RESUMEN EMBOQUILLADOS 8/2/2009

Total a Ejecutar 10,221.40


Total Ejecutado 3,568.11
Faltante 6,653.29

386287815.xls : Emboquillado 1/6


CONTROL DE AVANCE DE BORDILLOS

UBICACIÓN PROYECTADO AVANCE EJECUTADO

Inicio Fin Lado Long Descarga Total Inicio Fin Fecha Long Descarga Total

37+120 37+300 IZQ 180.00 5.00 185.00 - - -

37+204 37+250 DER 46.00 - 46.00 - - -

37+360 37+377 IZQ 17.00 - 17.00 - - -

37+377 37+392 IZQ 15.00 - 15.00 - - -

39+480 39+484 IZQ 4.00 - 4.00 - 4.00


39+480 39+484 4.00

39+483 39+487 DER 4.00 - 4.00 - 4.00


39+483 39+487 4.00

39+498 39+502 DER 5.00 - 5.00 - 4.00


39+498 39+502 4.00

39+500 39+504 IZQ 5.00 - 5.00 - 4.00


39+500 39+504 4.00

39+940 40+508 IZQ 568.00 25.00 593.00 88% 25.00 521.50


39+940 39+967 7/20/2009 27.00
39+967 40+021 7/21/2009 54.00
40+021 40+039 7/22/2009 18.00
40+039 40+084 7/23/2009 45.00
40+084 40+103 7/23/2009 19.00
40+103 40+130 7/24/2009 27.00
40+130 40+178 7/28/2009 48.00
40+178 40+217 7/29/2009 39.00
40+217 40+249 7/30/2009 32.00
40+224 40+258 7/31/2009 34.00
40+258 40+315 7/31/2009 57.00
40+315 40+353 7/23/2009 19.00
40+353 40+407 7/24/2009 27.00
40+407 40+479 7/25/2009 36.00
40+479 40+508 7/27/2009 14.50
40+508 40+596 DER 88.00 - 88.00 40% - - 35.00
40+508 40+544 7/27/2009 18.00
40+544 40+578 7/29/2009 17.00

41+000 41+135 DER 135.00 - 135.00 50% - - 67.50


41+000 41+082 7/29/2009 41.00
41+082 41+135 7/30/2009 26.50
42+320 42+355 IZQ 35.00 5.00 40.00 23% - - 9.00
42+320 42+338 8/1/2009 9.00

42+560 42+615 IZQ 55.00 5.00 60.00 - - -

42+590 42+688 DER 98.00 - 98.00 - - -

42+630 42+688 IZQ 58.00 - 58.00 - - -

43+115 43+170 DER 55.00 5.00 60.00 - - -

43+177 43+204 DER 27.00 5.00 32.00 - - -

43+425 43+515 IZQ 90.00 - 90.00 - - -

43+827 43+886 DER 59.00 5.00 64.00 - - -

43+933 44+155 IZQ 222.00 - 222.00 - - -

45+460 45+505 DER 45.00 - 45.00 - - -

45+460 45+505 IZQ 45.00 5.00 50.00 - - -

45+515 45+600 DER 85.00 - 85.00 - - -

45+576 45+600 IZQ 24.00 5.00 29.00 - - -

45+733 45+835 DER 102.00 - 102.00 - - -

45+835 45+906 DER 71.00 - 71.00 - - -

45+880 45+930 IZQ 50.00 - 50.00 - - -

45+906 45+930 DER 24.00 5.00 29.00 - - -

46+045 46+090 DER 45.00 10.00 55.00 - - -

46+045 46+090 IZQ 45.00 10.00 55.00 - - -

46+175 46+260 DER 85.00 15.00 100.00 - - -

386287815.xls : Bordillo 2/6


46+175 46+260 IZQ 85.00 15.00 100.00 - - -

46+400 46+512 DER 112.00 - 112.00 - - -

46+400 46+512 IZQ 112.00 - 112.00 - - -

46+765 46+838 IZQ 73.00 5.00 78.00 - - -

46+838 46+911 IZQ 73.00 - 73.00 - - -

47+155 47+200 DER 45.00 15.00 60.00 - - -

47+180 47+210 IZQ 30.00 15.00 45.00 - - -

48+580 48+695 IZQ 115.00 - 115.00 - - -

48+695 48+730 IZQ 35.00 - 35.00 - - -

48+760 48+785 IZQ 25.00 - 25.00 - - -

48+805 48+840 IZQ 35.00 5.00 40.00 - - -

48+840 48+940 IZQ 100.00 - 100.00 - - -

49+400 49+610 IZQ 210.00 - 210.00 - - -

49+900 50+040 IZQ 140.00 - 140.00 - - -

50+450 50+532 IZQ 82.00 - 82.00 - - -

50+532 50+639 DER 107.00 5.00 112.00 - - -

50+980 51+130 IZQ 150.00 - 150.00 - - -

51+150 51+215 IZQ 65.00 - 65.00 - - -

54+635 54+670 IZQ 34.31 - 34.31 - - -

58+265 58+390 DER 125.00 - 125.00 - - -

60+500 60+530 IZQ 30.00 - 30.00 - - -

60+510 60+540 DER 30.00 - 30.00 - - -

60+840 60+860 DER 20.00 - 20.00 - - -

60+840 60+860 IZQ 20.00 - 20.00 - - -

TOTAL - 7,966.68 225.00 4,405.31 624.00 25.00 649.00

386287815.xls : Bordillo 3/6


CUNETAS LADO DERECHO DESCARGA TOTAL AVANCE EJECUTADO EJECUTOR TRAMOS OBSERVACIONES

Inicio Fin Tipo Long Inicio Long m Inicio Fin Fecha Long Descarga Total FALTANTES

36+720 36+740 1 20.00 20.00 - - - 20.00


-
-
36+740 36+743 2 3.00 3.00 - 3.00 -
3.00

36+743 36+750 1 7.00 7.00 - - - 7.00


-
-
37+337 37+380 2 43.00 43.00 - - - 43.00
-
-
37+380 37+666 2 285.70 285.70 - - - 285.70
-
-
38+690 38+980 3 286.31 286.31 - 286.31 -
286.31 JJM

41+746 41+760 2 14.00 14.00 - 14.00 -


14.00 JJM

42+015 42+028 3 13.00 13.00 - 13.00 -


13.00 JJM
3 42+146 2.00 2.00 - 2.00 2.00 JJM

42+159 42+309 1 150.33 42+309 16.45 166.78 150.33 16.45 166.78 JJM -
1 42+159 14.75 14.75 - 14.75 14.75 JJM -
3 42+322 21.20 21.20 - 21.20 21.20 PUPUCHE -
3 42+357 11.30 11.30 - 11.30 11.30 PUPUCHE -
42+364 42+469 1 104.50 42+364 8.95 113.45 104.50 8.95 113.45 PUPUCHE -

1 42+469 14.66 14.66 - 14.66 14.66 PUPUCHE


42+740 42+810 3 70.75 42+810 11.50 82.25 70.75 11.50 82.25 PUPUCHE -

42+820 42+853 3 33.00 42+853 6.30 39.30 33.00 6.30 39.30 PUPUCHE -

43+322 43+361 3 39.49 39.49 39.49 - 39.49 PUPUCHE -

43+375 43+448 1 75.40 43+375 5.28 80.68 75.40 5.28 80.68 JJM -
1 43+448 12.30 12.30 - 12.30 12.30 JJM -
3 43+554 2.75 2.75 - 2.75 2.75 JJM -
43+560 43+649 1 89.00 89.00 - - - 89.00
3 43+560 6.55 6.55 - 6.55 6.55 JJM -
1 43+649 6.25 6.25 - 6.25 6.25 JJM -
43+661 43+790 1 129.00 43+661 3.94 132.94 129.00 3.94 132.94 JJM -

44+368 44+380 2 12.00 12.00 - - - 12.00


-
-
45+610 45+714 1 104.00 104.00 - - - 104.00
-
-
45+714 45+717 2 3.00 3.00 - - - 3.00
-
-
45+717 45+733 1 16.20 16.20 - - - 16.20
-
-
45+929 45+940 2 11.00 11.00 - - - 11.00
-
-
46+090 46+170 1 80.00 80.00 - - - 80.00
-
-
46+235 46+248 2 13.00 13.00 - - - 13.00
-
-
46+248 46+303 1 55.00 55.00 - - - 55.00
-
-
46+303 46+309 2 6.00 6.00 - - - 6.00
-
-
46+309 46+317 1 8.00 8.00 - - - 8.00
-
-
46+317 46+320 2 3.00 3.00 - - - 3.00
-
-
46+320 46+329 3A 9.00 9.00 - - - 9.00
-
-
46+338 46+341 2 3.00 3.00 - - - 3.00
-
-
46+341 46+395 1 54.00 54.00 - - - 54.00
-
-
46+395 46+398 2 3.00 3.00 - - - 3.00
-
-
46+398 46+410 1 12.00 12.00 - - - 12.00
-
-
46+475 46+764 1 288.50 288.50 - - - 288.50
-
-
46+768 46+837 1 69.20 69.20 - - - 69.20
-
-
46+841 46+912 1 70.81 70.81 - - - 70.81
-
-
46+912 47+070 1 158.49 158.49 - - - 158.49
-
-
47+127 47+130 2 3.00 3.00 - - - 3.00
-
-
48+926 48+966 1 40.00 40.00 - - - 40.00
-
-
48+966 48+970 2 4.00 4.00 - - - 4.00
-
-
48+970 49+049 1 79.00 79.00 - 69.00 10.00 REVISAR SI SE HA RECORTADO EL TRAMO
48+980 49+049 7/16/2009 69.00 PRUCIL

49+050 49+265 1 215.00 215.00 - 215.00 -


49+050 49+150 7/13/2009 100.00 PRUCIL -
49+150 49+265 7/15/2009 115.00 PRUCIL -
49+265 49+328 1 62.90 63.00 - 63.00 -
49+265 49+328 7/18/2009 63.00 PRUCIL

49+328 49+334 2 6.00 6.00 - - - 6.00


-
-
49+334 49+350 1 16.00 16.00 - - - 16.00 VERIFICAR SI SE VA A REALIZAR O ANULADA
-
-
49+350 49+375 3A 25.00 25.00 - - - 25.00
-
-
49+375 49+378 2 3.00 3.00 - - - 3.00
-
-
49+378 49+424 3A 46.00 46.00 - - - 46.00
-
-

386287815.xls : Cunetas 4/6


49+424 49+677 1 253.00 253.00 - 253.00 -
49+424 49+450 26.00 PRUCIL
49+450 49+580 7/16/2009 130.00 PRUCIL
49+580 49+677 97.00 PRUCIL

49+677 49+700 1 23.00 23.00 - 23.00 -


49+677 49+700 23.00 PRUCIL

49+700 49+703 2 3.00 3.00 - - - 3.00

49+703 49+905 1 202.00 202.00 - 202.00 -


49+703 49+714 11.00 PRUCIL
49+714 49+788 7/19/2009 74.00 PRUCIL
49+788 49+905 117.00 PRUCIL

49+983 49+992 3 9.00 9.00 - - - 9.00


-
-
49+992 50+000 1 8.00 8.00 - - - 8.00 VERIFICAR SI SE VA A REALIZAR O ANULADA
-
-
50+000 50+532 1 532.00 532.00 - 439.00 93.00
50+017 50+020 7/30/2009 3.00 PRUCIL
50+020 50+080 7/28/2009 60.00 PRUCIL
50+080 50+347 7/28/2009 267.00 PRUCIL
50+347 50+400 7/29/2009 53.00 PRUCIL
50+400 50+456 7/30/2009 56.00 PRUCIL
FALTA EJECUTAR DEL KM 50+456 @ KM 50+456

50+045 50+050 2 5.00 5.00 - - - VERIFICAR PASES 5.00

51+364 51+389 3A 25.00 25.00 - - - 25.00


-
-
51+389 51+395 2 6.00 6.00 - - - 6.00
-
-
51+395 51+450 3A 55.00 55.00 - - - 55.00
-
-
51+450 51+850 1 400.00 400.00 - - 193.00 207.00
51+448 51+515 7/31/2009 67.00 PRUCIL
51+515 51+680 7/31/2009 82.50 PRUCIL FALTA EJECUTAR DEL KM 51+680 @ KM 51+690
51+690 51+720 7/31/2009 15.00 PRUCIL FALTA EJECUTAR DEL KM 51+720 @ KM 51+764
51+764 51+821 7/31/2009 28.50 PRUCIL FALTA EJECUTAR DEL KM 51+821 @ KM 51+850
-
51+850 51+870 3A 20.00 20.00 - - - 20.00
-
-
51+900 51+951 1 51.00 51.00 - - - 51.00
-
-
51+951 51+956 2 5.00 5.00 - - - 5.00
-
-
51+956 52+040 1 84.00 84.00 - - - 84.00
-
-
52+040 52+140 1 100.00 100.00 - - 42.50 57.50
52+055 52+140 7/31/2009 42.50 PRUCIL
-
52+270 52+481 1 210.67 210.67 12% - - 25.00 185.67
52+270 52+320 7/31/2009 25.00 PRUCIL
-
52+481 52+495 2 14.01 14.01 - - - 14.01
-
-
52+495 52+587 1 92.32 92.32 - - - 92.32
-
-
52+587 52+589 2 2.00 2.00 - - - 2.00
-
-
52+589 52+702 1 113.00 113.00 - - - 113.00
-
-
52+770 52+860 1 90.00 90.00 - - - 90.00
-
-
52+893 52+895 1 2.00 2.00 - - - 2.00
-
-
54+901 54+935 3A 34.00 34.00 - - - 34.00
-
-
54+935 55+100 1 165.00 165.00 - - - 165.00
-
-
55+100 55+144 3A 44.00 44.00 - - - 44.00
-
-
55+144 55+170 3A 26.00 26.00 - - - 26.00
-
-
55+170 55+270 3A 100.00 100.00 - - - 100.00
-
-
55+270 55+347 3A 77.00 77.00 - - - 77.00
-
-
55+347 55+520 1 173.00 173.00 - - - 173.00
-
-
55+693 55+740 3 47.00 47.00 - - - 47.00
-
-
55+740 55+830 1 90.00 90.00 - - - 90.00
-
-
55+829 55+831 2 2.00 2.00 - - - 2.00
-
-
55+831 55+876 3A 45.00 45.00 - - - 45.00
-
-
56+795 56+990 1 195.00 195.00 - - - 195.00
-
-
58+230 58+277 3 47.00 47.00 - - - 47.00
-
-
60+070 60+076 3 6.00 6.00 - - - 6.00
-
-
60+076 60+080 2 4.00 4.00 - - - 4.00
-
-
60+080 60+155 3 75.00 75.00 - - - 75.00
-
-
60+170 60+240 3 70.00 70.00 - - - 70.00
-
-
61+070 61+110 3 39.90 39.90 - - - 39.90
-
-
TOTAL 6,387.48 144.18 6,531.76 2,587.46 3,944.30

RESUMEN CUNETAS 8/2/2009

Total a Ejecutar 8,715.06


Total Ejecutado 3,398.96
Faltante 5,316.10

386287815.xls : Cunetas 5/6


Fecha: 8/4/2009

SUBDRENES
Prog Inicial Prog. Final Long Descarga Lado
60+900 61+100 200 15 LD
60+920 61+090 170 8 LI

Materiales
Long Tub. Tub (Unid.) Geotextil Rollos
215 47 960 2
178 39 816 1.7

BORDILLOS
Tramos Faltantes 3,756.31 ml
Acero 3/8" 15,460.97 Kg
3,067.65 Varillas
Codos 45° 1 Unid