Chapter 1: Classification of ground reinforcement tecniques
3
Chapter 2: Steel pipe umbrella
4
Chapter 3: Design approach
5 References
3 Solutions
2
Tunnel ground reinforcement methods can be
classified on the basis of
3
2 Construction method
improvement
3
reinforcement
4 presupport
drainage
5
4
Injection (at low pressure)
5 Jet grouting
Freezing
REINFORCEMENT
2 Methods which use the insertion, inside the rock mass, of
structural elements with one prevalent dimention
5
Tunnel face reinforcement schemes
Highspeed railway between Bologna and Florence (Italy)
5
Tunnel face reinforcement schemes
Highspeed railway between Bologna and Florence (Italy)
5
Brossure CAVET
Pre-support
2 Methods which use the insertion, in the rock mass, of
structural elements ahead the tunnel face with the
purpose to create a pre-support before the excavation
3
4
Mechanical precut
Pretunnel
5 Steel pipe umbrella
Arch of microtunnels
(1/2)
4
Jet-grouting arch with or without reinforcement
Consolidation of the tunnel profile: injected and reinforced
5 with glass fiber elements
Injection around the tunnel (2/2)
4
Steel pipe umbrella
5 Jet grouting columns on the face
precut
2
DRAINAGE
2
5
Methods which guarantee the stability of local volumes
2
pressure
P0
5
displacement
3
linea di reazioneLINE
REACTION dei sostegni
OF THE SUPPORTS
4
REDUCTION OF THE DISPLACEMENT AT THE TUNNEL FACE
5 u0 * u
0
displacement
2 Methods which guarantee the stability of the free span and of the face
3
Face stabilization
5 lining
4
It is possible to cover advance lengths of 12-13m, of which 9-10m are
5 actual excavation, account being taken of the necessary overlap
between two sets of steel pipes to guarantee the stability of the face.
3
the convergence-confimement curve
5
Guarantee the stability of the tunnel free span
Steel pipe
2
3
head
4
bench
2
ur (mm) Without face reinforcement
TUNNEL FACE
REINFORCEMENT
3 With face reinforcement Reduces the radial
displacement of the tunnel
boundaries near the face
5 distanza
Distancedal fronte
from the di scavo
face [m](m)
4 -the total injection method: each pipe is injected using a packer placed at
the top of the pipe.
2
The execution of the umbrella arch required the
developments of special equipments capable of
3 performing all the consolidation of each umbrella in the
shortest possible time.
For this reason, equipments capable of operating in
4 confined space, quickly setting-up in the required
drilling position and also capable of assuring a very
high production rate have been designed.
5
3 It is important:
-to check that the steel arches and the pipes are in good
4 contact
5
Enlarged foot and underpinning of the steel arch
centina
Steel arch Tunnel face
fronte di scavo
3
d s g
4 q
a)
L=(d+s+g)
5 q
b)
L=(d+s+g)
2 DESIGN APPROACH
DESIGN VERSATILITY
3
Consider and
4
compare all the
To make the
technologies
design using
Compare the various which are
modern
options taking into availoable
procedure
account the long and
5 Use 3D models
shoret term stability
3
⇒High level of mechanization
⇒High flexibility to adapt the reinforcement ahead the tunnel
4 face at the geological conditions encountered during excavation
⇒Good control of boundaries displacement and face extrusion
⇒Good control of the subsidences
5
⇒Possibility of casting the invert, near the face