Sie sind auf Seite 1von 9

SHARIKET KAHRABA

SKIKDA.SPA Revision Page


No. Date

VENDOR DATA 2003-XX-XX G-1


REQUIREMENTS (VDR) LIST

TITLE OF PACKAGE:
PACKAGE NO: P XX-XXXX

INSTRUCTIONS TO THE SPECIFICATION WRITER

1) Remove this page

2) Part 2, Quality to be completed by Project Quality Assurance Group

3) Person responsible for commitment package to complete part 1 and parts 3 to the end.
Items added to list will also be added to generic

4) Items with no line entries will be deleted during formatting of list for specific packages
SHARIKET KAHRABA
SKIKDA.SPA Revision Page
No. Date

VENDOR DATA 2003-XX-XX G-2


REQUIREMENTS (VDR) LIST

TITLE OF PACKAGE:
PACKAGE NO: P XX-XXXX

APPENDIX “G”

VENDOR DATA REQUIREMENTS


SHARIKET KAHRABA
SKIKDA.SPA Revision Page
No. Date

VENDOR DATA 2003-XX-XX G-3


REQUIREMENTS (VDR) LIST

TITLE OF PACKAGE:
PACKAGE NO: P XX-XXXX

1.0 GENERAL

Instructions, drawings, procedures, spare parts lists, operation manuals, etc. specified on the Vendor Data Requirements list shall be
considered as forming part of this order and quantities required shall be received by the date indicated or earlier. Any document issued to
the plant site shall not be considered as received by Document Control.

Vendor means Vendor of goods and/or Subcontractor of site contracts.

2.0 VENDOR DRAWINGS AND DOCUMENTS

Vendor’s drawings and documents will be reviewed only as to overall compatibility and conformance with interface requirements and
related drawings, and such review shall not be construed to relieve or mitigate the Vendor’s responsibility for accuracy or adequacy and
suitability of materials and/or equipment represented thereon. Vendor shall submit all requested drawings and documents in the format
following specification “Standards for Technical Drawings and Documents”.

3.0 TIME LIMIT

“No. of Weeks (ARO)”, as stated in the table, is the number of weeks after receipt of order, to receipt by Document Control the documents
for “REVIEW”. “No. of Weeks (ARAD)”, as stated in the table, is the number of weeks after receipt of approved documents, to receipt by
Document Control the “FINAL” (certified) documents. Buyer’s review turnaround time will be 10 working days from acknowledgement of
receipt for the documents.

4.0 TRANSMISSION OF VENDOR TECHNICAL DATA FOR PRE-FABRICATION REVIEW

- All preliminary technical data must be issued upon Buyer’s request.

- The detailed Vendor data list must be submitted as requested on the Vendor Data Requirements list prior to the transmittal of any
other document. This Vendor data list must always be kept up-to-date. Documents listed on the Vendor transmittal or on the Vendor
data list must be cross-referenced to item numbers shown on the Vendor Data Requirements list.

- All substitutions of materials shall first be approved by the Buyer before documents are submitted for review.

- Once the Vendor drawings and other technical data have been reviewed, one copy will be returned to the Vendor to allow him to
proceed as agreed upon.
VA: Not suitable, resubmit before fabrication.
VB: Modify as noted, resubmit before fabrication.
VC: Modify as noted, commence fabrication & resubmit.
VD: Suitable, start fabrication, resubmit certified reproducible.
VE: Other, as indicated on transmittal.
VF: Final, no further re-submittal.
- Vendor shall make all corrections indicated and shall resubmit corrected drawings and/or documents as soon as possible, and not
later than the specified date. A copy stamped with the appropriate action code will be sent back to the Vendor for his files.

- Review and/or authorization to proceed with fabrication by the Buyer shall not be interpreted as relieving the Vendor from any of his
obligations or responsibilities concerning the documents and items to be supplied by him by virtue of the purchase order agreements.

5.0 TRANSMISSION OF VENDOR’S DOCUMENTS FOR INFORMATION PURPOSE ONLY

Certified prints and/or electronic copy shall also be submitted for documents or drawings where review is not necessary. There shall be no
acknowledgement of receipt for these documents or drawings.
SHARIKET KAHRABA
SKIKDA.SPA Revision Page
No. Date

VENDOR DATA 2003-XX-XX G-4


REQUIREMENTS (VDR) LIST

TITLE OF PACKAGE:
PACKAGE NO: P XX-XXXX

WITHOUT
FOR REVIEW FINAL (CERTIFIED) REVIEW
Total
No. of No. of No. of No. of No. of No. of No. of
copies printed E-copy weeks printed E-copy weeks printed weeks
DRAWINGS & DATA REQUIRED with Bid copies (ARO) copies (ARAD) copies (ARO)
Notes

1.0 GENERAL

1.1 Detailed Vendor Data List and submittal


schedule

1.2 General arrangement drawings

1.3 Installation drawings & instruction

1.4 Commissioning instructions/procedures

1.5 Maintenance and operating manuals

1.6 Instructions for transportation

1.7 Instructions for long term storage

1.8 Packaging List

1.9 List of spare parts

1.10 List of consumables, chemicals and parts


for start-up

1.11 Recommended spare parts list (2 yrs and 5


yrs) operation

1.12 Effluent and emission list

1.13 Training program

1.14 List of required erection equipment and


special tools

1.15 Marking & packaging procedure

1.16 Production schedule

1.17 Permits - copy

1.18 Shipping Bill of Materials

1.19 List of embedded parts by Vendor & others

1.20 List of embedded parts by others

1.21 Health & Safety Prevention Plan

1.22 As built

1.23 Simulation/modeling test results

2.0 QUALITY

2.1 Quality assurance system manual

2.2 Project quality plan

2.3 Quality system registration certificate

2.4 Inspection and Test Plans and procedures

2.5 Quality records

2.6 Purchase order register

2.7 QC dossier and code data books


SHARIKET KAHRABA
SKIKDA.SPA Revision Page
No. Date

VENDOR DATA 2003-XX-XX G-5


REQUIREMENTS (VDR) LIST

TITLE OF PACKAGE:
PACKAGE NO: P XX-XXXX

WITHOUT
FOR REVIEW FINAL (CERTIFIED) REVIEW
Total
No. of No. of No. of No. of No. of No. of No. of
copies printed E-copy weeks printed E-copy weeks printed weeks
DRAWINGS & DATA REQUIRED with Bid copies (ARO) copies (ARAD) copies (ARO)
Notes

2.8 Welding Procedure (WPS)

2.9 Welding Procedures Qualification Record


(PQR)

2.10 Welder Qualification Record

2.11 Welding consumables certificates

2.12 Weld map

2.13 Non-destructive examination procedures


(NDE)

2.14 NDE reports

2.15 NDE operator qualifications

2.16 Test reports (all types)

2.17 Pressure test certificates

2.18 Material certificates

2.19 Inspection reports (on subvendors)

2.20 Expediting reports (on subvendors)

2.21 Site inspection data sheets/checklists

2.22 Painting/galvanizing inspection reports

2.23 Construction/installation quality control


plans

2.24 Equipment calibration certificates

2.25 API certificates

2.26 Certificates of conformity

2.27 Non-conformity reports (internal and


subvendor)

2.28 Audit reports (internal & subvendor)

2.29 Shipping releases

3.0 CIVIL

3.1 Civil design calculations

3.2 Concrete layout drawings

3.3 Piling layout drawings

3.4 Concrete detail drawings

3.5 Column loading drawings

3.6 Reinforcement detail drawings

3.7 Reinforcing bending schedules

3.8 Embedded items drawing/schedule

3.9 Dynamic analysis report


SHARIKET KAHRABA
SKIKDA.SPA Revision Page
No. Date

VENDOR DATA 2003-XX-XX G-6


REQUIREMENTS (VDR) LIST

TITLE OF PACKAGE:
PACKAGE NO: P XX-XXXX

WITHOUT
FOR REVIEW FINAL (CERTIFIED) REVIEW
Total
No. of No. of No. of No. of No. of No. of No. of
copies printed E-copy weeks printed E-copy weeks printed weeks
DRAWINGS & DATA REQUIRED with Bid copies (ARO) copies (ARAD) copies (ARO)
Notes

3.10 Civil specification

3.11 Calculations of quantities

3.12 Concrete compression test results

3.13 Reinforcing steel mill test reports

3.14 Compaction test results

3.15 Granular metric analysis

3.16 Asphalt sample test results

3.17 Drilling logs

3.18 Flow measurement

3.19 Topographical surveys

3.20 Engineering geometry surveys

4.0 STRUCTURAL

4.1 Design calculations

4.2 Layout drawings

4.3 Shop detail drawings

4.4 Bill of quantities

4.5 Expansion joint details

4.6 Foundation loadings

4.7 Foundation outline drawings

4.8 Permissible external loads

4.9 Raw material analysis/test/mill certificates

4.10 Data sheets on all materials

4.11 Shop pre-assembly details

4.12 Erection drawings

4.13 Corrosion protection spec.

4.14 Paint specification

5.0 MECHANICAL
5.1 Detailed technical specifications

5.2 Design calculations

5.3 Detailed equipment list

5.4 Equipment data sheets

5.5 General arrangement drawings

5.6 Assembly drawings and instructions


SHARIKET KAHRABA
SKIKDA.SPA Revision Page
No. Date

VENDOR DATA 2003-XX-XX G-7


REQUIREMENTS (VDR) LIST

TITLE OF PACKAGE:
PACKAGE NO: P XX-XXXX

WITHOUT
FOR REVIEW FINAL (CERTIFIED) REVIEW
Total
No. of No. of No. of No. of No. of No. of No. of
copies printed E-copy weeks printed E-copy weeks printed weeks
DRAWINGS & DATA REQUIRED with Bid copies (ARO) copies (ARAD) copies (ARO)
Notes
5.7 List & location of bearings and seals

5.8 Lubrication sheets (including frequency)

5.9 Equipment weights

5.10 Foundation loadings

5.11 Foundation outline drawings

5.12 Process flow diagram

5.13 Utilities flow diagrams

5.14 Certified utilities requirements

5.15 Rotating machinery performance and


operating curves
5.16 Noise and vibration data

5.17 Performance test procedures

5.18 Performance test certificates

5.19 Noise and vibration test certificates

5.20 Erection consumables list

5.21 List of special tools

5.22 Piping layouts

5.23 Piping isometrics

5.24 Raw material analysis/test/mill certificates

5.25 Radiographic test reports & certificates

5.26 Hydrostatic test results

5.27 Shop performance test results

6.0 ELECTRICAL
6.1 Design calculations

6.2 Detailed technical specification

6.3 Motor and equipment lists

6.4 List of bearings and seals

6.5 Electrical single line diagrams

6.6 Schematic and control diagrams

6.7 General arrangement drawings

6.8 Electric plant layout

6.9 Certified dimensional drawings

6.10 Electrical equipment weights

6.11 Foundation loadings

6.12 Foundation outline drawings

6.13 Equipment data sheets


SHARIKET KAHRABA
SKIKDA.SPA Revision Page
No. Date

VENDOR DATA 2003-XX-XX G-8


REQUIREMENTS (VDR) LIST

TITLE OF PACKAGE:
PACKAGE NO: P XX-XXXX

WITHOUT
FOR REVIEW FINAL (CERTIFIED) REVIEW
Total
No. of No. of No. of No. of No. of No. of No. of
copies printed E-copy weeks printed E-copy weeks printed weeks
DRAWINGS & DATA REQUIRED with Bid copies (ARO) copies (ARAD) copies (ARO)
Notes
6.14 Cable schedules and routing drawings

6.15 Bill of quantities

6.16 Motor/alternator performance and


operating curves
6.17 Noise and vibration data

6.18 Performance test procedures

6.19 Performance test certificates

6.20 Noise and vibration test certificates

6.21 Factory test reports and certificates (of


each)
6.22 Construction power supply requirements

6.23 Protection settings

6.24 Connection diagrams/lists

6.25 Material certificates

6.26 Motor data sheets

6.27 Nameplate drawings

7.0 INSTRUMENTATION & CONTROL


SYSTEMS
7.1 Detailed technical specification

7.2 Process and instrumentation diagram

7.3 Automation system configuration

7.4 Interconnection cabling block diagram

7.5 Control panel layouts

7.6 Instrument and control device lists

7.7 Instrument data sheets

7.8 Instrument calculation reports

7.9 Instrument calibration reports

7.10 I & C schematics

7.11 Instrument loop drawings

7.12 I & C wiring and connection diagrams

7.13 I & C cable list

7.14 Instrument location drawings

7.15 Certified dimensional drawings

7.16 Mounting details

7.17 Earthing details

7.18 Functional logic diagrams

7.19 User manual


SHARIKET KAHRABA
SKIKDA.SPA Revision Page
No. Date

VENDOR DATA 2003-XX-XX G-9


REQUIREMENTS (VDR) LIST

TITLE OF PACKAGE:
PACKAGE NO: P XX-XXXX

WITHOUT
FOR REVIEW FINAL (CERTIFIED) REVIEW
Total
No. of No. of No. of No. of No. of No. of No. of
copies printed E-copy weeks printed E-copy weeks printed weeks
DRAWINGS & DATA REQUIRED with Bid copies (ARO) copies (ARAD) copies (ARO)
Notes
7.20 Level 1 functional specification

7.21 Level 2 computer interface data table

7.22 PLC and operator interface

7.23 Shop test/platform test program

7.24 Shop test/platform test report

7.25 Demonstration software

7.26 Software lists

7.27 I/O schedules

8.0 ARCHITECTURAL
8.1 3D perspective

8.2 Detailed technical specification

8.3 Detailed working drawings and general


layout drawings
8.4 Room finish schedule

8.5 Interior & exterior color schedule

8.6 Door & frame schedule

8.7 Hardware list & keying schedule

8.8 Detailed equipment list

8.9 Equipment data sheets c/w make, model,


equipment no., part NOs, catalogue no.
8.10 Product data sheets

8.11 Detailed shop drawings & erection


drawings
8.12 Test reports & test certificates

8.13 List of special tools

8.14 Samples

8.15 Mock-ups

8.16 Progress photographs

8.17 Maintenance data & manuals

8.18 Maintenance materials

8.19 Warranties

8.20 Commissioning & start-up procedures,


check lists and punch list
8.21 Completion certificate

8.22 Certified as-built drawings, specifications,


equipment lists & parts lists
8.23 Permits

8.24 Training & certification

8.25 Spare parts list

Das könnte Ihnen auch gefallen