It is observed that when a power of 75MW is imported to bus 1, the loss amounted to
5MW. Find the generation needed from each plant and also power received by the
load, if the system λ is given by 20 Rs/MWh. The incremental fuel cost at the 2 plants
are given by =0.03P1+15 Rs/MWh, =0.05P2+18 Rs/MWh.
1 of 2
|''|'||||''|''||'|'|
Code No: R41024
Set No. 1
R10
3. Explain hydro thermal economic load scheduling. Derive the necessary equations?
5. a) With a neat diagram explain briefly different parts of turbine speed governing system?
b) Discuss in detail the importance of load frequency problem?
6. a) Explain how the tie line power deviation can be incorporated in a two area system
block diagram?
b) Two control areas have the following characteristics
Area 1:R1=0.011p.u., B1=0.85p.u., Base MVA=1000
Area 2: R2=0.018 p.u., B2=0.95p.u., Base MVA=1000
a load change of 200MW occurs in area 1.Determine the new steady state
frequencies?
7. Explain clearly about proportional plus integral LFC with a block diagram and show that
frequency change in steady state is zero.
2 of 2
|''|'||||''|''||'|'|
Code No: R41024
Set No. 2
R10
IV B.Tech. I Semester Regular Examinations, December 2013
POWER SYSTEM OPERATION AND CONTROL
(Electrical and Electronics Engineering)
2. Derive the transmission loss formula for a system consisting of n-generating plants
supplying several loads inter connected through a transmission networks. State any
assumptions made.
1 of 2
|''|'||||''|''||'|'|
Code No: R41024 R10 Set No. 2
6. Develop the block diagram of two area system with controllers and draw neat diagram.
7. a) Distinguish between load frequency control and economic load dispatch control with
neat block diagram.
b) a 500MW generator has a speed regulation of 4%. If the frequency drops by 0.13Hz
with an unchanged reference. Determine the increasing turbine power. Also find by
how much the reference power setting should be changed, if the turbine power remains
unchanged..
8. Explain clearly what you mean by compensation of lines and discuss briefly different
methods of compensation.
2 of 2
|''|'||||''|''||'|'|
Code No: R41024 R10 Set No. 3
3. A two plant system has a steam plant near the load centre and hydro plant at a remote
location. The characteristics of both the stations are
C1= (0.045PT+26) PT Rs/hr
W2= (0.004PH+7) PH m3/sec.
And γ2=4 x 10-4 Rs/m3 and B22= 0.0025 MW-1.
Determine the power generation at each station and power received by the load when λ
=65 Rs/MWh.
1 of 2
|''|'||||''|''||'|'|
Code No: R41024 R10 Set No. 3
5. a) With a block diagram explain the load frequency control for a single area system.
b) A 500MW generator is operated at a load of 20MW. A load change of 1% causes the
frequency to change by 1%. If the system frequency is 50Hz, determine the value of load
damping factor in p.u.
6. Derive the relation between steady state frequency error and tie line deviation for step
load disturbances in both areas with neat block diagram.
7. a) Explain the dynamic response of an isolated area for LFC with controlled system.
b) Describe the combined operation of an LFC and an economical dispatch control with
neat block diagram.
8. a) What are the merits and demerits of different types of compensating equipment for
transmission system?
b) Explain the specifications of load compensation?
2 of 2
|''|'||||''|''||'|'|
Code No: R41024
Set No. 4
R10
IV B.Tech. I Semester Regular Examinations, December 2013
POWER SYSTEM OPERATION AND CONTROL
(Electrical and Electronics Engineering)
1 of 2
|''|'||||''|''||'|'|
Code No: R41024
Set No. 4
R10
3. A two plant system having a steam plant near the load centre and hydro plant at a remote
location. The load is 4500MW for 16hrs a day. The characteristics of the units are
C1= 0.075 PT2+45PT+120,
W2=0.0028 PH2+0.6PH,
B22=0.001MW-1.
Find the generation schedule, daily water used by the hydro plant and daily operating cost of
thermal plant for γj=85.5 Rs/m3-hr.
5. a) Derive the model of a speed governing system and represent it by a block diagram.
b) A 100MVA asynchronous generator operates on full load at a frequency of 50Hz. the
load is suddenly reduced to 50MW. Due to time lag in governing system the steam value
begins to close after 0.4 sec.
Determine the change in frequency that occurs in time. Given H=5kW-sec/kVA of
generator capacity.
7. For a single area system, show that the static error in frequency can be reduced to zero
using frequency control and comment on dynamic response of controlled system with
necessary equation.
2 of 2
|''|'||||''|''||'|'|