oceaneering.

com

ROV Test Pool


Full scale test capability of subsea equipment
Oceaneering’s new ROV Test Pool with full scale
test capability of BOP stacks, Xmas trees,
manifolds, well systems and other related
subsea equipment.

8m

FEATURES
10m
Full scale test of Subsea equipment
15m

Access to workshop facilities

Fastening points in pool


2015.09-A
ROV Test Pool
Full scale test capability of subsea equipment

Features Technical data


» Fastening points in pool (see drawings) Measures
» Associated operation room w/ office facilities Width 10.000 mm
and internet
Length 15.000 mm
» Access for truck and forklift
Depth 8.000 mm
» Hot water washing area 6 x 7 m Height over ground 2.000 mm
» Access to outdoor and indoor workshop facilities,
storage area, offices and parking Capacitys

ELECTRIC POWER:

Fastening points 690 Volt - 50 & 60Hz – 250 Amp.

440 Volt - 60Hz – 250 Amp.


Floor Wall
400 Volt - 50Hz – 125 Amp.
15000 10000
220 Volt - 50Hz (1 phase)

3500 3000 110 Volt (on demand)


3000 3000 2000
HYDRAULIC POWER:
10000

8000
3000

3000

On demand
3500

LIFTING CRANES:
1700

1 ea. bridge crane, singel point lift 25.000 kg

1 ea. bridge crane, singel point lift 20.000 kg

Tandem lift 40.000 kg

Lifting height over pool 8.000 mm


Associated operation room w/ office
facilities and internet 1 ea. Overhead crane 2.000 kg

Water

Freshwater

Saltwater (on demand)

Filter system for removing off particle and oilspill

Fill time approx. 48 hrs.

Drain time approx. 48 hrs.

Volume of pool: 1.200.000 liter / 1.200 m3