Beruflich Dokumente
Kultur Dokumente
02
Semester: 7th
Submitted to : Sir Uzair Iqbal
SUBMITTED BY:
Muhammad TALHA JAVED (10872)
KHAWAR ILYAS (10963)
AZIZ UR REHMAN (10948)
USMAN FAZAL (10965)
Dated: 1/05/2018
1|Page
Car Insurance
Page2 of 9
All Copyright Reserved 2018
Car Insurance
TABLE OF CONTENTS
1 INTRODUCTION.....................................................................................................................4
1.1 Purpose of The Test Plan Document ..........................................................................4
2 TEST ITEM...............................................................................................................................4
2.1 Project description ......................................................................................................4
2.2 Items to be Tested / Not to be Tested .........................................................................4
2.3 Items to be tested ........................................................................................................4
2.4 Test Approach(s) ........................................................................................................5
2.5 Test Entry / Exit Criteria ............................................................................................5
2.6 Test Deliverables ........................................................................................................6
2.7 Test Suspension / Resumption Criteria ......................................................................6
3 RISK AND MITIGATION ......................................................................................................6
3.1 Test Risks / Issues ......................................................................................................6
4 TEST ENVIRONMENT ..........................................................................................................6
5 ROLES AND RESPONSIBILITIES .......................................................................................7
5.1 Roles and assigned responsibilities ............................................................................7
6 TEST SCHEDULE ...................................................................................................................7
6.1 Milestones and schedule ............................................................................................7
Page3 of 9
All Copyright Reserved 2018
Car Insurance
1 INTRODUCTION
1.1 PURPOSE OF THE TEST PLAN DOCUMENT
The Test Plan is designed to prescribe the scope, approach, resources, and schedule of all
testing activities of the project Online CAR INSURANCE. The plan identify the items to be
tested, the features to be tested, the types of testing to be performed, the personnel
responsible for testing, the resources and schedule required to complete testing, and the
risks associated with the plan.
2 TEST ITEM
2.1 PROJECT DESCRIPTION
Car insurance is insurance for cars. Its primary use is to provide financial protection against
physical damage or bodily injury resulting from traffic collisions and against liability that
could also arise from incidents in a vehicle.
User Interfaces
Hardware Interfaces
Page4 of 9
All Copyright Reserved 2018
Car Insurance
Software Interfaces
Website Security and Performance
Unit Testing
Unit testing is the testing of an individual unit or group of related units. It is often done by
the programmer to test that the unit he/she has implemented is producing expected output
against given input.
Integration Testing
Integration testing is testing in which a group of components are combined to produce
output. Also, the interaction between software and hardware is tested in integration testing
if software and hardware components have any relation.
Functional Testing
Functional testing is the testing to ensure that the specified functionality required in the
system requirements works.
System Testing
System testing is the testing to ensure that by putting the software in different environments
(e.g., Operating Systems) it still works. System testing is done with full system
implementation and environment.
Exit Criteria
Specifies the criteria that denote a successful completion of a test phase
Run rate is mandatory to be 100% unless a clear reason is given
Page5 of 9
All Copyright Reserved 2018
Car Insurance
4 TEST ENVIRONMENT
Page6 of 9
All Copyright Reserved 2018
Car Insurance
6 TEST SCHEDULE
6.1 MILESTONES AND SCHEDULE
specification
Perform Test Tester, Test 80 man-hour 10-4-2018 19-4-2018
Execution Administrator
Test Report Tester 10 man-hour 20-4-2018 25-4-2018
Test Delivery 20 man-hour 26-4-2018 27-4-2018
Total 280 man-hour
Page8 of 9
All Copyright Reserved 2018
Car Insurance
Page9 of 9
All Copyright Reserved 2018