Job No Sheet No Rev

Company Name 1
Engineer Date

Job Title Checked Date

Approved Date

Client File Detail Tulangan Tiang Pancang.etc


Dt/Tm 18-Apr-2018 21:03

Input
Pile Property Data
Item Value Unit
Total Pile Length 14 m
Pile Length Over EGL 0.5 m
Diameter 0.4 m
Pile Head Condition Fixed
Modulus of Elasticity 24000 MPa

Soil Property Data


Item Value Unit
Type of Soil PreLoaded Cl
Unconfined Compressive Strength of Clayey soil Greater tha

Loads Data
Item Value Unit
Designed Max. Vert. Load Capacity 800 kN
Designed Lat. Load Capacity 100 kN
Allowable Deflection 0.03 m

Constants
Item Value Unit
Grade of Concrete M15
Grade of Steel Fe 250

Reinforcement Details
Item Value Unit
Clear Cover 0.05 m
Dia.of Main Reinforcement(mm) 20
Minimum Steel % 0.4
Maximum Steel % 4
Dia.of Transverse Reinforcement 10
Type of Transverse Reinf Circular
Minimum Spacing for Transverse Reinf 0.1 m
Maximum Spacing for Transverse Reinf 0.3 m

Print Time/Date: 04/18/2018 21:16 STAAD.etc Release 4.5 Page 1 of 5


Job No Sheet No Rev
Company Name 2
Engineer Date

Job Title Checked Date

Approved Date

Client File Detail Tulangan Tiang Pancang.etc


Dt/Tm 18-Apr-2018 21:03

Output

PILE GEOMETRY

Pile Length (m) Pile Length Over G.L. (m)

14.00 0.50

Pile Diameter (mm) Pile Head Condition

400.00 Fixed

LOAD DATA

Vertical Load Capacity (KN) Lateral Load Capacity (KN)

800.00 100.00

Length of Fixity (m) Maximum Moment (KNm)

2.04 102.93

STABILITY

Actual Lateral Deflection (mm) Allowable Lateral Deflection (mm)

4.53 30.00

REINFORCEMENT DETAILS

Longitudinal Reinforcement Detail

Required Perc. of Steel Provided Perc. of Steel

3.69 3.75

Required Area of Steel (mm^2) Provided Area of Steel (mm^2)

4643.27 4712.39

Dia. of Longitudinal Reinf.(mm) No. of Bars

20 15

Transverse Reinforcement Detail

Type of Reinforcement. Dia. of Reinforcement (mm) Spacing. of Reinforcement (mm)

Circular 10 140.00

Print Time/Date: 04/18/2018 21:16 STAAD.etc Release 4.5 Page 2 of 5


Job No Sheet No Rev
Company Name 3
Engineer Date

Job Title Checked Date

Approved Date

Client File Detail Tulangan Tiang Pancang.etc


Dt/Tm 18-Apr-2018 21:03

Calculation

Design of Piles : Pondasi Bor Pile Menara Masjid


DESIGN CALCULATIONS
Calculation of Length of Fixity
Total Length of Pile =
14.00 m
Length of Pile Over Ground Level, L1 =
0.50 m
Diameter of Pile=
400.00 mm
Modulus of Elasticity of Concrete =
24000.00 N/mm2
Pile Head Condition =
Fixed
Type of Soil =
Preloaded Clay
Moment of Inertia =
1256637061.44 mm4
K2 =
195.50 Kg/cm2
R=
1114.47 mm
L1/R =
0.45
Corresponding value of Lf/R =
1.83 , where Lf = Length of Fixity
Length of Fixity, Lf =
2.04 m
Checking of Deflection
Lateral Load Capacity of Pile, Q =
100.00 KN
Actual Lateral Deflection =
4.53 mm
Allowable Lateral Deflection =
30.00 mm
Allowable Lateral Deflection > Actual Lateral Deflection, Hence O.K.
Final Loads and Moments Calculation
Gross Vertical Load Capacity of Pile =
800.00 KN
Maximum Moment Due to Lateral Load, Q = Q(L1 + Lf)^3 / 12EI =
127.02 KNm
Moment Reduction Factor =
0.81
Final Reduced Moment =
102.93 KNm
Calculation of Reinforcements
Required Percentage of Steel =
3.69
Required Area of Steel =
4643.27 mm2

Print Time/Date: 04/18/2018 21:16 STAAD.etc Release 4.5 Page 3 of 5


Job No Sheet No Rev
Company Name 4
Engineer Date

Job Title Checked Date

Approved Date

Client File Detail Tulangan Tiang Pancang.etc


Dt/Tm 18-Apr-2018 21:03

Calculation, cont...

Dia of Main Reinforcement =


20.00 mm
Area of Main Reinforcement =
314.16 mm2
Total no. of Bars reqd. =
15.00
Total no. of Bars Provided. =
15.00
Area of Steel Provided. =
4712.39 mm2
Percentage of Steel Provided. =
3.75
Check For Shear
Type of Stirrup. =
Circular
Dia of Stirrup. =
10.00 mm
Area of Stirrup. =
78.54 mm2
Actual Shear Stress, Tau_V. =
1.10 n/mm2
Allowable Shear Stress, Tau_C. =
0.65 n/mm2
Actual Shear Stress, Tau_V > Allowable Shear Stress Tau_C
Vus. =
41.02 KN
Calculated Spacing of Stirrups =
141.61 mm
Final Provided Spacing =
140.00 mm

Print Time/Date: 04/18/2018 21:16 STAAD.etc Release 4.5 Page 4 of 5


Job No Sheet No Rev
Company Name 5
Engineer Date

Job Title Checked Date

Approved Date

Client File Detail Tulangan Tiang Pancang.etc


Dt/Tm 18-Apr-2018 21:03

Ground Level

10 mm dia stirrups @ 140.00 mm c/c

15 Nos. 20 mm dia bars


0.50 m
14.00 m

0.40 m

0.40 m

Print Time/Date: 04/18/2018 21:16 STAAD.etc Release 4.5 Page 5 of 5