Sie sind auf Seite 1von 9

QUIZ MODULE 1: BASIC CONCEPTS IN QUALITY AND TQM

These questions cover Sessions 1, 2, 5, 6, 7.

The correct answer is shown in bold

A fundamental attribute of TQM is Process capability =1 indicates that

• Drawing control charts • Suppliers can be trusted


• Having team meetings • Workers are motivated
• Top management's direct • Process is in control
involvement • There are no random variations
• Meeting ISO 9000 audit • Some fraction of production is
• All of the above outside specs

Drawing control charts requires SPC helps determine

• Calculation of statistics from • If assignable causes are


data disturbing the process
• Adjusting the machines • If vendor performance is falling
• Teamwork training of workers • If customers are happy
• Top management involvement • If customers are motivated
• Meetings with suppliers • If top management is involved

Inspection assures that Vision states

• The process is in control • Where the workers want to go


• Workers are motivated after work
• Product meets specification • Whether we should use SPC
• Quality problems are solved • Whether we should use
• Supplier quality is acceptable inspection
• Where the company wants to
be in the long run
A control chart displays • That customers are the boss

• Whether workers are motivated


• Top management takes interest Quality is wanting generally because
in quality
• Inspectors are doing their job • Workers lack team spirit
• Process variability • No competition exists
• Process capability • People don’t know statistics

1
A stakeholder is generally An assignable cause is generally
known to
• Someone who manages the
company • Vendors
• People who run the company's • Top management
payroll • Product designer
• Interested in the success of • Workers
the enterprise • Customers
• Only the customer
• Only the vendor
Flow charts indicate

Systematic problem solving requires • Causes of process variation


• The kind of forms to fill out
• Motivating the worker • Who reports to whom
• Defining the problem to be • How inputs get processed into
solved outputs
• Drawing control charts • How samples are rejected
• Keeping management informed
• Keeping tab on the
environmental impact A sampling plan helps in

• Keeping the process in control


ISO 9000 determines • Keeping workers motivated
• Tuning the machines
• If the company practices its • Adjusting ovens in the kitchen
written procedures • Rejecting lots that are of
• If vendors are performing well unacceptable quality
• Process capability
• The kind of control chart to be
used Process Diagnosis determines
• Random causes of variation
• If the workers are doing their job
• The possible cause of a failure
An example of a random cause is • If control charts are in control
• When top management should
• Absenteeism talk to vendors
• Shortage of material supplies • If vendors are motivated
• Photocopy machine failure
• Small vibrations in the
equipment
• Word Processor not having
Spellchecker

2
Team orientation means Benchmarking determines

• Workers having lunch with their • Customer requirements


families • Process capability
• Workers getting daily briefing • How company is doing relative
• Working collectively toward a to others
common goal • Getting ISO 9000 audit done
• Cooperation with government • If management is motivated
regulators
• ISO 9000 orientation meetings
Control charts help in

Creativity requires • Reaching six sigma


• Rejecting parts supplied by
• Control charts vendors
• Complete knowledge of vendor's • Keeping workers motivated
capability • Deciding when to investigate
• Managing the quality of ideas the process
generated • Zero defect production
• Facilitation
• Physical exercise
Seven tools include

Problem identification requires • Team meetings


• Management meeting regularly
• Flow charting the process with workers
• Monitoring customer complaints • Workers' toolkit
• Knowing how to draw control • Histogram
charts • All above
• Team meetings
• Maintaining clean cafeterias
A Pareto chart shows

Problem solving begins with • That the process is in control


• The vital few from the trivial
• Team discussions many
• SPC • Process capability
• Design of experiments • A line drawn as production
• Problem identification proceeds
• Punching time clock • Fraction defective

3
Individuals who have no role in Efficiency means
quality management
• There are no defects in the
• Teachers in universities output
• Government regulators • Process is capable
• Workers • Cost of quality is low
• ISO 9000 trainers • Resources are made the most
• Vendors of
• Workers arrive on time

Quality management requires


The case of waiting too long at the
• ISO 9000 certification elevator is
• Workers not working overtime
• Printing promotional brochures • A well-structured problem
• Keeping internal customers • A candidate for control charts
satisfied • Indication of timely arrival at
• Keeping oil off the floor work
• Ignoring external customers
• None of the above
A problem definition should include

• A control chart The difference between


• Names of members of the team manufacturing and service is
• What the problem is and what
it is not • Nonexistent
• Who was operating the machine • Products cannot be inventoried
that day • Service can't be backordered
• Ideas to solve the problem • Production is instantaneous
• Service is consumed as
produced
The role of R&D is
Service quality cannot be managed
• To improve working conditions in when
the lab
• To keep top management • No vendors are involved
informed of competition • Customer expectations are not
• To regularly study control charts known
• To determine how processes • Workers don't meet regularly
work with management
• To keep the company competitive • Consultants are not consulted
• Histogram cannot be drawn

4
Accuracy can be improved by TQM does not imply

• Use of Xbar charts • Strong external customer


• Team meetings orientation
• TQM principles • Partnership with vendors
• Management talking to workers • Meticulously re-stocking
• Customer visits defective products
• Training
• Team meetings
Design of Experiments implies

• Good instruments used in the lab Precision in production means


• Team meetings in product trials
• A method to find factor effects • Workers are well-trained
• Aesthetic quality of products • Hi-tech equipment is used
• Careful recording of data • Instruments are kept clean
• Parts produced have little or
no variation
Cause-effect diagram is used in • Shop uses control charts

• Problem identification
• Field visits Accuracy implies
• Vendor surveys
• Problem analysis • We know customer targets
• Negotiating with unions • Computerized machines
• Average performance is on
target
Cost of quality is really • All products are of same size

• A way to prioritize actions


• Cost of production Six sigma is
• Cost of sales
• Cost of high-quality products • Latest Japanese Quality Theory
• An accounting jargon • A BMW
• Cpk = 2.0

The Baldrige Award is


The American model for TQM is
• A ISO 9000 requirement
• An indication of SPC being used • ISO 9000
• Indication of no competition • ISO 14000
• Indication that TQM programs • The Baldrige Award criteria
are effective • Use of control charts
• All of the above • Use of quality circles in the shop

5
Six Sigma implies Process Flow Charts help explain

• A statistical method • Process steps and their


• A trouble-shooting method relationship
• Teams are effective • Cost of quality
• 3 defects per million in output • A clause in ISO 9000
• All above • Customer complaints
• Assignable causes

A service cannot be
Quality control does not apply to
• Stored
• Inspected • Drawing flow charts
• Targeted • Drawing control charts
• Appraised • Driving
• Flowcharted • Idea generation
• PTA meetings

SPC implies
Strategy implies
• Statistical process control
• Use of control charts • What level of quality the
• Fixing assignable causes customers want
• Sometimes leaving the process • What the company has to do to
alone reach its vision
• All above • How competitive we are
• Practices on the shop floor
A Stable Process has • Workers can talk to management

• No defects in output
• 3 ppm output QFD is the way to
• Good control on vendors
• Motivated workers • Fix typing errors
• No variation with time in • Fix sampling plans
output • Conduct quality circle meetings
• Develop product specs
Fishbone diagrams are drawn

• To find customer needs A key reason for lost productivity is


• To find the cost of quality
• To brainstorm causes of an • Not implementing TQM
effect • Mgmt. not listening to workers
• To screen workers’ suggestions • The hidden factory
• To explain what the process does

6
Most auto accidents are When you have too many factors on
a fish-bone chart, then
• Correlated with fuel efficiency
• Caused by chance • Take top ten
• Preventable • Take top five
• At 6 sigma level • Inquire to find which factors
• Caused by bad design are suspected to be significant
• Conduct design of experiments
• Talk to customers
A system involves

• Components The word Control implies


• An overall objective or mission
• Humans, procedures, technology • Inspecting every item
• Environment in which it operates • Plotting charts
• All above • Using a signal to adjust the
process
• Management by Objectives
A process is predictable if • Team control the shop

• We can forecast its output


• It is always at the same level QFD is a method for
• It has no humans involved
• The data can be plotted on a • Controlling quality in production
chart • Controlling quality in restaurants
• The same workers stay employed • Finding out what customer wants
• Translating customer needs to
product specs
Range of 1, 2, 3, 4, 5 is • Quality circles

• 5
• 4 A Capable Process
• 3
• 2 • Is never outside control limits
• 0 • Meets or exceeds spec
requirements
• Has no defects in output
The quantity sigma (σ) indicates • Has good management support
• Is ISO 9000 certified
• Trend in the process
• Dispersion in the data
• Lack of attention by workers
• Average
• Range

7
DOE may fail because ISO 9002 requires

• Control charts are incorrectly • Constantly holding meetings with


drawn customers
• No team involvement • Frequent vendor visits
• A key factor has been left out • Getting production and
• Top management not visible inspection/installation
• Workers overzealous methods certified
• Getting final inspection methods
shipshape
TQM is part of • Team deliberations for quality

• Strategic management
• ISO 9000 certification Quality is a problem because
• QS 9000 certification
• Hospital management • Modern processes are too
• Project reviews complex
• Workers don’t do the job
• It is expensive to control
The word target in quality means • All processes have some
variation
• The specification • Management do not fund projects
• The control limits
• Xbar points on the chart
• The ideal quality requirement A Reaction Plan is
• Six sigma production
• A flow chart
• An afterthought
Six sigma requires • A way to produce good products
• A checklist to use when things
• Process knowledge don’t look right
• An indulging mindset • A way to check incoming parts
• Action on causes of defects
• DOE trials
The best strategy in quality is
• All above
• To inspect the output before
Spec limits are used for shipment
• To aim to produce on target
• Talking to workers about quality • To check machines every day
• Adjusting control charts • To keep workers relaxed
• Finding process capability • To hold training meetings every
• Drawing R charts week
• Troubleshooting

8
DOE identifies Cost of quality is affected by

• Causes of delayed shipments • Workers’ performance


• Factors that affect the output • Field failures
• Traffic congestion points • Calibration of instruments
• Control limits • Preventive actions
• Why meetings are not running • All above
smoothly

Quality of education can be


Interaction implies impacted by

• Effect of one factor depends on • Surplus in federal budget


where some other factor is set • Sports programs
• Managers moving about • Attention to details
• Team meetings • Parents meeting with city officials
• Xbar and R charts looking • Kids having friends
similar • Closer tab on principals
• Teamwork

Study methods can be improved by


Weather variation is difficult to
explain because • Benchmarking
• Improved note taking
• Atmosphere is too large a system • Vacations
• We cannot plot temperature on • Sitting in the front row
Xbar charts • Buying books
• Don’t understand the process
behind it
• Experts have not taken trouble to
explain weather
• TV channels use graphics

Das könnte Ihnen auch gefallen