Sie sind auf Seite 1von 33

PRESENTATION OF THE COMPANY

CENTER FOR ENERGY EFFICIENCY


AND SUSTAINABLE DEVELOPMENT

CEEFOR L.T.D.

1
COMPANY PROFILE
FIELD OF EXPERTISE

• ENERGY EFFICIENCY
• RENEWABLE ENERGY SOURCES
(SOLAR, HYDRO, BIOMASS, BIOGAS, WIND)
• COGENERATION - CHP
• PROCESS OPTIMIZATION
• TRAINING
• TECHNICAL SUPPORT
• CONTACT BETWEEN INVESTORS AND BANKS

2
COMPANY PROFILE
ACTIVITIES/SERVICES

• DEVELOPMENT OF ENERGY AUDITS (SHORT,


PRELIMINARY, DETAILED AND HOLISTIC AUDITS) AND
EX – POST VERIFICATION
• DEVELOPMENT OF FEASIBILITY STUDIES FOR ENERGY
EFFICIENCY AND RENEWABLE ENERGY SOURCES
IMPROVEMENT
• DEVELOPMENT OF ALL KIND OF PROJECTS,
CONCEPTUAL DESIGNS, STUDIES AND FINANCIAL
ANALYSIS, PROJECTS TECHNICAL CONTROL
• CONSULTING AND ENGINEERING (OBTAINING ALL
CONDITIONS, PERMITS AND APPROVALS, CONTACTS
WITH SUPPLIERS OF EQUIPMENTS AND MATERIALS)
3
COMPANY PROFILE
TEAM

• CEEFOR TIM HAS 30 EXPERTS WITH LARGE


EXPERIENCE IN THE FIELDS OF RENEWABLE ENERGY
AND ENERGY EFFICIENCY

• STRUCTURE OF TEAM:
• MECHANICAL ENGINEERS
• ELECTRICAL ENGINEERS
• CIVIL ENGINEERS
• ARCHITECTURAL ENGINEERS
• TRAFFIC ENGINEERS
• FIRE PROTECTION ENGINEERS
• EKONOMICS AND FINANCIAL EXSPERTS
• PHILOLOGIST-INTERPRETERS
4
ENERGY AUDITS FOR INDUSTRIAL
COMPANIES

• DEVELOPED 34 ENERGY AUDITS FOR INDUSTRIAL


COMPANIES – PRELIMINARY AND HOLISTICS (IMLEK,
SOKO ŠTARK, KNJAZ MILOŠ, UNIMET, STANDARD
FURNITURE FACTORY SARAJEVO, KOTEKS VISCOFAN,
PROPULZIJA)

• DEVELOPED 10 DETAILED ENERGY AUDITS FOR


INDUSTRIAL COMPANIES (SWISSLION VRŠAC, SL
PRODUKT INĐIJA, TAKOVO GORNJI MILANOVAC,
NEOPLANTA, ADOC - TERMOVENT, SOKO ŠTARK,
JASMIL, KNJAZ MILOŠ, TOPLANA KOLUBARA)

5
DEVELOPMENT OF ENERGY AUDITS FOR
INDUSTRIAL COMPANIES – ACTIVITIES

• COLLECTION AND ANALYSIS OF DATA ON ENERGY CONSUMPTION


AND ENERGY COSTS (FOR THE LAST 3 YEARS)
• ANALYSIS AND CHARACTERISTICS OF THE TYPE AND VOLUME
PRODUCTION
• INSPECTION OF INDUSTRY FACILITIES AND SYSTEMS THAT USE
ENERGY WITH MEASURES
• DATA ANALYSIS AND DEFINITION OF POTENTIAL AND MEASURES
TO REDUCE ENERGY CONSUMPTION AND / OR COSTS OF ENERGY
• MAKING OF TECHNO-ECONOMIC ANALYSIS OF THE PROPOSED
MEASURES
• PREPARATION OF LIST WITH RANKED MEASURES TO REDUCE
ENERGY CONSUMPTION AND / OR COSTS OF ENERGY
• DESIGN OF PLANT ANALYSIS FINAL REPORT AND PROPOSING OF
MEASURES FOR ENERGY EFFICIENCY IMPROVEMENT
• DESIGN OF STUDIES, CONCEPTUAL DESIGNS AND PROJECTS
• RESULTS PRESENTATION TO THE MANAGMENT 6
OPTIMIZATION OF BOILER PLANT -
ANALYSIS OF EXHAUST GASES IN THE BOILER

7
STEAM BOILER
OPTIMIZATION OF BOILER PLANT -
ANALYSIS OF EXHAUST GASES

CONTENT ANALYSIS OF OXYGEN AND CONTENT ANALYSIS OF CARBON MONOXIDE


CARBON DIOXIDE IN FLUE GAS AND NITROGEN OXIDES IN FLUE GAS

8
EXHAUST GASES MEASURING IN THE
FURNACES

SMOKE CHANNEL AND POSITION CONVEYOR WITH PRODUCTS AND


OF MEASURING PLACE HOODS FOR AIR EXTRACTION

9
THERMOVISION ANALYSIS OF ENERGY
LOSSES IN THE ENVIRONMENT

BUILDING FACADES RECORDING WITH THERMOVISION CAMERA


10
THERMOVISION ANALYSIS OF ENERGY
LOSSES IN THE ENVIRONMENT

CONSUMERS OF ENERGY AND PIPELINE


11
RECORDING WITH THERMOVISION CAMERA
RECORDING OF THE ELECTRICITY
CONSUMPTION CHARACTERISTICS

COMPRESSED AIR MEASUREMENTS ON COMPRESSOR


12
ANALYSIS OF THE CURRENT LIGHTING SYSTEM
AND DEVELOPING OF CONCEPTUAL DESIGNS
AS SAVING ENERGY PROPOSED MEASURES

13
SOLAR ENERGY

• TWO PV PLANTS ON THE GROUND IN KLADOVO, POWER 2


MW – PERIOD BETWEEN 2011-2014 – PROJECT
DEVELOPMENT, OBTAINING OF ALL PERMITS, SUPERVISION
OF CONSTRUCTION, ORGANIZATION OF TECHNICAL
EXAMINATION

• DEVELOPMENT OF INVESTMENT-TECHNICAL
DOCUMENTATION FOR PV PLANT ON THE GROUND, POWER
9.9 MW FOR THE INVESTOR „JP EPS“ - DEVELOPMENT OF
PRE-FEASIBILITY STUDY WITH GENERAL PROJECT,
DEVELOPMENT OF FEASIBILITY STUDY WITH CONCEPTUAL
PROJECT, DEVELOPMENT OF CONCEPTUAL DESIGN FOR
OBTAINING LOCATION CONDITIONS AND DEVELOPMENT OF
14
PROJECT FOR BUILDING PERMIT – PERIOD 2016.
SOLAR ENERGY

• DEVELOPMENT OF INVESTMENT-TECHNICAL
DOCUMENTATION FOR PV PLANT ON THE IKEA STORE
ROOF IN BELGRADE, 340 kW FOR THE INVESTOR IKEA
SRBIJA (DETAILED DESIGN PROJECT (PROJECT FOR
EXECUTION OF WORKS) AND AS BUILT DESIGN)

• DEVELOPMENT OF 25 FEASIBILITY STUDIES, 14


CONCEPTUAL DESIGNS, 14 MAIN PROJECTS OR
PROJECTS FOR OBTAINING THE BUILDING PERMIT FOR
THE PV PLANTS ON THE ROOF IN SERBIA, TOTAL POWER
(FOR 14 OBJECTS) 3.259 MW – PERIOD 2015.
15
EXAMPLE OF GOOD PRACTICE
PV PLANTS IN KLADOVO,
INVESTOR SOLARIS ENERGY

PV PLANTS „SOLARIS 1“ AND „SOLARIS 2“


16
EXAMPLE OF GOOD PRACTICE
PV PLANT ON THE ROOF,
INVESTOR IKEA SRBIJA

MSE „IKEA“ 17
EXAMPLES OF GOOD PRACTICE
CHP AND GAS POWER PLANTS
INVESTOR NIS – GAZPROM NEFT

• PROJECT DEVELOPMENT, OBTAINING OF ALL


PERMITS, ORGANIZATION OF TECHNICAL
EXAMINATION FOR CHP AND GAS POWER PLANTS IN
SERBIA FOR INVESTOR NIS – GAZPROM NEFT

• ACTIVITIES INCLUDED JOBS FOR 6 POWER PLANTS AND


ONE POWER PLANT ADAPTATION / RECONSTRUCTION,
TOTAL POWER 8 MW

• LOCATIONS: MUNICIPALITIES - KANJIŽA, SRBOBRAN,


VELIKO GRADIŠTE

(PERIOD 2013 - 2015) 18


EXAMPLES OF GOOD PRACTICE
CHP AND GAS POWER PLANTS
INVESTOR NIS – GAZPROM NEFT

SS-I VELEBIT, KANJIŽA


2X995 kW CHP PLANTS AND
2X1000 kW GAS POWER PLANT 19
EXAMPLES OF GOOD PRACTICE
CHP AND GAS POWER PLANTS
INVESTOR NIS – GAZPROM NEFT

SGS SRBOBRAN 2X999 kW SOS SIRAKOVO, VELIKO GRADIŠTE


CHP PLANTS 2X1000 kW GAS POWER PLANT
20
EXAMPLES OF GOOD PRACTICE
CHP AND GAS POWER PLANTS
INVESTOR NIS – GAZPROM NEFT

GAS PLANT – INSIDE LOOK OF CHP CONTAINER

21
SMAL HYDRO POWER PLANTS

• DEVELOPED 14 FEASIBILITY STUDIES FOR SHPP IN


SERBIA AND REPUBLIC OF SRPSKA, TOTAL POWER 27
MW,
• DEVELOPED 4 CONCEPTUAL AND 4 MAIN PROJECTS
FOR SHPP IN SERBIA AND REPUBLIC OF SRPSKA,
TOTAL POWER 2.7 MW
• PROJECT REVISION FOR SHPP IN MONTENEGRO,
1 MW AND 375 kW IN SERBIA
• PARTICIPATION IN CONSTRUCTION OF 5 SHPP IN
SERBIA, TOTAL POWER 5.4 MW
• ACTIVITIES INCLUDED CONSULTING SERVICES,
TECHNICAL AND FINANCIAL ANALYSIS, PROJECT
DEVELOPMENT AND COMMUNICATION WITH
SUPPLIERS OF EQUIPMENTS AND MATERIALS 22
ECO-MOBILITY

• DEVELOPED 5 CONCEPTUAL PROJECTS FOR


INSTALLATION OF ELECTRIC CHARGERS FOR THE
ELECTRIC CARS

• ACTIVITIES INCLUDED CONSULTANCY SERVICES,


TECHNICAL AND FINANCIAL ANALYSIS, PROJECT
DESIGN AND COMMUNICATION WITH SUPPLIERS OF
EQUIPMENTS AND MATERIALS

23
ECO-MOBILITY

ELECTRICAL CHARGER - IKEA BELGRADE


24
ECO-MOBILITY

ELECTRICAL CHARGER - BMW CAR SALON ČUKARICA


25
ECO-MOBILITY

ELECTRICAL CHARGER - PROCREDIT BANK BELGRADE


26
ECO-MOBILITY

ELECTRICAL CHARGER - PUBLIC GARAGE „OBILIĆEV VENAC“


27
CONSULTING SERVICES
ENERGY EFFICIENCY

• OFFICIAL CONSULTANT OF INSTITUTIONS „GREEN


FOR GROWTH FUND“ AND ČAČANSKA BANK,
PERIOD 2011 - 2013

• DEVELOPMENT OF 22 VERIFICATION ENERGY


AUDITS, 3 HOLISTIC AUDITS AND 3 EX POST
VERIFICATION AUDITS

• VALUE OF CREDIT LINE WAS 5 MILLIONS EUR

28
CONSULTING SERVICES
ENERGY EFFICIENCY

• OFFICIAL CONSULTANT OF INSTITUTIONS „GREEN


FOR GROWTH FUND“ WITH IPC GMBH AND
PROCREDIT BANK, PERIOD 2015 - NOW

• DEVELOPMENT OF 4 HOLISTIC AUDITS, 1 TECHNICAL


DUE DILIGENCE FOR SHPP AND 3 TECHNICAL DUE
DILIGENCE FOR BIOGAS PLANTS

• VALUE OF CREDIT LINE WAS 10 MILLIONS EUR

29
CONSULTING SERVICES
ENERGY EFFICIENCY

• OFFICIAL CONSULTANT OF INSTITUTIONS KFW BANK


AND PROCREDIT BANK, SINCE 2011

• DEVELOPMENT OF 18 VERIFICATION ENERGY AUDITS,


12 EX POST VERIFICATION AUDITS AND 5 DUE –
DILIGENCE REPORT

• VALUE OF CREDIT LINE WAS 10 MILLIONS EUR

30
CONSULTING SERVICES
ENERGY EFFICIENCY
• TECHNICAL DUE DILIGENCE FOR THE BIOMASS PLANT IN
KRUŠEVAC FOR THE PRODUCTION OF ELECTRICITY AND
HEAT ENERGY (CHP), CAPACITY 4.8 MWe / 20 MWth
FOR THE CLIENT „BUILDING ENERGY 1“ Ltd KRUŠEVAC
WITH THE COMPANY PROTOS, ITALY, PERIOD 2017

• PRE-FEASIBILITY STUDY FOR THE BIOGAS PLANT 999 kW


FOR THE INVESTOR „MAX AGRAR“, STARA PAZOVA,
PERIOD 2015

• MAIN MECHANICAL PROJECT FOR THE


RECONSTRUCTION AND UPGRADING OF THE PART OF
BIOGAS PLANT FOR THE INVESTOR PKB, KOVILOVO,
PERIOD 2012 31
CONTACT INFORMATIONS

Adress: Bulevar Oslobođenja 103/3


11010 Belgrade, Serbia
tel/fax: + 381 11 40 63 160

Nevena Đukić, - MA, philologist - Director


Tel. +381 11 77 04 566
E-mail: info@ceefor.co.rs

Miloš Kostić , mechanical engineer - Coordinator


Tel. +381 64 111 6887
E-mail: milos.kostic@ceefor.co.rs

www.ceefor.co.rs, info@ceefor.co.rs 32
THANK YOU FOR YOUR
ATTENTION!

QUESTIONS?

33

Das könnte Ihnen auch gefallen