line has to Sewerage line has Reuse pipe Minor Drain
bend to bend has to merges with Major
bend Drain
5 Power 220KV Water supply line has to Power lines has to Reuse pipe Power lines has to Merge
bend bend has to bend
bend
6 Power 33KV For water supply trunk- Power lines has to Power Power lines has to 33KV Lines Merge/Any one
33KV lines has to bend bend lines has to bend has to bend can bend
For Water supply distri- bend
bution- water supply
lines has to bend
7 Power 415V Power lines has to bend Power lines has to Reuse pipe Power lines has to 415V Lines 415V Lines has to Merge/Any one can
bend has to bend has to bend bend bend
bend
8 Gas Gas line has to bend Gas line has to Reuse pipe Gas line has to Power lines Gas line has to Gas line has to bend Merge/ mi-
bend has to bend has to bend bend nor size pipe
bend has to bend

9 ICT (Optical ICT lines has to bend ICT lines has to Reuse pipe ICT lines has to Power lines ICT lines has to ICT lines has to bend ICT lines has Merge/
Fibre) bend has to bend has to bend bend to bend Any one
bend can bend