0 2870 0 0 0.00 0 0 0
0 2131 0 0 0.00 0 0 0
0 1629 0 0 0.00 0 0 0
0 1461 0 0 0.00 0 0 0
0 1022 0 0 0.00 0 0 0
0 1172 0 0 0.00 0 0 0
2016 2358 0 0 0.00 0 0 513.5
9185 252729 5998 4820 0 0 7471 5628 2431 3721
387 0 1154.00 1006 305 521
Recived Pipe to
Total Quantity be laid
Stock
Position
0 6756 6756
245.5 1000 754.5
125 600 475
332 420 88
0 50 50
0 80 80
30 152 122
0 0
0 0
0 0
0 0
0 0
0 0
513.5 1010 496.5
30068 14264
3373 5590 2217
Gharpure Engineering and Constructions Pvt Ltd
Construction of Sewerage System for Sambalpur City
Unit Approved Design Qty ( CH 3 & CH 4 Inspected Ordered Qty Recived
Sl No Dia of Pipe Balance Remarks
CH 1,2,5,6,7,8) Qty at Site
A B C D E F G H I
(D+E)-H
1 Laying of SW SP3 Sewers
200 mm dia m 118019 141887 26500 20000 21619 238287
2 Laying of RCC NP3 Sewer
200 mm dia m 1372 3819 3000 52000 500 4691
250 mm dia m 8963 1408 1500 2000 500 9871
300 mm dia m 7186 1957 500 2000 9143
350 mm dia m 4528 4116 900 4000 8644
400 mm dia m 560 2073 50 1000 2633
450 mm dia m 2089 3418 50 1000 5507
500 mm dia m 1925 1264 50 1000 3189
3 Laying of RCC NP3 Sewer with HDPE lining
600 mm dia m 0 2870 2870
700 mm dia m 1357 2131 3488
800 mm dia m 1629 1629 3258
900 mm dia m 239 1461 1700
1200 mm dia m 30 1022 1052
1400 mm dia m 0 1172 1172
1600 mm dia m 2186 342 1000 1650 210 2318
Total (Rmt) 150082 170569 33550 84650 22829 297822
CONSTRUCTION OF SEWERAGE SYSTEM OF SAMBALPUR TOWN ON EPC MODE
Submission Approved
Sl. No. Drawing Details Letter No.
Date Date
1 Boundary Wall of 40 MLD STP 1313 21.03.2017 17.04.2017
2 Manhole Drawings up to 1.65 m depth (Brick & Composite Manhole) 1479 26.04.2017
3 Process & Hydraulic Design of 40 MLD STP 1932 24.05.2017
4 Sewer Network of Catchment 7 & 8. 1852 19.05.2017
5 Hydraulic Design & Drawing of MPS at Dhanupali STP 2395 28.06.2017
6 BEP of 40 MLD STP and Main Pumping Station (MPS). 2445 16.03.2017 30.06.2017
7 LAYOUT PLAN (Mechanical) 16.03.2017 30.06.2017
8 GA Drawing & Data Sheet of Decanter with QAP in SBR Basin 2736 21.03.2017 20.07.2017
9 RCC Drawing of Compound Wall for SPS 7. 2664 16.06.2017 14.07.2017
10 GA Drawing of Chlorination System, Treated Water Sump & Pump House 2667 16.06.2017 14.07.2017
11 Manhole Drawings-1.65 m to 9.00 m depth of dia.1200, 1500 mm (Brick & Composite Manhole) 2673 14.07.2017
12 Sewer Network of Catchment 5 and 6. 3054 08.08.2017
13 Manhole Drawings of 1800, 2100 & 2400 mm dia (Brick & Composite Manhole) 3127 11.08.2017
14 BEP of SPS 7 and SPS 6 3286 09.08.2017 24.08.2017
15 QAP of SFRC Manhole cover and frame 3280 10.04.2017 24.08.2017
16 QAP for Civil works 3289 10.04.2017 24.08.2017
17 GA Drawing, Data Sheet & QAP of Diffuser 3453 12.09.2017
18 QAP for SW, SP-3 Pipes 3473 15.09.2017
19 Layout and Compound Wall of SPS – 1,4,6,8 3470 12.09.2017 15.09.2017
20 RCC Design & Drawing of SBR 3745 06.07.2017 11.10.2017
21 RCC Design Raw Sewage Pumping Main & Pump House 3869 06.07.2017 20.10.2017
22 Sewer Network of Catchment 1 4095 01.11.2017
23 Revised Preliminary Approval of Sewer Network of Catchment - 5,6,7,8 4173 08.11.2017
24 QAP for SFRC MH cover & frame of Rajvaibhav 4420 25.11.2017
Page 7 of 64
CONSTRUCTION OF SEWERAGE SYSTEM OF SAMBALPUR TOWN ON EPC MODE
Submission Approved
Sl. No. Drawing Details Letter No.
Date Date
25 L section for SPS 6 and SPS 7 pumping main 4544 10.11.2017 4.12.2017
26 RCC Design and Drawing for SPS 6 and 7 4690 10.11.2017 13.12.2017
27 GA Drawing of Security Cabin 4687 27.11.2017 13.12.2017
28 Layout, GA & Hydraulic Design for SPS 5 & L-Section for Pumping Main of SPS-5 4663 30.11.2017 13.12.2017
29 RCC Design of CCT & Pump House 4782 21.08.2017 20.12.2017
30 Final document for RSTP, SAS, RAS, TWTP 4684 13.12.2017
31 Price breakup Schedule 4812 22.12.2017
32 GA drawing of staff quarter (type – 2) 4977 09.05.2017 30.12.2017
33 Hydraulic Design, GA and Layout of SPS 1 36 (WE) 24.12.2017 03.01.2018
34 Plan and L section of Pumping Main from SPS 1 36 (WE) 14.12.2017 03.01.2018
35 Final Document for Decanter Centrifuge 122 (WE) 10.01.2018
36 GA drawing of sludge sump, pump, blower and centrifuge house, poly dosing tank 125(WE) 10.01.2018
37 Final Document for Fine Screen Mechanical and Manual, Coarse Screen Mechanical and Manual 227 (WE) 15.01.2018
38 Final Document for Isolation Gate 230(WE) 15.01.2018
39 Boundary wall of SPS-5 233(WE) 15.01.2018
40 Sewer Network of Catchment 2 (upto railway crossing) 272(WE) 17.01.2018
41 GA for SBR Basin 436(WE) 30.01.2018
42 SPS 2 & 3 Compound wall structural drawing 664(WE) 13.02.2018
43 GA Drawing of Admin cum Blower Room 670(WE) 13.02.2018
44 CH 2 Bedding design & layout 667(WE) 13.02.2018
45 Final document for Bar screen fine 661 (WE) 13.02.2018
46 GA for Staff Quarter Type 1 832 (WE) 24.02.2018
47 Centrifuge Feed pump, Poly Electolyte dosing tank, Poly Electolyte dosing pump 829 (WE) 24.02.2018
48 GA for Selector air grid in C- Tech Basins 818 (WE) 24.02.2018
Page 8 of 64
CONSTRUCTION OF SEWERAGE SYSTEM OF SAMBALPUR TOWN ON EPC MODE
Submission Approved
Sl. No. Drawing Details Letter No.
Date Date
49 RCC Drawing for Security Cabine 820 (WE) 24.02.2018
50 GA & RCC Drawing for Sludge sump pump, Blower & centrifuge house: poly dosing tank 824 (WE) 24.02.2018
51 Revise layout Drawing for SPS-7 1016 (WE) 13.03.2019
52 Design & Drawing of Sludge sump pump, Blower & centrifuge house: poly dosing tank 1052 (WE) 14.03.2020
Page 9 of 64
CONSTRUCTION OF SEWERAGE SYSTEM OF SAMBALPUR TOWN ON EPC MODE
Page 10 of 64
YSTEM OF SAMBALPUR TOWN ON EPC MODE
Remarks
A
p
p
r
o
v
e
d
Page 11 of 64
o
v
YSTEM OF SAMBALPUR TOWN ON EPC MODE e
d
Remarks
A
p
p
r
o
v
e
d
Page 12 of 64
p
p
r
o
YSTEM OF SAMBALPUR TOWN ON EPC MODE v
e
d
Remarks
Page 13 of 64
YSTEM OF SAMBALPUR TOWN ON EPC MODE
Remarks
Page 14 of 64
CONSTRUCTION OF SEWERAGE SYSTEM OF SAMBALPUR TOWN ON EPC MODE
Submission
Sl. No. Drawing Details Letter No.
Date
1 Boundary Wall of 40 MLD STP 1313 21.03.2017
2 Manhole Drawings up to 1.65 m depth (Brick & Composite Manhole) 1479
3 Process & Hydraulic Design of 40 MLD STP 1932
4 Sewer Network of Catchment 7 & 8. 1852
5 Hydraulic Design & Drawing of MPS at Dhanupali STP 2395
6 BEP of 40 MLD STP and Main Pumping Station (MPS). 2445 16.03.2017
7 GA Drawing & Data Sheet of Decanter with QAP in SBR Basin 2736 21.03.2017
8 RCC Drawing of Compound Wall for SPS 7. 2664 16.06.2017
9 GA Drawing of Chlorination System, Treated Water Sump & Pump House 2667 16.06.2017
10 Manhole Drawings-1.65 m to 9.00 m depth of dia.1200, 1500 mm (Brick & Composite Manhole) 2673
11 Sewer Network of Catchment 5 and 6. 3054
12 Manhole Drawings of 1800, 2100 & 2400 mm dia (Brick & Composite Manhole) 3127
13 BEP of SPS 7 and SPS 6 3286 09.08.2017
14 QAP of SFRC Manhole cover and frame 3280 10.04.2017
15 QAP for Civil works 3289 10.04.2017
16 GA Drawing, Data Sheet & QAP of Diffuser 3453
17 QAP for SW, SP-3 Pipes 3473
18 Layout and Compound Wall of SPS – 1,4,6,8 3470 12.09.2017
19 RCC Design & Drawing of SBR 3745 06.07.2017
20 RCC Design Raw Sewage Pumping Main & Pump House 3869 06.07.2017
21 Sewer Network of Catchment 1 4095
22 Revised Preliminary Approval of Sewer Network of Catchment - 5,6,7,8 4173
23 QAP for SFRC MH cover & frame of Rajvaibhav 4420
24 L section for SPS 6 and SPS 7 pumping main 4544 10.11.2017
25 RCC Design and Drawing for SPS 6 and 7 4690 10.11.2017
26 GA Drawing of Security Cabin 4687 27.11.2017
27 Layout, GA & Hydraulic Design for SPS 5 & L-Section for Pumping Main of SPS-5 4663 30.11.2017
28 RCC Design of CCT & Pump House 4782 21.08.2017
29 Final document for RSTP, SAS, RAS, TWTP 4684
30 Price breakup Schedule 4812
31 GA drawing of staff quarter (type – 2) 4977 09.05.2017
32 Hydraulic Design, GA and Layout of SPS 1 36 (WE) 24.12.2017
33 Plan and L section of Pumping Main from SPS 1 36 (WE) 14.12.2017
34 Final Document for Decanter Centrifuge 122 (WE)
35 GA drawing of sludge sump, pump, blower and centrifuge house, poly dosing tank 125(WE)
36 Final Document for Fine Screen Mechanical and Manual, Coarse Screen Mechanical and Manual 661 (WE)
37 Final Document for Isolation Gate 661 (WE)
38 Boundary wall of SPS-5 233(WE)
39 Sewer Network of Catchment 2 (upto railway crossing) 272(WE)
40 GA for SBR Basin 436(WE)
41 SPS 2 & 3 Compound wall structural drawing 664(WE)
42 GA Drawing of Admin cum Blower Room 670(WE)
43 CH 2 Bedding design & layout 667(WE)
44 GA for Staff Quarter Type 1 832 (WE)
45 Centrifuge Feed pump, Poly Electolyte dosing tank, Poly Electolyte dosing pump 829 (WE)
46 GA for Selector air grid in C- Tech Basins 818 (WE)
47 RCC Drawing for Security Cabine 820 (WE)
48 GA & RCC Drawing for Sludge sump pump, Blower & centrifuge house: poly dosing tank 824 (WE)
49 Revise layout Drawing for SPS-7 1016 (WE)
50 Design & Drawing of Sludge sump pump, Blower & centrifuge house: poly dosing tank 1052 (WE)
Approved
Remarks
Date
17.04.2017
26.04.2017
24.05.2017
19.05.2017
28.06.2017
30.06.2017
20.07.2017
14.07.2017
14.07.2017
14.07.2017 A
08.08.2017 p
11.08.2017
p
24.08.2017
24.08.2017
r
24.08.2017 o
12.09.2017 v
15.09.2017 e
15.09.2017
d
11.10.2017
e
d
20.10.2017
01.11.2017
08.11.2017
25.11.2017
4.12.2017
13.12.2017
13.12.2017
13.12.2017
20.12.2017
13.12.2017
22.12.2017
30.12.2017
03.01.2018
03.01.2018
10.01.2018
10.01.2018
13.02.2018
13.02.2018 A
15.01.2018 p
p
17.01.2018
r
30.01.2018 o
13.02.2018 v
13.02.2018 e
d
13.02.2018
v
e
d
24.02.2018
24.02.2018
24.02.2018
24.02.2018
24.02.2018
13.03.2019
14.03.2020
Name of Agency :- M/s Garpure Engineering & Construction (P) Ltd
Tender Agreement No :- LS-02/PMU-I/OWSSB/SBP/2016-17
Contract Amount :- 324,31,98,000/-
Date of Start :- 09.01.2017
Date of Completion :-08.01.2020
DAILY PROGRESS REPORT
Project Name SAMBALPUR UNDER GROUND DRAINAGE PROJECT Date
Location Sambalpur, Odisha Day
Start Monday, January 09, 2017 No of days lapse 449 Days Nos of days remainig
CONSTRUCTION OF SEWERAGE SYSTEM OF SAMBALPUR TOWN
Page 23 of 64
Qty. as per Qty. as per Planed Today Actual Billed Qty
Sl No Item of Works Unit Approved
Tender Design Programme progress Progress till Feb- 18
Page 24 of 64
Qty. as per Qty. as per Planed Today Actual Billed Qty
Sl No Item of Works Unit Approved
Tender Design Programme progress Progress till Feb- 18
Page 25 of 64
Qty. as per Qty. as per Planed Today Actual Billed Qty
Sl No Item of Works Unit Approved
Tender Design Programme progress Progress till Feb- 18
SPS-1
SPS-2
SPS-3
SPS-4
SPS-5
SPS-6
SPS-7
SPS-8
9 40 MLD STP
Page 26 of 64
Qty. as per Qty. as per Planed Today Actual Billed Qty
Sl No Item of Works Unit Approved
Tender Design Programme progress Progress till Feb- 18
MPS
Centrifuge building
Sludge Sump
Todays Labour
Total Labour for net work 920 Nos
Total Labour for STP work 170 Nos
Total Labour for SPS work 105 Nos
Note-: Total front work in progress 36
Note -: Due to Sambalpur Banda No work done
Page 27 of 64
2-Apr-18
Monday
646
5442
0
0
5442
6756
754.5
475
88
50
80
122
8325.5
0
0
0
Page 28 of 64
Pipe stock Qty
0
0
0
496.5
496.5
14264
2217
Page 29 of 64
Pipe stock Qty
Page 30 of 64
Pipe stock Qty
Page 31 of 64
Pipe stock Qty
Page 32 of 64
Monthly Progress for Catchment 1
Date
Qty. as Qty. as per Planed Previous Executed Qty Actual Billed Qty
Sl No Item of Works Unit per approved Programme Quantity for the day Progress till Feb- 18
Tender Design
1 Laying of SW SP3 Sewers
Rmarks
1687 mtr
Hydrotest
completed
Monthly Progress for Catchment 2
Date
Qty. as Qty. as per Billed Qty
Planed Previous Executed Qty Actual
Sl No Item of Works Unit per approved till Feb-
Programme Quantity for the day Progress
Tender Design 18
1 Laying of SW SP3 Sewers
200 mm dia m 70493 33135 4820 0 4820
250 mm dia m 3211 1587 0 0
300 mm dia m 2966 1526 0 0
200 RCC 630 630
2 Laying of RCC NP3 Sewer
200 mm dia m 961 421 0 0
250 mm dia m 223 102 0 0
300 mm dia m 697 401 0 0
350 mm dia m 2314 1162 0 0
400 mm dia m 560 337 0 0
450 mm dia m 1610 866 0 0
500 mm dia m 482 217 0 0
3 Laying of RCC NP3 Sewer with HDPE lining
600 mm dia m 0 0 0 0
700 mm dia m 1357 700 0 0
800 mm dia m 1629 948 0 0
900 mm dia m 239 131 0 0
1200 mm dia m 30 6 0 0
1400 mm dia m 0 0 0 0
1600 mm dia m 0 0 0 0
Total (1+2+3) 86772 41539 4820 0 4820 0
4 Manholes
900 mm dia No. 2009 1038 114 0 114
1200 mm dia No. 1315 496 14 0 14
1500 mm dia No. 1278 189 0 0
1800 mm dia No. 0 0 0 0
2100 mm dia No. 0 0 0 0
2400 mm dia No. 0 0 0 0
Total 4602 1723 128 0 128
5 100 mm dia RCC NP3 House Sewer m 51450 13351 0 0
Road restoration 40 0 40
4/2/2018
Rmarks
70 Hydrotest
0
Monthly Progress for Catchment 3
Date 4/2/2018
Qty. as Qty. as per Billed Qty
Planed Previous Executed Qty Actual
Sl No Item of Works Unit per approved till Feb- Rmarks
Programme Quantity for the day Progress
Tender Design 18
1 Laying of SW SP3 Sewers
200 mm dia m 71394 33559
250 mm dia m 2614 1292
300 mm dia m 2304 1186
Rmarks
Monthly Progress for Catchment 5
Date
Qty. as Qty. as per Billed Qty
Planed Previous Executed Qty Actual
Sl No Item of Works Unit per approved Progress till18
Feb-
Programme Quantity for the day
Tender Design
1 Laying of SW SP3 Sewers
200 mm dia m 12345 12517 5803 7471 0 7471.00
250 mm dia m 541 678 267 0 0 0
300 mm dia m 208 0 107 0 0
2 Laying of RCC NP3 Sewer 0 0
200 mm dia m 382 251 167 0 0
250 mm dia m 0 213.5 0 0 0
300 mm dia m 0 368.5 0 0 0
350 mm dia m 1374 1341.5 690 0 0
400 mm dia m 0 0 0 0 0
450 mm dia m 0 248.5 0 0 0
500 mm dia m 0 0 0 0 0
3 Laying of RCC NP3 Sewer with HDPE lining 0 0
600 mm dia m 0 0 0 0 0
700 mm dia m 0 0 0 0 0
800 mm dia m 0 0 0 0 0
900 mm dia m 0 0 0 0 0
1200 mm dia m 0 0 0 0 0
1400 mm dia m 0 0 0 0 0
1600 mm dia m 0 0 0 0 0
Total (1+2+3) 14850 15618 7034 7471 0 7471
4 Manholes 0 0
900 mm dia No. 391 320 202 267 0 267
1200 mm dia No. 206 264 78 48 0 48
1500 mm dia No. 317 338 47 1 0 1
1800 mm dia No. 0 0 0 0 0
2100 mm dia No. 0 0 0 0 0
2400 mm dia No. 0 0 0 0 0
Total 914 922 327 316 0 316 0
5 100 mm dia RCC NP3 House Sewer m 4794 4794 1244 1154 0 1154
Road restoration 205 0 205
Monthly Progress for Catchment 5
4/2/2018
Rmarks
2547 m hydrotest
completed
Monthly Progress for Catchment 6
Date 4/2/2018
Qty. as Qty. as per Executed Actual Billed Qty
Planed Previous
Sl No Item of Works Unit per approved Qty for till Feb- Rmarks
Programme Quantity the day Progress
Tender Design 18
1 Laying of SW SP3 Sewers
200 mm dia m 5083 5470.5 2389 5382 0 5382 2916 mtr Hydrotest
250 mm dia m 203 1161.5 100 0 0
300 mm dia m 561 0 289 0 0
Rmarks
400 m hydrotest
completed
Monthly Progress for Catchment 8
Date 4/2/2018
Qty. as Qty. as per Actual Billed
Executed Qty
Planed Previous
Sl No Item of Works Unit per approved Qty for the till Feb- Rmarks
Programme Quantity day Progress
Tender Design 18
1 Laying of SW SP3 Sewers
1552 m hydrotest
200 mm dia m 7058 7596 3318 3207 0 3207 completed
250 mm dia m 0 0 0 0 0
300 mm dia m 0 0 0 0 0
2 Laying of RCC NP3 Sewer 0 0
200 mm dia m 111 0 49 0 0
250 mm dia m 0 0 0 0 0
300 mm dia m 0 0 0 0 0
350 mm dia m 0 0 0 0 0
400 mm dia m 0 0 0 0 0
450 mm dia m 0 0 0 0 0
500 mm dia m 0 0 0 0 0
3 Laying of RCC NP3 Sewer with HDPE lining 0 0
600 mm dia m 0 0 0 0 0
700 mm dia m 0 0 0 0 0
800 mm dia m 0 0 0 0 0
900 mm dia m 0 0 0 0 0
1200 mm dia m 0 0 0 0 0
1400 mm dia m 0 0 0 0 0
1600 mm dia m 2016 2185.5 1966 513.5 0 513.5
Total (1+2+3) 9185 9781.5 5333 3720.5 0 3720.5
4 Manholes 0 0
900 mm dia No. 188 221 97 90 0 90
1200 mm dia No. 109 101 41 41 0 41
1500 mm dia No. 123 90 18 8 0 8
1800 mm dia No. 0 0 0 0 0
2100 mm dia No. 44 0 0 0 0
2400 mm dia No. 0 71 0 0 0
Total 464 483 156 139 0 139
5 100 mm dia RCC NP3 House Sewer m 5586 5586 1449 521 0 521
Road restoration 549 0 549
Name of Agency :- M/s Garpure Engineering & Construction (P) Ltd
Tender Agreement No :- LS-02/PMU-I/OWSSB/SBP/2016-17
Contract Amount :- 324,31,98,000/-
Date of Start :- 09.01.2017
Date of Completion :-08.01.2020
DAILY PROGRESS REPORT
Project Name SAMBALPUR UNDER GROUND DRAINAGE PROJECT
Location Sambalpur, Odisha
Weather Condition SUNNY 36° C
Start Date Monday, January 09, 2017 No of days lapse 449 Days Nos of days remainig
Qty. as
Qty. as Planed Qty till
per Actual February date
Sl No Item of Works Unit per Program of
Approved Progress Progress March
Tender me
Design
1 Laying of SW SP3 Sewers
200 mm dia m 0 0 68600 13373 11712 1661
250 mm dia m 0 0 3398.4 0 0 0
300 mm dia m 0 0 3653.2 0 0 0
0 0 0
2 Laying of RCC NP3 Sewer 0 0 0
200 mm dia m 0 0 2262.4 0 0 0
250 mm dia m 0 0 882 0 0 0
300 mm dia m 0 0 1320 0 0 0
350 mm dia m 0 0 3106.8 0 0 0
400 mm dia m 0 0 1300 0 0 0
450 mm dia m 0 0 1661.6 0 0 0
500 mm dia m 0 0 800.4 0 0 0
3 Laying of RCC NP3 Sewer with HDPE lining 0 0 0
600 mm dia m 0 0 1450 0 0 0
700 mm dia m 0 0 852.4 0 0 0
800 mm dia m 0 0 850 0 0 0
900 mm dia m 0 0 750 0 0 0
1200 mm dia m 0 0 520 0 0 0
1400 mm dia m 0 0 468.8 0 0 0
1600 mm dia m 0 0 2358 514 181 333
Total (1+2+3) m 0 0 94234 13887 11893 1994
4 Manholes 0 0 0
Total 0 0 0 579 503 76
5 100 mm dia RCC NP3 Hous m 0 0 59900 1980 1643 337
Road restoration 912 310 602
Date 2-Apr-18
Day Monday
Todays
progress
0 28822
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Name of Agency :- M/s Garpure Engineering & Construction (P) Ltd
Tender Agreement No :- LS-02/PMU-I/OWSSB/SBP/2016-17
Contract Amount :- 324,31,98,000/-
Date of Start :- 09.01.2017
Date of Completion :-08.01.2020
Qty. as
Qty. as Planed
per Actual
Sl No Item of Works Unit per Program
Approved Progress
Tender me
Design
1 Laying of SW SP3 Sewers
200 mm dia m 0 0 68600 15449
250 mm dia m 0 0 3398.4 0
300 mm dia m 0 0 3653.2 0
2 Laying of RCC NP3 Sewer 0
200 mm dia m 0 0 2262.4 0
250 mm dia m 0 0 882 246
300 mm dia m 0 0 1320 125
350 mm dia m 0 0 3106.8 332
400 mm dia m 0 0 1300 0
450 mm dia m 0 0 1661.6 0
500 mm dia m 0 0 800.4 30
3 Laying of RCC NP3 Sewer with HDPE lining 0
600 mm dia m 0 0 1450 0
700 mm dia m 0 0 852.4 0
800 mm dia m 0 0 850 0
900 mm dia m 0 0 750 0
1200 mm dia m 0 0 520 0
1400 mm dia m 0 0 468.8 0
1600 mm dia m 0 0 2358 0
Total (1+2+3) m 0 0 94234 16182
4 Manholes 0
Total 0 0 0 639
5 100 mm dia RCC NP3 H m 0 0 59900 1393
Road restoration 3189
Qty till
February Todays
date of
Progress progress
March
10747 4702 0
0 0 0
0 0 0
0 0 0
0 0 0
62 184 0
0 125 0
0 332 0
0 0 0
0 0 0
0 30 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
10809 5373 0
0 0 0
402 237 0
1355 38 0
1905 1284 0