PROYECTO PUENTE PARAISO- 3 UNIDOS

UNIDAD
ITEM DESCRIPCIÓN DE CANTIDADES COSTO UNITARIO COSTO PARCIAL COSTO TOTAL
MEDIDA

1.00 OBRAS PRELIMIANRES 1,000.00


1.10 TRAZO Y REPLANTEO GBL 1.00 1,000.00 1,000.00

2.00 OBRAS CONCRETO ARMADO 692.20


2.10 ENCONFRADO M2 4.80 50.00 240.00
2.20 ACERO DE REFUERZO Fy=42000 KG 21.43 6.50 139.28
2.30 CONCRETO FC= 210 KG/CM2 m3 0.80 391.15 312.92

3.00 ESTRUTURA DEL PUENTE 40,584.54


MADERA ESTRUCTURAL PIES 11,595.58 3.50 40,584.54

4.00 ESTRUCTURA DE TECHO 2,732.94


MADERA ESTRUTURAL PIES 780.84 3.5 2,732.94

5.00 COBERTURA DE TECHO 3,976.60


5.01 COBERTURA DE TECHO M2 198.83 20.00 3,976.60

6.00 OTROS 3,090.00


6.01 ABRAZADERAS UND 18.00 100.00 1,800.00
6.02 ENCHAPE METALICO UND 15.00 28.00 420.00
6.03 PERNOS UND 72.00 5.00 360.00
6.04 CLAVOS DE CALAMINA KG 30.00 9.00 270.00
6.05 CLAVOS PARA MADERA KG 30.00 8.00 240.00
6.06 ALAMBRE DE AMARRE N° 16 KG 3.00 6.00 18.00

VALOR COSTOS DIRECTOS 52,076.28


15622.8836941522
REL
ACIO
N DE
INSU
MOS UNIDAD
COSTO
ITEM DESCRIPCIÓN DE CANTIDADES
UNITARIO
MEDIDA

MANO DE OBRA
OPERARIO HH 70.38 70.00
OFICIAL HH 147.80 50.00
PEONES HH 410.55 30.00

MATERIALES
ABRAZADERAS UND 18.00 100.00
ACERO DE REFUERZO Fy=42000 D=1/2 " VARR 3.00 20.00
ALAMBRE DE AMARRE N° 16 KG 3.00 6.00
ARENA M3 1.00 80.00
BARANDA PASAMANOS 4"x 6"x 3.5m UND 26.00 34.45
BRIDAS 2"x 3" x 2.10m UND 32.00 8.61
CEMENTO PORTLAND TIPO II m3 7.20 24.00
CLAVOS DE CALAMINA KG 30.00 9.00
CLAVOS PARA MADERA KG 30.00 8.00
COBERTURA DE TECHO M2 198.83 20.00
CORREAS 2" x 3"x 3.5m UND 104.00 8.61
DIAGONAL 2"x4"x3.36 UND 4.00 11.02
DIAGONAL 2"x4"x3.5 UND 4.00 16.40
DIAGONAL 2"x4"x3.6 UND 4.00 11.81
DIAGONAL 2"x4"x3.77 UND 4.00 12.37
DIAGONAL 2"x4"x3.84 UND 4.00 12.60
DIAGONAL 2"x4"x4.26 UND 4.00 13.98
DIAGONAL 2"x4"x4.54 UND 4.00 14.90
ENCHAPE METALICO UND 15.00 1.87
MONTANTES 4"X6"x3.5m UND 2.00 34.45
MONTANTES 4"X6"x3.6 UND 2.00 35.43
MONTANTES 4"X6"x3.85 UND 2.00 37.89
MONTANTES 4"X6"x3.95 UND 2.00 38.88
MONTANTES 4"X6"x3.95 UND 2.00 38.88
MONTANTES 4"X6"x3.95 UND 2.00 38.88
MONTANTES 4"X6"x4 UND 2.00 39.37
MONTANTES 4"X6"x4.06 UND 2.00 39.96
MONTANTES 4"X6"x4.13 UND 2.00 40.65
MONTANTES 4"X6"x4.13 UND 2.00 40.65
MONTANTES 4"X6"x4.24 UND 2.00 41.73
MONTANTES 4"X6"x4.5 UND 2.00 44.29
MONTANTES 4"X6"x4.62 UND 2.00 45.47
MONTANTES 4"X6"x4.67 UND 2.00 45.96
MONTANTES 4"X6"x5.38 UND 2.00 52.95
MONTANTES 4"X6"x5.44 UND 2.00 53.54
MONTANTES 4"X6"x5.7 UND 2.00 56.10
PERNOS UND 72.00 5.00
PIEDRA CHACHADA DE 3/4" M3 2.00 100.00
PLATAFORMA 1.5"x 8"x3.5m UND 80.00 17.22
VIGA DE AMARRE 4"x 6"x 3.5m UND 26.00 34.45
VIGA LONG. 6" X 16"X 12m UND 24.00 472.44
VIGA TRANSVERSAL 6" X 8" X 3m UND 2.00 59.06
VIGA TRANSVERSAL 8" X 8" X 3m UND 12.00 78.74

EQUIPO
EQUIPO TOPOGRAFICO GBL 1.00
HERRAMIENTAS % 1.00

VALOR COSTOS DIRECTOS


COSTO PARCIAL COSSTO TOTAL

24,633.10
4,926.62 8.7975357143
7,389.93 18.474825
12,316.55 51.3189583333

26,162.03
1,800.00
60.00
18.00
80.00
895.67
275.59
172.80
270.00
240.00
3,976.60
895.67
44.09
65.62
47.24
49.48
50.39
55.91
59.58
420.00
68.90
70.87
75.79
77.76
77.76
77.76
78.74
79.92
81.30
81.30
83.46
88.58
90.94
91.93
105.91
107.09
112.20
360.00
200.00
1,377.95
895.67
11,338.58
118.11
944.88

1,281.14
500.00
781.14

52,076.28 52,076.28

52076.279

0.00
PROYECTO PUENTE PARAISO- 3 UNIDOS

UNIDAD
ITEM DESCRIPCIÓN DE CANTIDADES VALOR UNITARIO
MEDIDA

1.00 OBRAS PRELIMIANRES


1.10 TRAZO Y REPLANTEO GBL 1.00 1,000.00

2.00 OBRAS CONCRETO ARMADO


2.10 ENCONFRADO M2 4.80 50.00
2.20 ACERO DE REFUERZO Fy=42000 KG 21.43 6.50
2.30 CONCRETO FC= 210 KG/CM2 m3 0.80 391.15

3.00 OBRAS DE CARPINTERIA DE MADERA


3.01 VIGA LONG. 6" X 16"X 12m UND 24.00 26,456.69
3.02 VIGA TRANSVERSAL 8" X 8" X 3m UND 12.00 2,204.72
3.03 VIGA TRANSVERSAL 6" X 8" X 3m UND 2.00 275.59
3.04 BARANDA PASAMANOS 4"x 6"x 3.5m UND 26.00 2,089.90
3.05 VIGA DE AMARRE 4"x 6"x 3.5m UND 26.00 2,089.90
3.06 PLATAFORMA 1.5"x 8"x3.5m UND 80.00 3,215.22
3.07 MONTANTES 4"X6"x3.5m UND 2.00 160.76
3.08 MONTANTES 4"X6"x4.24 UND 2.00 194.75
3.09 MONTANTES 4"X6"x5.44 UND 2.00 249.87
3.10 MONTANTES 4"X6"x5.38 UND 2.00 247.11
3.11 MONTANTES 4"X6"x4.62 UND 2.00 212.20
3.12 MONTANTES 4"X6"x4 UND 2.00 183.73
3.13 MONTANTES 4"X6"x3.95 UND 2.00 181.43
3.14 MONTANTES 4"X6"x3.95 UND 2.00 181.43
3.15 MONTANTES 4"X6"x4.13 UND 2.00 189.70
3.16 MONTANTES 4"X6"x3.95 UND 2.00 181.43
3.17 MONTANTES 4"X6"x3.85 UND 2.00 176.84
3.18 MONTANTES 4"X6"x4.06 UND 2.00 186.48
3.19 MONTANTES 4"X6"x4.13 UND 2.00 189.70
3.20 MONTANTES 4"X6"x4.67 UND 2.00 214.50
3.21 MONTANTES 4"X6"x5.7 UND 2.00 261.81
3.22 MONTANTES 4"X6"x4.5 UND 2.00 206.69
3.23 MONTANTES 4"X6"x3.6 UND 2.00 165.35
3.24 DIAGONAL 2"x4"x3.5 UND 4.00 153.11
3.25 DIAGONAL 2"x4"x4.26 UND 4.00 130.45
3.26 DIAGONAL 2"x4"x4.54 UND 4.00 139.02
3.27 DIAGONAL 2"x4"x3.77 UND 4.00 115.44
3.28 DIAGONAL 2"x4"x3.6 UND 4.00 110.24
3.29 DIAGONAL 2"x4"x3.84 UND 4.00 117.59
3.30 DIAGONAL 2"x4"x3.36 UND 4.00 102.89

4.00 ESTRUCTURA DE TECHO


4.01 CARREAS 2" x 3"x 3.5m UND 104.00 2,089.90
4.02 BRIDAS 2"x 3" x 2.10m UND 32.00 643.04

5.00 COBERTURA DE TECHO


5.01 COBERTURA DE TECHO M2 198.83 20.00
6.00 OTROS
6.01 ABRAZADERAS UND 18.00 100.00
6.02 ENCHAPE METALICO UND 15.00 28.00
6.03 PERNOS UND 72.00 5.00
6.04 CLAVOS DE CALAMINA KG 30.00 9.00
6.05 CLAVOS PARA MADERA KG 30.00 8.00
6.06 ALAMBRE DE AMARRE N° 16 KG 3.00 6

VALOR COSTOS DIRECTOS


UNIDOS

VALOR TOTAL POR


VALOR TOTAL PARCIAL
CAPITULO

1,000.00
1,000.00

0.00 692.20
240.00
139.28
312.92

0.00 40,584.54
26,456.69
2,204.72
275.59
2,089.90
2,089.90
3,215.22
160.76
194.75
249.87
247.11
212.20
183.73
181.43
181.43
189.70
181.43
176.84
186.48
189.70
214.50
261.81
206.69
165.35
153.11
130.45
139.02
115.44
110.24
117.59
102.89

0.00 2,732.94
2,089.90
643.04

3,976.60
3,976.60
0.00 3,090.00
1,800.00
420.00
360.00
270.00
240.00
18.00

52,094.28
PROYECTO PUENTE PARAISO- 3 UNIDO

P
UNIDAD
U
ITEM DESCRIPCIÓN DE CANTIDADES PIES
L
MEDIDA
G

1.00 OBRAS PRELIMIANRES


1.10 TRAZO Y REPLANTEO GBL 1.00

2.00 OBRAS CONCRETO ARMADO


2.10 ENCONFRADO M2 4.80
2.20 ACERO DE REFUERZO Fy=42000 KG 21.43
2.30 CONCRETO FC= 210 KG/CM2 m3 0.80

3.00 OBRAS DE CARPINTERIA DE MADERA


3.01 VIGA LONG. 6" X 16"X 12m UND 24.00 ### 39.37
3.02 VIGA TRANSVERSAL 8" X 8" X 3m UND 12.00 ### 9.84
3.03 VIGA TRANSVERSAL 6" X 8" X 3m UND 2.00 ### 9.84
3.04 BARANDA PASAMANOS 4"x 6"x 3.5m UND 26.00 ### 11.48
3.05 VIGA DE AMARRE 4"x 6"x 3.5m UND 26.00 ### 11.48
3.06 PLATAFORMA 1.5"x 8"x3.5m UND 80.00 ### 11.48
3.07 MONTANTES 4"X6"x3.5m UND 2.00 ### 11.48
3.08 MONTANTES 4"X6"x4.24 UND 2.00 ### 13.91
3.09 MONTANTES 4"X6"x5.44 UND 2.00 ### 17.85
3.10 MONTANTES 4"X6"x5.38 UND 2.00 ### 17.65
3.11 MONTANTES 4"X6"x4.62 UND 2.00 ### 15.16
3.12 MONTANTES 4"X6"x4 UND 2.00 ### 13.12
3.13 MONTANTES 4"X6"x3.95 UND 2.00 ### 12.96
3.14 MONTANTES 4"X6"x3.95 UND 2.00 ### 12.96
3.15 MONTANTES 4"X6"x4.13 UND 2.00 ### 13.55
3.16 MONTANTES 4"X6"x3.95 UND 2.00 ### 12.96
3.17 MONTANTES 4"X6"x3.85 UND 2.00 ### 12.63
3.18 MONTANTES 4"X6"x4.06 UND 2.00 ### 13.32
3.19 MONTANTES 4"X6"x4.13 UND 2.00 ### 13.55
3.20 MONTANTES 4"X6"x4.67 UND 2.00 ### 15.32
3.21 MONTANTES 4"X6"x5.7 UND 2.00 ### 18.70
3.22 MONTANTES 4"X6"x4.5 UND 2.00 ### 14.76
3.23 MONTANTES 4"X6"x3.6 UND 2.00 ### 11.81
3.24 DIAGONAL 2"x4"x3.5 UND 4.00 ### 16.40
3.25 DIAGONAL 2"x4"x4.26 UND 4.00 ### 13.98
3.26 DIAGONAL 2"x4"x4.54 UND 4.00 ### 14.90
3.27 DIAGONAL 2"x4"x3.77 UND 4.00 ### 12.37
3.28 DIAGONAL 2"x4"x3.6 UND 4.00 ### 11.81
3.29 DIAGONAL 2"x4"x3.84 UND 4.00 ### 12.60
3.30 DIAGONAL 2"x4"x3.36 UND 4.00 ### 11.02

4.00 ESTRUCTURA DE TECHO


4.01 CARREAS 2" x 3"x 3.5m UND 104.00 ### 11.48
4.02 BRIDAS 2"x 3" x 2.10m UND 32.00 ### 11.48

5.00 COBERTURA DE TECHO


5.01 COBERTURA DE TECHO M2 198.83

6.00 OTROS
6.01 ABRAZADERAS UND 18.00
6.02 ENCHAPE METALICO UND 15.00
6.03 PERNOS UND 72.00
6.04 CLAVOS DE CALAMINA KG 30.00
6.05 CLAVOS PARA MADERA KG 30.00
6.06 ALAMBRE DE AMARRE N° 16 KG 3.00

VALOR COSTOS DIRECTOS


PUENTE PARAISO- 3 UNIDOS

VALOR TOTAL POR


PIES TABLAR VALOR UNITARIO VALOR TOTAL PARCIAL
CAPITULO

1,000.00
1,000.00 1,000.00

692.20
50.00 240.00
6.50 139.28
391.15 312.92

40,584.54
314.96 7,559.06 26,456.69 26,456.69
52.49 629.92 2,204.72 2,204.72
39.37 78.74 275.59 275.59
22.97 597.11 2,089.90 2,089.90
22.97 597.11 2,089.90 2,089.90
11.48 918.64 3,215.22 3,215.22
22.97 45.93 160.76 160.76
27.82 55.64 194.75 194.75
35.70 71.39 249.87 249.87
35.30 70.60 247.11 247.11
30.31 60.63 212.20 212.20
26.25 52.49 183.73 183.73
25.92 51.84 181.43 181.43
25.92 51.84 181.43 181.43
27.10 54.20 189.70 189.70
25.92 51.84 181.43 181.43
25.26 50.52 176.84 176.84
26.64 53.28 186.48 186.48
27.10 54.20 189.70 189.70
30.64 61.29 214.50 214.50
37.40 74.80 261.81 261.81
29.53 59.06 206.69 206.69
23.62 47.24 165.35 165.35
10.94 43.74 153.11 153.11
9.32 37.27 130.45 130.45
9.93 39.72 139.02 139.02
8.25 32.98 115.44 115.44
7.87 31.50 110.24 110.24
8.40 33.60 117.59 117.59
7.35 29.40 102.89 102.89
1,009.69
2,732.94
5.74 2,089.90 2,089.90
5.74 643.04 643.04

3,976.60
20.00 3,976.60

3,090.00
100.00 1,800.00
28.00 420.00
5.00 360.00
9.00 270.00
8.00 240.00
6.00 18.00

52,094.28
RELACION DE INSUMOS

UNIDAD
ITEM DESCRIPCIÓN DE CANTIDADES VALOR UNITARIO
MEDIDA

1.10 EQUIPO TOPOGRAFICO GBL 1.00 500.00

2.20 ACERO DE REFUERZO Fy=42000 D=1/2 " VARR 3.00 20.00


2.30 CEMENTO PORTLAND m3 7.20 24.00
ARENA M3 1.00 80.00
PIEDRA CHACHADA DE 3/4" M3 2.00 100.00

3.01 VIGA LONG. 6" X 16"X 12m UND 24.00 11,338.58


3.02 VIGA TRANSVERSAL 8" X 8" X 3m UND 12.00 944.88
3.03 VIGA TRANSVERSAL 6" X 8" X 3m UND 2.00 118.11
3.04 BARANDA PASAMANOS 4"x 6"x 3.5m UND 26.00 895.67
3.05 VIGA DE AMARRE 4"x 6"x 3.5m UND 26.00 895.67
3.06 PLATAFORMA 1.5"x 8"x3.5m UND 80.00 1,377.95
3.07 MONTANTES 4"X6"x3.5m UND 2.00 68.90
3.08 MONTANTES 4"X6"x4.24 UND 2.00 83.46
3.09 MONTANTES 4"X6"x5.44 UND 2.00 107.09
3.10 MONTANTES 4"X6"x5.38 UND 2.00 105.91
3.11 MONTANTES 4"X6"x4.62 UND 2.00 90.94
3.12 MONTANTES 4"X6"x4 UND 2.00 78.74
3.13 MONTANTES 4"X6"x3.95 UND 2.00 77.76
3.14 MONTANTES 4"X6"x3.95 UND 2.00 77.76
3.15 MONTANTES 4"X6"x4.13 UND 2.00 81.30
3.16 MONTANTES 4"X6"x3.95 UND 2.00 77.76
3.17 MONTANTES 4"X6"x3.85 UND 2.00 75.79
3.18 MONTANTES 4"X6"x4.06 UND 2.00 79.92
3.19 MONTANTES 4"X6"x4.13 UND 2.00 81.30
3.20 MONTANTES 4"X6"x4.67 UND 2.00 91.93
3.21 MONTANTES 4"X6"x5.7 UND 2.00 112.20
3.22 MONTANTES 4"X6"x4.5 UND 2.00 88.58
3.23 MONTANTES 4"X6"x3.6 UND 2.00 70.87
3.24 DIAGONAL 2"x4"x3.5 UND 4.00 65.62
3.25 DIAGONAL 2"x4"x4.26 UND 4.00 55.91
3.26 DIAGONAL 2"x4"x4.54 UND 4.00 59.58
3.27 DIAGONAL 2"x4"x3.77 UND 4.00 49.48
3.28 DIAGONAL 2"x4"x3.6 UND 4.00 47.24
3.29 DIAGONAL 2"x4"x3.84 UND 4.00 50.39
3.30 DIAGONAL 2"x4"x3.36 UND 4.00 44.09

4.01 CORREAS 2" x 3"x 3.5m UND 104.00 895.67


4.02 BRIDAS 2"x 3" x 2.10m UND 32.00 275.59
5.01 COBERTURA DE TECHO M2 198.83 20.00

6.01 ABRAZADERAS UND 18.00 100.00


6.02 ENCHAPE METALICO UND 15.00 28.00
6.03 PERNOS UND 72.00 5.00
6.04 CLAVOS DE CALAMINA KG 30.00 9.00
6.05 CLAVOS PARA MADERA KG 30.00 8.00
6.06 ALAMBRE DE AMARRE N° 16 KG 3.00 6.00

VALOR COSTOS DIRECTOS


VALOR TOTAL POR
VALOR TOTAL PARCIAL
CAPITULO

500.00

60.00
172.80
80.00
200.00

11,338.58
944.88
118.11
895.67
895.67
1,377.95
68.90
83.46
107.09
105.91
90.94
78.74
77.76
77.76
81.30
77.76
75.79
79.92
81.30
91.93
112.20
88.58
70.87
65.62
55.91
59.58
49.48
47.24
50.39
44.09

895.67
275.59
3,976.60

1,800.00
420.00
360.00
270.00
240.00
18.00

26,662.03 0.00