Sie sind auf Seite 1von 1

Paper No.

670

with tolls from users. On the other hand, higher a thorough analysis in the bid proposal stage.
limit of 200% of the prescribed limits was adopted Nevertheless, suggestion could be made that PPP
for some of the BOT (Annuity) projects. In case of PQ has to incorporate other dimensions like past
BOT (Annuity) model, the traffic risk and revenue performance related metrics apart from technical
risk is taken care of by the government and high and financial assessments.
technical expertise has been set to limit the number 10. Conclusions
of bidders as the level of competition is quite high
due to the reduced risk exposure to private entities. This paper identified and analysed the PQ limits
In addition, three projects of project cost more observed in highway PPP projects of India. The
than INR 4000 crore exceeded the minimum PQ findings indicate that in case of national highways
limits. With maturity of PPP market in India, the the prequalification limits converged to a common
number of competent bidders has also increased. value whereas. Prequalification limits in case of
highway projects it is less dependent on the project
Implementing agency for highway projects,
size. This study found that there are inconsistencies
therefore, has further modified the minimum net
in the practices being adopted in prequalification
worth based on the project cost. The minimum net
in India from the theory.
worth has been set to 25% of the project cost for
project cost of below INR 2000 crores, 50% of the The prequalification limits are set in such a way
project cost of INR 2000-3000 crores and 100% that the numbers of private parties qualifying
for project cost of above INR 3000 crores26. The for the project is neither so large so as to cause
reason for setting higher limit for high value enormous efforts and time in evaluation nor so
projects was to ensure that the project do not get small so as to thwart competitions. In India, a range
delayed due to participation of smaller firms in of 5-8 shortlisted bidders is considered enough
bidding for large projects that are beyond their to foster healthy competitions. While the
capacity26. This has been a move to facilitate conventional prequalification limits of 100%
megaprojects, defined as spanning over 400 to Technical capacity and 25% financial capacity is the
600 km and costing more than INR 5000 crores, recommended required standards, many projects
by bringing in very sound domestic and shows extreme deviation. High prequalification
international companies. limits is adopted in expressway projects and
also in National Highways projects which lies in
9. Inferences the Golden Quadrilateral. The reason for this is
The findings of highway projects could indicate a attributed to high traffic density in these projects
sort of saturation in the experience gained by the and ultimately interest of the large number of
procuring authorities due to centralized governing private parties. Lower prequalification limits than
body coupled with timely rules and regulations. the conventional occurs in the projects when PPP
This also could be due to the fact that significant was taken up in 2007- 2008 possibly due to global
number of players in the road sector exists and the recession and corresponding low GDP of India.
winning bidder is expected to perform similar to Due to involvement of high level of risks in
the project in past. This would ensure participation BOT (Toll) project, the private parties’ interests
of experienced and competent bidders and screen varies from project to project. As a result, the
out bidders with less experience that hinder strong prequalification limits in these projects fluctuates.
competition in the procurement process. On the contrary, in BOT (Annuity) projects, the
Another inference from the study is the comparison traffic risk is eliminated since a fixed payment is
of PQ with that of contractor selection procedures assured by the Government. Therefore, for BOT
followed in the traditional and Design-Build (Annuity) projects the prequalification limits do
procurement. The criteria of PQ are quite simple in not fluctuate.
nature when compared with the robustness of other This paper sum up that prequalification limits are
procurement systems. The reason for this could be directly dependent on the number of interested
that the granting authorities might have wanted to private parties in the project which again is
keep the PQ simple on purpose so as to facilitate dependent on the traffic density and willingness

Journal of the indian Roads Congress, July - September, 2017 107

Das könnte Ihnen auch gefallen