Beruflich Dokumente
Kultur Dokumente
Responses About You - Details - "3D CRT Photon Planning Competency Evaluation"
Print
1 of 1 1
Evaluation by: Clinical Instructors (PACELLA, Matthew)
Evaluation of: Students (Frieling, Daniel)
Evaluation Period: 3/29/2018
Survey Completed: 3/29/2018 11:11:34 AM CT
Add your comments
Select the external beam photon planning competency from the drop down menu below:
• No response
https://www.typhongroup.net/eval/analyze/studentdetails.asp?r=0&facility=9094&survey=3... 5/4/2018
Typhon Group: EASI - Evaluation & Survey Instrument Page 2 of 2
Overall rating:
• Pass [2 pts]
https://www.typhongroup.net/eval/analyze/studentdetails.asp?r=0&facility=9094&survey=3... 5/4/2018
Typhon Group: EASI - Evaluation & Survey Instrument Page 1 of 2
1 of 1 1
Evaluation by: Clinical Instructors (PACELLA, Matthew)
Evaluation of: Students (Frieling, Daniel)
Evaluation Period: 3/29/2018
Survey Completed: 3/29/2018 11:10:41 AM CT
Overall rating:
• Pass [2 pts]
Additional Comments:
• No response
https://www.typhongroup.net/eval/analyze/studentdetails.asp?r=0&facility=9094&survey=1... 5/4/2018
Typhon Group: EASI - Evaluation & Survey Instrument Page 2 of 2
https://www.typhongroup.net/eval/analyze/studentdetails.asp?r=0&facility=9094&survey=1... 5/4/2018
Typhon Group: EASI - Evaluation & Survey Instrument Page 1 of 2
1 of 2 1
Evaluation by: Clinical Instructors (PACELLA, Matthew)
Evaluation of: Students (Frieling, Daniel)
Evaluation Period: 4/12/2018
Survey Completed: 4/12/2018 6:59:56 AM CT
Add your comments
Select the external beam IMRT planning competency from the drop down menu below:
• Prostate IMRT
• No response
https://www.typhongroup.net/eval/analyze/studentdetails.asp?r=0&facility=9094&survey=3... 5/4/2018
Typhon Group: EASI - Evaluation & Survey Instrument Page 2 of 2
Overall rating:
• Pass [2 pts]
https://www.typhongroup.net/eval/analyze/studentdetails.asp?r=0&facility=9094&survey=3... 5/4/2018
Typhon Group: EASI - Evaluation & Survey Instrument Page 1 of 2
2 of 2 2
Evaluation by: Clinical Instructors (PACELLA, Matthew)
Evaluation of: Students (Frieling, Daniel)
Evaluation Period: 4/27/2018
Survey Completed: 4/27/2018 3:16:04 PM CT
Add your comments
Select the external beam IMRT planning competency from the drop down menu below:
• No response
https://www.typhongroup.net/eval/analyze/studentdetails.asp?facility=9094&survey=38356... 5/4/2018
Typhon Group: EASI - Evaluation & Survey Instrument Page 2 of 2
Overall rating:
• Pass [2 pts]
https://www.typhongroup.net/eval/analyze/studentdetails.asp?facility=9094&survey=38356... 5/4/2018