Bill No.

Item Description
Bill No.1
PRELIMINARIES
1 A-1 Performance bond
1 A-2 Mobilisation Advance Gurantee
1 A-3 Provide Security to Site
1 A-4 Provide electricity and water site
EXCAVATION and EARTHWORK
1 B-1 Site Clearing all vegitation and reducing to depth
not exceeding 150mm
1 B-2 Excavation of trenches for Random Rubble
masonry not exceeding 1.0m depth
1 B-3 Excavation of pits for Coloumn fottings not
exceeding 1.5m depth
1 B-4 Filling from excavated soil of foundation trenches
and pits
1 B-5 Filling foundations from imported soil

BLOCK-WALLS
2 E-1 100mm thick hollow cement blocks for walls in
1:5 mix
2 E-2 150mm thick hollow cement blocks for walls in
1:5 mix
ROOF WORK
2 F-1 Roof covering laid on class 2 timber framework
2 F-2 Ridge covering with asbestos or clay tiles set in
cement sand mortar
PAINTING
J-1 Painting of Exteranl walls with one coat of primer
3 and two coats of weatherhseild paint
J-2 Painting of internal walls with one coat of primer
3 and two coats of emulsion
3 J-3 Painting of doors
3 J-4 Polishing of windows

WATER SUPPLY
4 L1 Installation of Water tank 1000liters
4 L2 Installation of a kitchen sink 1500X450mm
4 L3 Installation of Commode
4 L4 Installation of washbasin
4 L5 Installation of bib tap
4 L6 Installation of pipe 32mm dia
4 L7 Insallation of pipe 20mm dia
4 L7 Insallation of pipe 25mm dia
Dimensions
Unit L(m) W(m) Area(m2) H(m) Nos Quantity Rate Amount

Nr 1
Nr 1
Months 4
Months 4

m2 12.7 10.5 133.35

m3 49.373 0.3 14.812 0.35 5.184

m3 2.4

m3 20.8

m3 58.15 0.21 12.2

m2 25 25

m2 130 130

m2 113.1 113.1

m2 9.555 0.4 3.82 1

m2 101.76

Nr 144.84
Item 1
Item 1

Nr 1
Nr 1
Nr 1
Nr 1
Nr 1
m 1.2 1.2
m 11.4 11.4
m 1.8 1.8
GM1 - PRELIMINARIES, EXCAVATION and EARTHWORK, RUBBLE FOUNDATION and DPC
GM2 - CONCRETE WORK, DOORS and WINDOWS, ELECTRICAL WORK
GM3 - BLOCKWALLS, ROOF WORK, WATER SUPPLY

This is spot pricing put conversion factor to be value around 8000


This is spot pricing put conversion factor to be value around 12000
This is to perform as Rate Analysis giving resources - assume two unskilled labour for for two shifts
This is spot pricing put conversion factor to be value around 1500

Area for the site clearing is taken as demarcating 1.5 m offset from the biuilding
line (wall outside). Hence Area = 12.7m * 10.5m = 133.35 m2
L refers to Rubble Foundation strip length which is 49.37 m; W refers to the
excavation width = 0.3 m and excavation depth is taken as 0.35 m
As per the data provided in the assignment
volume is taken as 2.4 m3
As per the data provided in the assignment
volume is taken as 20.8 m3
The foundation area to be backfilled = 58.15 m3; Clay Brick thickness is taken as
65 mm; Hence the fill height = 250 -65 = 185 mm; lift thickness = 185+25 = 210 mm)

All load bearing and non load bearing walls are cast from 150 mm thick hollow
blocks for walls.
Total wall Area = (9.951 + 11.5 + 16.327 + 12.22 + 12.06 + 10.128 + 8.207 + 9.8 + 4
+11.82+9.14 +9.14 +5.66 = 129.953 ~ 130 m2

A roof Angle of 20 degrees is assumed. Hence

BSR-Q10

External wall area = 24.82+20.74+2(14.4)+15.6+11.8 = 101.76 m2


BSR-M03
Internal wall area = 101.76+(3.23*2.83*2)+2.83(1.888+2.988)+(1.943*2.83*2) =
144.84 m2 BSR-M05 and change
BSR-M12
Find

BSR-T040
BSR-S56
BSR-S44
BSR-S14
Find
Find
Find
Find