The existing tariff and the tariff proposed are shown below:
Table 7.1
Sl. No Details Existing (Rs./Unit) Proposed (Paise/Unit)
Energy charges
(including recovery
1 6.48 7.30
towards service
main charges
Table 7.3
Existing Tariff Proposed
Details Particulars
(Rs/unit) (Rs/unit)
Fixed Charges per For the first KW Rs.25
Month For every additional KW Rs.40
For the first 30 units 3.15 3.97
31 to 100 units: 4.4 5.22
Energy Charges 101 to 200 units 5.95 6.77
201 to 300 units 6.8 7.62
Above 300 units 6.85 7.67
LT 2 (b) (i): Applicable in BBMP Areas, Davangere city Corporation and all areas
coming under Urban Local Bodies.
Table 7.4
Existing Tariff Proposed
Details Particulars
(Rs/unit) (Rs/unit)
Fixed Charges Rs.55 Per KW subject to a
per Month minimum of Rs.85 PM
Energy 0-200 units: 6.50 7.32
Charges Above 200 units: 7.75 8.57
Table 7.5
Existing Tariff Proposed
Details Particulars
(Rs/unit) (Rs/unit)
Rs.45 Per KW subject
Fixed Charges per
to a minimum of
Month
Rs.70 PM
0-200 units: 5.95 6.77
Energy Charges
Above 200 units: 7.20 8.02
4. LT3- Commercial:
Table 7.6
Existing Tariff Proposed
Details Particulars
(Rs/unit) (Rs/unit)
Fixed charges per
Rs. 60 per KW
Month
For the first 50 units: 7.5 8.32
Energy Charges
For the balance units: 8.5 9.32
Demand based tariff (Optional) where sanctioned load is above 5 KW but below
50 KW.
Table 7.7
Existing Tariff Proposed
Details Particulars
(Rs/unit) (Rs/unit)
Fixed charges per
Rs. 75 per KW
Month
For the first 50 units: 7.5 8.32
Energy Charges
For the balance units: 8.5 9.32
Demand based tariff (Optional) where sanctioned load is above 5 KW but below
50 KW.
Table 7.9
Existing Tariff Proposed
Details Particulars
(Rs/unit) (Rs/unit)
Fixed charges per
Rs. 65 per KW
Month
For the first 50 units: 7.00 7.82
Energy Charges
For the balance units: 8.00 8.82
Revised:
Table 7.11
Particulars (P/Unit)
Fixed charges Free
Energy charges
Commission Determined Tariff (CDT) for LT4 (a) category 4.16
is
Table 7.12
Existing Tariff Proposed
Details Particulars
(Rs/unit) (Rs/unit)
Fixed charges per Rs. 50 per HP per
Month month.
Energy charges 3.0 3.82
LT4 (c) (ii): Applicable to Horticultural Nurseries, Coffee and Tea Plantations
above 10 HP.
Table 7.14
Existing Tariff Proposed
Details Particulars
(Rs./unit) (Rs./unit)
Fixed charges per
Rs.50 per HP per month
Month
Energy charges 3.00 3.82
6. LT5 - LT Industries:
i) Fixed Charges:
Table 7.15
Details Particulars
i) Rs. 40 per HP for 5 HP & below
Fixed Charges per ii) Rs. 45 per HP for above 5 HP & below 40 HP
Month iii) Rs. 60 per HP for 40 HP & above but below 67 HP
iv) Rs. 120 per HP for 67 HP & above
Table 7.16
Rs. 65 per KW of billing
Above 5 HP and less than 40 HP
demand
Demand
40 HP and above but less than Rs. 90 per KW of billing
Based
67 HP demand
Tariff
Rs. 170 per KW of billing
67 HP and above
demand
Tariff for LT 5 (b): Applicable to all other areas other than BBMP & Davangere
corporation area.
i) Fixed Charges:
Table 7.18
Details Particulars
i) Rs. 35 per HP for 5 HP & below.
Fixed Charges ii) Rs. 40 per HP for above 5 HP & below 40 HP.
per Month iii) Rs. 55 per HP for 40 HP & above but below 67 HP.
iv)Rs. 110 per HP for 67 HP & above.
Proposed
Particulars Existing Tariff (Rs./unit)
(Rs./unit)
For the first 500 units 5.00 5.82
For the next 500 units 5.90 6.72
For the balance units 6.20 7.02
8. LT 7- Temporary Installations:
LT-7 (a):
Existing:
Table 7.25
Details Approved Tariff
Energy charge at 1000 paiseunit subject to a weekly
Less than 67 HP:
minimum of Rs.190 per KW of the sanctioned load.
Proposed:
Table 7.26
Existing:
Table 7.27
Details Approved Tariff
Energy charge at 1000 paiseunit subject to a weekly
Less than 67 HP:
minimum of Rs.60 per KW of the sanctioned load.
Proposed:
Table 7.28
Details Approved Tariff
Energy charge at 1082 paise unit subject to a weekly
Less than 67 HP:
minimum of Rs. 160 per KWof the sanctioned load.
Table 7.29
Existing Tariff Proposed
Details Particulars
(Rs./unit) (Rs./unit)
Rs. 200 / kVA of
Demand charges billing demand /
month
Energy charges 4.85 5.67
Tariff for HT – 2 (a) (i): Applicable to BBMP area and Davangere City Municipal
Corporation.
Table 7.31
Existing Tariff Proposed
Details Particulars
(Rs./unit) (Rs./unit)
Rs. 210 / kVA of billing
Demand charges
demand / month
Energy charges
For the first one lakh
6.65 7.47
units
For the balance units 6.95 7.77
Railway Traction & Effluent Treatment Plants applicable to both HT2a (i) &
HT2 a (ii):
Table 7.33
Existing Tariff Proposed
Details Particulars
(Rs./unit) (Rs./unit)
Rs. 210 / KVA of billing
Demand charges
demand / month
Energy charges for all
6.2 7.02
the units
BMRCL Tariff:
Table 7.34
Existing Tariff Proposed
Details Particulars
(Rs./unit) (Rs./unit)
Rs. 210/ KVA of billing
Demand charges
demand / month
Energy charges for all
6.00 6.82
the units
HT – 2 (b) (i): Applicable to BBMP area & Davangere City Municipal Corporation .
Table 7.35
Existing Tariff Proposed
Details Particulars
(Rs./unit) (Rs./unit)
Rs. 230 / kVA of billing
Demand charges
demand / month
Energy charges
(i) For the first two
8.45 9.27
lakh units
(ii) For the balance
8.55 9.37
units
HT – 2 (b) (ii): Applicable to all areas other than covered under HT-2(b) (i) above.
Table 7.36
Existing Tariff Proposed
Details Particulars
(Rs./unit) (Rs./unit)
Rs. 220 / kVA of billing
Demand charges
demand / month
Energy charges
(i) For the first two
8.25 9.07
lakh units
(ii) For the balance
8.35 9.17
units
Table 7.37
Existing Tariff Proposed
Details Particulars
(Rs./unit) (Rs./unit)
Rs. 200 / kVA of billing
Demand charges
demand / month
Energy charges
(i) For the first two lakh
6.4 7.22
units
(ii) For the balance
6.8 7.62
units
Table 7.38
TOD Tariff applicable to HT2 (a), HT2 (b) and HT2(c) category:
Table 7.39
Existing:
Table 7.40
Energy charges / 225 paise/ unit subject to an annual minimum of
Minimum charges Rs. 1240 per HP / annum.
Revised:
Table 7.41
Energy charges / 307 paise/ unit subject to an annual minimum of Rs.
Minimum charges 1000 per HP / annum.
HT 3 (a) (ii): Applicable to Pvt. LI Schemes and Lift Irrigation Societies fed
through express/ urban feeders.
Table 7.42
Existing Tariff Proposed
Details Particulars
(Rs./unit) (Rs./unit)
Rs. 50 / HP / Month of
Fixed charges
sanctioned load
Energy charges 2.25 3.07
HT 3 (a) (iii): Applicable to Pvt. LI Schemes and Lift Irrigation Societies other
than those covered under HT-3(a) (ii).
Table 7.43
Existing Tariff Proposed
Details Particulars
(Rs./unit) (Rs./unit)
Rs. 30 / HP / Month
Fixed charges
of sanctioned load
Energy charges 2.25 3.07
Existing:
Table 7.44
Details Tariff
Energy charges / 425 paise/ unit subject to an annual minimum
minimum charges of Rs. 1240 per HP /annum.
Revised:
Table 7.45
Details Tariff
Energy charges/
507 paise/ unit subject to an annual minimum of Rs.
minimum
1102 per HP / annum.
charges
Existing:
Table 7.47
67 HP and above
Fixed charges Rs.240/HP/month for the entire sanctioned load/contract demand.
Energy Charge 1000 paise/ unit.
Proposed:
Table 7.48
67 HP and above
Fixed charges Rs.210/HP/month for the entire sanctioned load/contract demand
Energy Charge 1082 paise/ unit
Existing:
Table 7.49
67 HP and above
Fixed charges Not applicable
Energy Charge 1100 paise/ unit.
Proposed:
Table 7.50
67 HP and above
Fixed charges Not applicable
Energy Charge 1182 paise/ unit