Nestle Waters - Material Submittals

Item No. Document Reference Description Date Submitted Status


1 PSBC-NW-MA-0072 Glazing (White Aluminum Enterprise LLC) by Sama Steel 26-Mar-18 For Stamping at CEC Office
2 PSBC-NW-MA-0074 Aluminum Accessories (GIESSE) by Sama Steel 26-Mar-18
Refrigeration and Air Conditioning System
3 PSBC-NW-MA-0089 25-Apr-18
(Pressurization Unit, Skid (Reflex, Kelvion/Grundfos, Dynair, Ventilation Pan)
4 PSBC-NW-MA-0091 Sample Board by Naffco 25-Apr-18
5 PSBC-NW-MA-0092 Neutralization Tank (Orion) by Al Manar 25-Apr-18
6 PSBC-NW-MA-0093 Floor Trap (SHW) - Industrial Use (Factory and Lab) 25-Apr-18
7 PSBC-NW-MA-0094 Floor Trap (ACO) - Domestic Use 25-Apr-18
8 PSBC-NW-MA-0095 Air Handling Units, Fresh Air Handling and Fan Coils by Build Up 29-Apr-18
9 PSBC-NW-MA-0096 Electrical Components by Adearest 02-May-18
10 PSBC-NW-MA-0097 Aerofoam XLPE Polyolefin Foam Insulation for Duct by Build Up 02-May-18
11 PSBC-NW-MA-0098 Aerofoam XLPE Polyolefin Foam Insulation for Chiller Water Pipes by Build Up 02-May-18
12 PSBC-NW-MA-0099 Compressive Strength of Concrete Cubes Report 02-May-18 For Stamping at CEC Office
13 PSBC-NW-MA-0100 Compaction Test Results for 1st Layer of Road Base for Factory Building 02-May-18 For Stamping at CEC Office

Nestle Waters - Technical Submittals


Item No. Document Reference Description Date Submitted Status
1 PSBC-NW-TT-0050 Risk Assessment for Cast in Place Concrete in Underground Water Tank 10-Apr-18
Refrigeration and Air Conditioning System(Adearest)
2 PSBC-NW-TT-0051 (Motor Data Sheet, VFD Data Sheet, Load Distribution Schedule, Electrical Load Schedule and Single Line 25-Apr-18
Diagram (MCC-01 & MCC-02)

Nestle Waters - Method Statement and Risk Assessment


1 PSBC-NW-MSA-0021 Method Statement and Risk Assessment for Water Stopper Supercast SW30 23-Apr-18
2 PSBC-NW-MSA-0021 Method Statement and Risk Assessment for Cementitious Grouting 23-Apr-18

Nestle Waters - Shop Drawings


Item No. Document Reference Description Date Submitted Status
1 PSBC-NW-DA-0003 Rev.01 PAVA & Fire Telephone System by Naffco 25-Apr-18
2 PSBC-NW-DA-0005 Rev.01 Fire Alarm System by Naffco 25-Apr-18
3 PSBC-NW-DA-0006 Rev.01 Fire Figthing, Fire Sprinkler and Fire Extinguisher System by Naffco 23-Apr-18
4 PSBC-NW-DA-0007 Rev.01 Fire Suppression & Detection Layout for LV Room & Central Battery System Layout by Naffco 16-Apr-18
5 PSBC-NW-DA-0010 Rev.01 Under Ground Pump Room Plan, Section and Isometric Drawings @ LVL -3.65M 23-Apr-18
6 PSBC-NW-DA-0011 Rev.01 Under Ground Pump Room Foundation & Typical Detail Drawings @ LVL -3.65M 23-Apr-18
7 PSBC-NW-DA-0014 Telephone Layout by Al Banan 26-Apr-18
8 PSBC-NW-DA-0015 Drainage Layout by Al Manar 26-Apr-18
9 PSBC-NW-DA-0016 Chiller Room Civil Requirement and Refrigeration Room P & ID by Adearest 29-Apr-18
10 PSBC-NW-DA-0017 Chilled Water Layout , AC Layouta and Ventilation Layout by Build Up 29-Apr-18
11 PSBC-NW-DA-0019 Water Supply Layout by Al Manar 01-May-18
12 PSBC-NW-DA-0020 Chiller Room Piping Layout 02-May-18