NMS Idendified by Power Plant PH#1 APRIL -


S.N. NMS (NEAR MISS SITUATIONS)
1 Water proofing require above above control room
2 Near cwp-1 a over size angle to be cut
3 From CT chemical storage room chemicals are flowing outside
4 CT top air vent of discharge line is in rusty condition
5 BFP room should not used as parking area
6 A metallic plate in front of control room pathway to be removed
7 Proper housekeeping required near 100 TPH FD fan area
SAFETY FIRST & SAFETY MUST"
dified by Power Plant PH#1 APRIL -2018
IDENTIFIED BY AREA TARGET DATE STATUS
D.S.Pawar Control Room Top 15.05.2018 In Progress
D.S.Pawar CWP CT area 15.05.2018 Informed to mech
D.S.Pawar CT area 15.05.2018 Not completed
D.S.Pawar CT top 15.05.2018 Informed to mech
D.S.Pawar BFP 6&7 15.05.2018 Completed
D.S.Pawar Control room enterance 15.05.2018 Completed
D.S.Pawar 100 TPH 15.05.2018 Completed
"SAFETY FIRST & SAFETY MUST"
NMS Idendified by Power Plant PH#2 APRIL -2018

SN NMS (NEAR MISS SITUATIONS)


AFETY FIRST & SAFETY MUST"
ified by Power Plant PH#2 APRIL -2018

IDENTIFIED BY AREA TARGET DATE STATUS

Das könnte Ihnen auch gefallen