MONTHLY PROGRESS REPORT (ABSTRACT)


Sector: - District Roads Month: 11/2012 District: - Mansehra
(Rupees in million)

%Age financial Addl: demand (+)/


Number of scheme ADP Allocation (CFY) Expenditures
Expdr: utilizaton (CFY)on Surrrender (-)
Sub-Sector Estimated Cost Ending Releases
PKY During the Additional
All AA TS Original Revised Progressive Allocation Releases Surrender Net (+) or (-)
Demand
Monthly CFY

1981.955
OG = 4 4 266.847 75.000 0 118.995 16.970 61.568 136.568 51%
Compact

1000
NEW= 1 0 0 0 0
Compt;

RURAL
ROADS

N/ADP= - - - - - - - - - - - -

2081.955
TOTAL=5 4 - 266.847 75.000 0 118.995 16.970 61.568 136.568 51%
Compact

Note: only Non-ADP (funded) schemes shall be exhibited against the designated space above, as well as in the monthly progress report

1.Communicatio-Road
2

PROGRESS REPORT
SECTOR: COMMUNICATION
SUB SECTOR: DISTRICT ROADS

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Status of Scheme Allocation during C.F.Y Expenditure during the

the end of

Utilization
ADP No Name of work

Date of AA

Date of
T.S with
AA Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14
New Scheme
289/10005
Rehabilitation of 13/12/2011 91.995 12/5/2012 10.000 81.995 81.995 7.703 25.300 35.300 31%
5
Saiful Malook Road (8.55-KMs) District Mansehra. PK-
55
Repair/Rehabilitation of Constn: of Road Network in KPK
305/10003 600.000
(200-Kms) SH: - 6-Km in District Mansehra. SH: - (6 Kms 5/9/2011 60.00 42.000 7.000 7.000 49.000 100%
7 Compt:
in District Mansehra)
7.281
8.769
1 Rehar Road. (1-Km) PK-53. 4.092 2.515 6.607

5-9-2011
2 Karer Road. (0.750 Km). PK-53. 4.823 4.823
3.950
Mansehra By Pass Road. (Remaining Portion) (0.250 Km) 5-9-
3 2011 3.987 3.987
PK-53.
20.00 20.00 5-9-
2011
4 Phul Doga to Jaba Road Via Shanaya (Km 1&2) PK-57. 11.422 4.485 17.122
20.00 5-9- 20.00
2011 5-9-2011
5 Hassa Nakot Road (Km No. 1) PK-54. 22-10-2011 17.676 17.676
5-9-
New Scheme 59.852
2011 5-9-2011
306/10042 300.00
13.000 10.00 10.000 23.000 100%
9 Constriction of Compt:
13-Nos RCC Bridge in KPK. 28/12/2011

1.Communicatio-Road
3

DISTRICT ROAD

Physical Targets during

since Commencement
end of previous year
Achievement to the

Scheduled Date of
Total Achievement
Achievement during

Completion
C.F.Y
C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

289 11% 89% - 11% Work in Progress. 6/2013 T.S Under Process

305 70% 30% 2% 72% 6/2014 //

E/W M/W S/B B/C Premix / PCC

1 100% 100% 100% 100% 90% - //

2 100% 90% - - 70% //

3 Complete //
100% 100% 100% 100% 80%
4 //
50%
5 80% 70% - - 40% //

306 22% 78% - 22% Work in Progress.

1.Communicatio-Road
4

PROGRESS REPORT
SECTOR: COMMUNICATION
SUB SECTOR: - District Road.

Commencement

%age Financial
previous year

during C.F.Y
Expenditure
Expenditure to

Progressive
Expenditure during
Status of Scheme Allocation during C.F.Y

Total Cost/FE

the end of
the

Utilization
ADP No Name of work

Date of
T.S with
AA with Date Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8
1000.00 9 10 11 12 13 14
55.000
Up-Gradation of Strengthening of Road
308/110224 10.000 10.00 10.000 20.000 100%
Network in KPK.
17/12/2011
Compact
Shalia Lassan Thakral Road. (PK-53)
1 9.00 (M) 5.301 1.126 6.427
(1.800-Kms).

2 Moyan Road. (0.700-Km) (PK-53). 4.00 (M) 1.449 1.275 2.724

3 Drain Chakrali Road. (Drain) (PK-53). 2.00 (M) 1.122 0.874 1.996

4 Lassan Mohar Road. (1-Kms) PK-57 7.412 (M)

5 Kotla Basangar Road. (1-Kms) PK-57 7.588 (M) 1.101 1.969 3.070

6 Kamal Ban Road. (1.500 Km) PK-54 15.00 (M) 1/6/2012 1.027 2.683 3.710

7 Ghandian Lang Sharif Road. (1-Km) PK-55 5.00 (M) 1.211 1.211

8 Mathal Road. (1-KM) (PK-56). 3.00 (M)

9 Jatian Road. (1-KM) (PK-56). 2.00 (M) 0.861 0.861

1.Communicatio-Road
5

DISTRICT ROAD

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

308 18% 82% 12% 30% 6/2014


E/W M/W S/B B/C Premix / PCC

1 Completed

2 100% 100% - - - 90%

3 90% Completed

4 100% 70% 90% 90% -

5 100% 90% 80% 50% -

6 80% - - - - -

7 90% 80% - - - - 40%

8 60% - - - - -

9 70% - - - - - 50%

1.Communicatio-Road
6

PROGRESS REPORT
SECTOR: COMMUNICATION
SUB SECTOR: - District Roads.

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Expenditure during
Status of Scheme Allocation during C.F.Y

the end of
Total Cost/FE
the

Utilization
ADP No Name of work

Date of
T.S with
AA with Date Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

71.520

Rehabilitatioan of Garhi Habibullah Barrarkot 20.000


296 22-9-12 10.000 9.267 9.267 9.269 93%
Riad in KPK 7 Kms in District Mansehra. (M)
24-
05/2012

1.Communicatio-Road
15

296
16
Scope of Work

Achievement to the end


17

of previous year

Physical Targets during


18

C.F.Y

Achievement during
19

C.F.Y

Total Achievement since


20

Commencement
7

District Road

1.Communicatio-Road
21

Work Started
Physical Progrss

Scheduled Date of
22

Completion
6/2014
23
Remarks
8

PROGRESS REPORT
SECTOR: COMMUNICATION

SUB SECTOR: - District Roads.

Commencement

%age Financial
Total Cost/FE

previous year

during C.F.Y
Expenditure
Expenditure to

Progressive
Expenditure during
Status of Scheme Allocation during C.F.Y

the end of
the

Utilization
ADP No Name of work

Date of
T.S with
AA with Date Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

120754-Rehabilitation and Improvement of


302 1000.00
Road Network in Khyber Pakhtunkhwa.

(i). Kotla Basangar Road 1-Km (PK-57) SH:


9.950 (M)
KM-2

(ii). Barat Jinkiari Road 1-Km (PK-53) SH:


9.950 (M)
KM-2

1.Communicatio-Road
15

(i).

(ii).
302
16
Scope of Work

Achievement to the end of


17

previous year
18

Physical Targets during C.F.Y


19

Achievement during C.F.Y

Total Achievement since


20

Commencement
9

District Road

1.Communicatio-Road
21
Physical Progrss

Tender Under Process


Tender Under Process
22

Scheduled Date of Completion


23
Remarks
10

MONTHLY PROGRESS REPORT (ABSTRACT)


SECTOR: - BUILDING & HOUSING Month: 11/2012 District: - Mansehra
(Rupees in million)

%Age financial Addl: demand (+)/


Number of scheme ADP Allocation (CFY) Expenditures
Expdr: utilizaton (CFY)on Surrrender (-)
Estimated
Ending Releases
Cost
PKY During the Additional Net (+) or
All AA TS Original Revised Progressive Allocation Releases Surrender
Demand (-)
Monthly CFY

97.663
OG=2 988.004 38.405 38.405
Comp:

NEW=

N/ADP=

97.663
TOTAL=2 988.004 38.405 38.405
Comp:

Note: only Non-ADP (funded) schemes shall be exhibited against the designated space above, as well as in the monthly progress report

2.Building & Housing


11

PROGRESS REPORT
SECTOR: Building.

SUB SECTOR: District Programme.

Expenditure during
Status of Scheme Allocation during C.F.Y

Expenditure to the end

Progressive Expenditure

%age Financial Utilization


the

of previous year
Commencement

during C.F.Y
ADP No Name of work
T.S with

Date of
AA Original Revised Releases Month C.F.Y

Date of AA
Date

1 2 3 4 5 6 7 8 9 10 11 12 13 14

110140-Construction / Rehabilitation of
Material testing Laboratories for C&W
334 Department in various District in Khyber 20.000
Pakhtunkhwa.
1-No at Mansehra.

2.Building & Housing


15
16
Scope of Work

Achievement to
17

the end of
previous year

Physical Targets
18

during C.F.Y

Achievement
19

during C.F.Y

Total Achievement
since
20

Commencement
12

2.Building & Housing


BUILDING & HOUSING

21
Physical Progrss

Completed upto Plinth Level.

Scheduled Date
22

of Completion
23
Remarks
13

PROGRESS REPORT
SECTOR: LAW & JUSTICE
SUB SECTOR: LAW & JUSTICE

Commencement

%age Financial
previous year

during C.F.Y
Expenditure
Expenditure to

Progressive
Expenditure during
Status of Scheme Allocation during C.F.Y

the end of
the

Utilization
Date of AA
ADP No Name of work

Date of
T.S with
AA Original Revised Releases Month C.F.Y
972.980 Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Construction of Judicial Complex in KPK (01


878/1004
No on need basis) SH: - Constn: of Judicial 26-5-11 25.905 45.141 25.905
25 27.3.12
Complex at Mansehra SH: -

1- Boundary Wall, Civil Work PK-53 Revised

2-
Developmental Work Over Head Tank Civil
Work PK-53

3-
Trial Drilling & Conversion in to Tube well.
PK-53

2.Building & Housing


14

BUILDING & HOUSING

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

878 -

1- Further Works suspended by Peshawar


High Court Peshawar on dated
16/05/2012.
2-

3-

2.Building & Housing


15

PROGRESS REPORT
SECTOR: HOME
SUB SECTOR: PRISON

Expenditure during
Status of Scheme Allocation during C.F.Y

Commencement

%age Financial
the

previous year
Expenditure to

during C.F.Y
Expenditure
Progressive
the end of
Date of AA

Utilization
ADP No Name of work T.S with
AA Original Revised Releases Month C.F.Y

Date of
Date

1 2 3 4 5 6 7 8 9 10 11 12 13 14

927/1004 Constn: of High Security Zones in 6-Jails in


10/3/2011 15.024 6/6/2011 12.500 52.522 12.500
56 KPK. SH: - 25 Cells and a Guard Room

2.Building & Housing


16

BUILDING & HOUSING

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

(i). 25-Nos cell roof laid.


927 83% 17% - 83% 6/2013
(ii). Guard room roof laid.

2.Building & Housing


17

PROGRESS REPORT
SECTOR: Home
SUB SECTOR: Prisons

Commencement

%age Financial
previous year

during C.F.Y
Expenditure
Expenditure to

Progressive
Expenditure during
Status of Scheme Allocation during C.F.Y

the end of
the

Utilization
Date of AA
ADP No Name of work

Date of
T.S with
AA Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

12.843
110131-Improvement of Existing Jails in
928 60.000
Khyber Pakhtunkhwa.
19-4-12

2.Building & Housing


18

BUILDING & HOUSING

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

1- DPC Level (Warder Barrack)

928 2- Foundation in Progress (Juvinile Cell 10-Nos)

3- Work in Progress (B/Wall)

2.Building & Housing


19

PROGRESS REPORT
SECTOR: Home
SUB SECTOR: Prisons

Commencement

%age Financial
previous year

during C.F.Y
Expenditure
Expenditure to

Progressive
Expenditure during
Status of Scheme Allocation during C.F.Y

the end of
the

Utilization
Date of AA
ADP No Name of work

Date of
T.S with
AA Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

110455-Construction / Improvemetn of 9.551


930 Judicial Lockups (Bakhshi Khanas) in 100.000
Khyber Pakhtunkhwa. 28-6-12

2.Building & Housing


15

930
16
Scope of Work

Achievement to the end of


17

previous year

Physical Targets during


18

C.F.Y

Achievement during
19

C.F.Y

Total Achievement since


20

Commencement
20

2.Building & Housing


BUILDING & HOUSING

21

Layout Given.
Physical Progrss

Scheduled Date of
22

Completion
23
Remarks
21

MONTHLY PROGRESS REPORT (ABSTRACT)


Sector: - SCHOOL & LITERACY Month: 11/2012 District: - Mansehra
PRIMARY ECUCATION
(Rupees in million)

%Age financial Addl: demand (+)/


Number of scheme ADP Allocation (CFY) Expenditures
Expdr: utilizaton (CFY)on Surrrender (-)
Estimated
Sub-Sector Ending Releases
Cost
PKY During the Additional Net (+) or
All AA TS Original Revised Progressive Allocation Releases Surrender
Demand (-)
Monthly CFY

OG=6 6 159.353 70.411 20.350 0.441 12.574 82.985 61%

NEW=2

N/ADP=

TOTAL=8 6 159.353 70.411 20.350 0.441 12.574 82.985 61%

Note: only Non-ADP (funded) schemes shall be exhibited against the designated space above, as well as in the monthly progress report

3.Primary Education
22

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: PRIMARY EDUCATION

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Status of Scheme Allocation during C.F.Y Expenditure during the

the end of

Utilization
ADP No Name of work

Date of AA

Date of
AA T.S with Date Original Revised Releases Month C.F.Y
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Establishment of 110 Primary school (B&G) 75.039


5/90200 5-3-210 25.764 May-10 28.911 28.911
on need Basis (6 in Mansehra). Compt:
4.721 (M)
GPS Dehruan U/C paran. PK-53 Shifted to
1 10/6/2010 4.836 4.836
Talli de Kassi
1-12-2010
4.883 (M)
2 GPS Cham Dhano U/C Jarid. PK-54 17-5-10 5.069 5.069
15-1-2010
4.721
3 GGPS Tredha. PK-55 15-5-10 4.649 4.649
11/2/2010

4 GPS Khoru Galli U/C Bhogarmong. PK-56 4.720 11/6/2010 4.905 4.905

5 GGPS Angarben U/C Nika pani. PK-57 14-6-10 4.729 4.729

29-
GPS Kaloo Khan Seri Kohani H/Zai Kala 11-2011
6 29/5/2010 4.723 4.723
Dhaka PF-58

3.Primary Education
23

PRIMARY EDUCATION

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

Civil Work I/Electrification I/Water


5 100% - - 100% 6/2013
Supply

Civil Work I/Electrification I/Water


1 Completed & Handed Over.
Supply

Civil Work I/Electrification I/Water


2 Completed.
Supply

Civil Work I/Electrification I/Water


3 Completed & Handed Over.
Supply

Civil Work I/Electrification I/Water


4 Completed.
Supply

Civil Work I/Electrification I/Water


5 Completed & Handed Over.
Supply

6 Completed

3.Primary Education
24

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: PRIMARY EDUCATION

Commencement

%age Financial
previous year

during C.F.Y
Expenditure
Expenditure to

Progressive
Status of Scheme Allocation during C.F.Y Expenditure during the

Total Cost/FE

the end of

Utilization
ADP No Name of work

Date of
AA T.S with Date Original Revised Releases Month C.F.Y
1 2 3 4 5 6 7 8 9 10 11 12 13 14
18.112
New SCHEMES
Poovn: of Basic Facilities B/walls, Group 330.833
6/100264 12.000 6.100 0.693 0.693 12.693 11%
Latrine, W/X & Electrification in GPSs, Compt:
7-9-
GMSs & GHSs in KPK on need Basis.
2011
Package No. 1
1 GPS Urgal Gali. (B/Wall) PK-55. 0.575
2 GGCMS Faqeer Abad Tajal. B/Wall PK-55. 0.575 0.329 0.329
Package No. 2
1 GPS Trada (W/Supply). PK-55. 0.400

2 GPS Sherpur (I/Electrification). PK-55. 0.050

3 GPS Murad Pur. (W/Supply. PK-55. 0.400


Package No. 3
1 GMS Bandi Salya. (B/Wall) PK-57. 0.672 0.664 0.664

2 GPS Beerbat (B/Wall) PK-57. 0.672 0.7 0.700


Package No. 4
1 GPS Khar Maira. (B/Wall) PK-57. 0.672 0.481 0.481

2 GMS Malhar (B/Wall) PK-57. 0.672 0.654 0.654


Package No. 5
1 GGMS Madsarian (B/Wall) PK-57. 0.672

2 GPS Nowan sher (B/Wall) PK-57. 0.672

3 GMS Bandi Kainth (B/Wall) PK-57. 0.672

3.Primary Education
25

PRIMARY EDUCATION

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23
6 66% 34% - 66%

Package No. 1

1 Not Yet Started. Work Stop.

2 Above DPC

Package No. 2

1 In Progress.

2 In Progress.

3 In Progress.

Package No. 3

1 Completed

2 In-Progress

Package No. 4

1 Above DPC

2 Above DPC

Package No. 5

1 Site Shifted

2 Site Shifted

3 Site Shifted

3.Primary Education
26

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY

SUB SECTOR: PRIMARY EDUCATION

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Status of Scheme Allocation during C.F.Y Expenditure during the

Total Cost/FE

the end of

Utilization
ADP No Name of work

Date of
AA T.S with Date Original Revised Releases Month C.F.Y

1 2 3 4 5 6 7 8 9 10 11 12 13 14
Package No. 6
1 GMS Hadobandi. (B/Wall) PK-53. 0.784 0.776 0.776

2 GPS Karer (B/Wall) PK-53. 0.784 0.237 0.237 0.237


Package No. 7
0.862
1 GPS Hoter. (B/Wall) PK-53. 0.784 0.474 0.474

2 GPS Jaba (B/Wall) PK-53. 0.784 15-11-2011 0.811 0.267 1.078

Package No. 8 19-


3-2012
1 GPS Mardoodan (B/Wall) PK-53. 0.784 15-11-2011 1.012 1.012

2 GPS Mongan Machi Pol (B/Wall) PK-53. 0.784 0.493 0.493


Package No. 9
1 GHS Balakot. (B/Wall) PK-54. 0.784 14-10-2011 0.9 0.900

2 GPS Kagul. (B/Wall) PK-54. 0.784 14-10-2011 0.9 0.900


Package No. 10
1 GPS Chapra Loharan. (B/Wall) PK-54. 0.784 1.724 9/9/2011 0.906 0.906

2 GPS Kotbala. (B/Wall) PK-54. 0.784 9/9/2011 0.877 0.028 0.028 0.905
Package No. 11 26-1-2012
1 GPS Garlat. (B/Wall) PK-54. 0.784 20-9-2011 0.402 0.402

2 GPS Garlat Payeen. (B/Wall) PK-55. 0.784 20-9-2011 0.652 0.652

3.Primary Education
27

PRIMARY EDUCATION

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23
Package No. 6
1 Completed
2 In Progress
Package No. 7
1 In Progress
2 Completed
Package No. 8
1 Completed
2 Completed
Package No. 9
1 Completed
2 Completed
Package No. 10
1 Completed
2 Completed
Package No. 11
1 Completed
2 Completed

3.Primary Education
28

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY

SUB SECTOR: PRIMARY EDUCATION

during
Expenditure to the
end of previous
Commencement

%age Financial
Expenditure
Progressive
Status of Scheme Allocation during C.F.Y Expenditure during the

C.F.Y
year
Total Cost/FE
ADP No Name of work

Date of

Utilization
AA T.S with Date Original Revised Releases Month C.F.Y

1 2 3 4 5 6 7 8 9 10 11 12 13 14
Package No. 12

1 GPS Oghi. (Open Well) PK-56. 0.400 0.330 0.330

2 GPS Ghania. (Open Well) PK-56. 0.400 0.426 0.426

Package No. 13

1 GHS Ichrian. (Open Well) PK-56. 0.400

2 GGMS Bandi Sadiq. (Open Well) PK-56. 0.400 0.530 0.530

3 GPS Arbora. (Open Well) PK-56. 0.400

3.Primary Education
29

PRIMARY EDUCATION

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

Package No. 12

1 Completed

2 In Progress

Package No. 13

1 In Progress.

2 Completed

3 Not Started

3.Primary Education
30

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY

SUB SECTOR: PRIMARY EDUCATION

end of previous year

during
Expenditure to the
Commencement

%age Financial
Expenditure
Progressive
Status of Scheme Allocation during C.F.Y Expenditure during the

C.F.Y
Total Cost/FE
ADP No Name of work

Date of

Utilization
AA T.S with Date Original Revised Releases Month C.F.Y

1 2 3 4 5 6 7 8 9 10 11 12 13 14
19.173
Constn: of 300 Addl: Classrooms in Primary
112.272
7/100289 School in KPK on need basis. 14.300 12.000 2.250 0.441 0.956 12.956 48%
Compt:
(11 in Mansehra).
7-9-2011
1 GGPS Shehlia (2-R) (PK-53). 2.600 2.782 2.782

2 GPS Phelwan Jaba (1-R) (PK-53). 1.300 1/10/2011 1.070 0.441 0.441 1.611 1.070

3 GPS Soni Batakundi (1-R) (PK-54). 1.300

4 GPS Dhani Dhano (2-R) (PK-54). 2.600 1/10/2011 2.489 0.362 0.362 2.851

GPS Batang (1-R) PK-55 S/T GGPS Pano


5 1.300 0.988 0.988
Dheri No. 2.
1.425
6 GPS Dhara Banda (1-R) (PK-56). 1.300 1.464 1.464
26-1-2012
7 GGPS Karkala (3-R) (PK-57). 3.900 3.207 0.153 3.360

3.Primary Education
31

PRIMARY EDUCATION

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

7 62% 38% - 62% 6/2013

1 Finishing in Progress.

2 Finishing in Progress.

3 Site not available.

4 Roof Level

5 Roofing in Progress.

6 Completed & Handed Over.

7 Completed & Handed Over.

3.Primary Education
32

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: PRIMARY EDUCATION

Commencement

%age Financial
Status of Scheme Allocation during C.F.Y Expenditure during the

previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Total Cost/FE

the end of

Utilization
ADP No Name of work

Date of
AA T.S with Date Original Revised Releases Month C.F.Y

1 2 3 4 5 6 7 8 9 10 11 12 13 14
44.104
Establishment of 200 Primary Schools
205.000
8/110431 (B&G) in Khyber Pakhtunkhwa (8 in District 6.000 5.000 5.000 11.000 100%
Compt:
Mansehra).
14/12/2011
1 GGPS Basti Shahzman. PK-53 2/5/2012 2.215 2.215

2 GGPS Dotal. PK-53

3 GPS Sum. PK-54 2/5/2012 1.858 1.858

4 GPS Kamal Ban No. 2. PK-54 2/5/2012 1.330 1.330

5 GGPS Landi. PK-55 0.597 1.880 2.477

6 GPS Dabimar. PK-56 2.397 2.397

7 GGPS Ahl. PK-57 0.723 0.723

8 GGPS Lubar. PK-57

3.Primary Education
33

PRIMARY EDUCATION

since Commencement
end of previous year
Achievement to the

Scheduled Date of
Total Achievement
Achievement during
Physical Targets
during C.F.Y

Completion
C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

8 14% 86% - 14% 6/2014

1 Roof Level

2 Exc: in Progress.

3 Roof Level

4 Lintel Level.

5 Glooring & B/Wall in Progress.

6 Roof Laid

7 Lintel Level.

8 DPC Level.

3.Primary Education
34

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: PRIMARY EDUCATION

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Status of Scheme Allocation during C.F.Y Expenditure during the

Total Cost/FE

the end of

Utilization
ADP No Name of work

Date of
AA T.S with Date Original Revised Releases Month C.F.Y
37.500 (M)
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Up-gradation of 120 Primary Schools to


Middle Schools (B&G) in Khyber 294.000
9/110432 8.500 5.000 3.660 12.160 73%
Pakhtunkhwa on need basis (Phase-II). (05 Compt:
in District Mansehra).

10-1-
1 GGPS Matial. PK-53 2012 1.665 0.711
2.376

2 GPS Sat Bani. PK-54 20-4-2012 1.326 2.050 3.376

3 GGPS Eidgah. PK-55 1.665 1.665

4 GGPS Jabbar Gali. PK-56 2.178 0.899 3.077

5 GGPS Mohar. PK-57 1.666 1.666

3.Primary Education
35

PRIMARY EDUCATION

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

9 23% 77% - 23% 6/2014

1 Lintel Level.

2 Lintel Level.

3 Site Changes.

4 Roof Level

5 S/Structure in Progress.

3.Primary Education
36

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: PRIMARY EDUCATION

Status of Scheme Allocation during C.F.Y Expenditure during the

during
Expenditure to the
end of previous
Commencement

%age Financial
Expenditure
Progressive

C.F.Y
Total Cost/FE

year
ADP No Name of work

Date of

Utilization
AA T.S with Date Original Revised Releases Month C.F.Y

1 2 3 4 (M)
14.700 5 6 7 8 9 10 11 12 13 14

Conversion of 100 Mosque Schools into 100.000


10/110438 Regular Primary Schools in Khyber 3.000 2.000 2.000 5.000 100%
Pakhtunkhwa. (03 in District Mansehra). Compt:
10-1-
2012
1 GMPS Danna Phagla S/T Bela Mundair. PK-53 20-5-2012 1.313 1.313

2 GMPS Bela Kaghan. PK-54 20-5-2012 1.616 1.616

3 GMPS Hoter Bala. PK-57 1.687 0.384 2.071

3.Primary Education
10
15

3
2
1
16
Scope of Work

Achievement to
the end of
17

21%
previous year

Physical Targets
18

79%

during C.F.Y

Achievement
-
19

during C.F.Y

Total
Achievement
20

21%

since
Commencement
37

3.Primary Education
PRIMARY EDUCATION

21

Roof Level.
DPC Level.
Roof Level.
Physical Progrss

Scheduled Date
22

of Completion
6/2014
23
Remarks
38

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: PRIMARY EDUCATION

Status of Scheme Allocation during C.F.Y Expenditure during the

%age Financial Utilization


Progressive Expenditure
Expenditure to the end of
Commencement

during C.F.Y
previous year
Total Cost/FE
ADP No Name of work

Date of
AA T.S with Date Original Revised Releases Month C.F.Y

1 2 3 4 5 6 7 8 9 10 11 12 13 14

100.000
14/12042 Establishment of 100 Govt. Primary Schools
0 (B&G) on need basis in KPK (PH:-II).
Compt:

(i). GGPS Baro Bandi (PK-53) 5.397 (M)

(ii). GPS Mukhian (PK-54) 5.397 (M)

(iii). GGPS Kaniaap (PK-55) 5.397 (M)

(iv). GGPS Dheri Kajla (PK-57) 5.397 (M)

(v). GPS Nikka Kabal (PK-53) 5.397 (M)

3.Primary Education
39

PRIMARY EDUCATION

Total Achievement since


Achievement to the end

Physical Targets during

Scheduled Date of
Commencement
of previous year

Achievement during

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

14

1 Tender Under Process

2 Tender Under Process

3 Tender Under Process

4 Tender Under Process

5 Tender Under Process

3.Primary Education
40

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY

SUB SECTOR: PRIMARY EDUCATION

Total Cost/FE
Status of Scheme Allocation during C.F.Y Expenditure during the

Expend
Expend

the end

previou

Financi

Utilizati
Date of

iture to
encem

Progre
Comm

during
s year

%age

C.F.Y
ssive

iture
ent
ADP No Name of work

al
AA T.S with Date Original Revised Releases Month C.F.Y

of

on
1 2 3 4 5 6 7 8 9 10 11 12 13 14

100.000
19/12067 UP-Gradation of 50 Girls Primary Schools to
1 Middle Level in KPK.
Compt:

(i). GGPS Garhala (PK-53) 7.371 (M)

3.Primary Education
41

MONTHLY PROGRESS REPORT (ABSTRACT)


Sector: - SCHOOL & LITERACY Month: 11/2012 District: - Mansehra
SECNDARY EDUCATION
(Rupees in million)

%Age financial utilizaton


Number of scheme ADP Allocation (CFY) Expenditures Addl: demand (+)/ Surrrender (-)
Expdr: (CFY)on
Estimated
Sub-Sector Ending Releases
Cost
PKY During the Additional
All AA TS Original Revised Progressive Allocation Releases Surrender Net (+) or (-)
Demand
Monthly CFY

500.00
OG=16 16 620.517 333.538 77.100 8.193 58.579 392.117 75%
Compact

NEW=2 2

N/ADP=

500.00
TOTAL=18 18 620.517 333.538 77.100 8.193 58.579 392.117 75%
Compact

Note: only Non-ADP (funded) schemes shall be exhibited against the designated space above, as well as in the monthly progress report

4.Secondary Education
42

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: SECONDARY EDUCATION

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
the end of
Status of Scheme Allocation during C.F.Y Expenditure during the

Utilization
Date of AA
ADP No Name of work

Date of
AA T.S with Date Original Revised Releases Month C.F.Y
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Upgradation of 150 Middle Schools to High Level 151.863


23/90203 5/3/2010 68.145 13-5-2010 71.023 1.000 0.957 71.980 96%
(B&G) on Need Basis (7 in Distt. Mansehra). Compt:

9.998
1 GGMS Baidra. PK-53 6/6/2010 9.390 9.390
28-7-2011
2 GGMS Reerh. PK-53 15-5-10 10.697 10.697

3 GMS Hangrai. PK-54 Shifted to Betora 13-5-10 11.220 11.220

4 GGMS Bai Bala Chattar Plain. PK-56 13-5-10 9.387 0.957 10.344

9.998
5 GMS Chamiyal PK-57 3/6/2010 10.093 10.093
1/12/2010

6 GMS Kalwal. PK-57 17-5-10 9.781 9.781


9.998
7 GMS Gawandla Mada Khail (PK-58). 1/6/2010 10.455 10.455
1-
12-2010

4.Secondary Education
43

SECONDARY EDUCATION

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

Civil Work I/E Water Supply I/E


23 100% - - 100% 6/2013
Electrification

1 -do- Completed & Handed Over.

2 -do- Completed & Handed Over.

3 -do- Completed.

4 -do- Completed.

5 -do- Completed & Handed Over.

6 -do- Completed & Handed Over.

7 -do- Completed.

4.Secondary Education
44

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: SECONDARY EDUCATION

during
Expenditure to the
end of previous
Commencement

%age Financial
Expenditure
Progressive

C.F.Y
Status of Scheme Allocation during C.F.Y Expenditure during the

year
ADP No Name of work

Date of AA

Date of

Utilization
AA T.S with Date Original Revised Releases Month C.F.Y
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Upgradation of 150 Pry. Schools to Middle Level (B&G) 83.881


24/90204 5/3/2010 53.055 13-5-2010 54.191 1.000 54.191
on Need Basis (9 in Distt. Mansehra). Compt:

1 GGPS Jaloo Shifted to GGPS Bani Karnol. 15-6-10 4.482 4.482


6.484

2 GGPS Korhy Pher. PK-53 S/T Garhi Habibullaha. 17-5-10 6.804 6.804

3 GGPS Naran. PK-54


21-1-2011
6.484 17-5-10 6.096 6.096
6.484

4 GPS Jabri Choshal. PK-54 1/6/2010 6.890 6.890

15-1-2011
5 GGPS Kharar Mera. PK-55 30-5-10 4.671 4.671

6 GGPS Kotli Bala. PK-55 13-5-10 6.778 6.778

7 GGPS Arbora. PK-56 S/T GGPS Seri Arbora 13-5-10 4.856 4.856

6.484
8 GGPS Sokal. PK-57 27-5-10 6.816 6.816
6.4841/12/2010

9 GGPS Shanai Tilli Syedan hassan Zai KD PK-58 20-5-2010 6.798 6.798
1-12-
2010

4.Secondary Education
45

SECONDARY EDUCATION

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

24 -do- 10% - - 100% 6/2013

1 -do- . DPC Level.

2 -do- Completed & Handed Over.

3 -do- Completed.

4 -do- Completed & Handed Over.

5 -do- Plastering in Progress.

6 -do- Completed.

7 -do- Flooring & B/Wall in Progress.

8 -do- Completed & Handed Over.

9 -do- Completed.

4.Secondary Education
46

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: SECONDARY EDUCATION

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
the end of
Status of Scheme Allocation during C.F.Y Expenditure during the

Utilization
ADP No Name of work

Date of AA

Date of
AA T.S with Date Original Revised Releases Month C.F.Y
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Construction of 1000 Additional Class Rooms in
135.424
25/90205 Pry. And High Schools in KPK (Phase-II) (40 in 4/6/2010 48.000 Nov-10 50.500 1.500 50.500
Compt:
Distt. Mansehra)

1 GGMS Khushala (2-R) PK-53 16-6-10 2.339 2.339

1.320
2 GHS Mongan Machi Pole (1-R) PK-53 20-6-10 1.258 1.258
8/12/2010
1.320
3 GHS Baidra (1-R) PK-53 11/6/2010 1.303 1.303
2.628 28-11-
2010
4 GMS Rehar (2-R) PK-53 2.595 20-6-10 2.616 2.616

GMS Mor Baffa Kalan (2-R) PK-53 shifted to 15-1-2011


5 18-6-10 2.526 2.526
GGMS Narbeer
2.628 14-
6 GPS Jaba (2-R) PK-55. 5-2011 21-6-10 2.619 2.619
2.570
15/2/2010
7 GPS Chitta Batta (2-R) PK-55. 21-6-10 2.585 2.585
1.319
1-1-2011
8 GPS Mera Mura Murad Pur (1-R) PK-55. 12/6/2010 1.313 1.313
8/12/2010
2.600
9 GPS Banda Gian (2-R) PK-55. 16-6-10 2.558 2.558
30/11/2010
1.320
10 GPS Bankot s/t GPS Dehran (1-R) PK-56. 8/7/2010 1.234 1.234
9/12/2010
1.321
11 GPS Sumbal Boot (1-R) PK-56. 11/6/2010 1.298 1.298
9/12/2010
1.321
12 GPS Bhaloo (1-R) PK-56. S/T GPS Khrian. 1.373 1.373
9/12/2010
1.320
13 GPS Dharra Banda s/t GPS Arbora Bathi (1-R) PK-56. 25-6-10 1.328 1.328
9/12/2010
1.320
14 GGPS Malokra (1-R) PK-56. 11/6/2010 1.294 1.294
9/12/2010

4.Secondary Education
47

SECONDARY EDUCATION

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

Civil Work
25 100% - - 100% 6/2013
Internal Electrification

1 -do- Completed.

2 -do- Completed and handed over

3 -do- Completed & Handed Over.

4 -do- Completed.

5 -do- Completed and handed over

6 -do- Completed.

7 -do- Completed.

8 -do- Completed & Handed Over.

9 -do- Completed

10 -do- Completed.

11 -do- Completed.

12 -do- Completed.

13 -do- Completed & Handed Over.

14 -do- Completed & Handed Over.

4.Secondary Education
48

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: SECONDARY EDUCATION

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
the end of
Status of Scheme Allocation during C.F.Y Expenditure during the

Utilization
ADP No Name of work

Date of AA

Date of
AA T.S with Date Original Revised Releases Month C.F.Y
1 2 3 4 5 6 7 8 9 10 11 12 13 14

15 GHS Mohar (6-R) PK-57. 7.219 7.219


2.630

16 GHS Seheki (2-R) PK-57. 20-7-10 2.632 2.632

4-5-2011
17 18-6-10 2.321 2.321
GHS Chandoor Shifted GPS Naryalah (2-R) PK-57.

18 GHS Bai Bohal (2-R) PK-57. 16-6-10 2.627 2.627

19 GHS Phulra (2-R) PK-57. 17-6-10 2.191 2.191


2.634

20 GPS Bandi Shungli (2-R) PK-57. 1.309 17-6-10 2.584 2.584

23-4-2011
21 GPS Jisgran Bala (1-R) PK-57. 12/6/2010 1.325 1.325

22 GPS Bir Bat (1-R) PK-57. 28-3-2011 12/6/2010 1.322 1.322

23 GGMS Moorat Mera (2-R) PK-57. 23-6-10 2.635 2.635

4.Secondary Education
49

SECONDARY EDUCATION

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23
Civil Work
15 Completed.
Internal Electrification

16 -do- Completed.

17 -do- Completed & Handed Over.

18 -do- Completed.

19 -do- Finishing in Progress.

20 -do- Completed & Handed Over.

21 -do- Completed.

22 -do- Completed & Handed Over.

23 -do- Completed.

4.Secondary Education
50

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: SECONDARY EDUCATION

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
the end of
Status of Scheme Allocation during C.F.Y Expenditure during the

Utilization
ADP No Name of work

Date of AA

Date of
AA T.S with Date Original Revised Releases Month C.F.Y
1 2 3 4 4.839 5 6 7 8 9 10 11 12 13 14
Re-construction/Rehabilitation of Building of Govt.
81.286
26/90206 Middle & High Schools in KPK (Phase-II) (6 in 5/3/2010 10.000 9.500 May-10 9.400 0.600 9.400
Compt:
Distt. Mansehra).

1 GGHS Phulra. PK-57 4.286 4.286

2 GHS Bai Bohal. PK-57 28-5-10 0.970 0.970


9-
12-2011
3 GHS Bandi Shungli. PK-57 10/5/2010 1.130 1.130

4 GMS Bai Bajna. PK-57 5/5/2010 1.549 1.549

5 GMS Khambian Bala. PK-57 0.593 0.593


0.867

6 GGHS Perhina. PK-57 10/5/2010 0.872 0.872

22-4-2011

4.Secondary Education
51

SECONDARY EDUCATION

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

Civil Work I/E Water Supply I/E


26 100% - - 100% 6/2013
Electrification

1 -do- Completed

2 -do- Completed & Handed Over.

3 -do- Completed

4 -do- Completed

5 -do- Completed

6 -do- Completed

4.Secondary Education
52

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: SECONDARY EDUCATION

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Status of Scheme Allocation during C.F.Y Expenditure during the

Total Cost/FE

the end of

Utilization
ADP No Name of work

Date of
AA with
T.S with Date Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14
On Going
128.00
Upgradation of 150 High Schools to Higher 490.00
29/100280 33.174 12.000 12.000 45.174 100%
Secondary Level (B&G) (30:70) in KPK on Need Compt:
Basis. (7 in District Mansehra). 24-08-11

1 GHS Parian (PK-53) S/T Doga. 18.000 19-1-2012 7.909 0.230 8.139

2 GHS Kaghan (PK-53) S/T Sangar. 18.000 21-11-2011 5.369 1.705 7.074

3 GGHS Trangri Bala (PK-55). 18.000 3.113 1.119 4.232

4 GHS Jalgali (PK-56). 18.000 6.136 1.864 8.000

5 GHS Mohar (PK-57). 18.000 7.222 2.000 9.222

6 GGHS Sher Ghar S/T GHS Seri Goria (PK-57) 18.000 0 1.898 1.898

7 GGHS Shinkari. 3.425 3.184 6.609

4.Secondary Education
53

SECONDARY EDUCATION

Achievement

Achievement
Achievement
to the end of

during C.F.Y

Commence

Completion
Scheduled
previous

Physical
Targets

Date of
C.F.Y

since

ment
Total
year
Scope of Work Physical Progrss Remarks

during
15 16 17 18 19 20 21 22 23

29 26% 74% - 26% 6/2014

1 First Floor S/Structure B.B Work in Progress.

2 Gound Floor Roof Level.

3 Roof Level.

4 F/Floor Roof Level.

5 F/Floor Roof Level.

6 G/Floor Super Structure in Progress.

7 First Floor S/Structure Completed.

4.Secondary Education
54

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: SECONDARY EDUCATION

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Status of Scheme Allocation during C.F.Y Expenditure during the

Total Cost/FE

the end of

Utilization
ADP No Name of work

Date of
AA with
T.S with Date Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

On Going

22.605
Upgradation of 100 Pry. Schools to Middle Level in KPK 750.00 149.100
30/100283 (B&G) (30:70) on Need Basis. (03 in District Mansehra).
10.000 4.000 4.000 14.000 100%
Compt: Compt:
24-08-11

1 GGPS Samian (PK-53). 7.675 15-10-2011 4.424 0.705 5.129

2 GPS Soach (PK-54). 7.675 25-5-2012 3.295 3.295

3 GGPS Palsala (PK-57). 7.675 5.576 5.576

4.Secondary Education
55

SECONDARY EDUCATION

Achievement

Achievement
Achievement
to the end of

during C.F.Y

Commence

Completion
Scheduled
previous

Physical
Targets

Date of
C.F.Y

since

ment
Total
year
Scope of Work Physical Progrss Remarks

during
15 16 17 18 19 20 21 22 23

30 44% 56% - 44% 6/2014

1 Plastering in Progress.

2 Lintel Level.

3 Roof Level.

4.Secondary Education
56

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: SECONDARY EDUCATION

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Status of Scheme Allocation during C.F.Y Expenditure during the

Total Cost/FE

the end of

Utilization
ADP No Name of work

Date of
AA with
T.S with Date Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

On Going

Upgradation of 100 Middle Schools to High Level in 35.022


KPK (B&G) (30:70) on Need Basis. 950.00 190.000
31/100286 12.000 5.000 9.538 16.538 90%
Compt: Compt:
(03 in District Mansehra). 24-08-11

1 GGMS Laloo Bandi (PK-53) S/T GGMS Narbeer. 11.674 6.574 1.590 8.164

2 GGMS Shohal Mazullah (PK-54). 11.674 15-10-2011 5.426 0.948 6.374

3 GGMS Gali Badral (PK-57). 11.674 2.000 2.000

4.Secondary Education
57

SECONDARY EDUCATION

Achievement

Achievement
Achievement
to the end of

during C.F.Y

Commence

Completion
Scheduled
previous

Physical
Targets

Date of
C.F.Y

since

ment
Total
year
Scope of Work Physical Progrss Remarks

during
15 16 17 18 19 20 21 22 23

31 34% 66% - 34% 6/2014

1 Flooring & B/Wall in Progress.

2 Roof Level.

3 DPC Level.

4.Secondary Education
58

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: SECONDARY EDUCATION

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Status of Scheme Allocation during C.F.Y Expenditure during the

Total Cost/FE

the end of

Utilization
ADP No Name of work

Date of
AA with
T.S with Date Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

On Going

Construction of 300 Additional Class Rooms in 17.600


Secondary Schools in KPK on Need Basis. 450.00 214.000
32/100290 11.500 6.500 0.918 2.870 14.370 44%
Compt: Compt:
(11 in District Mansehra). 24-08-11

1 GHS Baidra (1-R) PK-53. 1.600 1.415 1.415

2 GGHS Lassan Thakral (2-R) (PK-53). 3.200 1.230 0.814 2.044

3 GHSS Ghari Habibullah (3-R) PK-53. 4.800 1/10/2011 3.485 0.200 3.685

4 GHS Khaki shifted to GGHS Khaki(1-R) PK-55. 1.600 0.679 0.216 0.216 0.895
1.759

5 GHS Shamdra (1-R) PK-56. 1.600 1.687 0.100 1.787

28-2-
12
6 GGHS Lassan Nawab (3-R) PK-57. 4.800 3.004 0.702 1.540 4.544

4.Secondary Education
59

SECONDARY EDUCATION

Achievement

Achievement
Achievement
to the end of

during C.F.Y

Commence

Completion
Scheduled
previous

Physical
Targets

Date of
C.F.Y

since

ment
Total
year
Scope of Work Physical Progrss Remarks

during
15 16 17 18 19 20 21 22 23

32 65% 35% - 65% 6/2013

1 Completed & Handed Over.

2 Roof Laid.

3 Flooring in Progress.

4 Roofing in Progress.

5 Completed & Handed Over.

6 Finishing in Progress.

4.Secondary Education
60

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: SECONDARY EDUCATION

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Total Cost/FE
Status of Scheme Allocation during C.F.Y Expenditure during the

the end of

Utilization
ADP No Name of work

Date of
AA with
T.S with Date Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

150.00
6.700 250.000
Construction of 50 Examination Halls in GHSs &
34/100295 3.000
GHSSs in KPK. SH: - GGHSS Lassan Nawab.
19/4/2011 Compt:
Compt:

12.00

Construction of District Education Offices in 10-Districts 100.00 70.000


35/100296 10.000 2.000 1.413 1.413 11.413 70%
(If Land Available). SH: - EDO (S&F) Office Mansehra. Compt: Compt:
3-10-
2011

4.Secondary Education
61

SECONDARY EDUCATION

Achievement

Achievement
Achievement
to the end of

during C.F.Y

Commence

Completion
Scheduled
previous

Physical
Targets

Date of
C.F.Y

since

ment
Total
year
Scope of Work Physical Progrss Remarks

during
15 16 17 18 19 20 21 22 23

34 - 100% - - Work Order Issued & Site not yer Handed Over. 6/2013

35 83% 17% - 83% Ist Floor - Roof Laid, B/Wall + Finishing in progress. 6/2013

4.Secondary Education
62

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: SECONDARY EDUCATION

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Total Cost/FE
Status of Scheme Allocation during C.F.Y Expenditure during the

the end of

Utilization
ADP No Name of work 26.324

Date of
AA with
T.S with Date Original Revised Releases Month C.F.Y
Date
5-1-
1 2 3 2012 4 5 6 7 8 9 10 11 12 13 14
42.000
100.00
Construction of Model School Mansehra (Including
36/100458 40.500 21.000 1.612 21.000 61.500 100%
land cost).
Compt:
Compt:
200.000
1350.00 99.990
58.000
Up-gradation of 150 Middle Schools to High Level
39/110433 (B&G) in Khyber Pakhtunkhwa on need basis 12.850 4.500 4.500 17.350 100%
(Phase-III). (05 in Distt: Mansehra)
Compt: 1-3-
10-1-2012
2012 Compt:
1 GGMS Tatar. 3.331 3.331

2 GMS Rajwal. 5.515 2.500 8.015


1/5/2012

3 GMS Bedadi.

4 GGMS Trappi S/T GGMS Chamial S/T GGMA Karori

5 GGMS Satan Gali. 4.004 2.000 6.004

4.Secondary Education
63

SECONDARY EDUCATION

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23
Development Work = 70% Completed.

Main Building =
36 41% 59% - 41% 6/2014
Work in Foundation in Progress.

Boundary Wall = 60% Completed.

39 22% 78% - 22% 6/2014

1 Super Structure in Progress.

2 Roof Level.

3 Site Not Yet Hanced Over.

4 Layout Given.

5 Roof Level.

4.Secondary Education
64

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: SECONDARY EDUCATION

Status of Scheme Allocation during C.F.Y Expenditure during the

during
Expenditure to the
end of previous
Commencement

%age Financial
Expenditure
Progressive
Total Cost/FE

C.F.Y
year
ADP No Name of work AA with

Date of
T.S with Date Original Revised Releases Month C.F.Y

Utilization
Date

1 2 3 4 5 6 7 8 9 10 11 12 13 14
18.00
200.000
2000.00
Up-gradation of 100 High Schools to Higher
40/110434 Secondary Level (B&G) in Khyber Pakhtunkhwa on 5.500 2.500 2.270 2.270 7.770 90%
need basis. (03 in Distt: Mansehra).
Compt:
Compt:
10-1-2012

1 GGHS Darband. 1.920 2.270 2.270 4.190

2 GHS Tallatta. 10/5/2012 3.580 3.580

4.Secondary Education
65

SECONDARY EDUCATION

Total Achievement since


Achievement to the end

Physical Targets during

Scheduled Date of
Commencement
of previous year

Achievement during

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

31% 69% - 31 Super Structure in Progress. 6/2014

40

G/Floor Super Structure in Progress.

4.Secondary Education
66

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: SECONDARY EDUCATION

Status of Scheme Allocation during C.F.Y Expenditure during the

Progressive Expenditure
end of previous year

during
Expenditure to the
Commencement

%age Financial

C.F.Y
Total Cost/FE
ADP No Name of work AA with

Date of
T.S with Date Original Revised Releases Month C.F.Y

Utilization
Date

1 2 3 4
15.800 5 6 7 8 9 10 11 12 13 14
79.500
330.00
Construction of 300 additional class room in
41/110435 Primary, Middle and High Schools in Khyber 5.800 6.000 1.238 3.475 9.275 57%
Pakhtunkhwa. (11 C/R in Distt: Mansehra).
Compt: 10-1-
Compt:
2012
1 GHSS Behali (2-R). 1.178 0.638 1.301 2.479

2 GHS Dilbori. (1-R). 0.485 0.877 1.362

GHS Phulra (3-R) S/T GMS Karka 2-R & GGMS


3 0.485 0.592 0.592 1.077
Karka 1-R

4 GGPS Chair (2-R). 2/5/2012 1.587 1.587

5 GPS Dham Dhama (2-R). 15-5-2012 1.545 0.697 2.242

6 GGMS Khaki (1-R). 0.521 0.008 0.008 0.529

4.Secondary Education
67

SECONDARY EDUCATION

Scheduled Date of Completion


C.F.Y
Physical Targets during C.F.Y
Achievement to the end of

Total Achievement since


Commencement
previous year

Achievement during
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23
41 37% 63% - 37% 6/2013

1 Roof Laid.

2 Roof Level.

3 DPC Level.

4 Flooring in Progress.

5 Roofing in Progress.

6 Lintel Level.

4.Secondary Education
68

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: SECONDARY EDUCATION

Expenditure to the
Status of Scheme Allocation during C.F.Y Expenditure during the

end of previous
Commencement

%age Financial

during C.F.Y
Expenditure
Progressive
Total Cost/FE

Utilization
year
ADP No Name of work AA with

Date of
T.S with Date Original Revised Releases Month C.F.Y
Date

1 2 3 4 5 6 7 8 9 10 11 12 13 14

45.000
100.00
15.600
Reconstruction of Buildings of Government Middle
42/110436 and High Schools in Khyber Pakhtunkhwa (PH-III) 5.600 5.600
(2 in District Mansehra).
2/4/2012
Compt:
Compt:

7.800
1 GGHS Khaki. 2.740 2.740
2/4/2012
7.800
2 GMS Ahl. 2.860 2.860
2/4/2012

4.Secondary Education
42
15

2
1
16
Scope of Work

Achievement to the end


17

36%
of previous year

Physical Targets during


18

64%

C.F.Y

Achievement during
-
19

C.F.Y

Total Achievement since


20

36%

Commencement
69

4.Secondary Education
21
SECONDARY EDUCATION

Lintel Level.
Lintel Level.
Physical Progrss

Scheduled Date of
22

Completion
6/2013
23
Remarks
70

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: SECONDARY EDUCATION

Status of Scheme Allocation during C.F.Y Expenditure during the

Progressive Expenditure
Expenditure to the end of

%age Financial Utilization


Commencement
Total Cost/FE

previous year

during C.F.Y
ADP No Name of work AA with

Date of
T.S with Date Original Revised Releases Month C.F.Y
Date

1 2 3 4 5 6 7 8 9 10 11 12 13 14

12.000
120.000
150.00
Construction of 50 Science Labs in High Schools in
43/110439 1.500 6.500 0.742 1.556 3.056 23%
Khyber Pakhtunkhwa. (2 in District Mansehra).
Compt:
10-1-
Compt:
2012

1 GHS Khushala. 4.000 0.642 0.814 1.456

2 GGHS Laloo Bandi. 4.000 0.858 0.742 0.742 1.600

3 GGHS Lassan Nawab. 4.000

4.Secondary Education
71

SECONDARY EDUCATION

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

43 13% 87% - 13% 6/2013

1 Lintle Level.

2 DPC Level.

3 Site is not H/Over.

4.Secondary Education
72

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY
SUB SECTOR: SECONDARY EDUCATION

Status of Scheme Allocation during C.F.Y Expenditure during the

Progressive Expenditure
Expenditure to the end of

%age Financial Utilization


Commencement
Total Cost/FE

previous year

during C.F.Y
ADP No Name of work AA with

Date of
T.S with Date Original Revised Releases Month C.F.Y
Date

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Up-Gradation of 50 Middle Schools to High Level in 300.000


52/120425
Deficient Union Counils. Compt:

(i). GGMS Paras (PK-54) 12.616 (M)

(ii). GMS Khamian Bala (PK-57) 12.616 (M)

(iii). GGMS Bajna (PK-55) 12.616 (M)

4.Secondary Education
73

SECONDARY EDUCATION

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

52

1 Tender Under Process

2 Tender Under Process

3 Tender Under Process

4.Secondary Education
74

PROGRESS REPORT
SECTOR: SCHOOL & LITERACY

SUB SECTOR: SECONDARY EDUCATION

during C.F.Y
previous year
Commencement

Progressive Expenditure
Total Cost/FE

%age Financial Utilization


Expenditure to the end of
Status of Scheme Allocation during C.F.Y Expenditure during the
ADP No Name of work

Date of
AA with
T.S with Date Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14
UP-Gradation of 25 High Schools to Higher 200.000
53/120431
Secondary Level in Deficient Union Councils. Compt:

(i). GGHS Battal (PK-56) 19.470 (M)

4.Secondary Education
1
53
15
16
Scope of Work

Achievement
to the end of
17
previous
year

Physical
18

Targets
during C.F.Y

Achievement
19

during
C.F.Y

Total
Achievement
20

since
Commence
ment
75

4.Secondary Education
21
SECONDARY EDUCATION

Physical Progrss

Tender Under Process

Scheduled
22

Date of
Completion
23
Remarks
76

MONTHLY PROGRESS REPORT (ABSTRACT)


Sector: - HIGHER EDUCATION. Month: 11/2012 District: - Mansehra
COLLEGE ECUCATION
(Rupees in million)

%Age financial Addl: demand (+)/


Number of scheme ADP Allocation (CFY) Expenditures
Expdr: utilizaton (CFY)on Surrrender (-)
Estimated
Sub-Sector Ending Releases
Cost
PKY During the Additional Net (+) or
All AA TS Original Revised Progressive Allocation Releases Surrender
Demand (-)
Monthly CFY

588.245
OG=4 4 210.580 68.000 6.766 61.716 272.296 90%
Compt:

NEW= 2

N/ADP=

588.245
TOTAL=6 4 210.580 68.000 6.766 61.716 272.296 90%
Compt:

Note: only Non-ADP (funded) schemes shall be exhibited against the designated space above, as well as in the monthly progress report

5.Higher Education
77

PROGRESS REPORT
SECTOR: HIGHER EDUCATION.
SUB SECTOR: COLLEGE EDUCATION

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Expenditure during
Status of Scheme Allocation during C.F.Y

the end of
the

Utilization
ADP No Name of work

Date of AA

Date of
T.S with
AA Original Revised Releases Month C.F.Y
Date
1 ON GOING 2 3 4 5 6 7 8 9 10 11 12 13 14

63/80389
Establishment of Govt:
Colleges in KPK. PH: III on need basis.

650.00
1 Govt: Degree College at Darband. PK-57 31-12-09 171.329 179.564 4/5/2010 95.730 20.000 20.000 115.730 100%
Compt:

Govt: Girls Degree College at Atter Shisha. 650.00


2 31-12-09 178.916 195.00 85.00 10.000 10.000 95.000 100%
PK-53 Compt:

5.Higher Education
78

5.Higher Education
79

COLLEGE EDUCATION

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

63 6/2014

2 Darband 56% 44% 6% 62%

Acadamic Block 3rd Floor ------ Roof Laid.

Administration Block & Cafeteria Flooring in Progress.

40- Students Hostel Plastering in Progress.


02-No suits Guard Rooms/ Visitors
Room Roof Laid.

Developmental Works 60% Completed.

3 Attershisha 48% 52% 3% 51%

Main Building BB in FF in Progress.


Administration Block & Cafeteria Plastering in Progress.

40- Students Hostel Plastering in Progress.


02-No suits Guard Rooms/ Visitors
Room Plastering in Progress.

Developmental Works 80% Completed.

5.Higher Education
80

PROGRESS REPORT
SECTOR: HIGHER EDUCATION.
SUB SECTOR: COLLEGE EDUCATION

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Expenditure during

Total Cost/FE
Status of Scheme Allocation during C.F.Y

the end of
the

Utilization
ADP No Name of work

Date of
T.S with
AA with Date Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

212.916
Establishment of 15 Govt: Colleges in KPK for
64/100248 200.000 650.000
(B&G). PH-IV SH: - Establishmetn of GGD 20.000 25.000 6.763 25.000 45.000 100%
1 Compt: Compt:
College Oghi (PK-56) Main Building + Hostel.
7/1/2012

Administration Block & Cefiteria (Civil Work +


2 .
Water Supply).

3 Suits 2 Nos. Guard Room + Visitor Room.

4 Boundary Wall.

5 Developmental Work

5.Higher Education
81

COLLEGE EDUCATION

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

64
Main Building + Hostel. 10% 90% - 11% (1). Foundation in Progress. 6/2014
1

2 Admin Block & Cafiteria. (2). Work in Foundation in Progress.

Suits 2-Nos, Guard Room + Visitor


3 (3). Super Structure in Progress.
Room

4 B/Wall In Progress.

5 Dev: Work. In Progress.

5.Higher Education
82

PROGRESS REPORT
SECTOR: HIGHER EDUCATION.
SUB SECTOR: COLLEGE EDUCATION

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Expenditure during

Total Cost/FE
Status of Scheme Allocation during C.F.Y

the end of
the

Utilization
ADP No Name of work

Date of
T.S with
AA with Date Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

8.980
Constn: of Library Blocks & Boundary Walls in
40.000 18.710
68/100267 existing Govt: Colleges in KPK. SH: - GPGC 5.200 3.000 0.0036 2.691 7.891 89%
Compt: Compt:
Mansehra.
21/4/2012

15.125
200.00
Major Repair of Govt. Colleges in Khyber 160.000
71/110266 4.650 10.000 4.022 8.672 40%
Pakhtunkhwa. SH: - Compt:
Compt:
27/3/2012

1 GPGC Mansehra. 13.125 3.647 4.022 7.669

2 GGDC Mansehra. 2.000 1.003 1.003

5.Higher Education
83

COLLEGE EDUCATION

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

68 58% 42% - 58% Roof Level 6/2013

71 31% 69% - 31% 6/2013

1 Repair. 60% work completed.

2 70% Completed.
B/Wall.

5.Higher Education
84

PROGRESS REPORT
SECTOR: HIGHER EDUCATION.
SUB SECTOR: COLLEGE EDUCATION

Expenditure to the
end of previous
Commencement

%age Financial

during C.F.Y
Expenditure
Progressive
Expenditure during

Total Cost/FE
Status of Scheme Allocation during C.F.Y

Utilization
year
ADP No Name of work the

Date of
T.S with
AA with Date Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

100.000
Provision of additional facilities in Govt.
75/120273
Colleges of Khyber Pakhtunkhwa.
Compt:

5.Higher Education
75
15
16
Scope of Work

Achievement to the end of


17

previous year

Physical Targets during


18

C.F.Y

Achievement during
19

C.F.Y

Total Achievement since


20

Commencement
85

5.Higher Education
COLLEGE EDUCATION

21
Physical Progrss

Scheduled Date of
22

Completion
23
Remarks
86

PROGRESS REPORT
SECTOR: HIGHER EDUCATION.
SUB SECTOR: COLLEGE EDUCATION

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Expenditure during

Total Cost/FE
Status of Scheme Allocation during C.F.Y

the end of
the

Utilization
ADP No Name of work

Date of
T.S with
AA with Date Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Reconstruction of GGDC Mansehra damaged 30.000


80/120661 70.00
due to earthquake. Compt:

5.Higher Education
87

COLLEGE EDUCATION

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

Detail Cost Estimate amounting to Rs.


99.777 Million, submitted to Chief Planning
80 Officer Higher Education Peshawar vide this
office letter No. 2452/16-W dt: 20/09/2012.
AA Awaited.

5.Higher Education
88

MONTHLY PROGRESS REPORT (ABSTRACT)


Sector: - HEALTH Month: 11/2012 District: - Mansehra
(Rupees in million)

%Age financial Addl: demand (+)/


Number of scheme ADP Allocation (CFY) Expenditures
Expdr: utilizaton (CFY)on Surrrender (-)
Estimat
Sub-Sector Ending Releases
ed Cost
PKY During the Additional Net (+) or
All AA TS Original Revised Progressive Allocation Releases Surrender
Demand (-)
Monthly CFY

OG=3 3 145.647 35.540 28.000 2.559 19.726 55.266 70%

NEW=

Non ADP

TOTAL=3 3 145.647 35.540 28.000 2.559 19.726 55.266 70%

Note: only Non-ADP (funded) schemes shall be exhibited against the designated space above, as well as in the monthly progress report

6.Health
89

PROGRESS REPORT
SECTOR: HEALTH
SUB SECTOR: BASIC HEALTH

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Expenditure during
Status of Scheme Allocation during C.F.Y

the end of
the

Utilization
ADP No Name of work

Date of AA

Date of
T.S with
AA Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

ON GOING

66.420
200.000
163/80643 Up- 16-5-10 7.540 15.000 1.877 6.736 14.276 44%
Compt:
gradation of 10 BHU to RHC in KPK on 27/3/10
need basis Sub Head: - BHU Naran. PK-
54

39.068
Estabtt: of 15 BHUs in KPK. (01 No in 70.000
164/80644 Distt: Mansehra)SH: - Village Bara U/C 27-3-10 17-6-10 23.000 3.000 0.410 3.000 26.000 100%
Shanaya (PK-57) Compt:
27/3/10

6.Health
90

HEALTH

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

1- Main Building. 1- Above DPC Level.

2- Residence. 2- DPC Level.


163 11% 89% - 11%
3- B/Wall. 3- Work in Progress.

4- Developmental Work. 4- Work in Progress.

Main Building Plastering in Progress.

Residence Type III Roof Laid.

164 Residence Type IV 59% 41% 6% 65% Roof in Progress.

Residence Type V Roof Level.

Developmental Work 70% Completed.

6.Health
91

PROGRESS REPORT
SECTOR: HEALTH
SUB SECTOR: BASIC HEALTH

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Expenditure during

Total Cost/FE
Status of Scheme Allocation during C.F.Y

the end of
the

Utilization
ADP No Name of work

Date of
T.S with
AA with Date Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

40.159
120386-Establishment of BHU at Murad
175 5.000 10.000 0.682 9.990 14.990 99%
Pur Mansehra.
31/3/2012

6.Health
92

HEALTH

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

1- Main Building.
1- Roof Level.

2- Cat-III (1 No). 2- Work in Foundation in Progress.

175 3- Type-IV = 2. 13% 87% - 13%


3- ...do...
4- 4-
Type-V = 2. Roof Level.

5- Developmental Work + 5- Work in Progress + 50%.


B/Wall.

6.Health
93

MONTHLY PROGRESS REPORT (ABSTRACT)


Sector: - INDUSTRIES Month: 11/2012 District: - Mansehra
Technical & Main Power
(Rupees in million)

%Age financial Addl: demand (+)/


Number of scheme ADP Allocation (CFY) Expenditures
Expdr: utilizaton (CFY)on Surrrender (-)
Estimated
Sub-Sector Ending Releases
Cost
PKY During the Additional Net (+) or
All AA TS Original Revised Progressive Allocation Releases Surrender
Demand (-)
Monthly CFY

OG= 2 324.245 62.000 80.000 40.00 40.000 102.000 100%

NEW=

N/ADP=

TOTAL=2 324.245 62.000 80.000 40.00 40.000 102.000 100%

Note: only Non-ADP (funded) schemes shall be exhibited against the designated space above, as well as in the monthly progress report

7.Industries
94

PROGRESS REPORT
SECTOR: INDUSTRIES
SUB SECTOR: TECHNICAL EDUCATION & MAIN POWER

Commencement

%age Financial
previous year

during C.F.Y
Expenditure
Expenditure to

Progressive
Expenditure during

Total Cost/FE
Status of Scheme Allocation during C.F.Y

the end of
the

Utilization
ADP No Name of work

Date of
AA with T.S with
Original Revised Releases Month C.F.Y
Date Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

170.00
NEW SCHEME
40.000
701/100358 15-4-2012 32.000 20.00 20.000 52.000 100%
Establishment of Commerce College at
Compt:
Balakot. PK-54
9/3/12

154.245
40.000
715/110499 Construction of building for GPI Mansehra. 30.000 20.00 20.000 50.000 100%
Compt:
24/1/2012

7.Industries
95

INDUSTRIES

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y
C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

1- Block A Lintel Level.

2- Block B DPC Level.

3- Development Work in Progress.


701 19% 81% - 19%
4- Teacher Hostel Lintel Level.

5-40-Student Hostel Above DPC Level.

6- Auditorium, Cafeteria, G/Latrine Block


Above DPC Level.

Main Building - Lintel Level

715 19% 81% - 19% Hostel - Above DPC Level.

Admin Block - Above DPC Level.

7.Industries
96

MONTHLY PROGRESS REPORT (ABSTRACT)


Sector: - AGRICULTURE Month: 11/2012 District: - Mansehra

(Rupees in million)

%Age financial Addl: demand (+)/


Number of scheme ADP Allocation (CFY) Expenditures
Expdr: utilizaton (CFY)on Surrrender (-)
Estimated
Sub-Sector Ending Releases
Cost
PKY During the Additional Net (+) or
All AA TS Original Revised Progressive Allocation Releases Surrender
Demand (-)
Monthly CFY

OG=1 1 101.850 101.222 3.00 - 3.000 3.000 104.222

NEW=

N/ADP=

TOTAL=2 1 101.850 101.222 3.00 - 3.000 3.000 104.222

Note: only Non-ADP (funded) schemes shall be exhibited against the designated space above, as well as in the monthly progress report

8.Agriculture
97

PROGRESS REPORT
SECTOR: AGRICULTURE
SUB SECTOR: LIVE STOCK RESEARCH & DEVELOPMENT.

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Expenditure during

Total Cost/FE
Status of Scheme Allocation during C.F.Y

the end of
the

Utilization
ADP No Name of work

Date of
AA with T.S with
Original Revised Releases Month C.F.Y
Date Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

110.630
101.850
Strengthening & Development of Poultry
511/80618 9/6/2009 101.222 3.000 3.000 3.000 104.222 100%
Sector in Hazara Division. PK-53
23/5/09
30/3/2012

8.Agriculture
98

AGRICULTURE

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y
C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

Civil Work Electrification


511 99% 1% 1% 100% 6/2013
Water Supply &

1 Admn: Block & store Completed.

2 Laboratories (2 Nos) -do-

3 Laboratories (2 Nos) -do-

4 Poultry Shed (4-Nos) -do-

5 Developmental Works 90% Completed.

Category-III Residences
6 Completed.
(1-No)
Category-V Residences
7 Completed.
(4-Nos)

8 Hostel for 20-Officer Finishing in Progress

9 Tube Well Work in Progress

8.Agriculture
Page 99

PROGRESS REPORT
Month: 11/2012
SECTOR: SPORT, CULTURE, TOURISM & ARCHEOLOGY.
SUB SECTOR: - TOURISM

Commencement

%age Financial
previous year

during C.F.Y
Expenditure
Expenditure to

Progressive
Expenditure during

Total Cost/FE
Status of Scheme Allocation during C.F.Y

the end of
the

Utilization
ADP No Name of work

Date of
T.S with
AA with Date Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14
40.000
Improvement and Rehabilitation of
630/110097 Playgrounds in Khyber Pakhtunkhwa. 2.5000 3.000 1.000 3.000
PH-II.
Compt:

0.500
1 GHS Kajla. 0.500 0.500
19/03/2012

0.500
2 GGHS Sawan Maira. 0.500 0.500
19/03/2012

0.500
3 Thathi Khurd. 0.500 0.500
19/03/2012

0.500
4 GGHS Danda Kholian. 0.500 0.500
19/03/2012

0.417
5 GHS Oghi & FC Ground Oghi. 1.000 1.000
19/03/2012

9. Sport Programme
Page 100

SPORT PROGRAMME

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

630

1 Completed.

2 Completed.

3 Completed.

4 Completed.

5 In Progress.

9. Sport Programme
Page 101

PROGRESS REPORT
SECTOR: SPORT, CULTURE, TOURISM & ARCHEOLOGY.

SUB SECTOR: - TOURISM

Expenditure during
Status of Scheme Allocation during C.F.Y

Commencement

%age Financial
the

previous year

during C.F.Y
Expenditure
Expenditure to

Progressive
Total Cost/FE

the end of

Utilization
ADP No Name of work

Date of
T.S with
AA with Date Original Revised Releases Month C.F.Y
Date

1 2 3 4 5 6 7 8
75.000 9 10 11 12 13 14
Establishment of Playgrounds in
624/100227 35.000 1.000 35.000
Khyber Pakhtunkhwa.
1.000 Compt:
1 GGHS Phagla. 20-5-2012 0.500 0.500
19/3/2012
1.000
2 GHS Jabba. 20-5-2012 0.500 0.500
0.500
19/3/2012
3 Dannad Shangai. 0.500 0.500
0.500
19/3/2012
4 GHS Murat Maira. 0.500 0.500
0.500
19/3/2012
5 Degree College Lassan Nawab. 0.500 0.500
0.500
19/3/2012
6 GHS Phulra. 0.500 0.500
0.500
19/3/2012
7 GHS Sekhi. 0.500 0.500
19/3/2012

9. Sport Programme
Page 102

SPORT PROGRAMME

end of previous year


Achievement to the

Achievement during

Scheduled Date of
Total Achievement

Commencement
Physical Targets
during C.F.Y

Completion
C.F.Y

since
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

624

1 Finishing in Progress.

2 Finishing in Progress.

3 Completed.

4 Completed.

5 Completed.

6 Completed.

7 Completed.

9. Sport Programme
Page 103

PROGRESS REPORT
SECTOR: SPORT, CULTURE, TOURISM & ARCHEOLOGY.

SUB SECTOR: - TOURISM

Expenditure during
Status of Scheme Allocation during C.F.Y

Commencement
the

%age Financial
previous year

during C.F.Y
Expenditure
Expenditure to

Progressive
Total Cost/FE

the end of

Utilization
ADP No Name of work
T.S with

Date of
AA with Date Original Revised Releases Month C.F.Y
Date

1 2 3 4 5 6 7 8 9 10 11 12 13 14

15.000
20.000
Rehabilitation of Mansehra Stadium
628/110095 11.000 9.000 0.010 2.436 13.436 27%
Mansehra.
9/02/2012
Compt:

9. Sport Programme
Page 104

SPORT PROGRAMME

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

1- Repair of Office. 1- 80% Completed.

2- Repair of ---------- 2- 40% Completed.

628 3- B/Wall. 3- 90% Completed.

4- Open Well + OHT. 4- 80% Completed.

5- Developmental Work. 5- 75% Completed.

9. Sport Programme
105

PROGRESS REPORT
Month: 11/2012
SECTOR: REGIONAL DEVELOPMENT
SUB SECTOR: LOCAL DEVELOPMENT.

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Expenditure during

Total Cost/FE
Status of Scheme Allocation during C.F.Y

the end of
the

Utilization
ADP No Name of work

Date of
AA with T.S with
Original Revised Releases Month C.F.Y
Date Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

10.809 3.600
Construction of Offices of 20 Union Councils
750/80016 12.368 12.368
in KPK. SH: -
9-3-2011 Compt:

1- Union Council Karnol 7/9/2011 4.035 4.035

2- Union Council Lassan Thakral 4.117 4.117

3- Union Council Parain 16-9-2011 4.216 4.216

10.Multi-Sectoral Development
106

MULTI-SECTORAL DEVELOPMENT

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y
C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

750 100% - - 100% 6/2013

1 Completed.

2 Completed.

3 Completed.

10.Multi-Sectoral Development
107

MONTHLY PROGRESS REPORT (ABSTRACT)


Sector: - FINANCE. Month: 11/2012 District: - Mansehra
Sub Sector: - BOARD OF REVENUE.
(Rupees in million)
%Age financial Addl: demand (+)/
Number of scheme Expdr: ADP Allocation (CFY) Expenditures
Estimated utilizaton (CFY)on Surrrender (-)
Sub-Sector Ending Releases During the Additional Net (+) or
All AA TS Cost Original Revised Progressive Allocation Releases Surrender
PKY Monthly CFY Demand (-)

100.000
2 1
Compact

100.000
2 1
Compact

Note: only Non-ADP (funded) schemes shall be exhibited against the designated space above, as well as in the monthly progress report

11.Board of Revenue
108

PROGRESS REPORT
SECTOR: FINANCE.
Sub Sector: - BOARD OF REVENUE

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Expenditure during

Total Cost/FE
Status of Scheme Allocation during C.F.Y

the end of
the

Utilization
ADP No Name of work

Date of
AA with T.S with
Original Revised Releases Month C.F.Y
Date Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

24.489
100313-Construction of New Muhafiz 40.000
903 Khanas / Record Rooms at Peshawar, D.I. - - - - - - - - -
Khan, Mansehra & Mardan. Compact
8/4/2012

100314-Construction of 100 Nos Patwar


200.000 60.000
904 Khanas in KPK. S/H:- Construction of 10
Compt: Compt:
Nos Patwar Khanas in Distt. Mansehra.

11.Board of Revenue
109

BOARD OF REVENUE

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

Work Order Issued and site not yet handed


903 6/2014
over by revenue department.

D/Cost Dstimate Amounting to Rs. 33.452


904 (M) sent DO (R&E) Mansehra vide this
office No, 1547/16-W dated 27-9-10.

11.Board of Revenue
110

MONTHLY PROGRESS REPORT (ABSTRACT)


Sector: - FOOD. Month: 11/2012 District: - Mansehra

(Rupees in million)
%Age financial Addl: demand (+)/
Number of scheme ADP Allocation (CFY) Expenditures
utilizaton (CFY)on Surrrender (-)
Expdr: During the
Estimated
Sub-Sector Ending Releases Additional Net (+) or
All AA TS Cost Original Revised Progressive Allocation Releases Surrender
PKY Demand (-)
Monthly CFY
432.580 259.232
2 2 39.264 66.772 5.099 6.327 45.591 9%
Comp: Comp:

432.580 259.232
Total= 2 2 39.264 66.772 5.099 6.327 45.591 9%
Comp: Comp:

Note: only Non-ADP (funded) schemes shall be exhibited against the designated space above, as well as in the monthly progress report

12.District Food
111

PROGRESS REPORT
SECTOR: FOOD.
SUB SECTOR FOOD.

during
Expenditure to the
end of previous
Commencement

%age Financial
Expenditure
Progressive
Expenditure during
Status of Scheme Allocation during C.F.Y
the

C.F.Y
Total Cost/FE

year
ADP No Name of work

Date of

Utilization
AA with T.S with
Original Revised Releases Month C.F.Y
Date Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

New Scheme
Construction of Food Grain Godowns in
40.614 100.000
Distt. Bannu, Mardan, Mansehra, Battagram 352.250
846/100027 and Chitral (Booni, Mastuj, Garam 12.802 9.432 12.802
Chashma, Darosh, Chitral). Compt:
13/1/2012 Compt:
SH: - 02-No in District
Mansehra.

12.District Food
112

FOOD

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

Godown No. 1 = Roof Level


Work Stopped due to old structure, which
846 32% 68% - 32% 6/2014
should be demolished.
Godown No. 2 = DPC Level.

12.District Food
113

PROGRESS REPORT
SECTOR: FOOD.
SUB SECTOR FOOD.

during
Expenditure to the
end of previous
Commencement

%age Financial
Expenditure
Progressive
Expenditure during
Status of Scheme Allocation during C.F.Y
the

C.F.Y
Total Cost/FE

year
ADP No Name of work

Date of

Utilization
AA with T.S with
Original Revised Releases Month C.F.Y
Date Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14
83.800
Reconstruction and rehabilitation of
earthquake affected godowns in Districts of
82.310
Battagram, Mansehra and Abbottabad.
848/110106 26.462 57.340 0.771 7.098 33.560 12%
Compt:
SH: - 04 No. in District Mansehra.
10-12-11

500 Matric Ton Grain Godam (2-Nos.) (Civil


1
Work).

500 Matric Ton Grain Godam (2-Nos.) (Civil


2
Work).

DFC / AFC Office / Wheel Drain (Civil Work


3
+ Water Supply).

4 (4) Internal Road.

5 Compund Wall.

12.District Food
114

FOOD

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

848 32% 68% - 32% 6/2013

one unit Lintel Level, 2nd not yet started due


1
to abstacle of old building.

2 Lintel Level.

3 Flooring in Progress.

4 80% Completed.

5 70% Completed.

12.District Food
115

MONTHLY PROGRESS REPORT (ABSTRACT)


Sector: - Information Month: 11/2012 District: - Mansehra
Sub Sector Information Department.
(Rupees in million)
%Age financial Addl: demand (+)/
Number of scheme Expdr: ADP Allocation (CFY) Expenditures
Estimate utilizaton (CFY)on Surrrender (-)
Sub-Sector Ending Releases During the Additional Net (+) or
All AA TS d Cost Original Revised Progressive Allocation Releases Surrender
PKY Monthly CFY Demand (-)

1 7.038 3.000 18.861 3.096 18.768 21.768 99%

Total= 1 7.038 3.000 18.861 3.096 18.768 21.768 99%

Note: only Non-ADP (funded) schemes shall be exhibited against the designated space above, as well as in the monthly progress report

13.Information
116

PROGRESS REPORT
SECTOR: Information
Sub Sector: - Information Department.

Expenditure to the end of

Progressive Expenditure

%age Financial Utilization


Commencement

previous year

during C.F.Y
Expenditure during
Status of Scheme Allocation during C.F.Y
the
ADP No Name of work

Date of
Total Cost/FE
AA with T.S with
Original Revised Releases Month C.F.Y
Date Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

7.038
49.191
80062-Establishment of District Press
Clubs in Khyber Pakhtunkhwa, on need 120.00
867 3.000 18.861 3.096 18.768 21.768 99%
basis. SH: - Extension/Improvement of Comt:
Press Club Mansehra.
Compt:
28-7-11

13.Information
117

Information

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

GF = Roof Laid.
IF =
867 43% 57% - 43% 6/2013
Roof Level. F/Floor
Roofing in Progress.

13.Information
118

MONTHLY PROGRESS REPORT (ABSTRACT)


Sector: - Mines & Minerals Month: 11/2012 District: - Mansehra
Sub Sector Mines & Minerals
(Rupees in million)
%Age financial Addl: demand (+)/
Number of scheme Expdr: ADP Allocation (CFY) Expenditures
Estimated utilizaton (CFY)on Surrrender (-)
Sub-Sector Ending Releases During the Additional Net (+) or
All AA TS Cost Original Revised Progressive Allocation Releases Surrender
PKY Monthly CFY Demand (-)

1 78.194 78.194 24.242 18.861 1.248 1.248 25.489 7%

Total= 1 78.194 78.194 24.242 18.861 1.248 1.248 25.489 7%

Note: only Non-ADP (funded) schemes shall be exhibited against the designated space above, as well as in the monthly progress report

14.Mines & Mineral


119

PROGRESS REPORT
SECTOR: Mines & Meneral.
Sub Sector: - Mines & Meneral.

Progressive Expenditure
end of previous year

during
Expenditure to the
Commencement

%age Financial
Expenditure during
Status of Scheme Allocation during C.F.Y
the

C.F.Y
Total Cost/FE
ADP No Name of work

Date of

Utilization
AA with T.S with
Original Revised Releases Month C.F.Y
Date Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

233.853
100323-Improvement / Construction of 78.194
500.00
Shingle Roads in Mineral Bearing Areas of
857 Khyber Pakhtunkhwa. SH: - Soach of sput - - 24.241 - 18.861 1.248 1.248 25.489 7%
valley (10 Kms) District Mansehra (2011-12)
Compact
(Chief Minister Directive). 3/3/2012
Compt:

14.Mines & Mineral


120

Mines & Meneral

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23
E/W M/W
Km 1
75% -

Km 2
70% E/W 60% M/W
Km 3
65% 40%

Km 4
75% 45%

Km 5 E/W 50% M/W -


857 31% 69% - 31% Km 6 6/2014
75% 40%

Km 7
30% 35%

Km 8 70%

Km 9 50%
Km
10 Not Started.

14.Mines & Mineral


121

MONTHLY PROGRESS REPORT (ABSTRACT)


Sector: - Crush Programme Month: 11/2012 District: - Mansehra
(Rupees in million)

Commencement

%age Financial
previous year

during C.F.Y
Expenditure to

Expenditure
Progressive
Status of Scheme Allocation during C.F.Y Expenditure during the

the end of

Utilization
ADP No Name of work

Date of AA

Date of
T.S with
AA Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Improvement & Rehabilitation of Oghi Darband


1 Road under CRASH Programme in District
Mansehra.

(i). 2, 3 KM 22.753 (M)

(ii). 4, 5 KM 22.326 (M)

(iii). 6, 7 KM 21.518 (M)

(iv). 8, 9 KM 23.365 (M)

(v). 10-KM 10.952 (M)

15.Crush Programme
122

Crush Programme

Physical Targets during

since Commencement
end of previous year
Achievement to the

Scheduled Date of
Total Achievement
Achievement during

Completion
C.F.Y
C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

(i).
Tender Under Process

(ii).
Tender Under Process

(iii).
Tender Under Process

(iv).
Tender Under Process

(v).
Tender Under Process

15.Crush Programme
123

MONTHLY PROGRESS REPORT (ABSTRACT)


Sector: - Crush Programme Month: 11/2012 District: - Mansehra
(Rupees in million)

Date of AA
Status of Scheme Allocation during C.F.Y Expenditure during the

Expend

Expend
previou
Date of

Financi

Utilizati
encem

Progre
Comm

during
iture to

s year

%age

C.F.Y
the

ssive
end of

iture
ent
ADP No Name of work T.S with

al
AA Original Revised Releases Month C.F.Y

on
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Construction / Reconstruction & Rehabilitation of


1 Road under CRASH Programme (2012-13) in KPK
(PK-53) in District Mansehra.

Package No. 1 Repair / Rehabilitation of


10.000 (M)
(i). Shelai & Hadu Bandi Road

Package No. 2 Repair / Rehabilitation of


(i). Potha Pakwal Road
(ii). Kashmir Road 10.000 (M)
(iii). Safdar Road
(iv). Datta Road

15.Crush Programme
1
15

(i).

(ii).
16
Scope of Work

Achievement to
17

the end of
previous year

Physical Targets
18

during C.F.Y

Achievement
19

during C.F.Y

Total Achievement
20

since
124

Commencement
15.Crush Programme
Crush Programme

21
Physical Progrss

Tender Under Process


Tender Under Process

Scheduled Date of
22

Completion
23
Remarks
PROGRESS REPORT
Month: 11/2012
SECTOR: HEALTH
SUB SECTOR: BASIC HEALTH

Commencement

%age Financial
previous year

during C.F.Y
Expenditure
Expenditure to

Progressive
Expenditure during
Status of Scheme Allocation during C.F.Y

the end of
the

Utilization
ADP No Name of work

Date of AA

Date of
T.S with
AA Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Construction of CMW School, Labor Suit 18.894


Upgradation of existing CMW school in
Nursing examinatio building office etc under
Non-ADP 19-10-09 12.500 12.500
MNCH Programme KPK SH: - Construction
of CMW School at Mansehra (Civil Work
including W/S & S/I) 19/10/09
HEALTH

Achievement to the end of

Total Achievement since


Physical Targets during

Scheduled Date of
Commencement
Achievement during
previous year

Completion
C.F.Y

C.F.Y
Scope of Work Physical Progrss Remarks

15 16 17 18 19 20 21 22 23

Civil Work I/Electrification G/Floor & Ist Floor roof laid. Finishing in
Non-ADP 66% 34% 66%
I/Water Supply Progress
PROGRESS REPORT

Commencement

%age Financial
previous year

during C.F.Y
Expenditure
Expenditure to

Progressive
Expenditure during
Status of Scheme Allocation during C.F.Y

the end of
the

Utilization
ADP No Name of work

Date of AA

Date of
T.S with
AA Original Revised Releases Month C.F.Y
Date
1 2 3 4 5 6 7 8 9 10 11 12 13 14

14.553
141.000
Up-Gradation and Reconstruction of PFI
Non-ADP 14.553
Field Station Shinkiari at Mansehra.
Compact.
17/7/2012
15

Non-ADP
16
Scope of Work

Achievement to the end of


17

previous year

Physical Targets during


18

C.F.Y

Achievement during
19

C.F.Y

Total Achievement since


20

Commencement
21
Physical Progrss

to starts the work at site.


Work Order issued the contractor is directed

Scheduled Date of
22

Completion
23
Remarks
129

PROGRESS REPORT CHIEF MINISTER DIRECTIVE


Month: 11/2012

Reference of
Implementation
Reference of SO (III) C.M
S.No Section, Text of C.M Directives
Secretariat
Establishment
Department

1 2 3 4

Rehabilitation of 12-KMS Roads in Union Council


Kaghan, Tehsil Balakot Sh:
SO-III/CMS/NWFP P/6- 1. Rawalkot Road 03-Kms
1 4/2009/Mansehra, Fated: C&W Department 2. Lari Road 03-Kms
22-10-2009 3. Hassa Nokote Road 02-
Kms 4. Hassa
Village Road 01-KM

SO-III/CMS/NWFP P/6-
Improvement & Balck Topping of Manoor Valley Road
2 4/2009/Mansehra, Fated: C&W Department
14-Kms, Tehsil Balakot.
22-10-2009

Chief Minister Visit at Rehabilitation of Murad Pur Village Road (Chief Minister
3 C&W Department
Mansehra on 18-11-2011 Directive), District Mansehra (Non-ADP)
130

ER DIRECTIVE

Latest Position

PC-I/DCE amounting to Rs. 124.574 (M)


sent to SO-R C&W Department
Peshawar in C.E (N) No. 239/4-CD/CE
(N) MNS, dated: 17-05-2011

PC-I/DCE amounting to Rs. 163.886 (M)


sent to SO-R C&W Department
Peshawar in C.E (N) No. 239/4-CD/CE
(N) MNS, dated: 17-05-2011

Completed
ghori2sh@yahoo.com

directorpnmcnw@gmail.com
MONTHLY PROGRESS REPORT FOR THE MONTH OF 11/2012
COMMUNICATION & WORKS DIVISION MANSEHRA.

(COMMUNICATION SECTOR)
DISTRICT ROADS ADP (2012-2013)
MONTHLY PROGRESS REPORT FOR THE MONTH OF 11/2012
COMMUNICATION & WORKS DIVISION MANSEHRA.

(BUILDING & HOUSING)


BUILDING & HOUSING ADP (2012-2013)
MONTHLY PROGRESS REPORT FOR THE MONTH OF 11/2012
COMMUNICATION & WORKS DIVISION MANSEHRA.

(SCHOOL & LITERACY)


PRIMARY EDUCATION ADP (2012-2013)
MONTHLY PROGRESS REPORT FOR THE MONTH OF 11/2012
COMMUNICATION & WORKS DIVISION MANSEHRA.

(SCHOOL & LITERACY)


SECONDARY EDUCATION ADP (2012-2013)
MONTHLY PROGRESS REPORT FOR THE MONTH OF 11/2012
COMMUNICATION & WORKS DIVISION MANSEHRA.

(HIGHER EDUCATION)
COLLEGE EDUCATION ADP (2012-2013)
MONTHLY PROGRESS REPORT FOR THE MONTH OF 11/2012
COMMUNICATION & WORKS DIVISION MANSEHRA.

HEALTH ADP (2012-2013)


MONTHLY PROGRESS REPORT FOR THE MONTH OF 11/2012
COMMUNICATION & WORKS DIVISION MANSEHRA.

(INDUSTRIES)
TECHNICAL EDUCATION & MAIN POWER ADP (2012-2013)
MONTHLY PROGRESS REPORT FOR THE MONTH OF 11/2012
COMMUNICATION & WORKS DIVISION MANSEHRA.

AGRICULTURE ADP (2012-2013)


MONTHLY PROGRESS REPORT FOR THE MONTH OF 11/2012
COMMUNICATION & WORKS DIVISION MANSEHRA.

(SPORTS SECTOR)
SPORTS PROGRAMME ADP (2012-2013)

MONTHLY PROGRESS REPORT FOR THE MONTH OF 11/2012


COMMUNICATION & WORKS DIVISION MANSEHRA.
(REGIONAL DEVELOPMENT)
MULTI-SECTORAL DEVELOPMENT ADP (2012-2013)

MONTHLY PROGRESS REPORT FOR THE MONTH OF 11/2012


COMMUNICATION & WORKS DIVISION MANSEHRA.
BOARD OF REVENUE ADP (2012-2013)

MONTHLY PROGRESS REPORT FOR THE MONTH OF 11/2012


COMMUNICATION & WORKS DIVISION MANSEHRA.
DISTRICT FOOD ADP (2012-2013)

MONTHLY PROGRESS REPORT FOR THE MONTH OF 11/2012


COMMUNICATION & WORKS DIVISION MANSEHRA.

INFORMATION DEPARTMENT ADP (2012-2013)


MONTHLY PROGRESS REPORT FOR THE MONTH OF 11/2012
COMMUNICATION & WORKS DIVISION MANSEHRA.

NON ADP (2012-2013)


MONTHLY PROGRESS REPORT FOR THE MONTH OF 11/2012
COMMUNICATION & WORKS DIVISION MANSEHRA.

MINES & MINERAL ADP (2012-2013)


MONTHLY PROGRESS REPORT FOR THE MONTH OF 11/2012
COMMUNICATION & WORKS DIVISION MANSEHRA.

(CHIEF MINISTER DIRECTIVE)


MONTHLY PROGRESS REPORT FOR THE MONTH OF 11/2012
COMMUNICATION & WORKS DIVISION MANSEHRA.

(COMMUNICATION SECTOR)
(CRASH PROGRAMME)

Das könnte Ihnen auch gefallen