0 Bewertungen0% fanden dieses Dokument nützlich (0 Abstimmungen)
24 Ansichten9 Seiten
This document contains measurement sheets for excavation works related to a road project in Hamriya, Sharjah. It includes details of 16 trial trenches excavated for water, electricity, and Etisalat lines along various roads, with information on location, dimensions, and quantities of material removed. A second section provides excavation details for 6 cuttings along roads for widening, listing road names, widths, depths, lengths, and total quantities of material. The total quantity of materials from trial trenches is calculated as 34.61 cubic meters for water works, 32.40 cubic meters for electricity, and 24.02 cubic meters for Etisalat works. The total quantity of materials from cuttings is estimated at 5484.
This document contains measurement sheets for excavation works related to a road project in Hamriya, Sharjah. It includes details of 16 trial trenches excavated for water, electricity, and Etisalat lines along various roads, with information on location, dimensions, and quantities of material removed. A second section provides excavation details for 6 cuttings along roads for widening, listing road names, widths, depths, lengths, and total quantities of material. The total quantity of materials from trial trenches is calculated as 34.61 cubic meters for water works, 32.40 cubic meters for electricity, and 24.02 cubic meters for Etisalat works. The total quantity of materials from cuttings is estimated at 5484.
This document contains measurement sheets for excavation works related to a road project in Hamriya, Sharjah. It includes details of 16 trial trenches excavated for water, electricity, and Etisalat lines along various roads, with information on location, dimensions, and quantities of material removed. A second section provides excavation details for 6 cuttings along roads for widening, listing road names, widths, depths, lengths, and total quantities of material. The total quantity of materials from trial trenches is calculated as 34.61 cubic meters for water works, 32.40 cubic meters for electricity, and 24.02 cubic meters for Etisalat works. The total quantity of materials from cuttings is estimated at 5484.
Development and Application of "Green," Environmentally Friendly Refractory Materials For The High-Temperature Technologies in Iron and Steel Production