JAYSEE COMPANY LIMITED DATE
CONTRACTOR
PREPARED
PROJECT
BY
RESOURCE OUTPUT
RESOURCES INPUT ENVIRON
MENTAL,
HEALTH &
ID TASK MODE OF EXECUTION QTY
OUTPUT DURATION UNI SAFETY
EQUIPMENT LABOUR MATERIAL UNIT CONCERN
T
S/RISKS
50mm x 100mm
1. Fix timber post into concrete
KIA truck, Earth 2 Masons, x 4200mm wawa
pad at 1200mm centers.
1 Hoading of site Chisel, Wheel 2 Labourers, scantling, mass 122 m 80m/day 2 days Minor injuries
2. Nail
Barrow 3 Carpenters concrete, roofing
roofing sheets to timber posts
sheets & nails
Foreman;
1. Excavate manually Pick axe, 2 days
1 Mason Dust, minor
5 Excavating pits 2. Dispose shovel/spade, 28 m³ 2 m³/day (7
1 injuries
debris on site wheel barrows Labourers)
Labourer
Foreman;
1. Excavte manually Pick axe, 6 days
1 Mason Dust, minor
6 Excavating trenches 2. Dispose debris shovel/spade, 55 m³ 2 m³/day (7
1 injuries
on site wheel barrows Labourers)
Labourer
Installation of
Supply and fix balustrade and Sub Dust, minor
21 Balustrdes & ITEM 7 days
railings concontractor injuries
Railings
1Site Engineer,
1 Forman,
1. Supply and fix doors
Caperntery 2
22 Fixing of Doors including locks Doors and Locks 28 nr 14 nr /day 2days Minor injuries
Small Tools Carpenters,
2
1Apprentice
Foreman,
1 Mason
1. Supply and fix Prefabricated 1
23 Windows fixing Window Sets 36 nr 18nr /day 2days Minor injuries
Aluminium Windows Fabricator
2
Labourers
1Site Engineer,
1 Forman,
1. Take level
Caperntery 2 Plastic T & G 3 days
24 Celing finishes 321 m² 25m²/day Minor injuries
Small Tools Carpenters, Panels (4 Gangs)
2. Fix T & G
2
Apprentice
1 Site Engineer
Electrical Works - 1. Fix all electrical fittings and Electrician's 1 Foreman Electrical fittings
25 ITEM 8 days Minor injuries
2nd Fix accessories small tools 1 and accessories
Electrician
1 Labourer
Site Engineer; 1
Plumbing fittings
Plumbing Refrigerators 2
26 Fix all sanitary appliances and sanitary ITEM 13 days Minor injuries
Installations Plumbers, 6
appliances
Labourers 4
Site Engineer;
1. Excavate trenches for conduits Pvc conduits
Foreman; 1 Dust, minor
29 External lighting 2. Lay conduit pipes pipes, cables, ITEM 2 days
Electricians, 6 injuries
and draw cables knock out boxes
Labourers 4
2 Labourers
PROPOSED MODE OF
MITIGATION