The bidding and award procedures differ across generalization of the findings. The current study,
countries and sectors and thus contextual empirical therefore, grounds its context and relevance to
research is required for crafting the right pre Indian conditions in order to make right application
qualification procedures for a given country. For of PQ process. This is achieved by analysing,
instance, European Union has established an comparing and contrasting PPP highway projects.
over arching procurement process with separate The main objective of this paper is, therefore, to
procedures for handling different sizes of bidders5. examine what criteria encompass the PQ limits and
This also highlights the fact that the design of
how to set the PQ limits in case of Indian Highway
the procurement process inherently plays a key
PPP projects. The paper has been divided into eight
role in limiting the number of bidders that will
sections. The next section presents the literature
be allowed to participate in the bidding process.
review on the state of the theory and practice of PQ
The EU procedures of selection also vary in the
limits. This is further carried to Section 3, which
detail of information required during the tendering
sets the context of the study for PQ of PPP projects
process6. Thus, the procurement procedures have to
in India. The research design of the current study
be designed in terms of the informational aspects
is presented in section 4. Section 5 present the
beforehand so that the desired number of qualified
identification of PQ criteria for highway projects.
bidders is allowed to participate in the bidding
The identified data set is modelled using simple
process.
multiple linear regression as presented in
Coming to the sectorial landscape of PPP section 6. Analysis and discussion is presented in
infrastructure projects in India, PPP projects in the section 7. The paper presents few inferences
national highways sector is counted as one of the and concludes by laying practical implications and
sectors, besides power sector, which have been able direction of future research.
to successfully attract private capital investment
in India. High level of private sector participation 2. LITERATURE REVIEW
in national highways sector could be attributed Most of the studies on PQ design has focused on
to the various initiatives and reforms undertaken projects procured through traditional route. For
by the government in addition to the commercial instance,7 have asserted, through interviews with
attractiveness and the revenue generation potential construction stakeholders, that PQ is a three part
of projects. For instance, the Indian Government has process concerned with the characteristics of owner,
set up well established procedure for procurement contractors and the resulting decision. In order to
of PPP projects besides drafting of standardised operationalize it, Xia et al.8 have developed various
bid documents and model concession agreements factors that should be taken into consideration while
for different categories of PPP road projects. designing the PQ process of design build projects
Dedicated institutional framework in the form of based on the data set of United States. Studies on
establishment of an autonomous implementation PQ for projects procured through PPP route, which
agency, National Highway Authority of India differs from traditional procurement, is limited.
(NHAI), besides introduction of legal reforms to Carbonara et al.6 have noted two important reasons
enable private sector participation have played that set PPP tendering process different from
an important role in enhancing private sector traditional procurement – (i) the parameters used
participation in national highways sector. for evaluation need to encompass all the phases of
But these documents are largely prescriptive to PPP project lifecycle, and (ii) there is a need to
direct the PQ procedures and criteria. Furthermore, ensure strong competition to bring improvement
no previous study has attempted to examine how from value for money perspective. In the similar
the PQ limits are employed (and varied) from lines, De Schepper et al.9 have also stated that the
project to project in highway sector in order to PPP procurement process has a strong bearing on
make empirical generalizations. To this need, the various aspects of the projects such as transaction
current study focus to buttress the procurement costs, value of money, and lead time for project
of PPP projects, though inference from highway procurement. Furthermore, Doloi 10 has stressed
projects are used to supplement the relevance and the need to bring in enough competition as it is

92 Journal of the indian Roads Congress, July - September, 2017