ETAP

Project: Page: 1
12.6.0H
Location: Date: 11-28-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: unit6 Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus load 1 20.000 0 0 9.088 0 0 0 0 0 9.088 100.0 275.2

Bus load 2 20.000 0 0 4.801 0 0 0 0 0 4.801 100.0 141.4

Bus1 13.800 0 0 0 0 0 0 0 0 4.510 99.9 188.7

Bus2 13.800 0 0 0 0 0 0 0 0 4.510 99.9 188.7

Bus3 150.000 0 0 0 0 0 0 0 0 5.412 99.8 20.8

Bus5 20.000 0 0 0 0 0 0 0 0 14.408 100.0 416.6

Coupler 20.000 0 0 0 0 0 0 0 0 9.006 100.0 260.4

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: Page: 2
12.6.0H
Location: Date: 11-28-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: unit6 Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)

ID Type (Amp) Amp % (MVA) MVA % MVA %

Cable1 Cable 309.12 275.19 89.02

Cable2 Cable 309.12 141.44 45.76

Trafo Incoming Transformer 30.000 5.412 18.0 5.403 18.0

Trafo XYZ 1 Transformer 20.000 4.510 22.6 4.503 22.5

Trafo XYZ 2 Transformer 20.000 4.510 22.6 4.503 22.5

* Indicates a branch with operating load exceeding the branch capability.


ETAP
Project: Page: 3
12.6.0H
Location: Date: 11-28-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: unit6 Config.: Normal

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable1 -9.088 0.000 9.512 0.289 424.7 289.0 95.3 99.8 4.50

Cable2 -4.801 0.000 4.891 0.061 89.8 61.1 98.0 99.8 1.84

Trafo XYZ 1 4.507 0.164 -4.502 -0.063 5.1 101.6 100.0 99.8 0.17

Trafo XYZ 2 4.507 0.164 -4.502 -0.063 5.1 101.6 100.0 99.8 0.17

Trafo Incoming 5.401 0.347 -5.399 -0.225 2.7 122.0 100.0 99.8 0.17

527.3 675.3
ETAP
Project: Page: 4
12.6.0H
Location: Date: 11-28-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: unit6 Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus load 1 Bus Under Voltage 20.000 kV 19.066 95.3 3-Phase

Bus load 2 Bus Under Voltage 20.000 kV 19.598 98.0 3-Phase


ETAP
Project: Page: 5
12.6.0H
Location: Date: 11-28-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: unit6 Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 14.416 0.675 14.432 99.89 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 14.416 0.675 14.432 99.89 Lagging

Total Motor Load: 0.000 0.000 0.000

Total Static Load: 13.889 0.000 13.889 100.00 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.527 0.675

System Mismatch: 0.000 0.000

Number of Iterations: 2