METHOD STATEMENT

MAIN
JAYSEE COMPANY LIMITED DATE
CONTRACTOR

PREPARED
PROJECT
BY

RESOURCE OUTPUT
RESOURCES INPUT ENVIRON
MENTAL,
HEALTH &
ID TASK MODE OF EXECUTION QTY
OUTPUT DURATION UNI SAFETY
EQUIPMENT LABOUR MATERIAL UNIT CONCERN
T
S/RISKS

MOBILIZATION & SITE CLEARANCE

50mm x 100mm
1. Fix timber post into concrete
KIA truck, Earth 2 Masons, x 4200mm wawa
pad at 1200mm centers.
1 Hoading of site Chisel, Wheel 2 Labourers, scantling, mass 122 m 80m/day 2 days Minor injuries
2. Nail
Barrow 3 Carpenters concrete, roofing
roofing sheets to timber posts
sheets & nails

1. Cut down trees


Cut down trees; and 1 Operator,
2. Clear area of
clear site of over Eartworks 500m² Injuries, dust,
3 bush and strip off topsoil to max Dozer 404 m² 1 days
grown weeds and foreman, 2 /day noise
depth of 150mm and form
burn off site labourers
surface
1. Site offices
Foreman; 2
2. Stores 2Nr-40'
Temporal site Masons; 4
3 container; 2Nr- ITEM 8 days Minor injuries
structures Carpenters; 6
3. Canteen mobile laterines
Labourers 4
4. Shower/wc
1 Site Engineer
2'' x 4'' wawa
scantling, wawa
4 Setting Out 1. Use theodolite method Theodolite 2 Masons ITEM 2 days days Minor injuries
boards, nails,
line.
4 Labourers

Northwest Construction Limited


SUBSTRUCTURE WORKS

Foreman;
1. Excavate manually Pick axe, 2 days
1 Mason Dust, minor
5 Excavating pits 2. Dispose shovel/spade, 28 m³ 2 m³/day (7
1 injuries
debris on site wheel barrows Labourers)
Labourer

Foreman;
1. Excavte manually Pick axe, 6 days
1 Mason Dust, minor
6 Excavating trenches 2. Dispose debris shovel/spade, 55 m³ 2 m³/day (7
1 injuries
on site wheel barrows Labourers)
Labourer

1. Mix concrete on site using 1 Foreman;


Rough sand;
concrete mixer Wheel barrow, 2 Masons; 1 days
Foundation portland cement; Dust, minor
7 2. Transport and concrete mixer, 7 13 m³ 7 m³/day (2
Concretes granite injuries
concrete 3. vibrator Labourers Gangs)
chippings; water
Compacting concrete 1 Operator
1 Site Engineer

1. Stack 6'' and 9"sandcrete Concrete mixer, 1


11 days
blocks 2. Mix wheel barrow, Foreman Medium sand;
Blockwork in (5 Dust, minor
8 mortar spirit level, portland cement; 263 m² 5 m² /day
footing Gangs) injuries
3. Lay sandcrete blocks plumb bulb, line 1 Masons water
in footing and pins
1
1. Construct and fix formwork Labourer
2. Cut, bend and fix
1 Foreman;
reinforcement in position Rough sand;
Wheel barrow, 2 Masons;
3. portland cement; Dust, minor
9 Footing columns concrete mixer, 7 8 m³ 7 m³/day 1 day
Provide concrete granite injuries
vibrator Labourers
4. Transport and chippings; water
1 Operator
concrete 5.
Compacting concrete
1 Foreman
20m³ Tipper
1. Provide gravel material truck, wheel
4 days
2. Spread evenly, barrows, 5 tonne 1 Imported laterite, Dust, minor
10 Hardcore fillings 148 m³ 9 m³/day (5
water and compact in 250mm roller Labourer water injuries
Labourers)
thick layers compactor,
water hose 1
Operator

Northwest Construction Limited


1 Foreman;
1. Provide concrete Rough sand;
Wheel barrow, 2 Masons; 2 days
2. Transport and portland cement; Dust, minor
11 Oversite concrete concrete mixer, 7 51 m³ 7 m³/day (4
concrete 3. granite injuries
vibrator Labourers Gangs)
Compacting concrete chippings; water
1 Operator
1. Provide reinforcements bars
1 Site Engineer,
and mark out 2.
Electric cutting 1 Forman, Reinforcement 2 days
Cut and bend bars to shape 1704 200kg/
12 Reinforcement and bending 2 Steel bars, binding (4 Gangs) Injuries
3. Fix kg day
machine benders, 1 wire
bars into position using binding
labourer
wire
1Site Engineer,
1. Formwork to columns
1 Forman,
2. beams 2'' x 4'' wawa
2 2 days
13 Formworks 3. Slab scantling, wawa 87 m² 9 m²/day Injuries
Carpenters, (4 Gangs)
4. Striking of boards, nails.
2
formworks
labourers
SUPERSTRUCTURE WORKS - GROUND FLOOR
1. Provide reinforcements bars
1 Site Engineer,
and mark out 2.
Electric cutting 1 Forman, Reinforcement 13 days
Cut and bend bars to shape 5274 200kg/
14 Reinforcement and bending 2 Steel bars, binding (3 Injuries
3. Fix kg day
machine benders, 1 wire Gangs)
bars into position using binding
labourer
wire
1Site Engineer,
1. Formwork to columns
1 Forman,
2. beams 2'' x 4'' wawa
2 13 days
15 Formworks 3. Slab scantling, wawa 545 m² 9 m²/day Injuries
Carpenters, (2 Gangs)
4. Striking of boards, nails.
2
formworks
1. Mix concrete using concrete labourers
Mixer on site 1 Foreman;
Rough sand;
2. Load and transport Wheel barrow, 2 Masons;
portland cement; 12 days Dust, minor
16 In-situ concrete by wheel barrow and place in concrete mixer, 7 84 m³ 7 m³/day
granite injuries
position poker vibrator Labourers
chippings; water
3. Compact 1 Operator
1 Site Engineer;
concrete with the aid of vibrator
1. Stack 6'' and sandcrete blocks Concrete mixer, 1
Medium sand; 12 days
2. Mix mortar wheel barrow, Foreman; Dust, minor
17 Blockwork portland cement; 596 m² 10 m²/day (5
3. spirit level, line injuries
water Gangs)
Lay sandcrete blocks and pins 1 Masons,
1
Labourers

Northwest Construction Limited


1. Measure and mark out truss
1Site Engineer,
members, 2. cut into shape
1 Forman, 2" x 4"
3. 5 days
Carpentery 2 Hardwood, 2855 110
18 Roof Carcassing Apply preservative by surface (5 Injuries
small tools Carpenters, 2" x 3" m m/day
brushing and assemble by Gangs)
2 Hardwood
nailing.
labourers
4.Fix into position
1Site Engineer,
1 Forman, Currugated
Place and nail corrugated
Carpentery 2 Aluminium 131
19 Roof Sheeting aluminium roofing sheets to hard 393 m2 3 day Injuries
small tools Carpenters, Roofing sheets, m2/day
wood purlins
2 nails
labourers
1. Measure and mark out wood
1Site Engineer,
2. cut into sizes
1 Forman, 2" x 4"
3.
Carpentery 2 Hardwood,
20 Door Frames Apply preservative by surface 160 m 50 m/ day 3 Minor injuries
small tools Carpenters,
brushing and assemble by
2 Preservatives
nailing.
4.Fix into position 1Apprentice
Site Engineer
1. Mark out and cut chases for
1
conduit pipe
Foreman Pvc conduits
Electrical Works-1st 2. Lay pipes and Dust, minor
21 pipes, cables, ITEM 5 days
Fix fix knock out boxes injuries
1 knock out boxes
3. Draw
Electricians
cables into conduits 1 Site Engineer
4
Labourers
1 Foreman
1. Mark out and cut chases for
Mechanical & Air- PVC pipe PVC pipes,
Dust, minor
22 Conditioning-1st 2. Lay pipes and bends and ITEM 10 days
1 Plumber injuries
Fix accessories accessories
1 Ref Mechanic
4
1 Site Engineer;
1. Mix mortar using concrete Concrete mixer, Labourers
1
Plastering and mixer wheel barrow, Smooth sand; 12 days
Foreman; 1532 Dust, minor
19 Rendering to Walls 2. Take levels spirit level, line portland cement; 15 m²/day
1 m² injuries
and Column 3. Apply to and pins, water (8 Gangs)
Masons,
surface and trowel/float finish straight edge
1 Labourer

Northwest Construction Limited


1. Mix mortar 1 Site Engineer; Medium sand;
Concrete mixer,
2. Take levels 1 portland cement;
wheel barrow, 10 days
3. Foreman; water, creamic & Dust, minor
20 Screeding & Tiling spirit level, line 472 m² 8 m²/day
Screed to float finish 1 Tile porcelain tiles, injuries
and pins, (6 Gangs)
4. Fix wall and floor Layer 1 tile adhesive, tile
straight edge
tiles Labourer grout

Installation of
Supply and fix balustrade and Sub Dust, minor
21 Balustrdes & ITEM 7 days
railings concontractor injuries
Railings

1Site Engineer,
1 Forman,
1. Supply and fix doors
Caperntery 2
22 Fixing of Doors including locks Doors and Locks 28 nr 14 nr /day 2days Minor injuries
Small Tools Carpenters,
2
1Apprentice
Foreman,
1 Mason
1. Supply and fix Prefabricated 1
23 Windows fixing Window Sets 36 nr 18nr /day 2days Minor injuries
Aluminium Windows Fabricator
2
Labourers
1Site Engineer,
1 Forman,
1. Take level
Caperntery 2 Plastic T & G 3 days
24 Celing finishes 321 m² 25m²/day Minor injuries
Small Tools Carpenters, Panels (4 Gangs)
2. Fix T & G
2
Apprentice
1 Site Engineer

Electrical Works - 1. Fix all electrical fittings and Electrician's 1 Foreman Electrical fittings
25 ITEM 8 days Minor injuries
2nd Fix accessories small tools 1 and accessories
Electrician
1 Labourer
Site Engineer; 1
Plumbing fittings
Plumbing Refrigerators 2
26 Fix all sanitary appliances and sanitary ITEM 13 days Minor injuries
Installations Plumbers, 6
appliances
Labourers 4

Northwest Construction Limited


1Foreman,
1. Prepare and prime surfaces 2
Painting Wall Sand paper, 1383 9 days Dust, minor
27 2. Apply 1 Painters, 35 m²/day
(Emulsion) paints, brush m² (4 gangs) injuries
undercoats and1 finishing coats 1
Labourers
1Foreman,
1. Prepare and prime surfaces 2
Painting (Gloss on Sand paper, Dust, minor
28 2. Apply 1 Painters, 15 m² 20 m²/day 2 day
wood) paints, brush injuries
undercoats and1 finishing coats 1
Labourers
EXTERNAL WORKS

Site Engineer;
1. Excavate trenches for conduits Pvc conduits
Foreman; 1 Dust, minor
29 External lighting 2. Lay conduit pipes pipes, cables, ITEM 2 days
Electricians, 6 injuries
and draw cables knock out boxes
Labourers 4

Site Engineer; Kerbs, granite


5 tonne roller
1. Lay kerbs Foreman; 1 chippings, Dust, minor
30 kerbs compactor, KIA 47m 8m/day 6 days
Masons, 6 bitumen, quarry injuries
truck
Labourers 8 dust, solvents
1 Site Engineer
1
Foreman
5 tonne roller Paving Slabs,
1.Level ground and lay paving Dust, minor
31 Paving compactor, KIA bitumen, quarry 211m² 35 m²/day 6 days
slabs 2 Masons injuries
truck dust
1 Site Engineer2
Labourers
1. Fill & level with
KIA Truck, Black soil,
vegetable/black soil 1Foreman
Grassing and Earth Chisel, fertilizer, grass Dust, minor
32 2. 263m² 43 m²/day 6 days
flowering Wheel Barrow, seeds and injuries
Seeding and turfing 1
Hand Fork seedlings
3. Cultivating Gardeners

2 Labourers

Northwest Construction Limited


SOWAH-LARYEA FELIX

PROPOSED MODE OF
MITIGATION

Helmet, safety boots, first aid,


gloves etc.

Nose guards, reflective jackets,


safety boots, overall, flagsman,
earplugs

Helmet, safety boots, first aid,


gloves etc.

Helmet, safety boots, first aid,


gloves etc.

Northwest Construction Limited


Nose guards, Helmet, safety
boots, first aid, gloves etc.

Nose guards, Helmet, safety


boots, first aid, gloves etc.

Nose guards, Helmet, safety


boots, first aid, gloves etc.

Nose guards, Helmet, safety


boots, first aid, gloves etc.

Nose guards, Helmet, safety


boots, first aid, gloves etc.

Nose guards, Helmet, safety


boots, first aid, gloves etc.

Northwest Construction Limited


Nose guards, Helmet, safety
boots, first aid, gloves etc.

Helmet, safety boots, first aid,


gloves etc.

Helmet, safety boots, first aid,


gloves etc.

Helmet, safety boots, first aid,


gloves etc.

Helmet, safety boots, first aid,


gloves etc.

Nose guards, Helmet, safety


boots, first aid, gloves etc.

Nose guards, Helmet, safety


boots, first aid, gloves etc.

Northwest Construction Limited


Helmet, safety boots, first aid,
gloves etc.

Helmet, safety boots, first aid,


gloves etc.

Helmet, safety boots, first aid,


gloves etc.

Nose guards, Helmet, safety


boots, first aid, gloves etc.

Nose guards, Helmet, safety


boots, first aid, gloves etc.

Nose guards, Helmet, safety


boots, first aid, gloves etc.

Northwest Construction Limited


Nose guards, Helmet, safety
boots, first aid, gloves etc.

Nose guards, Helmet, safety


boots, first aid, gloves etc.

Helmet, safety boots, first aid,


gloves etc.

Helmet, safety boots, first aid,


gloves etc.

Helmet, safety boots, first aid,


gloves etc.

Helmet, safety boots, first aid,


gloves etc.

Helmet, safety boots, first aid,


gloves etc.

Northwest Construction Limited


Nose guards, Helmet, safety
boots, first aid, gloves etc.

Nose guards, Helmet, safety


boots, first aid, gloves etc.

Nose guards, Helmet, safety


boots, first aid, gloves etc.

Nose guards, Helmet, safety


boots, first aid, gloves etc.

Nose guards, Helmet, safety


boots, first aid, gloves etc.

Nose guards, Helmet, safety


boots, first aid, gloves etc.

Northwest Construction Limited