Sie sind auf Seite 1von 37

6/9/2013

Case Studies on 
Analysing 3D Problems 
3D Problems
Using PLAXIS 3D

Michelle Lew G T

Geotechnical Society of Singapore
Kiso‐Jiban Singapore Pte Ltd

Case Study 1

Deep excavation near 
existing MRT tunnel
existing MRT tunnel

1
6/9/2013

Case Study 1 ‐ Site  

SITE

Note: Extracted fromwebsite: www.streetdirectory.sg

Case Study 1 – MRT Reserve 

2
6/9/2013

Case Study 1 – Sections  

Case Study 1 – Section 3  

3
6/9/2013

Case Study 1 – LTA Railway Protection 

Case Study 1 – PLAXIS 2D 

4
6/9/2013

Case Study 1 – PLAXIS 3D Calibration 

Case Study 1 – Plain Strain in 3D & 2D 

5
6/9/2013

Case Study 1 – Plain Strain in 3D & 2D 

Case Study 1 – PLAXIS 3D Analysis 

6
6/9/2013

Case Study 1 – PLAXIS 3D Soil Model 

Case Study 1 – PLAXIS 3D Structures 

7
6/9/2013

Case Study 1 – PLAXIS 3D Supports 

Case Study 1 – PLAXIS 3D Mesh 

8
6/9/2013

Case Study 1 – PLAXIS 3D Tunnel 

Case Study 1 – PLAXIS 3D Tunnel 

9
6/9/2013

Case Study 2

Circular shafts subjected to 
non symmetrical loading
non‐symmetrical loading

Case Study 2 ‐ Site

Receiving 
Shaft

Launching 
Shaft

10
6/9/2013

Case Study 2 – Launching Shaft
‐ Jacking force

‐ Non‐symmetric 
loading on the 
diaphragm wall

Case Study 2 – PLAXIS 2D

11
6/9/2013

Case Study 2 – PLAXIS 3D

Case Study 2 – PLAXIS 3D

12
6/9/2013

Case Study 2 – Instrumenation

• 4 Inclinometers
• 2 Water Standpipes
• 2 Piezometers

Case Study 2 – 2D, 3D, Measured 

Wall  Bending  Shear  Hoop 


Type of 
Movement  Moment  Force  Force 
Analysis
(mm) (kNm/m) (kN/m) (kN/m)

Plaxis 2D 2 482 765 3630

Plaxis 3D 6 845 1191 4740

Measured  5.5 ‐ ‐ ‐

13
6/9/2013

Case Study 2 – Receiving Shaft
‐ Construction 
load

‐ Non‐symmetric 
loading behind the 
diaphragm wall

Case Study 2 – PLAXIS 2D

14
6/9/2013

Case Study 2 – PLAXIS 3D

Case Study 2 – PLAXIS 3D

15
6/9/2013

Case Study 3

Design of Deep Excavation 
using PLAXIS 3D

Case Study 3 – Cross Section

16
6/9/2013

Case Study 3 – Structure Elements

Case Study 3 – Soil Profile

17
6/9/2013

Case Study 3 – Half Model

Case Study 3

Excavate below Strut S1

18
6/9/2013

Case Study 3

Install Strut S1 & Excavate below Strut S2

Case Study 3

Install Strut S2 & Excavate below Strut S3

19
6/9/2013

Case Study 3

Install Strut S3 & Excavate below Strut S4

Case Study 3

Install Strut S4 & Excavate below Strut S5

20
6/9/2013

Case Study 3

Install Strut S5 & Excavate below Strut S6

Case Study 3

Install Strut S6 & Excavate Final Formation Level

21
6/9/2013

Case Study 3 – Deformed Mesh

Case Study 3 – DWall Displacement

22
6/9/2013

Case Study 3 – Bending Moment

Case Study 3 – Corner Effect

23
6/9/2013

Case Study 3 – Bored Piles 

Case Study 3

24
6/9/2013

Case Study 3 – One Strut Failure Check

Stage: Excavate to FEL Left Strut Strut Right Strut Top Strut


Before  One Strut Failure 1592 kN 1593 kN 1595 kN 817 kN
After One Strut Failure 1899 kN Failed 1850 kN 952 kN
Percentage Increase 19% ‐ 16% 17%

Case Study 3 – One Strut Failure Check

Before Strut Failure
1 strut failed

After Strut Failure

25
6/9/2013

Ongoing Projects

NATM Tunnel 

26
6/9/2013

NATM Tunnel 

NATM Tunnel 

Stage 1 – Tunnel 1 Excavation at Top Heading

27
6/9/2013

NATM Tunnel 

Stage 2 – Tunnel 1 Excavation at Invert

NATM Tunnel 

Stage 3 – Tunnel 2 Excavation at Top Heading

28
6/9/2013

NATM Tunnel 

Stage 4 – Tunnel 2 Excavation at Invert

NATM Tunnel 

Stage 5 – Tunnel 3 Excavation at Top Heading

29
6/9/2013

NATM Tunnel 

Stage 6 – Tunnel 3 Excavation at Invert

Pipe‐roofing Construction  

30
6/9/2013

Pipe‐roofing Construction  

Stage 1 – excavation to 4m

Pipe‐roofing Construction  

Stage 2 – Install frame & excavation to 8m

31
6/9/2013

Pipe‐roofing Construction  

Stage 3 – Install frame & excavation to 12m

Pipe‐roofing Construction  

Stage 4 – Install frame & excavation to 16m

32
6/9/2013

Pipe‐roofing Construction  

Stage 5 – Install frame & excavation to 20m

Pipe‐roofing Construction  

Stage 6 – Install frame & excavation to 24m

33
6/9/2013

Pipe‐roofing Construction  

Stage 7 – Install frame & excavation to 28m

Pipe‐roofing Construction  

Stage 8 – Install frame & excavation to 32m

34
6/9/2013

Pipe‐roofing Construction  

Deformed mesh

Pipe‐roofing Construction  

Pipe pile displacement

35
6/9/2013

Pipe‐roofing Construction  

Frames displacement

Pipe‐roofing Construction  

Axial force in the frame

36
6/9/2013

Pipe‐roofing Construction  

Bending moment in the frame

Chua Tong Seng, Edward Koh, Michelle Lew, Lim Chun Hong

Thank You.

37

Das könnte Ihnen auch gefallen