LOTE (ML) (ML) (ML) (ML) CALL. MIGUEL CARR. SAN LOTES 1 Y3 RIO HUAYLLAPAMPA 1 GRAU GREGORIO 9.25 22.45 19.70 8.70 CALL. 7 DE CALL. MIGUEL LOTE 3 LOTE 1 2 OCTUBRE GRAU 7.40 19.90 19.60 5.40 CALL. 7 DE LOTE 2 LOTES 4 Y 6 3 OCTUBRE 1.50 19.60 20.75 6.60 CALL. 7 DE LOTE 3 LOTES 5 Y 6 LOTES 3 Y 6 4 OCTUBRE 8.65 9.45 10.25 8.40 CALL. 7 DE LOTE 4 LOTE 6 LOTE 6 5 OCTUBRE 3.80 5.20 5.10 4.90 CALL. 7 DE LOTES 3, 4 Y 5 6 OCTUBRE 6.00 22.45 22.85 13.25 CALL. 7 DE LOTES 6 Y 8 7 OCTUBRE 49.75 38.80 34.66 56.10 CAMINO A LOTE 9 LOTE 7 CALL. 7 DE OCTUBRE 8 TAPACOCHA 19.40 14.95 21.65 10.40 CAMINO A CALL. MIGUEL LOTE 8 CALL. 7 DE OCTUBRE 9 TAPACOCHA GRAU Y LOTE 10 8.05 13.75 14.95 12.4 CAMINO A CALL. MIGUEL GRAU LOTE 9 CALL. 7 DE OCTUBRE 10 TAPACOCHA 4.35 6.38 6.60 4.65 SUMATORIA = AREA M2