Innovación Tecnológica: Diseño y Construcción Digital

Leonardo Rischmoller
Ing. Civil, M.Sc., Ph.D.
Innovación Tecnológica: Diseño y Construcción Digital
Leonardo Rischmoller
Ing. Civil, M.Sc., Ph.D.

1. Contratos, IPD
2. BIM (Building Information Modeling)
3. BIM+
4. ICE (Integrated Concurrent Engineering)
5. VDC (Virtual Design and Construction)
6. DDC (Digital Design and Construction)
7. Conclusiones
Click to edit Master title style
Integration
WHAT
REALIZE
HOW
WHO
Predesign Schematic Design Construction Agency Construction Closeout
Design Development Documents Permit /
Bidding
Traditional Agency
Owner
Architect
Engineers
GC
Subs
•Define the processes, structure and metrics up front!
Conceptual- Criteria Detailed Implementation Agency Coord / Construction Closeout
ization Design Design Documents Final Buyout
Agency
Owner
Architect
Engineers
GC
Integrated Subs
HOW
WHO
WHAT REALIZE

Lessons learned from applied Integrated Project Delivery May 01, 2009
AIA National Convention: F32 Slide ‹#›
Click to edit Master title style
Multi-Party Agreement
Tradicional

Dueño

B101 A201

Cons. Arquitecto Contratista Sub.

C401 A401

Lessons learned from applied Integrated Project Delivery May 01, 2009
AIA National Convention: F32 Slide ‹#›
Click to edit Master title style
Multi-Party Agreement
Tradicional: Limita la cooperación y la innovación

Dueño

B101 A201

Cons. Arquitecto Contratista Sub.

C401 A401

Lessons learned from applied Integrated Project Delivery May 01, 2009
AIA National Convention: F32 Slide ‹#›
Click to edit Master title
Shared style
Risk/Reward
No se distribuyen ni los riesgos ni las
recompensas

Lessons learned from applied Integrated Project Delivery May 01, 2009
AIA National Convention: F32 Slide ‹#›
Click to edit Master title style
Multi-Party Agreement
Separate Contracts + Joining Agreement

Owner

B195
B101 A195
A201

A295
Cons. Architect Contractor Sub.

C401 A401

Lessons learned from applied Integrated Project Delivery May 01, 2009
AIA National Convention: F32 Slide ‹#›
Value
Click to editProposition
Master title style of Collaboration
From the Construction Industry Institute – UT Austin

• Acuerdos:
 Prohibido demandarse
 Utilidades compartidas
• Problema?
 La única alternativa es solucionarlo
• Cambios?
 Reaccionar lo mas rápido posible

Lessons learned from applied Integrated Project Delivery May 01, 2009
AIA National Convention: F32 Slide ‹#›
Click to edit Master title style
Multi-Party Agreement
Everyone Signs the Same Agreement
Full IPD
Owner

Cons. Sub.

Cons. Architect Contractor Sub.

AIA C195
ConsensusDocs 300

Lessons learned from applied Integrated Project Delivery May 01, 2009
AIA National Convention: F32 Slide ‹#›
Click to edit Master title style
Multi-Party Agreement

Lessons learned from applied Integrated Project Delivery May 01, 2009
AIA National Convention: F32 Slide ‹#›
Value
Click to editProposition
Master title style of Collaboration
From the Construction Industry Institute – UT Austin

• Acuerdos:
 Prohibido demandarse
 Utilidades compartidas
• Problema?
 La única alternativa es solucionarlo
• Cambios?
 Reaccionar lo mas rápido posible

Lessons learned from applied Integrated Project Delivery May 01, 2009
AIA National Convention: F32 Slide ‹#›
Click to edit Master title style
Integration
WHAT
REALIZE
HOW
WHO
Predesign Schematic Design Construction Agency Construction Closeout
Design Development Documents Permit /
Bidding
Traditional Agency
Owner
Architect
Engineers
GC
Subs
•Define the processes, structure and metrics up front!
Conceptual- Criteria Detailed Implementation Agency Coord / Construction Closeout
ization Design Design Documents Final Buyout
Agency
Owner
Architect
Engineers
GC
Integrated Subs
HOW
WHO
WHAT REALIZE

Lessons learned from applied Integrated Project Delivery May 01, 2009
AIA National Convention: F32 Slide ‹#›
¿De que bomba
estas hablando?

La Presión de la
Bomba es 2 bar ¿Te refieres a la
presión normal
de succión?

Si, pero
necesitamos ¿Entonces
la presión cual es la
de diseño presión
minima de
succión?

¿Te refieres a la presión minima de succión que


Ya les dije: puede soportar la bomba o el proceso?
2 bar
Principios
Click to edit Master IPD
title style

• Respeto y confianza mutua


• Beneficio y recompensa mutua
• Innovacion y toma de decisiones colaborativamente
• Involucramiento temprano de los participantes
• Definición temprana de metas
• Planificación intensiva
• Comunicación abierta
• Tecnología apropiada

Lessons learned from applied Integrated Project Delivery May 01, 2009
AIA National Convention: F32 Slide ‹#›
Innovación Tecnológica: Diseño y Construcción Digital
Leonardo Rischmoller
Ing. Civil, M.Sc., Ph.D.

1. Contratos, IPD
2. BIM (Building Information Modeling)
3. BIM+
4. ICE (Integrated Concurrent Engineering)
5. VDC (Virtual Design and Construction)
6. DDC (Digital Design and Construction)
7. Conclusiones
Innovación Tecnológica: Diseño y Construcción Digital
Leonardo Rischmoller
Ing. Civil, M.Sc., Ph.D.

1. Contratos, IPD
2. BIM (Building Information Modeling)
3. BIM+
4. ICE (Integrated Concurrent Engineering)
5. VDC (Virtual Design and Construction)
6. DDC (Digital Design and Construction)
7. Conclusiones
BIM+
Innovación Tecnológica: Diseño y Construcción Digital
Leonardo Rischmoller
Ing. Civil, M.Sc., Ph.D.

1. Contratos, IPD
2. BIM (Building Information Modeling)
3. BIM+
4. ICE (Integrated Concurrent Engineering)
5. VDC (Virtual Design and Construction)
6. DDC (Digital Design and Construction)
7. Conclusiones
BIM+
http://www.911memorial.org/webcam
http://www.911memorial.org/webcam
BIM+
BIM+
Product
Modeling
Principios
Click to edit Master IPD
title style

• Respeto y confianza mutua


• Beneficio y recompensa mutua
• Innovacion y toma de decisiones colaborativamente
• Involucramiento temprano de los participantes
• Definición temprana de metas
• Planificación intensiva
• Comunicación abierta
• Tecnología apropiada

Lessons learned from applied Integrated Project Delivery May 01, 2009
AIA National Convention: F32 Slide ‹#›
Innovación Tecnológica: Diseño y Construcción Digital
Leonardo Rischmoller
Ing. Civil, M.Sc., Ph.D.

1. Contratos, IPD
2. BIM (Building Information Modeling)
3. BIM+
4. ICE (Integrated Concurrent Engineering)
5. VDC (Virtual Design and Construction)
6. DDC (Digital Design and Construction)
7. Conclusiones
ICE
Integrated Concurrent Engineering
Click to edit Master title style
Integration
WHAT
REALIZE
HOW
WHO
Predesign Schematic Design Construction Agency Construction Closeout
Design Development Documents Permit /
Bidding
Traditional Agency
Owner
Architect
Engineers
GC
Subs
•Define the processes, structure and metrics up front!
Conceptual- Criteria Detailed Implementation Agency Coord / Construction Closeout
ization Design Design Documents Final Buyout
Agency
Owner
Architect
Engineers
GC
Integrated Subs
HOW
WHO
WHAT REALIZE

Lessons learned from applied Integrated Project Delivery May 01, 2009
AIA National Convention: F32 Slide ‹#›
Integrated Concurrent Engineering (ICE) en JPL y CIFE

Photo thanks to JPL

Propiedades:
• Organización en el mismo lugar físico (Red
de conocimiento cercana)
• Excelente infraestructura técnica
• Métrica formales
• Cultura y procesos informales

45
Alaskan Way Viaduct Replacement
Project –Single Bore Tunnel, Seattle Wa.

Parsons
Brinckerhoff
Alaskan Way Viaduct and Seawall Replacement Program

 Approximately 3.2 km. long; 17 mt. in


diameter

 Up to 65.5 mt. feet deep to the crown

 Construction started in fall 2011 and


will run to 2015/2016

Visualization uses:
- Communication to a non professional audience and stakeholders
Alaskan Way Viaduct and Seawall Replacement Program

BIM Model - Under Seattle

• Seattle Underground 3D Model:


• Used in design validation and clearance check
• Used as a design tool, contributed to design decision process
Collaborative Design Sessions

Parsons
Brinckerhoff
Alaskan Way Viaduct and Seawall Replacement Program
Collaborative Work Environment
Computer Analysis and Visualization Environment (CAVE)

Tunnel Cross Section Systems Coordination:

3 sessions in 3 weeks
Attendees: WSDOT, Seattle Fire Dept, PB
Engineers (MEP/Structural/Civil)

VDC Model used for:


-Communication - all designers presented
Using 3d Model not 2D drawings
-Addressed all questions related to: Egress
and MEP Systems, Lighting and staging

Results:
Traditional Process: 12 weeks
VDC Process: 3 weeks
Alaskan Way Viaduct and Seawall Replacement Program

Bored Tunnel – Systems Coordination

Tunnel Cross Section Systems coordination Model Uses:


-MEP Coordination
-Construction Sequencing – Typical 500’ section
Alaskan Way Viaduct and Seawall Replacement Program

Bored Tunnel – Systems Coordination

Tunnel Cross Section Systems coordination Model Uses:


-MEP Coordination
-Construction Sequencing – Typical 500’ section
UCSF Mission Bay Hospital
ICE Session
Mejoramiento dramático de las métricas cuando el equipo del
proyecto trabaja en el mismo ambiente de trabajo utilizando VDC

• UCSF Mission Bay Hospital


– 60,000 m2 Hospital; 23,000 m2
Edificio para pacientes; 9,000 m2
Centro de energía
– Presupuesto ~ US$ 1,600
– Plazo Dic. 2014 Image Courtesy DPR Inc.
• Workshop VDC de planificación
integrada . 4 días. En el CIFE con 32
participantes clave del proyecto
• “Big Room” con 100 profesionales
trabajando en el proyecto (dueño,
arquitecto, ingenieros, contratistas,
subcontratistas)

Image Courtesy DPR Inc.


56
(c) 2012
Innovación Tecnológica: Diseño y Construcción Digital
Leonardo Rischmoller
Ing. Civil, M.Sc., Ph.D.

1. Contratos, IPD
2. BIM (Building Information Modeling)
3. BIM+
4. ICE (Integrated Concurrent Engineering)
5. VDC (Virtual Design and Construction)
6. DDC (Digital Design and Construction)
7. Conclusiones
BIM+
Product
Modeling
ICE
Integrated
Concurrent

BIM+ Engineering

Product
Modeling
VIRTUAL DESIGN AND CONSTRUCTION
(VDC)

Project
Objectives

ICE
Integrated
Concurrent

BIM+ Engineering
Process
Product Modeling
Modeling
Innovación Tecnológica: Diseño y Construcción Digital
Leonardo Rischmoller
Ing. Civil, M.Sc., Ph.D.

1. Contratos, IPD
2. BIM (Building Information Modeling)
3. BIM+
4. ICE (Integrated Concurrent Engineering)
5. VDC (Virtual Design and Construction)
6. DDC (Digital Design and Construction)
7. Conclusiones
DIGITAL PROTOTYPE
Innovación Tecnológica: Diseño y Construcción Digital
Leonardo Rischmoller
Ing. Civil, M.Sc., Ph.D.

1. Contratos, IPD
2. BIM (Building Information Modeling)
3. BIM+
4. ICE (Integrated Concurrent Engineering)
5. VDC (Virtual Design and Construction)
6. DDC (Digital Design and Construction)
7. Conclusiones
Click to edit Master title style
Integration
WHAT
REALIZE
HOW
WHO
Predesign Schematic Design Construction Agency Construction Closeout
Design Development Documents Permit /
Bidding
Traditional Agency
Owner
Architect
Engineers
GC
Subs
•Define the processes, structure and metrics up front!
Conceptual- Criteria Detailed Implementation Agency Coord / Construction Closeout
ization Design Design Documents Final Buyout
Agency
Owner
Architect
Engineers
GC
Integrated Subs
HOW
WHO
WHAT REALIZE

Lessons learned from applied Integrated Project Delivery May 01, 2009
AIA National Convention: F32 Slide ‹#›
Tool
Set
Skill Mind
Set Set
Tool
Set
Skill Mind
Set Set
CAMBIAR EL CHIP
Innovación Tecnológica: Diseño y Construcción Digital
Leonardo Rischmoller
Ing. Civil, M.Sc., Ph.D.