15 January 2015
OFFICE ORDER
Attention of RO/BOs is drawn towards Cl.10.1 of DGO(404) whereupon it was informed that the
structure of Product Manual was under consideration.
The structure of Product Manual has now been approved by Competent Authority and is available at
Annexure-A. The format is to be used by custodian BOs in preparing the Product Manuals.
A typical Product Manual based on the structure of the format approved by the Competent Authority
for Transformers as per IS 1180 (Part 1) has been drafted by CMD-II and enclosed at Annexure-B for
perusal and guidance of RO/BOs (the same however needs to be modified by the Custodian BO and
approval sought as per the office order).
It has further been decided that all Product Manuals (under preparation/already prepared) shall be re-
structured using format given under Annexure-A and finalized after following the procedure given in
DGO(404). The responsibility for preparation of Product Manual for new products under certification
shall be done as per DGO(404). As and when the software is made operational by ITS, necessary
inputs should be done in the software by the Custodian BOs.
All Product Manuals for existing products under Certification Marks scheme are to be hosted on
Intranet/Website latest by 30 June 2015. The responsibility adhering to the deadline shall lie with
custodian BO and this should be monitored by PCO of the Region. RO is requested to forward the
BO-wise list of IO assigned the responsibility of preparation of product Manual by 20 Jan 2015. Any
difficulty encountered shall be brought to the notice of concerned DDGR. A compliance report in this
regard shall be sent to CMD-II by the concerned PCO(ROs) on 01 July 2015.
Sd/- 15 01 2015
(V.K. Diundi )
Sc.F & Head
Ref.:CMD-II(L)/7
2. PCO(RO)s
TITLE:
IS NO:
No. of Amendments:
Custodian BO:
Date of Issue:
The use of Standard Mark is governed by the provisions of the Bureau of Indian Standards
Act, 1986 and the Rules and Regulations made thereunder. The details of conditions under
which the licence for the use of the Standard Mark may be granted to manufactures or
producers may be obtained from the Bureau of Indian Standards.
This Product Manual document is provided for informational purposes and should be used
for reference purposes only. The document may be used by prospective applicants desirous
of obtaining BIS certification licence. This Product Manual shall also be used as reference
material by all Regional / Branch Offices & licensees to ensure coherence of practice and
transparency in operation of BIS certification licence.
1. Title of the latest Indian Standard, IS Number & Total number of Amendments
TITLE:
IS NO:
No. of Amendments:
2. LIST OF REFERRED STANDARDS
IS No. Title
3. INTRODUCTION
Objective:
This Product Manual on “Indian Standard IS 1180 (Pt1): 2014 - Outdoor Type Oil Immersed
Distribution Transformers Up to And Including 2 500 KVA, 33KV provides all important
information / elements needed for grant of a product certification licence and its continued
operation and can be used by prospective applicants desirous of obtaining BIS certification
licence. This Product Manual shall also be used as reference material by all Regional /
Branch Offices to ensure coherence of practice and transparency. This will also help in
having a uniform and transparent approach in processing of application for grant of licence
and its operation
The Product Manual will serve as an important guide for all stakeholders including licensees
& applicant desirous of obtaining BIS Certification licence.
General :
A brief description of the Indian Standard applicable for the product and other provisions of
relevance shall be indicated..
.
4. REQUIREMENTS OF THE STANDARD
Grade
Class
Rating
Variety
Size
Any other
GENERAL Tests
ROUTINE TESTS
TYPE TESTS
In case of food industries the hygienic conditions required as per the relevant clause of the
standard to be to be maintained by the firm shall be given.
5. GROUPING GUIDELINES
Note :
1. All Type/Grade / Class / Rating / variety as per Standard has to be covered
2. Any specific instruction (if any) shall be given in remark column e.g relaxation for covering less
stringent grade/variety / Size / thickness if more stringent grade / variety / higher / lower size /
thickness is drawn.
3. Justification shall be given for grouping the types/Grades / Class / Rating / variety / sizes
4. Intention shall be to draw less number of sample and cover maximum numbers of grade / variety / size
based on criteria of most stringiest.
5. Grade/Size/Class/variety other than specified in standards or non standard size (e.g- which may be
supplied as per mutual agreement between manufacturer and purchaser) shall not be endorsed in
licence and hence shall not form part of grouping guideline.
A description of what should be in a typical licence document shall also be clearly spelt out.
Specimen contents of a typical licence documents shall be given.
Sizes
Any other aspect
required as per the
Standard
As per IS-----
7. Infrastructure for Production
A typical list of manufacturing machinery and equipment is given below for guidance as a
minimum requirement. Alternative machinery may be used based on advancement of
technology by various manufacturers which may be built into this manual from time to time".
PROCESS 1
Sl No Description of Machinery Capacity Remarks
PROCESS 2
Sl No Description of Machinery Capacity Remarks
PROCESS -----
Sl No Description of Machinery Capacity Remarks
7.2 Manufacturing Process
Complete test facility for all the requirements covered under ‘Routine Tests’ shall be available with the firm. For other tests, test report
of conformity from BIS recognized/Group-2 category of laboratories as per the frequency of STI shall be produced by the licensee to BIS (where
in-house test facilities are not available for these tests and relaxation as given by BIS).
A typical list of test equipment is given below for guidance as a minimum requirement. Alternative test equipment may be used based on
advancement of technology which may be built into this manual from time to time based on revision / amendment in Indian Standard.
Requirement Clause of Frequency Importance Test Least Count & Frequency of Approx Cost of test In-house arrangement
Standard per Control of test Equipment Range Calibration equipment Or
Unit requirement Outside Laboratory
General Requirements
Routine Test
Type Test
The control unit shall be defined depending upon the type of process. This shall be suitably
defined for level of controls to be exercised for the production.
10. TEST RECORDS TO BE MAINTAINED BY FIRM
Format I
Date of Control Quantity Quantity Parameter Parameter Parameter Parameter Parameter Parameter Parameter Parameter Parameter
manufacture Unit Under the marked x1 x2 x3 x4 x5 x6 x7 x8 xn
Control Unit with Frequency Frequency Frequency Frequency Frequency Frequency Frequency Frequency Frequency
Standard
Test result Test result Test result Test result Test result Test result Test result Test result Test result
Mark
Other Parameters
S.No Batch No & Date Total Quantity Total Quantity Quantity found Segregation / Dispatch details
of Manufacture Manufactured Marked under Non conforming Disposal of Non
under the the Control Conforming
Control Unit Unit product
Sl Date of Name Source In case ISI marked In case Testing done from In case Non ISI Results Remarks
No receipt of the raw material -No of Outside Laboratory raw material &
Raw the corresponding IS accompanied by
Material Number & Licence No Test Certificate-
Test Certificate
No & Date
Name of Sample TR No &
Lab sent On date
Format 4 RAW MATERIAL (In house Testing)
Marking & labeling shall be defined as per the requirement of standard and Scheme
of Testing & Inspection.
GENERAL
Clause Requirement Periodicity of testing the requirement in Independent Testing
ROUTINE TEST
Clause Requirement
TYPE TESTS: To be carried out at the first instance and whenever there is any change in design
Clause Requirement
In cases where licences are being operated based on factory testing only, guidelines to be
provided .
19 MARKING FEE#
Unit
Unit rate
Marking Fee (Minimum) Large scale
Marking Fee (Minimum) Small scale
MF Rates effective from
20.2 TEST(S) TO BE CARRIED OUT DURING ROM VISIT – All requirements as far possible
and requirements which has failed.
20.3 TEST REPORT PERFORMA (To be linked with test report format of T &C)
Custodian BO:
Date of Issue:
The use of Standard Mark is governed by the provisions of the Bureau of Indian Standards
Act, 1986 and the Rules and Regulations made thereunder. The details of conditions under
which the licence for the use of the Standard Mark may be granted to manufactures or
producers may be obtained from the Bureau of Indian Standards.
This Product Manual document is provided for informational purposes and should be used
for reference purposes only. The document may be used by prospective applicants desirous
of obtaining BIS certification licence. This Product Manual shall also be used as reference
material by all Regional / Branch Offices & licensees to ensure coherence of practice and
transparency in operation of BIS certification licence.
1. Title of the latest Indian Standard, IS Number & Total number of Amendments
IS No. Title
191: 2007 Copper
335 : 1993 New insulating oils
554 : 1999 Pipe Threads Where Pressure-Tight Joints are Made on the Threads -
Dimensions, Tolerances and Designation
1576 : 1992 Solid pressboard for electrical purpose
1608 : 2005 Mechanical testing of metals – tensile Testing
1747 : 1972 Nitrogen
1885 (Part 38) : 1993 Electrotechnical vocabulary: Part 38 Power transformers and reactors
1897 : 2008 Copper strip for electrical purpose
(Part 3/Sec 1) : 1984 Specifications for individual materials, Section 1 General purposes
electrical paper
(Part 3/ Sec 3) : 1984 Specifications for individual materials, Section 3 Crepe paper
(Part 3/ Sec 5) :1985 Specifications for individual materials, Section 5 Special papers
11149 : 1984 Specification for rubber gaskets
12444 : 1988 Continuously cast and rolled electrolytic copper wire rods for electrical
Conductors
13730(Part 0/Sec 3) : Specification for particular types of winding wires: General
2012 requirements Section 3: Enameled round copper wire
( Part 17) : 1996 Polyvinyl acetal enameled rectangular copper wire, Class 105
(Part 27) : 1996 Paper covered rectangular copper wire
16081 : 2013 Insulating liquids - Specification for unused synthetic organic esters for
electrical purposes
3. INTRODUCTION
Objective:
This Product Manual on “Indian Standard IS 1180 (Pt1): 2014 - Outdoor Type Oil Immersed
Distribution Transformers Up to And Including 2 500 KVA, 33KV provides all important
information / elements needed for grant of a product certification licence and its continued
operation and can be used by prospective applicants desirous of obtaining BIS certification
licence. This Product Manual shall also be used as reference material by all Regional /
Branch Offices to ensure coherence of practice and transparency. This will also help in
having a uniform and transparent approach in processing of application for grant of licence
and its operation
The Product Manual will serve as an important guide for all stakeholders including licensees
& applicant desirous of obtaining BIS Certification licence.
General :
Transformers are the crucial and key power system equipments in the electricity distribution
network. The reduction in total load loss and constant no-load electrical loss assume
importance, considering the fact that total number of distribution transformers in the
electricity network is quite large and these equipments are constantly under operation. Apart
from this energy conservation aspect, another critical facet is the reliability of the equipment
in ensuring uninterrupted power supply. Thus, the longevity of the distribution transformer is
quite an important attribute to realise the goal of having a reliable power system network.
Distribution Transformer Industry in the country has progressed a lot over the years. In view
of the importance of conservation of energy, minimum energy performance standards for
distribution transformers right up to 2500 KVA 3 phase ratings as well as single phase high
voltage distribution transformers up to 25 kVA has been specified in certain regulation.
Indian Standard IS 1180 (Pt1): 2014 - Outdoor Type Oil Immersed Distribution
Transformers Up to And Including 2 500 KVA, 33KV — Specification specifies the
requirements and tests which include standard loss levels of mineral oil immersed, natural
air-cooled, outdoor type, and double wound distribution transformers for use in power
distribution systems with nominal system voltages up to and including 33 kV and of
following types and ratings:
a) Three phase ratings up to and including 200 KVA both non-sealed type and sealed
type.
b) Three phase ratings higher than 200 KVA, up to and including 2 500 KVA both non-
sealed type and sealed type.
.
4. REQUIREMENTS OF THE STANDARD
Three Phase Sealed Type and Up to and including 11 kV 250, 315, 400, 500, 630,1000,
Non sealed type (above 200 1250, 1600, 2000 and 2500
kVA up to and including Above 11 kV &Up to & including 22 kV 250, 315, 400, 500, 630, 1000,
2500kVA) 1250, 1600, 2000, and 2500
Above 22 kV & Up to & including 33 kV 250, 315, 400, 500, 630, 1000,
1250, 1600, 2000, and 2500
Single phase transformer 11kV 5, 10, 16 and 25
(Sealed Type)
22kV 10, 16 and 25
33kV 16 and 25
Note 1: Rated Basic Insulation Level shall be as per Table 2, 5 & 8 of IS 1180 (Part 1)
Note2: Maximum Total Losses up to 11KV Class Transformer shall be as per Table 3, 6 and
9 of of IS 1180 (Part 1)
4.2 Clause Wise Requirements
4.2.1 Clause Wise Requirements Three Phase Sealed Type and Non sealed type (up to
and including 200kVA)
4.2.2 Clause Wise Requirements Three Phase Sealed Type and Non sealed type (above 200
kVA up to and including 2500kVA)
5. GROUPING GUIDELINES
Nominal System
Voltage
kVA Ratings All kVA ratings to mentioned individually as per the standard
Energy Efficiency
Levels
A typical list of manufacturing machinery and equipment is given below for guidance as a
minimum requirement. Alternative machinery may be used based on advancement of
technology by various manufacturers which may be built into this manual from time to time".
PROCESS 1
Sl No Description of Machinery Capacity Remarks
PROCESS 2
Sl No Description of Machinery Capacity Remarks
PROCESS -----
Sl No Description of Machinery Capacity Remarks
7.2 Manufacturing Process
The major raw material is CRGO Steel used for manufacturing the Core of the transformer.
The LV and HV windings are prepared using coil winding machines. Insulations are cut into
different dimensions based on the design.
The HV and LV coils are placed on the limbs of the core. The assembly is then put into an
oven for removal of moisture – this process referred to as baking.
The tank of the transformer is fabricated on the basis of the design and the electrical and
mechanical stress it has to withstand. This tank is shot blasted and primer coated. Mineral oils
used in the transformer are centrifuged- which is generally termed as oil filtration.
The assembled core with the windings on its limbs is placed in the transformer tank, the
process which is called as ‘tanking’ or ‘box-up’. Then, the transformer is tested to verify its
compliance to the requirements. Oil leakage test is also performed to ensure no-leakage of the
mineral oil from any of the joints.
GURANTEED TECHNICAL
PARAMETERS
DESIGN OF
TRANSFORMER
LV WINDING HV WINDING
PROCESSING
AND BAKING
TESTING
LEAKAGE
TEST
PAINTING
DESPATCH
8. Infrastructure for Testing
Complete test facility for all the requirements covered under ‘Routine Tests’ shall be available with the firm. For other tests, test report
of conformity from BIS recognized/Group-2 category of laboratories as per the frequency of STI shall be produced by the licensee to BIS (where
in-house test facilities are not available for these tests and relaxation as given by BIS).
A typical list of test equipment is given below for guidance as a minimum requirement. Alternative test equipment may be used based on
advancement of technology which may be built into this manual from time to time based on revision / amendment in Indian Standard.
Requirement Clause of Frequency Importance Test Least Count & Frequency of Approx Cost of test In-house arrangement
Standard per Control of test Equipment Range Calibration equipment Or
Unit requirement Outside Laboratory
General Requirements
Routine Test
Measurement 21.2 a) Each Performance Digital µ- 1µΩ, 199 µΩ -
of winding transformer requirement ohm meter 19.99KΩ
resistance IS Kelvin 0.002mΩ, 0-
2026 (Part 1). Bridge 11Ω
Wheatston 0.001Ω, 0-
e Bridge 106Ω
Measurement of 21.2 b) Each Compatibilit Transform 0.01%,
voltage ratio transformer y and er Ratio 0.9-900
and check of Meter
phase
displacement IS
2026 (Part 1).
Measurement of 21.2 c) Each Loss Current 5-10-25-50-
short-circuit 6.8 transformer Calculation Transform 100/5 A
impedance 7.8 er
(principal 8.8 Potential 2000-1800/
tapping, when Transform 600V
applicable) and er
load loss at 50 Portable 1W, 150-300-
percent and 100 Wattmeter 600V, 5-10A
percent load IS Portable
2026 (Part 1). AC 1/2/4V, 150-
Voltmeter 300-600V
Measurement of 21.2 d) Each To find out Current 5-10-25-50-
no-load loss and transformer the circuit transforme 100/5 A
current IS 2026 parameters r
(Part 1). Potential 2000-1800/
transforme 600V
r
Portable 1W, 150-300-
wattmeter 600V, 5-10A
Portable
AC 1/2/4V, 150-
voltmeter 300-600V
Frequenc
y meter 0.5Hz, 45-
Digital 55Hz
Power
Analyzer 600V/20A
Type Test
Control Unit : Control Unit : For the purpose of type tests, 50 transformers (of
identical design / construction and of same nominal system voltage
and rating) or part there of shall constitute one lot.
Format I
Date of Control Quantity Quantity Measurement Measurement of Measurement of Measurement Measurement Induced Separate- Pressure Test Oil Leakage
manufacture Unit Under the marked of Winding Voltage Ratio Short Circuit of no load of insulation overvoltage source Test
Control Unit with Resistance and check of Impedance loss and resistance withstand voltage
Phase (principal tapping, current test withstand
Standard
Displacement when applicable) test
Mark and load loss at 50
percent and 100
percent load
Each Each Each transformer Each Each Each Each Each Each
transformer transformer transformer transformer transformer transform transformer transformer
er
Test result Test result Test result Test result Test result Test result Test Test result Test result
result
Other Parameters
Date of Control Quantity Quantity Lightning Impulse Test Temperature rise test Short Circuit withstand Pressure Test
manufacture Unit Under the marked with test
Control Standard
Unit Mark One sample each of One sample from every lot of One sample each of One sample from every lot of
identical design / 50 transformers (of identical identical design / 50 transformers (of identical
construction and of same design/construction and of construction and of same design/ construction and of
nominal system voltage same nominal system voltage nominal system voltage same nominal system voltage
and rating once in five and rating) or part thereof. and rating once in five and rating) or part thereof.
years. years.
Test result Test result Test result Test result
Date of Control Quantity Quantity Permissible flux density and Minimum Construction of Painting of Conservator for non sealed
manufacture Unit Under the marked with over fluxing clearances in Air transformer tank Transformer type transformers
Control Standard Tank
One sample each of identical Each transformer Each transformer Each transformer Each transformer
Unit Mark
design/construction and of
same nominal system
voltage and rating once in
five years.
Test result Test result Test result Test result
Format 2
S.No Control Unit & Total Quantity Quantity found Segregation / Dispatch details
Date of Marked under Non conforming Disposal of Non
Manufacture the Control Conforming
Unit product
S.No Batch No & Date Total Quantity Total Quantity Quantity found Segregation / Dispatch details
of Manufacture Marked under Marked under Non conforming Disposal of Non
the Control Unit the Batch Conforming
product
Sl Date of Name Source In case ISI marked In case Testing done from In case Non ISI Results Remarks
No receipt of the raw material -No of Outside Laboratory raw material &
Raw the corresponding IS accompanied by
Material Number & Licence No Test Certificate-
Test Certificate
No & Date
Name of Sample TR No &
Lab sent On date
Format 4 RAW MATERIAL (In house Testing)
Rating Plate - Each transformer shall be provided with rating plate made of anodized
aluminium/stainless steel material securely fixed on the outer body, easily accessible,
showing the information given in Fig. 1 of IS 1180 (Pt1) for 3 phase transformers and Fig. 2
of IS 1180 (Pr1) for single phase transformers. The entries on the rating plate shall be
indelibly marked for example, by etching, engraving or stamping.
Terminal Marking Plate- Each transformer shall be provided with a terminal marking plate
in accordance with Fig. 3 to Fig. 5 of IS 1180 (Pt1) whichever is applicable.
Energy Efficiency Level -Each transformer shall also be clearly marked with its Energy
Efficiency Level rating
BIS Certification Mark- Each transformer shall also be clearly marked with and BIS
Certification Mark.
Document : Ref: CMD1(BD)/IS 1180 dated 27 Nov 2014 , Guidelines for Certification of
Outdoor Type Distribution Transformers as per IS 1180
IS 1180 (Part 1):2014 (Outdoor Type Oil Immersed Distribution Transformers Up to and
Including 2500kVA, 33kV – Specification Part 1 Mineral Oil Immersed) has been published,
amalgamating IS 1180 (Part 1):1989 and IS 1180 (Part 2):1989. This version of IS 1180 has come into
force with effect from 19.07.2014. All applications shall be recorded as per IS 1180 (Part 1):2014.
This revised ISS covers both sealed and non-sealed type distribution transformers up to 2500
kVA and nominal system voltage up to and including 33kV and also, single phase sealed type
distribution transformer up to 25 kVA rating and nominal system voltage up to and including 33kV.
Moreover, in this revised version, the distribution transformers have been grouped under three
different categories namely – ‘Energy Efficiency Level 1’, ‘Energy Efficiency Level 2’ and ‘Energy
Efficiency Level 3’ based on the maximum total loss.
Transformers are designed based on the Basic Insulation Level (BIL) consideration.
Accordingly, other parameters are also set for the transformer of a particular rating to achieve the
desired performance. Therefore, the existing guidelines have been reviewed and the following
guidelines have been proposed for certification of Outdoor Type Distribution Transformers as per IS
1180 (Part 1):2014.
Application for GOL as per IS 1180 (Part 1):2014 shall be processed as follows:
A Type of Tests
According to Cl.21 of IS 1180 (Part 1):2014, the tests on the transformers are classified into Routine
test, Type test and Special test as given below:
Change in flux density Change in current density and type Change in tank design
of winding material (Cu/Al)
Type of construction (core Change in type of connection Total loss and method of
type/shell type) (star/delta) & Vector Group cooling
The applicant is mandatorily required to have testing facilities in-house for all routine tests.
In-house testing facilities for type tests i.e. ‘Lightning Impulse Test’, ‘Short Circuit Test’,
‘Temperature Rise Test’ &’Permissible Flux Density & Overfluxing Test’, are desirable.
However, considering the facts of specialized nature of tests and costly testing equipments,
testing facilities of BIS recognized/Group-2 category of laboratories may be availed by the
applicant. Presently, CPRI (Bangalore and Bhopal) and ERDA (Vadodara) are having
complete testing facilities as informed by PP&C(T&C).
II. Conformity of Raw Material:
a. Compliance of CRGO Electrical Steel as per IS 3024(Clause 9.1 a) which is under compulsory
BIS certification shall be ensured through test certificate of supplier.
b. Compliance of Copper/Aluminium conductor (Clause 9.1 c) shall be ensured through a Test
Certificate from supplier or applicant firm getting the same tested from BIS
recognized/Group-2 category of laboratories.
c. Compliance of Kraft Paper (Cl. 9.1 d), Press Board (Cl. 9.1 e) and Gasket (Cl. 15.4) shall be
ensured through a Test Certificate from supplier.
d. Compliance of Transformer Oil (clause 10) as per IS 335 shall be ensured through a Test
Certificate from supplier/ISI Marked material with TC or applicant firm getting the same
tested from a BIS recognized lab.
e. Compliance of Bushings (clause 12) as per IS 2099 /7421 & relevant part of IS 3347 shall be
ensured through a Test Certificate from supplier or applicant firm getting the same tested from
BIS recognized/Group-2 category of laboratories.
b. For Single phase transformers, samples shall be drawn as per the following to cover
all the ratings:
Nominal System Voltage Standard Ratings
11kV One sample of highest rating
22kV -do-
33kV -do-
c. During Preliminary Inspection, one sample of highest rating, offered by the firm
shall be drawn to cover the entire range for which licence has been applied for, as per
the above table. The relevant drawings of the samples of transformer shall also be
collected and sent to the laboratory with the samples. Separate samples shall be drawn
for sealed and non-sealed type transformers, wherever applicable. The conformity
of the raw materials as per the requirements of the relevant standards shall be verified
while drawl of samples.
d. All tests shall be carried out at BIS recognized/Group-2 category of laboratories. The
licence shall be granted once the product passes in both the type tests and the routine
tests as indicated above.
e. If transformers with higher energy efficiency level is drawn for testing and found
passing, the scope of licence shall also cover transformers with lower energy
efficiency levels, as specified in the ISS.
f. The energy efficiency levels shall be clearly indicated in the licence document.
1. While operation of licence, surveillance inspections shall be carried out as per the renewal
policy of the BIS licensees. During each such surveillance inspection, sample shall be drawn
for independent testing at BIS recognized/Group-2 category of laboratories for all parameters
under Routine Tests. The licensee shall inform BIS its production schedule in advance for
timely planning of surveillance inspection.
2. The requirements of Type Tests shall also be carried out, periodically, from a BIS
recognized/Group-2 category of laboratories. (The frequency of type test is to be decided in
consultation with Ministry of Power.)
3. For inclusion of new rating of the transformer, licensee shall submit a complete test report
indicating conformity of the product from BIS recognized/Group-2 category of laboratories,
along with the certified drawings and technical parameters. The scope of licence shall be
extended to cover all the ratings, up to the highest rating tested so far, in the group as
mentioned in the above tables, without any further type test/ routine test. However, when the
highest rating is to be certified, the procedure as specified in III (c)/(e) above shall be fulfilled.
These tests shall be valid for a period as stated above.
4. For Market Samples, any one of the following may be adopted, in consultation with Ministry
of Power:
a. Buyers (Electricity Utilities) to send samples directly to BIS recognized laboratory
for testing
b. BIS recognized Laboratory can draw samples on behalf of the Electricity Utilities and
get them tested
c. BIS can draw samples as per the current practice prevailing in case of other products
Document : Ref: CMD1(BD)/IS 1180 dated 27 Nov 2014 , Guidelines for Certification of Outdoor
Type Distribution Transformers as per IS 1180
GENERAL
Clause Requirement Periodicity of testing the requirement in Independent Testing
6.9.1 & Permissible flux density and over
6.9.2 fluxing
7.9.1 & All requirements for every sample drawn for independent testing
7.9.2
8.9.1 &
8.9.2
11 Minimum clearances in Air
15.1 Construction of transformer tank
15.5 Painting of Transformer Tank
16 Conservator for non sealed type
transformers
ROUTINE TEST
Clause Requirement
21.2 a) Measurement of Winding
Resistance
21.2 b) Measurement of Voltage Ratio All requirements for every sample drawn for independent testing
and check of Phase
Displacement
21.2 c) Measurement of Short Circuit
6.8 Impedance (principal tapping,
7.8 when applicable) and load loss
8.8 at 50 percent and 100 percent
load
21.2 d) Measurement of no load loss
and current
21.2 e) Measurement of insulation
resistance
21.2 f) Induced overvoltage withstand
test
21.2 g) Separate source voltage
withstand test
15.2 & 21.2 h) Pressure test
15.2 & 21.2 j) Oil Leakage test
TYPE TESTS: To be carried out at the first instance and whenever there is any change in design
Clause Requirement
21.3 a) Lightning Impulse Test Once in five years or and whenever there is any change in
design
21.3 b) 6.10 Temperature rise test Every sample drawn for independent testing
7.10, 8.10
21.3 c) Short Circuit withstand test Once in five years or and whenever there is any change in
design
21.3 d) Pressure Test Every sample drawn for independent testing
NA
17. GUIDELINES TO ENSURE CONFORMITY OF RAW MATERIAL DURING GRANT
OF LICENCE
Document : Ref: CMD1(BD)/IS 1180 dated 27 Nov 2014 , Guidelines for Certification of Outdoor
Type Distribution Transformers as per IS 1180
Document : Ref: CMD1(BD)/IS 1180 dated 27 Nov 2014 , Guidelines for Certification of Outdoor
Type Distribution Transformers as per IS 1180
19 MARKING FEE#
201.2 TEST(S) TO BE CARRIED OUT DURING ROM VISIT – All requirements as far
possible and requirements which has failed.
20.3 TEST REPORT PERFORMA (To be linked with test report format of T &C)
(attached)
Draft
Doc: STI 1180 (Part 1)
2.0 TEST RECORDS: All records of tests and analysis shall be kept in suitable formats
2.1 Copies of any records or connected papers that may be required by BIS shall be made available at
any time on request.
2.2 For all stages of manufacture, the factory shall maintain appropriate controls and checks to ensure
that their product conforms to the various requirements of the Standard
3.0 QUALITY CONTROL: It is recommended that, as far as possible, Statistical Quality Control
(SQC) methods may be used for controlling the quality of the product during production as envisaged
in this Scheme. See IS 397(Part 1), IS397(Part 2), IS 397(Part 3) and IS 397(Part 4)].
3.1 In addition, efforts should be made to gradually introduce Quality Management System in
accordance with IS/ISO 9001.
4.0 CALIBRATION: Testing instruments/equipments shall be carried out periodically from NABL
accredited calibration laboratories wherever they are available in the same city. In case where such
laboratories are not available, traceability to a National Measurement System (NPL) to be ensured. All
records of such calibrations to be kept.
5.0 STANDARD MARK: The standard mark as given in column 1 of the First Schedule of the
license shall be applied clearly and indelibly by stencilling/screen or ink jet
printing/embossing/etching/engraving on the rating plate, provided that the distribution transformers
conform to specified requirements of the Indian Standard.
5.1 RATING PLATE : The rating plate shall be according to Clause 13 of IS 1180(Part 1):2014 and
shall be fitted in a visible position.
5.2 MARKING: In addition, the BIS Certification Mark Licence No. (CM/L XXXXXXX) shall be
clearly and indelibly marked on the rating plate:
5.3 TERMINAL MARKING PLATE: Each transformer to be provided with a terminal marking
plate as per Clause 13.2 of IS 1180 (Part 1):2014
6.0 LEVELS OF CONTROL: The tests, as indicated in Table 1 and at the levels of control specified
therein, shall be carried out on the whole production of the factory which is covered by this Scheme
and appropriate records and charts maintained in accordance with paragraph 2.0 above.
6.1.1 Each transformer when tested shall pass the routine tests. If a transformer fails in any one or
more of the requirements it shall be unfit for the purpose of marking.
6.1.1.1 The transformer rejected in 6.1.1 may however, be suitably repaired and the defects rectified.
Such repaired transformers when tested again shall conform to all the routine tests.
6.2 For the purpose of type tests (Table 1), 50 transformers (of identical design/construction and of
same nominal system voltage and rating) or part there of shall constitute one lot.
6.3 In respect of all other clauses of the Indian Standard, appropriate control and checks to be
maintained in order to ensure that the product conforms to the various requirements of the Indian
Standard.
6.4 All the production which conforms to the Indian Standard and covered by this License shall be
marked with the Standard Mark.
7.0 REJECTION: A separate record shall be maintained giving information relating to the rejection
of products which do not conform to the Indian Standard and the method of their disposal. Such
products shall in no case be stored together with those conforming to the Indian Standard.
8.0 SAMPLES: The licensee shall supply free of charge, the sample or samples required in
accordance with Bureau of Indian Standards (Certification ) Regulation, from his factory or godown.
BIS shall pay for the samples taken by it from the open market.
9.0 REPLACEMENT: Whenever a complaint is received soon after the product with Standard Mark
have been purchased and used, and if there is adequate evidence that the product has not been
misused, defective product shall be replaced or repaired free of cost by the licensee in case the
complaint is proved to be genuine and the warranty period (where applicable) has not expired. The
final authority to judge conformity of the product to the Indian Standard shall be with BIS. The firm
shall have own complaint investigation system as per IS/ISO 10002
9.1 In the event of any damages caused by the product bearing the Standard Mark, or claim being filed
by the consumers against BIS Standard Mark and “ not conforming” to the relevant Indian Standard,
entire liability arising out of such non conforming product shall be of the licensee and BIS shall not in
any way be responsible in such cases
10.0 STOP MARKING: The marking of the product shall be stopped under intimation to BIS, if at
any time, there is some difficulty in maintaining the conformity of the product to the Standard, or the
testing equipment goes out of order. The marking may be resumed as soon as the defects are removed
under intimation to BIS.
The marking of the product shall be stopped immediately if directed by BIS for any reason.
The markingmay then be resumed only after permission by BIS. The information regarding
resumption of marking shallalso be sent to BIS.
11.0 PRODUCTION DATA: The licensee shall send to BIS as per the enclosed Proforma-1
authenticated by a Chartered Accountant, a statement of quantity produced, marked and exported by
them and the trade value thereof at the end of each operative year of the license.
PROFORMA - 1
PROFORMA FOR YEARLY PRODUCTION DETAILS
Period covered *
Name of Licensee
CM/L No.
Grade/Type/Size
1.1 Brand/Trade/Name(s) of BIS Certification Marked Products
3. Production covered with BIS Certification Mark and its approximate value
a) Quantity
b) Invoice sale price
3.1 Brand Name used on production covered under BIS Certification Mark
3.2 Calculation of marking fee on unit rate basis: Marking Fee per unit
a) Unit
b) Quantity covered with BIS Certification Mark
------------------------------------------------------------------------------------------------------------
*Information to be filled up by BO before forwarding to the licensee.
Note : In case a clause is not applicable, suitable remarks may be given against it.
c) Marking fee rounded off in whole rupees as obtained by applying unit rates given in
(a) on quantity given in (b)
4. Quantity not covered with BIS Certification Mark. If any, and the reasons for such non-
coverage
4.1 Brand Name under which non-certified goods were sold
5.0 Quantity Exported with BIS Standard Mark and its value
5.1 Brand Name under which BIS Certified goods are exported