DRAFT ESTIMATE

ESTIMATE FOR THE PROPOSED XYZ

Sl.No. Description of work Unit Quantity


Rate Amount

EXV-000 EARTH WORK


EXV-001 Earth work Excavation for Retaining wall Footing/Raft CUM 150.00 -

EXV-002 Refilling with available earth CUM 35.00 -

TOTAL OF EARTH WORK Rs. -


PCC-000 PLAIN CEMENT CONCRETE & SOLING WORKS
Plain Cement Concrete 1:4:8, for Retaining wall raft / Below
PCC-001 CUM 15.00 -
base slab flooring

PCC-002 Providing boulder stone soling below Raft/base slab CUM 45.00 -

TOTAL OF PLAIN CEMENT CONCRETE Rs. -


RCC-000 REINFORCED CEMENT CONCRETE
RCC-001 M-25 Concrete for retaining wall Raft/Base slab CUM 43.00 -

RCC-002 M-25 Concrete for retaining wall/Columns CUM 31.00 -

RCC-003 M-25 Concrete for top slab CUM 50.00 -

RCC-004 M-25 Concrete for Beams CUM 1.50 -


TOTAL OF REINFORCED CEMENT CONCRETE Rs. -
STL-000 REINFORCEMENT STEEL

STL-001 Supply, Bend, Crank and Tieng of Reinforcement steel MT 9.10 -

TOTAL OF STRUCTURAL/ REINFORCEMENT STEEL WORKS Rs. -


FW-000 FORMWORKS
FW-001 Form work for retaining wall raft SMt 26.00 -

FW-002 Form work for retaining wall SMt 240.00 -

FW-003 Form work for top slab SMt 125.00 -


TOTAL OF FORMWORKS Rs. -

SUMMARY

Sl.no DESCRIPTION AMOUNT

EXV-000 EARTH WORK Rs. -


PCC-000 PLAIN CEMENT CONCRETE Rs. -
RCC-000 REINFORCED CEMENT CONCRETE Rs. -
STL-000 REINFORCEMENT STEEL Rs. -
FW-000 FORMWORKS Rs. -
TOCW TOTAL AMOUNT OF CIVIL WORKS Rs. -
Cost/Sft

Page : 1 Of 1