Gbaran Ubie IOGP (E-15811) SITE MATERIAL MANAGEMENT PROCEDURE
DAEWOO DN-54 GEN-E15811-C04-0002-C03
TABLE OF CONTENTS
1.0 PURPOSE
2.0 SCOPE
3.0 DEFINITIONS AND ABBREVIATIONS
4.0 REFERENCE
5.0 RESPONSIBILITY
6.0 SITE MATERIAL MANGEMENT
6.1 FILE SETUP AND ADMINISTRATION
6.6 NON-CONFORMANCE
10.0 ATTACHMENTS
Page 3 of 18
Gbaran Ubie IOGP (E-15811) SITE MATERIAL MANAGEMENT PROCEDURE
DAEWOO DN-54 GEN-E15811-C04-0002-C03
1.0 PURPOSE
2.0 SCOPE
This procedure applies to all the activities necessary to control the material and
equipment at Site, e.g. receiving, storage, handling, preservation and issue to
construction and disposal of surplus materials.
Page 4 of 18
Gbaran Ubie IOGP (E-15811) SITE MATERIAL MANAGEMENT PROCEDURE
DAEWOO DN-54 GEN-E15811-C04-0002-C03
4.0 REFERENCE
5.0 RESPONSIBILITY
The Site Material Management Group has a responsibility for ensuring the
implementation of site material management procedures and control of material from
receiving to issue for fabrication/construction. See the Site Material Management Plan.
The Site Material Manager (SMM) shall liaise with Project Procurement Team (JOPT)
on materials delivery schedule and advice of problem areas.
Additional specific responsibilities for the Site Material Management Group may also
be described in this procedure and in the other procedure.
The Site Material Management Group is composed of the SMM, Site Material Control
Engineer, Local Logistics Officer, Custom Clearance Officer, Construction Materials
Control Engineer and Quality Control Manager and they will report functionally to their
respective area manager / office and will report operationally to the SMM.
The Site Material Management Group is also composed of the Construction Manager,
Commissioning Manager, Quality Manager, HSE Manager, Security Manager, and
Construction Equipment Control Manager.
Page 5 of 18
Gbaran Ubie IOGP (E-15811) SITE MATERIAL MANAGEMENT PROCEDURE
DAEWOO DN-54 GEN-E15811-C04-0002-C03
Even though the local purchase approval document and details are contained in
the electronic material control system, a hard copy of each purchase approval
document and related change order will be filed numerically in a separate folder
in the Site Material Team.
Page 6 of 18
Gbaran Ubie IOGP (E-15811) SITE MATERIAL MANAGEMENT PROCEDURE
DAEWOO DN-54 GEN-E15811-C04-0002-C03
- When tally sheets are provided with mill shipments of pipe, it is not
necessary to check each length against the tally. Piece count and
approximate length match ups are sufficient
Page 7 of 18
Gbaran Ubie IOGP (E-15811) SITE MATERIAL MANAGEMENT PROCEDURE
DAEWOO DN-54 GEN-E15811-C04-0002-C03
Site Material Manager will coordinate with Engineering and/or Site Quality
Control/Inspection and/or Construction Manager when special technical
inspection is required. Materials requiring Positive Material Identification (PMI),
as outlined in the Project specifications, shall be coordinated, handled and
recorded by Site Material Management.
The Quality Control Manager or his delegate, prior to distribution, shall approve
manual and if required, hard copy computer generated MRR’s. Daily Receiving
Summaries are prepared each working day or as per Project requirements, to
reflect all receipts of materials and equipment processed during the previous 24
hours. The reports are distributed as required by Construction team.
The Site Material Manager will take action to immediately notify Logistics
Manager or Project Procurement Manager of OS&D conditions.
Page 8 of 18
Gbaran Ubie IOGP (E-15811) SITE MATERIAL MANAGEMENT PROCEDURE
DAEWOO DN-54 GEN-E15811-C04-0002-C03
JOPT will be the focal point for coordination of OS&D resolutions. Copies of
OS&D reports will be forwarded to JOPT with results of Site decisions (e.g., to
retain overages, return damaged material, etc.). JOPT will coordinate return
authorizations with suppliers, and will be responsible for any other matters that
affect the terms and conditions of the purchase order.
6.6 NON-CONFORMANCE
Page 9 of 18
Gbaran Ubie IOGP (E-15811) SITE MATERIAL MANAGEMENT PROCEDURE
DAEWOO DN-54 GEN-E15811-C04-0002-C03
internally in a manner suitable to the area, to enable the location of stored items
to be determined and recorded. In addition the warehouse has one special
room which will be controlled by air conditioner for instrument and special parts.
The warehouse officer shall maintain the Temperature / Humidity Check Record
(Attachment 4) for the areas which require control of temperature / humidity
Open lay-down area: For the storage of large bulk materials, such as large bore
valves, piping materials, pipe supports, a fenced storage yard will be prepared
with proper drainage. A limited number of access gates to the yard for
controlling the flow of materials in and out shall be prepared. Cleanliness and
good housekeeping practices shall be enforced at all times in the storage area.
The storage area shall be cleaned as required to avoid the accumulation of
trash, discarded packing materials, and other detrimental soil.
Inside Storage
Page 10 of 18
Gbaran Ubie IOGP (E-15811) SITE MATERIAL MANAGEMENT PROCEDURE
DAEWOO DN-54 GEN-E15811-C04-0002-C03
z Sensitive items stored outside shall be covered with tarpaulins, plastic, etc.
as appropriate.
Items will be stored within a fire-resistant, tear-resistant, weather tight, and well-
ventilated building or equivalent enclosure, with any additional requirements
detailed by the manufacturer and/or engineering representative.
• Instrumentation
• Electrical penetrations
• Batteries
• Welding electrode and wire
• Motor control centers, switchgear, and control panels
• Motors and generators
• Precision-machined parts
• Erection spares, such as gaskets and O-rings
• Air-handling filters
Items will be stored within a fire-resistant, tear-resistant, weather tight, and well-
ventilated building or equivalent enclosure.
Page 11 of 18
Gbaran Ubie IOGP (E-15811) SITE MATERIAL MANAGEMENT PROCEDURE
DAEWOO DN-54 GEN-E15811-C04-0002-C03
• Pumps
• Valves
• Fluid filters
• Compressors
• Turbines
• Instrument cable
• Thermal insulation
• Fans and blowers
Items will be stored indoors, or equivalent, heat and temperature controls are
not required.
Tanks
• Heat exchangers and parts
• Accumulators
• Demineralizers
• Evaporators
• Piping
• Electrical cable
• Structural items
• Reinforcing steel
Page 12 of 18
Gbaran Ubie IOGP (E-15811) SITE MATERIAL MANAGEMENT PROCEDURE
DAEWOO DN-54 GEN-E15811-C04-0002-C03
The main operations involved in material handling for itemized equipment and
materials are to:
• Check materials arrived against Purchase Order and packing list and issue
the material receiving report.
• Perform required material inspection by the discipline inspector to verify
material integrity.
• Check the integrity of the original packing protection: if needed restore the
required protection for field storage.
• Define inspection / preservation program during storage / erection
• Move the material / equipment to the proper storage area according to the
storage requirement for materials
• Check periodically the material / equipment storage conditions according to
the inspection program: perform periodically the scheduled preservation
operations.
The following is the general procedure that is normally adopted for storage and
preservation of equipment and materials. Nevertheless specific preservation
procedures, in accordance with SHELL / vendors specification/requirements,
will be followed for different type of project material/equipment/machinery and
different term (short or long) of preservation, if it will be necessary.
• Moisture
The continuous and heavy moisture present in the country must be opposed
with adequate protective coatings and/or housing and coverings for those
Project materials that can not be stored in an open area without protection
(i.e. electrical panel and small fittings)
• Temperature
Page 13 of 18
Gbaran Ubie IOGP (E-15811) SITE MATERIAL MANAGEMENT PROCEDURE
DAEWOO DN-54 GEN-E15811-C04-0002-C03
Elevated temperature may damage some Project material (e.g. material for
painting). Housing with air-conditioning facilities will be the adequate solution
6.9.3 Preservation
Piping fittings and valves: for all material shipping protection will be maintained
until prefabrication and/or installation
In addition, shipping crates will be maintained for the materials stored outside.
Crates will be protected from rain by tarpaulins, plastic film, zinc or other.
• Moisture content
• Oil level
• Shaft rotation
The above issues will be developed (treatment of NCRs, security, etc), as part
of the project documentation.
Page 14 of 18
Gbaran Ubie IOGP (E-15811) SITE MATERIAL MANAGEMENT PROCEDURE
DAEWOO DN-54 GEN-E15811-C04-0002-C03
If the equipment is designed for outside exposure, enclosing with box and/or
using plastic bags is generally not encouraged.
The quality control activities during storage will be carried out according to
Quality Control Plan.
Site Material Manager shall issue shortly materials and equipment to the
Construction Discipline Manager upon completion of receiving inspection and
receiving MRR from QA/QC Team. Material Issue Ticket form (Attachment 7)
shall be used for issuance of materials. Following issue of material to
Construction Team, the storage and inventory shall be controlled by the
Construction Discipline Team
Page 15 of 18
Gbaran Ubie IOGP (E-15811) SITE MATERIAL MANAGEMENT PROCEDURE
DAEWOO DN-54 GEN-E15811-C04-0002-C03
All the issued materials shall be recorded in the electronic material control
system with Material Inventory Check List (Attachment 3) by the Site Material
Control Engineer and the warehouse officer.
The Site Material Team shall make a periodic inventory checking for stock
status and monitor the status of shortage / proper storage
Site procurement will be in line with the Nigerian / Local Content Policy. The Site
Material Manager will conduct local procurement for material, equipment and services,
maximizing the use of local sources to the extent they are available and technically
acceptable, price competitive and can be delivered in time to suit the Project schedule.
Upon issue of a Material Requisition from the site, Site Material Manager will survey
the local market versus external availability and cost to obtain the necessary approval
as per project requirements.
DAEWOO intends to purchase the following items from the local supplier, partly or
wholly, depending on the availability and meeting specification.
• Cement
• Rebar
• Wire mesh
• Consumables
Procurement will be normally via local purchase orders but cash purchases subject to
items to be procured and order value
All activities for the above site procurement shall be in accordance with the Site
Procurement Procedure.
In the event that materials at the site have been identified as surplus, the disposal of
that surplus material is the responsibility of the Material Management group. Surplus
material is most often the result of design changes, errors in estimates and takeoff,
and/or duplicate buying efforts.
Page 16 of 18
Gbaran Ubie IOGP (E-15811) SITE MATERIAL MANAGEMENT PROCEDURE
DAEWOO DN-54 GEN-E15811-C04-0002-C03
Once surplus has been confirmed, the Site Material Manager shall closely coordinate
with the Project Procurement Manager and Construction Manager and has the
responsibility for leading the work process to disposition the surplus material /
equipment and working with Site Engineering to identify possible alternative uses prior
to disposition
The table in Attachment provides a listing of the forms that will generally be used while
performing Site Material Management activities on the Project. They are used in the
execution of receiving, storage, handling, preservation and issue of equipment and
material for construction and return of the surplus items.
• OS&D Report: Used for overages, shortages and damages report by SMCE
and SMM
• Material Inventory Check List: Used for material inventory by SMCE and
warehouse officer
The information on site material management activities, such as receiving and issue
for construction, shall be updated on Procurement Control / Progress Report, which is
an integrated material tracking report from requisition to issue for construction and
issued to SHELL on weekly basis, by the Project Schedule Controller under the Project
Control Team in accordance with the Material Tracking Procedure
Page 17 of 18
Gbaran Ubie IOGP (E-15811) SITE MATERIAL MANAGEMENT PROCEDURE
DAEWOO DN-54 GEN-E15811-C04-0002-C03
If any forms have been modified due to SHELL or Project requirements, they are
included as attachments in the following section.
10.0 ATTACHMENTS
Page 18 of 18
ATTACHMENT 1. (GEN-E15811-C04-00002)
CERTIFICATE/ INSPECTION
No ITEMS DESCRIPTION Unit Q’ty SPEC ID NO. Remark
MILL SHEET NO RESULTS
Certificate/Mill Sheet
Attachment Others
Inspected By :
Approved By :
Project Name : Gbaran Ubie Integrated Oil & Gas Project (E-15811) Page of
Item :
Equipment Tag No :
Description :
Photograph ( ) Yes / ( ) No
Recommended Action.
Prepared By : Date :
Approved By : Date :
Prepared By : Date :
Approved By : Date :
6. Result
No 5. Inspection Item Remark
Accept Reject N/A
5.1 Inspection of Storage Facility
Fire Protection
Identification
Coverings
Cleanness Check
7. Inspected By :
8. Verified By :
Date :
Received By :
Approved By :
Q'TY Q'TY
SCN DESCRIPTION SPEC UNIT BALANCE PO NO. REMARK
REQUESTED ISSUED
1
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
PAGE : 1 / 1
ATTACHMENT 8. (GEN-E15811-C04-00002)
Accepted By(QC)