Amount
Quanitity
executed Item of work
Rate Since previous Remark
Unit up-to-date per under subhead's & sub-work's of
Rs. P. Up-to-date bill (Total) for
measurement Estimate
book Rs. P. each sub-head
Rs. P.
1 2 3 4 5 6 8
Hact.
1. Clearing & grubbing road land 14760.00
including uprooting rank vegetation,
grass, brush, shrubs, spalings and trees
of girth upto 300 mm, removal of stumps,
disposal of unserviceable material and
stacking of serviceable material upto 100
M. from road boundary as per clause 201
in (a) Area of light jungle.
Cum. 43.00
2. Excavation of embankment, subgrade
and drain consisting of excavation,
removal and satisfactory disposal of all
excavated materials i/c handling and
stacking of or hauling to sides of
embankment and subgrade construction,
spoil banks or stacking of suitable cut
materials in specified manner and the
trimming and finishing of the road to the
specified dimensions or as directed by
the Engineer-in-charge i/c all lifts, lead up
to 250 meter sand dewatering complete,
shaping nad excavation in marsh and
complete disposal of all muck as per
clause 301 (excluding preparation of the
cut formation vide clause 301.6) and
excluding dressing of bed and sides of
drains vide clause 309.4
(i) Ordinary / Hard soil
1. The work full name of the as given in the estimate should be entered here except in the cash of bill for stock materials
2. The purpose of applicable to the case should be filled in and the rest recoded out.
3. If the oplay on the work is recorded by sub-head the total for each sub-head should be shown in column 6 and againstthe total theres
should be on entry in column 6 also in on other case should and entirse be made in column 6.
-2-
Quanitity Amount
executed Item of work
Rate Since previous
Unit up-to-date per under subhead's & sub-work's of Remark
Rs. P. Up-to-date bill (Total) for
measurement Estimate
Rs. P. each sub-head
book
Rs. P.
1 2 3 4 5 6 8
requirements (As per clause 305.1.1)
inclusive of the operations necessary as
per clause 306 & its sub clauses, where
required but with approved materials
obtained from excavation for road
construction(vide clause 301.3.11) i/c
consolidating the original ground by
rolling as directed by the Engineer-in
-charge but with maximum of six passes
of 8 to 10 tonne roller & i/c compecting
and maintenance of surface during
construction to ensure shedding and
preventing ponding of water(clause
305.3.7) finishing i/c all lifts but excluding
scarifying adjusting grannular /
bitumenous road surface Clause 305.6
Quanitity Amount
executed Item of work
Rate Since previous
Unit up-to-date per under subhead's & sub-work's of Remark
Rs. P. Up-to-date bill (Total) for
measurement Estimate
Rs. P. each sub-head
book
Rs. P.
1 2 3 4 5 6 8
8. Providing and laying of well graded
granular material for sub base consisting
of sand, gravel, crushed stone, crushed
slag, brick metal, laterite, kanker etc. as
per grading given in table 400-1 of the
specifications and compacting to the
required density as per I.S. 2720 (Part-8)
with 8-10 tonne roller in 150 mm thick
layers in all seasons, maintaining the
required slope & grade during the
operation, as approved by the
Engineer-in-Charge i/c watering to the
proper moisture content in accordance
with IS 2720 (Part-2) and suitably
sprinkled with the help of truck mounted
or trailer mounted water tank fitted with
suitable sprinkling arrangement as per
clause 401 but excluding scarifying
existing bituminous surface.
(i) River sand, shingle, stone crusher dust
Cum. (fully saturated having CBR value not 269.50
less than 20)
Cum. (ii) Gravel, crushed slag, brick metal 236.50
laterite, kankar, disintigreted rock i.e.
moorum having value of CBR not less
than 20 and of PI & LL not more than 6
and 20 respectively or combination
thereof depending upon grading required.
( This item may be used with specific
approvel of the engineer.)
Cum. 9. Providing laying and compacting of
WBM sub-base / base course including
preparation and compaction of subase
and spreading of clean and crushed
aggregate to proper grade and camber
including application of screening for
interlocking, sprinkings of water and
rolling with power roller as per clause 404
(excluding inverted choke and scarifying
of existing bitumenous surfaces) for: -
Cum. a) Grading No.2 Material. (63 to 45 mm 456.50
size) with (i) Stone screening and
binding materials.
Quanitity Amount
executed Item of work
Rate Since previous
Unit up-to-date per under subhead's & sub-work's of Remark
Rs. P. Up-to-date bill (Total) for
measurement Estimate
Rs. P. each sub-head
book
Rs. P.
1 2 3 4 5 6 8
Sqm. 12. Providing 20 mm open graded premix 48.40
carprt consist of laying and compacting
open graded carpet composed of
premixed aggregate 13.2 mm size @
0.18 cum per 10 sqm and 11.2 mmsize
@ 0.09 cum per 10 sqm with bitumen
binder @ 14.6 kg/per 10 sqm as [per
clause 511 excluding primer/ tack coat
and but i/c preparation of surface mixed
in hot mix plant and hot laid with paver
finishaer and rolled with smooth wheeled
tendum type roller(minimum thickness
shall not be less than 20 mm at any
place)
Quanitity Amount
executed Item of work
Rate Since previous
Unit up-to-date per under subhead's & sub-work's of Remark
Rs. P. Up-to-date bill (Total) for
measurement Estimate
Rs. P. each sub-head
book
Rs. P.
1 2 3 4 5 6 8
Quanitity Amount
executed Item of work
Rate Since previous
Unit up-to-date per under subhead's & sub-work's of Remark
Rs. P. Up-to-date bill (Total) for
measurement Estimate
Rs. P. each sub-head
book
Rs. P.
1 2 3 4 5 6 8
25. Construction of 200 mm thick
Sqm. 504.90
unreinforced dowel jointed, plain cement
concrete pavement mechanically vibrated
as par clause 602 of MORTH
specifications for road and bridge
concrete, constructioon by hand guided
method complete and inconformity with
the lines, grads and cross section shown
on the dawings and including form work
shuttering with steel plates, separation
membrane, with set of 15 nos. 25 mm
dia, 5000 mm long mild steel dowl bars in
each expansion joint @ 32 m C/C and 75
mm PVC pipe in 3.75 m width @ 50
metre centre to centre below bottom of
the concrte and contraction joints @ 4.57
metre centre to centre. As shown in
drawing including all materials, labour
and curing etc. as provided in the
specifications and as approved by the
Engineer-in-charge.
- 4-
Quanitity Amount
executed Item of work
Rate Since previous
Unit up-to-date per under subhead's & sub-work's of Remark
Rs. P. Up-to-date bill (Total) for
measurement Estimate
Rs. P. each sub-head
book
Rs. P.
1 2 3 4 5 6 8
Total
Tender percentage %
G. Total
Signature
Dated signature of Name …………...……………………
Contractor Designation (Asstt.Resident Engineer)
Dated signature of
Team leader
DPDC Consultant
-8-
III-MEMORANDUM OF PAYMENTS
Rs. P.
To
figures 1. Total value of work done as per account 1, Co. 5 entry (A)
for Rs.
Abstract 2. Deduct amount with held. Rs. P
. (a) From previous bill as per last runing bill
(b) From this bill
(c)Net amount
3. Balance i.e. up-to-date payment (Item 1-2)
4. Total amount of payment already made as per (K) of
last runing bill No.................
5. Payment new to be made as detailed below-
By recovery amount creditable to this work Rs. P
(a) Security deposit %
(b) Income Tax %
(c) Commercial Tax %
(d) Cost of Bill Form
(e) BOCWW CA Tax 1 %
(f) Extra deposit for E/W
(g)Extra deposit for PIU Checking
(h)Extra deposit for Time extention
(I) Extra deposit for
Total (a) to (I)
payable amount for
this Bill
Pay Rs. (in words) by Cheque
IV REMARKS
The Space reserved for remaks of the Disbursing officer