Sie sind auf Seite 1von 1

DATE: October 17, 2017 NAME: Hayden Robbins

CE 365: Environmental Engineering Laboratory (Field Trip)


LOCATION: Long Beach Water Reclamation Plant (7400 E. Willow St., Long Beach, CA 91766)
TOUR GUIDE: Charles Dunn

Please complete this worksheet and return to your instructor after the field trip.

1. The LBWR design capacity = 25 MGD


2. Average flow rate = 17.3 MGD
3. Max flow rate during wet period = 34 MGD
4. State a function of the primary clarifiers (primary settlementation tanks)
5. What is the sewage after primary clarifiers called?
6.

Das könnte Ihnen auch gefallen