Customer DE E&D S.B.No. Description Start App. Rec. For Prod. Remarks

03-04-03 03-04-03 Succesfully type tested on 23-09 at


14-01-03
Prototype 100/200kVA SJA/SHA Y5143 5100002190 100/200kVA PMT 23- 11/4/2004 Rewat/WAPDA Inspection on 20-
-
06-04 23-06-04 10/Approved on 27-10
Interloop (Pvt.) Ltd. MYS A0250 4800020535 01 x WIP + 01 VCB Owner's Panel 5/28/2004 6/1/2004 9/8/2004 02-06-04 Modification work
Megabird International KR A0263 4800014835 KESC Jr. Panels 2/4/2003 12-03-03 12-03-03 App awaited
Packages Ltd. SJA/FB A0276 5100002044 01 No. VCB for existing trolley 4/4/2003 Under clar
02x6.6KV INC./OUT.VCB, 01xCOS
WASO - Mianwali ( TD ) SJA A0307 5100002364 6/20/2003 21-08-03 26-04-04 13-10-03 Inspected on 28/29-07
LBS Panels
Highland Traders ( Shamail ) MYS A0308 4800016499 03x KESC Jr. Panels 6/23/2003 04-07-03 21-07-03 10-07-03
Bahria Town - Rawalpindi SJA A0332 4800016903 11 kV Switchgear / PMT 9/29/2003 08-10-03 30-10-03 05-11-03 MV Swgr dispatched

09-03-04 Refer Design Plan / POA &POB


03-12-03 17-05-04
16-01-04 08-12-04 dispatched / P1&P2 inspected on 21&22-
KCI Chashma ( EC ) KR A0342 5100002648 11kV Switchgear - 71 Panels 12/11/2003 22-01-04 04-
20-01-04 17- 03 / P3, P4, VA inspected on 26-28/04
02-08-04 11-04
01-05 and dispatched

K.E.S.C. SJA/MR A0356 4800018464 21X4MVAr,11kV Capacitor Banks 12/9/2003 16-01-04 26-02-04 21-01-04 Inspected on 02-08
Sialkot Int'l Airport Ltd. (EC) SMY A0357 5100002643 11kV Switchgear (05 Panels) 12/10/2003 16-01-04 12-02-04 01-03-04 Reinspected on 23-11-04
K.E.S.C. SJA/MR A0363 4800018961 15kV Switchgear (20 Panels) 1/16/2004 29-01-04 26-02-04 20/29-01 ###
PO recd 06-04/App awaited/Qty reduced
IESCO SHA A0367 4800018736 37x200KVA PMTs 12/30/2003 09-04-04 09-04-04
29-07/ Inspection on 17-09
09-04-04
Pakistan Refinery Ltd. KR A0370 4800018945 3.3 kV Switchgear - Simoprime 1/16/2004 24- 04-05-04 24-05-04 Inspected on 29-9 /Dispatch awaited
05-04
20-05-04
21-05-04
Decon Germany MYS A0371 4900000315 24kV Switchgear - 8BK20 1/22/2004 18-03-04 26-04-04 Lot 2.1 Inspection on 21-02
05-11-
04
11kV Switchgear (24xI/C+ CL rel on 13-01/ Inspected on 03/04-
WAPDA ADP27 SJA A0372 4800019094 1/7/2004 17-02-04 04-03-04 13-04-04
50xO/G+20xC) 08/Inspected on 07-09

Pioneer Multipurpose KR A0373 4800019145 02xKESC Outgg + 21xKESC Jr 2/9/2004 08-03-04 06-03-04 App awaited/KESC Jr Panels dispatched
16-03-04
25.03.04
Nishat Chunian Ltd. (Weaving) SJA A0375 4800019386 01xI/C+01xO/G 11kV VCB Panels 3/3/2004 7/1/2004 30- Additional Order on 24-06
13.07.04
01-07-04 06-04
Rahman Cotton Mills SJA A0377 4800019444 01x11KV Wapda O/G Grid Panel 3/5/2004 12-03-04 6/16/2004 11-03-04 App awaited/Inspection on 17-06
Masood Textile Mills KR A0380 4800019596 01x 11kV VCB I/C / O/G Panel 3/25/2004 30-03-04 15-04-04 15-04-04
Crystal Spinning (Pvt.) Ltd. MYS A0383 4800019721 01x Wapda Industrial Panel 3/26/2004 31-03-04 NR 29-03-04

SUPARCO SJA/ KR A0385 510002843 01x11KV 1/C +01x o/g Panels 4/20/2004 5/4/2004 11-05-04 11-05-04 CL rel on 30-04/ App awaited

01x 11kV VCB O/G Panel + Adaptor


Honda Atlas Cars (Pakistan) Ltd. KR A0386 4800019839 4/7/2004 19-04-04 5/5/2004 30-04-04 20-04-04 Relay changed to P124S
Panel for Simoprime
27-07-04
05.05.04
20-08-
General Tyres & Rubber Company MYS A0387 4800019787 04x 3.3kV Reversible Starter Panels 4/9/2004 19-04-04 15.06.04 8/12/2004 5th Panel to be dispatched
04
schematic
09-09-04
Abdul Razzak Kamani KR A0388 4800020033 01x KESC Jr with Prot w/o Metering 4/19/2004 29-04-04 29-04-04 CL rel on 23-04 /App awaited

29.04.04
25x11KV Capacitor Bank Control 26.05.04
NTDC/WAPDA-ADP29 (LOT III) SJA A0389 4800020047 4/19/2004 7/30/2004 7/22/2004 Inspection on 18-10
Switchgear Panels 08.06.04
14.07.04
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

01x11KV Wapda Industrial


Interloop (Pvt) Ltd. MYS A0390 4800020046 Panel+01x11KV VCB Owner's 4/20/2004 29-04-04 9/8/2004 29-04-04
Panel
CL rel on 27-04/Relay changed to 2TJM
Sitara Chemical Industries KR A0391 4800020056 01x11KV VCB I/C/ O/G Panel 4/20/2004 29-04-04 18-05-04 29-04-04
on 13-07
06 Nos Contact Arm Blade for
PTD Services / Fauji CEMENT Ltd MR A0392 5100000394 4/22/2004 NR NR 23-04-04
3AH1115-2
Berger Paints Pakistan Ltd. KR A0394 4800020138 01x11KV I/C /O/G Panel Simoprime 4/23/2004 29-04-04 14-05-04 29-04-04 CL rel on 27-04
Peoples Steel Mills Ltd. KR A0395 510002827 01xVCB 1250 A, 12KV, 20KA 4/20/2004 27-04-04 7/29/2004 6/3/2004 CL rel on 27-04
01x Wapda Industrial + 01xVCB
Sandal Dyestuff Industries Pvt Ltd. MYS A0396 4800020091 4/26/2004 5/4/2004 5/4/2004 9/8/2004 04-05-04
Owner's Panel
07-05-04
17.05.04
-
Ibrahim Fibers Ltd (ITM) KR A0397 4800020148 11KV Switchgear (03 Panels) 4/27/2004 5/5/2004 01.06.04 10-05-04 Inspected on 26-08
13.07.04
03-06-04
Olympia Chemicals Ltd. MYS A0398 4800020254 6.3KV Switchgear 4/30/2004 5/12/2004 18-05-04 6/23/2004 6/25/2004 Add.indent on 31-08/Inspected on 14-09
26-07-04
11-05-04
PARCO MYS A0399 4800020271 11KV Changeover Panel 5/4/2004 05-07- 18-08-04 Inspection on 18-10
13-
04
08-04
Shaikh Zayed Bin Sultan Al-Nahyan MYS A0400 4800020465 01X WAPDA Industrial Panel 5/24/2004 28-05-04 28-05-04 Under testing
Silver Knits KR A0402 4800020651 01 x KESC Jr with Metering & with P 6/9/2004 6/9/2004 6/29/2004 6/9/2004 CL rel on 07-06
Colony Textile Mills SJA A0403 4800020635 01 x Inc + 03 x Outgoing (8BD4) 6/11/2004 11-06-04 6/25/2004 7/1/2004
Highland Traders (Askari) RA A0404 4800020735 01xKESC grid+02xxKESC Jr+01xIsol 6/9/2004 6/29/2004 7/16/2004 7/5/2004 KESC Jr Panels dispatched
Noorani Spinning Mills Ltd. RA A0405 4800020634 01 x WAPDA Industrial Panel 6/10/2004 6/18/2004 6/21/2004 7/12/2004 7/28/2004

Chashma Sugar Mills Ltd. SJA A0406 4800020867 02x 6.6 KV VCB Panels 6/17/2004 7/19/2004 7/22/2004 8/10/2004 8/13/2004 Changes to be rel on SB S go-ahead

Roche Pakistan Ltd. MYS A0407 4800020910 01x VCB Phase CO Panel 6/22/2004 7/7/2004 7/16/2004 8/17/2004 7/27/2004 Inspected on 06-10/Changes
FESCO SJA/RA A0408 5100002938 04x I/C+15x O/G VCB Trolleys-WAP 6/22/2004 6/29/2004 8/6/2004 8/6/2004

25-06-04 Changes recd on 12-08 - qty revised /


23-06-04
16- Qty revised 07-10 / Changes on 27-12 /
30-03- 04-11-04 05-07-04
Habib Rafique Pvt. Ltd. SHA/SJA A0409 4800019795 215x 100KVA +242x 200 KVA PMTs 08-04 Go-ahead from SB S on 04-02, Rev CLs
05 22-02-05 15-04-05
04-02-05 to PR on 18-05 / Add indent / partially
19-08-05
15-04-05 dispatched / Rev indent for update

Fatima Sugar Mills KR A0410 4800020873 01x 11kV VCB I/C Panel 6/24/2004 7/2/2004 7/2/2004 7/20/2004 7/20/2004
Zaffar Enterprises RA A0411 4800020754 03x KESC Jr. +01x I/C / O/G Panels 7/1/2004 7/15/2004 7/15/2004 CL rel on 09-07/App awaited
Ghazi Fabrics International RA A0412 4800021130 01x 11KV VCB I/C / O/G Panel 7/2/2004 7/7/2004 7/19/2004 7/7/2004
Arshad Corporation Pvt. MYS A0413 4800021179 01x WIP + 01 x VCB Owner's Panel 7/7/2004 7/13/2004 9/8/2004 8/19/2004 CL rel on 12-07
Maxcorp Hussain Pakistan KR A0414 4800021244 01x FLBS Panel 7/13/2004 7/15/2004 7/22/2004 7/27/2004 7/26/2004
Krystalite Products (PTD SE) RA A0416 5100002991 01 x WIP 7/22/2004 8/2/2004 7/29/2004 24-08-04 7/29/2004 CL rel on 26-07

LESCO (PTD SE) RA A0417 5100002993


08x I/C + 15xO/G VCB Trolleys
7/22/2004 8/2/2004 7/28/2004 10/28/2004 10/28/2004 ###
-WAPDA

Islamabad Club MYS A0418 4800021501 01 x 11kV WAPDA Consumer Panel 8/3/2004 8/6/2004 8/6/2004 8/31/2004 24-08-04

Bawany Air Products KR A0419 4800021584


11 kV Switchgear-Simoprime(01x
8/5/2004 8/12/2004 8/11/2004 8/25/2004 8/11/2004 ###
I/C+03x O/G)
Tahir Builders MYS A0420 4800021621 11kV Switchboard 8/5/2004 8/12/2004 8/17/2004 8/30/2004 01-09-04 Voltmeter+SS added in O/G Panel
Colony Textile Mills MYS A0421 4800021612 01 x 11kV VCB O/G Panel 8/6/2004 8/10/2004 8/11/2004 8/23/2004 8/24/2004
13-09-04
01-10-04 CL rel on 10-09/PTs with secondary
Ghazi Fabrics International SJA/RA A0422 4800021793 08 x 11kV VCB Panels 8/23/2004 9/3/2004 9/28/2004 10/8/2004
110/3
Schematics
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

Habib Rafique Pvt. Ltd. KR A0423 4800021842 28x 3-Way + 18x 4-Way RMUs 8/24/2004 8/27/2004 9/29/2004 9/23/2004 ###
01xWIP+02x11kV VCB I/C/O/G
Haleeb Foods KR A0424 4800021812 8/24/2004 9/3/2004 9/2/2004 9/20/2004 9/2/2004
Panels
Indent/S.O. on 26-08 / Add indent for
IESCO SHA A0425 4800021875 (15+3) x 63kVA PMTs 8/6/2004 NR 9/3/2004
03Nos. on 23-02
Indent /S.O.No.on 19-10/Rating plate on
IESCO SJA A0426 4800022602 37 x 4 - Way RMUs 8/26/2004 NR NR 10/29/2004 21-09/Qty enhanced by 07 Nos. on 15-10
/ 30 Nos. dispatched
11-09-04
Reckitt Benckiser (PTD SE) KR A0427 5100003059 01x11kV Simoprime I/C/O/G VCB pan 9/3/2004 9/3/2004 e- 9/3/2004 CL rel on 03-09/App drgs recd 21-09
24-09-04 mail
15-10-
04 03-11-04
28-10-04 18-11-04
Maple Leaf Cement KR A0428 5100003131 6.3 kV Switchgear-14 x 8BD4 8/31/2004 9/21/2004 11/30/2004 Indent/S.O. No. on 13-10
05- 03-12-04
11-04 13-12-04

schematics
01 x 11kV WAPDA 16-09-04 23-09-04
CL rel on 02-11/04-11/Consumer panel
Baber Islam & Company KR A0429 4800022142 Consumer+02x11kV VCB I/C 9/14/2004 9/16/2004 11- 11/29/2004 11-
dispatched
Panels 11-04 11-04
Pakistan Petrolem Ltd. RA A0430 5100003087 01x VCB Trolley with contact arms 9/15/2004 9/16/2004 9/10/2004 9/16/2004 App awaited
Gulshan Weaving Mills Ltd. MYS A0431 4800022111 01x VCB I/C / O/G Panel 9/15/2004 9/17/2004 9/20/2004 12/15/2004 26-11-04
Commodities & Textiles Pvt. Ltd. KR A0432 4800022258 02 x KESC Jr 9/22/2004 10/1/2004 10/7/2004 10/22/2004 10/7/2004 CL rel on 27-09
ENI Pakistan Ltd. (EC) KR A0433 5100003138 02 x LBS+I/C Cable Connection Pan 9/23/2004 10/1/2004 10/4/2004 10/4/2004 Indent /S.O.No. on 14-10
27-09-04
Retrofit for MOCBs/Indent/ S.O.No. on
HESCO (PTD SE) RA A0434 5100003126 05xI/C+15xO/G VCB Trolleys - WAP 9/23/2004 12/8/2004 12/8/2004 13-10/Site Visit on 05-10 / Inspection on
06-10-
03-03
04
Indent/S.O.No. on 13-10 / CL rel on 18-10
20- 08-10-04
Holcim Cement Srilanka (MES) MYS A0435 5100003122 01x 3.3kV,2000A VCB+01xAdapter P 9/28/2004 10/5/2004 10/25/2004 / Rev drgs on 27-10 / Adapter Panel
10-04 28-02-05
dispatched
01 x 6.6 kV VCB Panel with Manual
Indus Sugar Mills (EC) SJA A0436 5100003139 9/28/2004 10/6/2004 10/19/2004 10/21/2004 10/26/2004 Indent /S.O.No. on 15-10
Synchronisation
Shahzor Feeds Pvt. Ltd. RA A0437 4800022424 01x WIP + 01x VCB Owner's Panel 10/7/2004 10/11/2004 10/21/2004 10/11/2004 CL rel on 12-10

23-02-05
02x 24 kV, 25kA, 800A VCB I/C / D01
20-10-04 23-02-05
Barqaab / NTDC (TD) SJA A0438 5100003125 O/G Panels for NTDC -KESC 10/8/2004 10/20/2004 28-04-05 CL rel on 12-10
22-12-04 email
Interconnection D02
10-05-05E01

CL rel on 15-10/App awaited / Inspected


Highland Traders KR A0439 4800022267 01x 15kV KESC Grid O/G Panel 10/13/2004 10/19/2004 10/18/2004 10/18/2004
on 20-04
02-11-04
24-12-04 19-01-05
KW&SB-NEK Pumping Station(KIII Project) 19-01-05 CL rel on 28-10 / 02x O/Gs put on hold
SJA A0440 5100003135 11 kV Switchgear & Capacitor Panel 10/14/2004 10/27/2004 27-12-04 11-03-05
(MES) e-mail by MES - Go-ahead on 07-07
15-07-05
03-01-05
02-11-04
KW&SB-Dhabeji Pumping Station (KIII Project) 27-12- 19-01-05 19-01-05
SJA A0441 5100003136 11 kV Switchgear & Capacitor Panel 10/14/2004 10/27/2004 CL rel on 28-10
(MES) 04 e-mail 28-03-05
03-01-05

01x 3-Way RMU + 01xWIP + 01x Protection CT revised to 50/5A on 31-03


British High Commission-Islamabad MYS A0442 4800022636 10/19/2004 10/27/2004 12/1/2004 12/7/2004
Bus PT + 02xVCB O/G Panels after inspection / Work to be done at site

Voltage relay added / Inspection on 01-


SF Engineering Services-EBM RA A0443 3000192078 01xKESC Jr Panel 10/22/2004 10/28/2004 12/17/2004 10/28/2004
02
04 x 11kV I/C/O/G VCB Panels-
Dewan Farooq Spinning Mills KR A0444 3000192068 10/25/2004 11/2/2004 11/12/2004 12/15/2004 11/12/2004 S.O# recd on 03-11/CL rel on 29-10
simoprime
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

01 x WIP + 01xI/C+02xO/G VCB 13-11-04 22-12-04 23-11-04


Rahman Cotton Mills KR A0445 3000193229 11/2/2004 CL rel on 12-11 / Changes / Resubmittal
Panels 29-12-04 31-01-05 29-12-04
01x WIP + 01 x I/C + 02 x O/G 11kV CL rel on 10-11/WIP CT ratio
Janana De Malucho Textile RFQ/SJA A0446 3000192099 11/4/2004 11/18/2004 11/25/2004 12/14/2004 12/15/2004
VCB Panels changed
26-11-04
MV Switchgear incl. NGRs- 08-11-04
21-11-04 17-
Ittehad Chemicals Ltd. SJA/RA A0447 4800022821 11&13.8kV (09 x 11kV + 12 x 11/5/2004 09-12-04 Inspected on 12-01
22-12-04 12-04
13.8kV) Schematics
29-12-04
12-11-04 19-11-04 CL rel on 10-11/CT revision FCT-15 PM
State Life Building-Islamabad RA A0448 5100003149 01x WIP + 01x VCB Owner's Panel 11/4/2004 12/8/2004
24-11-04 03-12-04 on 22-02
11 kV Switchgear (06 Panels) + 01x 18-11-04 24-12-04
ESS ESS Associats (EC) KR A0449 3000188690 5/25/2005 6/28/2005 6/28/2005 CL rel on 10-12 / Add Indent
11kV Gen I/C Panel 23-05-05 01-06-05
Bahria Town Pvt. Ltd. KR A0450 3000192035 11 x 4-way RMU's 29-11-04 11/29/2004 12/1/2004
QESCO KR A0451 3000197089 05 x WIP 12/7/2004 12/22/2004 12/7/2004 ###
01x WIP + 02x 11kV VCB I/C/O/G 23-12-04 8BD4 instead of SA2 03-01 /Inspection
Bismillah Textile Mills Ltd. KR A0452 3000196666 12/7/2004 1/6/2005 1/11/2005
Panels 03-01-05 21-12-04email on 28-03
16-12-04
20-12-04
01x 11kV VCB I/C Panel + 01x 09-12-04 10-01-05 CL rel on 13-12 / Add indent / CL rel on
Sapphire Power Gen. Ltd. RA A0453 3000199555 03-01- 24-12-04
Adapter Panel + 01x O/G Panel 23-02-05 17-03-05 02-03
05 12-01-
09-03-05 05 15-
01 x WIP+ 01 x11 kV VCB Owner's 03-05 Comments/Changes/Indent recd on 27-
Bahria University MYS A0454 3000204975 12/14/2004 12/14/2004 12/27/2004 12/29/2004
Panel 12/Inspection on 16-02
M. Talib Enterprises KR A0455 3000200218 03x KESC Jr. Panels 12/13/2004 12/21/2004 1/7/2005 App awaited
14-01-05(8BK)
07-02-05 (SA2)
19-01- 01-02-05
6.3 kV Switchgear (09 x 8BK20 + 28 16-12-04 05(SA2) As per Design Plan/ CL rel on 07-01 /
Pioneer Cement MYS/KR A0456 3000200950 email 09-02-05(8BK)
x SA2) 13-04-05 21-04- 20-04-05 Add indent / Changes in App
06-05-05
05 (Add scope)
(Add scope)
18-01-05
28-12-04 11-01-05
KSB (Pak Arab Fertilizer) SJA/RFQ A0457 3000201240 01x 6.3kV VCB I/C/O/G Panel-8BD4 12/22/2004 03-03- Changes 08-02 11kV to 6.3 kV
10-02-05 10-02-05
05e-mail
Chawla Spinning Mills Ltd. SJA/RFQ A0458 3000202527 01x WCP + 01 x WIP 12/22/2004 12/31/2004 12/27/2004 1/11/2005 TCS Relay changed on 06-04

Relay change on 28-01, rel in Prod on


11-01-2005 14-04 / Inspected on 09-06 / Drgs revised
01x WIP + 01x I/C + 02x O/G VCB
Kidney Center Peshawar MYS A0459 3000205185 12/27/2004 1/4/2005 1/5/2005 2/28/2005 12-07- & released based on inspection
Panels
05 points/Re-inspected / Fuji make CTUs
replaced with Elabs make

28-01-05 24-02-05email CL rel on 28-01 rev 09-02 / Inspected on


Crescent Bahuman Ltd. KR A0460 3000207654 01x 11kV I/C + 01x Adapter Panel 1/6/2005 1/25/2005 2/25/2005
15-02-05 07-03-05 18-05
CL rel on & 19-01 & 07-02 / Clar Meeting
Civil Works Organisation SJA/RA A0461 3000204995 01x 11kV I/C/O/G + 01xO/G Panels 1/12/2005 1/19/2005 2/18/2005 3/30/2005 4/1/2005
02-02 / Inspected on 20-05
Email SB D
09-
02-05
11kV Switchgear - 25xI/C + 14-02-05 01-04-05 NOA recd on 11-01 / CL rel on 14-01/
WAPDA ADP-43 (Lot-1) SJA A0462 3000209980 1/14/2005 1/14/2005 1/14/2005
172xO/G + 07xB/C Panels 04-05-05 O/G 125xO/G+13xI/C+07xB/C inspected
07-04-05
B/C
11-04-05 I/C
28-01-05e-
Nestle Milkpak Ltd. SJA/RFQ A0463 3000209208 01x WIP 1/14/2005 1/18/2005 1/18/2005 1/31/2005
mail
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

24-02-05
Clar recd 15-02 / CL for add comps on
07-04-05
25-03 / App comments replied 30-06 /
03-02-05 27-05-05 11-03-05
Meeting with Alstom 08-07 / Rev CL on
Auto changeover scheme in 06- 21-07-05 26-04-05
Alstom Pakistan (Pvt) Ltd. MYS/SJA A0464 3000212008 1/24/2005 NR 21-07 / App comments recd 04-08,
existing MV Panels 04-05 09-08-05 10-06-05
replied on 09-08 with rev drgs /
25-05-05 20-10-05 11-11-05
Comments on 26-08 replied & incorp in
01-11-05
drgs / App with minor changes
16-11-05

Pakistan Air Force KR A0465 3000216361 01x 11kV VCB I/C / O/G Panel 1/27/2005 2/23/2005 3/31/2005 4/1/2005 Fresh indent on 14-02 / CL rel on 23-02

Resham Textile Mills Ltd. RA A0466 3000215233 11kV Switchgear-8BD4 (06 Panels) 2/1/2005 2/11/2005 2/23/2005 2/23/2005 Changes in CT ratios on 25-02

CL rel on 15-02 / TCSR changed on 07-


M. K. Sons (Pvt.) Ltd. SJA/RFQ A0467 3000217198 01 x WAPDA Consumer Panel 2/11/2005 2/11/2005 3/10/2005 3/7/2005
04
Hold by SB S on 25-02/Cancelled on 07-
Bahria Town, Islamabad SJA/RFQ A0468 3000218803 60 x 200kVA PMTs 2/11/2005 2/16/2005 2/24/2005
04
Haleeb Foods (Pvt.) Ltd. SJA/RFQ A0469 3000218813 01x WCP 2/11/2005 2/15/2005 3/10/2005 4/11/2005

Changes in specs on 18-02 / CL rel on


11kV Switchgear (07xVCB +
Mughal Steel SJA/RA A0470 3000221388 2/11/2005 2/18/2005 3/3/2005 3/25/2005 4/18/2005 21-02 / SB S go-ahead for SA2 on 14-04 /
01xBPT + 01xNGR)
Bus PT panel revised (600mm)

CL rel on 14-03/CT mtg arrangement


Maple Leaf Cement KR A0471 3000221895 MV Panel + Adaptor Panel 2/16/2005 3/4/2005 3/18/2005 4/6/2005 4/6/2005
revised
6.3kV Switchgear - 8BD4 (03 Nos) +
22-02-05 14-03-05
Thatta Cement Co. Ltd. (MES) KR A0472 3000222460 01x 6.3kV, 450kVAr Capacitor 3/10/2005 4/4/2005 4/11/2005 Add indent / CL on 21-03, rev on 31-03
10-03-05 21-03-05
Panel

18-03-05
25-03-05 I/C
Nestle Milkpak Ltd. SJA/RFQ A0473 3000221408 01x I/C + 1xO/G 11kV VCB Panels 2/22/2005 3/5/2005 21-03-05 3/31/2005 CL rel on 08-03
Schematics
Loadstar (Pvt.) Ltd. MYS/RFQ A0474 3000224965 01x 7.2kV O/G Panel 2/25/2005 3/4/2005 3/10/2005 3/18/2005 3/22/2005 A1326 Old order/CL rel on 25-02
18-03-05
03x11kV VCB Panel + Loose 30-03-05 28-03-05
DS Textile Ltd. KR A0475 3000215568 2/22/2005 3/9/2005 3/31/2005 Changes in App / Rev CL on 06-04
Component 05-04-05
Schematics
18-03-05
02x 11kV VCB Panel + Loose 24-03-05 28-03-05
DS Industries (Pvt.) Ltd. MYS A0476 3000216345 2/22/2005 3/12/2005 3/28/2005
Component 05-04-05
Schematics
Coca Cola (Pvt.) Ltd. SJA/RFQ A0477 3000222996 01x WCP + 06nos. loose CTs 2/25/2005 3/1/2005 3/1/2005 3/8/2005 App awaited
02-03-05 02-03-05
Arshad Textile Mills Ltd. MYS/RFQ A0478 3000223443 02x 11kV I/C / O/G Panels 2/25/2005 3/2/2005 3/30/2005 Interlocking reqmt on 04-03
11-03-05 11-03-05
Karachi Export Processing Zone KR/RFQ A0479 3000222933 01x 11kV O/G Panel 3/7/2005 3/16/2005 3/16/2005 3/30/2005 4/20/2005 CL rel on 14-03
01x 11kV VCB I/C/O/G (8BD4) + 14-03-05 16-03-05 CL rel on 14-03 /Add indent for WIP - Go
Technical Associates Pakistan MYS A0480 3000225691 3/15/2005 3/15/2005 3/25/2005
01x WIP Panel 24-03-05 25-03-05 ahead on 21-04
Muhammad Mushtaq, Muhammad Naseer & 31-03-2005
MYS/RA A0481 3000228851 02x 11kV VCB I/C/O/G Panels 3/11/2005 3/16/2005 3/17/2005 3/17/2005 CL rel on 14-03/App drgs on 08-04
Co. email
21-03-05
12- TCS Relay deleted / CL rel on 21-03 /
11 kV Switchgear (06xSA2 + 18-03-05
Lucky Energy, Karachi SJA/RA A0482 3000230152 3/11/2005 04-05 4/29/2005 5/6/2005 Changes on 20-04 & 29-04 / Trip circuit
01xBPT Panels) 06-04-05
28-04-05 Supervision changes to be done
02-05-05
20-05-05 Clar Meeting with EC on 04-04 / CL rel
DHA Lahore - Phase VI SHA A0483 3000231988 01x 4-way RMU + 04x 100kVA PMTs 3/18/2005 4/7/2005 5/24/2005
19-07-05 on 07-04 / App with changes
15-04-05
11kV Switchgear
22-03-05 30-03-05 06-04-05 20-04-05 CL rel on 01-04 / Add indent / Changes
Nishat Chunian Ltd. - I KR A0484 3000231561 03xI/C+01xB/C+04xO/G+01xBPT
17-06-05 20-06-05 30-06-05 email 30-06-05 on 24-06
Panel + 01x11kV VCB Synch. Panel
12-07-05
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

State Life of Pakistan MYS A0485 3000233483 01x 11KV I/C /O/G Panel 3/24/2005 3/25/2005 3/29/2005 4/4/2005 3/29/2005 CL on 29-03
11kV Switchgear (02xI/C / O/G
Janana De Malucho Textile MYS A0486 3000234193 3/25/2005 3/31/2005 4/1/2005 NR 4/4/2005
Panels)
CL rel on 08-04 rev 28-04 / App with
08-04-05 Changes/ CT ratio changed to 1200/5A
Cherat Cement MYS A0487 3000215827 6.3kV Switchgear-8BK (08 Panels) 3/29/2005 4/6/2005 4/19/2005 5/17/2005
28-04-05 on 07/05/05 / O/G VCBs changed to
1250A by PTSI

18-04-05 26-05-05 CL rel on 18-04 / Meeting with Customer


11kV Switchgear (09xSA2+01xBPT 20-04-05
International Industries Ltd. KR A0488 3000238904 4/6/2005 20-05-05 04-07-05 7/7/2005 & Consultants on 18-05 / Rev CL on 20-
Panels) 20-05-05
08-06-05 12-07-05 05 / Meeting with customer 28-06

15-04-05
RMUs
19-04-05 20-04-05
11kVSwitchgear
WIP+11kV WIP+11kV+
(01xWIP+01xI/C+02xO/G Panels + 08-04-05 19-04-05
Glamour Developers (Pvt.) Ltd. MYS/SHA A0489 3000240107 27-04- 5/10/2005 RMU CL for RMUs on 15-04 / Add indent
11x200kVA & 01x100kVA PMTs + 07-06-05 09-06-05
05 16-05-05
02x4-Way RMUs) +01xWCP
PMT PMTs
10-06-05
WCP

04-05-2005
Chenab Engineering RFQ/SJA A0490 3000240259 01xWIP + 01xWCP 4/8/2005 4/11/2005 4/14/2005 5/5/2005
WCP

CL rel on 13-04 / Changes as per


inspection by KESC on 14-11 /
25x KESC Jr Panels - I/C w/o Successfully type-tested at Rawat on
KESC KR A0491 3000253966 4/12/2005 4/13/2005 4/13/2005 4/13/2005
Metering 12-12 & 13-12 for BIL, PF, SC & at SB
works from 28-30/12 for Temp rise &
Mech endurance

Karachi Golf Club SHA A0492 3000253969 01x 400kVA PMT 4/13/2005 4/25/2005 4/26/2005 6/3/2005
IESCO KR A0493 3000254703 37x 4-Way RMUs 4/14/2005 NR 4/15/2005 NR 4/15/2005
01xI/C+02xO/G 11kV VCB Panels -
Azgard Nine Ltd. KR A0494 3000256591 4/21/2005 4/27/2005 4/26/2005 4/27/2005 4/27/2005 CL rel on 26-04/As-built sent
8BD4

Pakistan Mineral Development Corporation KR A0495 3000257090 01x WIP 4/21/2005 NR 4/21/2005 NR 4/21/2005 CL rel on 21-04

Ashfaq Textile Mills Ltd. KR/RFQ A0496 3000257651 01x WIP + 01x VCB Owner's Panel 4/27/2005 4/29/2005 4/29/2005 5/11/2005 5/23/2005 CL rel on 29-04/CT changed

03-05-05
28-04-05 04-05-05 11-05-05 03-05-05 CL rel on 03-05 / CT ratio for WIP on 11-
Bhanero Textile Mills Ltd. KR A0497 3000257527 11kV Switchgear + 01xWCP 5/10/2005
08-06-05 13-06-05 09-06-05 09-06-05 05 / Add indent / WCP deleted
WCP
Al Noor MDF Board Industries
MYS/RA A0498 3000262987 11kV & 3.3kV Switchgear 5/3/2005 5/10/2005 5/31/2005 6/16/2005 6/20/2005 Meters shall be provided by PTD-SE
(PTD SE)
01x WCP + 01x WIP + 01x VCB
Citropak Ltd. MYS A0499 3000262516 5/5/2005 5/11/2005 5/10/2005 5/18/2005 5/18/2005
Owner's Panel
16-05-05
M/s Rousing Engg Services / 01x I/C + 04xO/G Panels - WAPDA 10-05-05 Formal Indent on 12-05 / Changes as per
RFQ/SJA A0500 3000267773 5/9/2005 5/10/2005 5/16/2005 10-06-05
M/s A. A. Spinning Mills Ltd. P44:96 09-06-05 meeting with Customer
21-06-05
11-05-05
01x 11kV VCB O/G Panel + 01x Add indent / Rev indent - 01xO/G panel
Bismillah Textile Mills Ltd. MYS A0501 3000264770 24-05-05 5/13/2005 6/10/2005 6/22/2005 6/23/2005
VCB Trolley reqd instead of owner's panel
07-06-05
AJK Electricity Dept. RFQ/SJA A0502 3000266732 01x WCP 5/11/2005 5/13/2005 5/13/2005 NR 5/24/2005 Inspected on 08-08
27-05-05
Century Paper & Boards Mills Ltd. KR A0503 3000269891 01x 11kV VCB I/C / O/G Panel 5/20/2005 5/24/2005 6/1/2005 6/7/2005 CL rel on 27-05
07-06-05
01x KESC Jr with Prot w/o
Babar Metal Industries KR A0504 3000272953 5/23/2005 5/24/2005 5/24/2005 5/24/2005
Metering
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

04x 6.6kV, 200kVAr Capacitor 04-07-05


PARCO / PS1 Korangi KR A0505 3000268318 5/23/2005 5/26/2005 5/30/2005 7/1/2005
Banks 29-07-05
02x KESC Jr Panels (with & w/o
Rohaan Enterprises / Kidney Centre Karachi KR A0506 3000273034 5/25/2005 5/26/2005 5/25/2005 NR 5/25/2005
metering)
Lucky Textile Mills Ltd. MYS A0507 3000267718 02x 11kV VCB I/C/O/G Panels 5/25/2005 5/27/2005 6/1/2005 6/7/2005 6/10/2005
CDG-61 instead of 2TJM11 - confirmed
CPC DG Khan MYS A0508 3000276806 02xInc+04xOutgg VCB Panels 6/1/2005 6/8/2005 6/10/2005 7/18/2005 7/27/2005
by PTD ISB

Tayyeb Textile Mills KR A0509 3000276293 01xInc/Outgg + 01xInc + 02xOutgg 6/7/2005 6/7/2005 6/14/2005 6/15/2005

01xKESC Jr. with Prot w/o


Al-Pak Ghee Mills KR A0510 3000278107 6/7/2005 6/8/2005 6/22/2005 6/22/2005 Inputs recd 22-06
Metering

05xI/C+15xO/G VCB trolleys as per 01-07-05 Resubmitted for approval / w-coil+acc


HESCO MYS/RA A0511 3000285529 6/16/2005 6/27/2005 9/26/2005
WAPDA specs P44:96 05-09-05 added on 24-10 in O/G VCBs

Tariq Glass Industry (PTD SE) MYS A0512 3000286314 01xI/C VCB trolley - 8BD4 6/20/2005 6/21/2005 6/24/2005 7/22/2005 7/26/2005

01-07-05
04-07-05 11-07-05 05-08-05
11kV Switchgear - 16x8BD4 + 13-07-05SLD J1,J2&J3
22-06-05 04-07-05 03-08-05JI&J2 CL rel on 04-07 / CL for add indent on
26-07-05J1&J2
12x8BK Additional 05xI/C + 25xO/G 15-08-05J3 27-09-05
M/s Packages Ltd./Bulleh Shah Paper Mill Project KR A0513 3000287128 01-09-05 15-09-05 02-08-05J3 16-09 / Change of CT ratio in 02xO/Gs on
(8BD4) Additional 04xI/C + 16xO/G 22-08-05 15-09-05 02-11-05
21-02-06 28-02-06 J3(PTSI) 18-05
(8BD4) 16-09-05 J3
Add indent 26-09-05 20-03-06
16-03-06

11kV Switchgear - 8BD4


Saif Textile Mills KR A0514 3000288439 6/23/2005 6/30/2005 7/12/2005 08-08-05email 8/9/2005 Clar recd 08-07
03xI/Cs+04xO/Gs+BPT
12-07-05
M/s Honda Atlas Cars (Pakistan) Ltd. MYS/RA A0515 3000288772 11kV Switchgear - 01xI/C+03xO/G 6/24/2005 6/30/2005 6/30/2005 7/13/2005
02-08-05
M/s The Thal Industries Corp. Ltd. / Layyah
RA A0516 3000288538 01x6.6kV I/C / O/G VCB Panel - 8BD 6/27/2005 7/7/2005 7/12/2005 8/2/2005 8/3/2005
Sugar Mills
06-07-05
M/s Victor Pipe Industries - Afghanistan SJA A0517 3000292427 01x2-way 24kV RMU, Scheme 20 6/29/2005 7/4/2005 8/30/2005 8/16/2005 Dim updated
08-07-05
Pioneer Cement KR A0518 3000294434 6.3kV Switchgear - 04xSA2 7/1/2005 7/7/2005 7/4/2005 7/7/2005 7/8/2005

Customer comments recd on 22-08


clarified on 22-08, Go-ahead for release
29-07-05 in prod / 01xO/G to be aligned with 6.3kV
11kV Switchgear - 01xWIP + 12-08-05 switchgear, S. O. No. 3-347560 - A0552
FFC MYS/RA A0519 3000288778 7/4/2005 7/20/2005 9/1/2005 9/1/2005
08xSA2 + Loose Components 02-09-05 with new CT ratio / Relay changed to
Schematics CDG61 from P124 / Informal meeting @
SB with customer dtd 02-11 / Earthing
switches reqd as per email dtd 17-01

Formal indent on 24-10, S. O. # on 21-


05-07-05
PESCO RFQ A0520 3000354645 03x11kV O/G Panels - WAPDA 7/4/2005 12/27/2005 10/21/2005 10 / Customer P.O. recd on 17-10, Qty
21-07-05
changed to 03Nos.
22.07.05
(Item 1)
01xWCP+01xWIP+01xI/C+02xO/G -
Blessed Testile Mills Ltd. - Unit No. 3 MYS A0521 3000289586 7/5/2005 7/8/2005 7/12/2005 7/19/2005
8BD4
19-07-05
(Item 2)
30/08/2005
Formal indent & S. O. # on 10-11 / Drgs
23-09-05
approved during meeting with customer
SP&EW KR A0522 3000348466 6.3kV Switchgear 8/17/2005 8/30/2005 24-11-05
SLD/FV/CLs/ 05-09 to 09-09, resubmitted for formal
SB D
FPs app / CL rel on 12-09
12-09-05
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

SUPARCO MYS A0523 3000296423 01x I/C / O/G VCB Panel 7/12/2005 7/15/2005 7/14/2005 8/2/2005 8/3/2005
PSM KR A0524 3000287792 03x VCBs 7/12/2005 7/13/2005 7/15/2005 7/27/2005 7/27/2005 CL on 15-07-05

11kV Switchgear - 01xKESC Grid


O/G+03xKESC Jr+01xI/C+04xO/G - 18-07-05 Meeting with consultants on 28-07 / CL
Siddiqsons Tin Plate Ltd. KR A0525 3000297394 7/25/2005 8/11/2005 26-08-05Email 8/26/2005
SA2 + 01xAdapter Panel for KESC 24-01-06 rel on 05-08 / Energy Meter changed
Grid S/S

CL rel on 28-07 / Relay changed to CDG


D. S. Industries Ltd. RFQ A0526 3000302535 01xI/C+01xO/G 11kV VCB Panels 7/19/2005 7/26/2005 7/28/2005 8/9/2005 8/9/2005
61 on 22-08 / CC box added on 18-10

HESCO RFQ A0527 3000303957 16xI/C+48xO/G WAPDA P44:96 7/19/2005 7/22/2005 7/21/2005 10/3/2005 9/26/2005 CL rel on 21-07
CL rel on 21-07 / Approved drgs recd on
Bahria Town Rawalpindi KR A0528 3000304924 04x 4-Way RMUs 7/21/2005 7/21/2005 7/26/2005 12-08-05email 8/23/2005
17-08
01x 11kV VCB I/C Panel for
Nagina Cotton Mills - Kotri KR A0529 3000304609 7/21/2005 7/28/2005 8/4/2005 8/16/2005 8/16/2005 Site visit on 01-08 / CL rel on 04-08
Jenbacher Generator
01x I/C + 05xO/G Panels - WAPDA PMT CL rel on 04-08 / EM
02-08-05 13-09-
P44:96 + 01x100kVA PMT Standard 27-07-05 09-08-05 15-09-05 Communciation matter to be considered
M/s Rousing Engg Services / Dost Steel RFQ A0530 3000302543 04-08-05 05email
w/o metering + 01xCapacitor O/G 21-06-06 26-06-06 17-07-06 by SB-LHR / Changes on 09-06 (ES,
29-06-06 13-07-06
Panel meters) / Add indent

DHA Lahor/Electrification Works of DHA Phase V SHA A0531 3000303414 02x 400kVA PMTs 7/27/2005 NR 8/12/2005 8/12/2005 CL rel on 10-08

28-07-05
See (Item1) 02-09-05 CL rel on 28-07(KESC Grid Panel) & 08-
01xKESC Grid O/G + remarks 05-08-05 10-11-05 08-09-05 08 (Bal) / Site visit on 30-08 / All
M/s Abbott Laboratories (EC) SJA/RA A0532 3000304671 7/27/2005
01xI/C+01xB/C KESC Jr Panels 05 -08- (Item 2&3) KESC Grid 21-10-05 equipment except KESC Grid panel
05 26-10-05 Panel dispatched
BC+Adaptor

11-08-05
01xWIP + 02x11kV VCB CT ratio 100/5A reqd for WIP as per
PAEC / NMC-1 RFQ A0533 3000309035 7/28/2005 8/11/2005 06-10-05 9/13/2005 9/14/2005
O/G+01xBPT Panels letter recd 03-10
WIP

01xWIP + 01x11kV VCB 13-09-05


Pakistan Railways Carriage Factory Islamabad RA A0534 3000309089 7/28/2005 8/13/2005 8/10/2005 9/14/2005
I/C+04xFLBS O/G Panels 26-09-05WIP

Revised indent / CLs on 08-09 / PMT


03-08-05 order cancelled / Surge Arr type
Maple Leaf Cement Factory KR A0535 3000298506 02xI/C+06xO/G+2xO/G 8/24/2005 9/8/2005 21-10-05email 10/25/2005
19-08-05 changed to Siemens/ Cu work revision
for Cable mounting

U. S. Embassy RFQ A0536 3000310158 01xWIP 8/3/2005 NR 8/5/2005 8/17/2005 CL rel on 05-08

F. E. S. C. O. SHA A0537 3000310190 21x100+24x200kVA PMTs 8/3/2005 NR 8/8/2005 CL rel on 09-08


S. O. # on 15-08, Formal indent recd on
M/s Muhammad Aslam RFQ A0538 3000317305 01xWIP 8/1/2005 8/5/2005 08-08-05email 8/17/2005
16-08

Formal indent recd on 16-08 / CL rel on


Technical Associates Pakistan / Abu Dhabi
RFQ A0539 3000315161 01xWIP + 01xOwner's Panel 8/15/2005 8/16/2005 9/16/2005 9/20/2005 16-08 / On-Hold since 23-08, go-ahead
Palace Rahimyar Khan
on 13-09 with trafo rating changed

01xWIP + 01x11kV VCB CO Panel + 17-08-05 26-08-05 25-08-05 01-09-05 CL rel on 25-08 / Energy meter reqd in
Gadoon Textile Mills Ltd. RA A0540 3000315535 9/2/2005
01x11kV I/C / O/G Panel 06-09-05 08-09-05 08-09-05 12-09-05 WIP as per App comments / Add indent

Olympia Chemicals Ltd. SJA/KZ A0541 3000316684 01x 6.3kV VCB O/G Panel-8BD4 8/17/2005 8/29/2005 8/25/2005 12-09-05email 9/13/2005 CL rel on 23-08
Formal indent on 10-10 / S.O. # on 07-
17-08-05 30-08-05
IESCO SHA A0542 3000346543 31x 63kVA PMT NR NR 10 / CL rel on 23-08 / Add indent for
16-02-06 01-03-06
06Nos.
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

17-08-05 30-08-05 Formal indent on 11-10 / S. O. # on 07-10


IESCO SHA A0543 3000346560 19x 100kVA PMT NR NR
16-02-06 01-03-06 / CL rel on 19-08 / Add indent for 04Nos.

24-10-05 11-11-05 Formal indent & S. O. # on 10-11 / Trafo


IESCO SHA A0544 3000349209 15x 400kVA PMT 8/17/2005 Prototype Prototype drg recd on 07-09 / WAPDA inspection
03-04-06 26-04-06 on 27-28/03
24-10-05 11-11-05 Formal indent & S. O. # on 10-11 / Trafo
IESCO SHA A0545 3000349180 05x 630kVA PMT 8/17/2005 Prototype Prototype drg recd on 07-09 / WAPDA inspection
03-04-06 26-04-06 on 27-28/03

Formal indent recd on 24-08 / CL rel on


01xWIP + 01x11kV VCB I/C / O/G 22-08-05 19-09-05
Wood World Plywood Industries SJA/RFQ A0546 3000320476 6/30/2006 8/31/2005 9/16/2005 26-08 / Rev indent - modif reqd in I/C /
Panel 28-06-06 30-06-06
O/G Panel (SA2 to 8BD4)

MV Switchgear - 03x11kV 23-09-05


Drgs resubmitted to SB S for review &
Peoples Steel Mills Ltd. (Extension) SJA/KZ A0547 3000322766 VCB+02x5kV VC Panels + Cable 8/24/2005 9/24/2005 12-10-05 10/29/2005 11/28/2005
release for App / CL rel on 12-10
Connection Box 28-10-05
15-09-05email
Gulistan Textile Mills Ltd. - Unit 4 RA A0548 3000327455 02x11kV VCB Manual CO Panels 8/24/2005 9/6/2005 9/6/2005 29-09-05 9/7/2005 Based on earlier order

15-09-05email
Gulshan Weaving Mills Ltd. - Unit 2 RA A0549 3000326254 02x11kV VCB Manual CO Panels 8/24/2005 9/6/2005 9/7/2005 29-09-05 9/7/2005 Based on earlier order

Components finalised with S / Meeting


with customer on 22-09 / Site visit on 21-
02xI/C+05xO/G(MT)+3xO/G(TR)
PARCO - Shikarpur Revamp Project KR A0550 3000327376
+01xBC
9/6/2005 9/24/2005 10/6/2005 11/7/2005 11/13/2005 /
11 Differential CT conf recd on 27-02 /
Buchholz+Schematics+TP+WL+LT
comptt+Assembly on 24.04.06

16-09-05 05-01-06 CT ratio changed on 05-01,


Umar Spinning Mills (Pvt.) Ltd. KR A0551 3000332848 01xWIP+01xI/C&O/G SA2 Panel 9/12/2005 9/16/2005 1/6/2006
05-01-06 email Resubmitted, Approved
6.3kV Switchgear - 01xI/C + 03xO/G Earthing Switches reqd as per email dtd
FFC SJA/RA A0552 3000347560 9/16/2005 9/21/2005 9/23/2005 12/20/2005 12/27/2005
Panels 17-01
30-09-05
26-10-05
11kV Switchgear - 07xSA2+BPT 19-09-05 06-10-05 20-10-2005
M/s. Interloop (Pvt.) Ltd. SJA/RA A0553 3000336251 9/28/2005 07-04-06 Changes in App/Additonal Indent
Panels + Additional Indent 06.03.06 Schematics 27.03.06
07-04-06
27.03.06

S. O. # on 14-11 / Qty of RMUs revised


Punjab Industrial Estate (Sunder Industrial 62x4-Way+29x3-Way RMUs +
KR/KZ A0554 3000348705 9/21/2005 9/27/2005 9/23/2005 10/28/2005 11/2/2005 by EC on 24-09/Revisions in CT ratio
State) 01xWIP + 01xWCP
expected
11kV Switchgear - 10xI/C + 20xO/G
WAPDA ADP-43 Variation Order RFQ A0555 T-011 9/21/2005 9/23/2005 NR 9/27/2005
Panels
01xWIP + 01x11kV VCB I/C / O/G
Zulfiqar industries Ltd. KR A0556 3000335402 9/22/2005 9/30/2005 9/27/2005 10/20/2005 10/24/2005 CT, Ammeter ratio recd in App
Panel
01xI/C / O/G + 01xI/C + 02xO/G
Interloop (Pvt.) Ltd. RFQ A0557 3000337622 Panels 9/27/2005 9/30/2005 10/4/2005 10/24/2005 10/25/2005 Minor changes in App
8BD

08-11-05
05-10-05 21-11-05 S. O. # on 14-11 / CL for Kiosk rel on 11-
HT Panel
HT Panel HT Panel 11 / SB D Details for HT Panel & Kiosk /
01xO/G Panel + 03x25kVA Kiosk 02-01-06
Sialkot Int'l Airport Ltd. (EC) SJA/RFQ A0558 3000345661 9/27/2005 10/5/2005 08-11-05 01-03-06 Kiosk drgs resubmitted / Meeting with
with RMU Scheme 10 Kiosk
28-02-06 Kiosk NESPAK on 03-05-06/Change received
10-05-06
17.08.06 17.08.06 on 21.07.06
21.07.06

10-10-05 14-10-05
01xWIP + 01xI/C+02xO/G 11kV VCB CL rel on 11-10 / Go-ahead for
Al-Rahim Textile Industries KR A0559 3000336850 10/10/2005 10/12/2005 FP, FV FP, FV 10/18/2005
Panels manufacturing on 17-10
11-10-05 19-10-05
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

01xI/C+04xO/G+2xB/C WAPDA Grid 19-10-05 SLD/FV/Assembly/FP submitted to TD


Sitara Chemical Industries RA A0560 3000346424 10/12/2005 10/14/2005 21-11-05 01-11-05email 12/12/2005
Panels Schematics/TPs
on 14-10

24-11-05
29-06-06 Formal indent, S. O. # recd on 28-03 / CL
01-12-05 26-06-06
KESC 2480-02 SJA A0561 3000403028 11kV Switchgear - 113x15kV Panels 10/13/2005 11/1/2005 07-12-06 & drgs for Remote Control Panels
09-01-06 email
RCP pending
05-05-06

??
HT Panel 24-04-06
02x11kV O/G VCB Panels (8BD4) + PMT Alternative I reqd as per email from
NTDC-WAPDA / Sahiwal S/S (TD) RFQ/SHA A0562 3000352782 10/19/2005 10/27/2005 22-11-05 25-04-06
02x630kVA PMTs SB S Ex on 22-11 / NESPAK comments
PMTs PMT
20-01-06

03xKESC Jr +
Innovative Engineering / Hilton Pharma Ltd. KZ A0563 3000352299 10/24/2005 10/27/2005 10/31/2005 11/30/2005 11/7/2005 CL rel on 24-10
01x11kV I/C/O/G Panel-8BD4
21-11-05 P124 instead of CDG 61 relay, Fuji
M/s Royal Palm Golf & Country Club RFQ A0564 3000352861 01x11kV I/C/O/G Panel-8BD4 10/24/2005 10/27/2005 10/28/2005 11/23/2005
05-12-05 instead of Elabs CTU reqd in App

2x(1000:2000/5/5A)+
11kV Switchgear - 15xI/C + 68xO/G 01-11-05 13x(1600:800/5/5A) / Formal indent &
WAPDA ADP-61 SJA/RFQ A0565 3000359838 10/25/2005 10/28/2005 11/1/2005 12/7/2005
+ 12xCoupler Panels 29-12-05 S.O. No. on 08-11 / Approval through
letter

08-12-05
03-01-06 Changes in App, Resubmitted / App with
15-11-05
Prefab Systems (Pvt.) Ltd. (Expo Centre) RA A0566 3000356489 01xI/C+02xO/G 11kV VCB Panels 11/2/2005 11/10/2005 16-01-06 26.01.06 comments in Meeting with NESPAK on
18-01-06
17-01-06 17-01
02-02-06

09-12-05 Site visit on 21-11 / CL for KESC Grid I/C


Annoud Power Plant SJA A0567 3000361720 03xKESC Grid I/C Panels 11/7/2005 11/15/2005 12/30/2005 1/20/2006
02-01-06 rel on 09-12/Spares ordered

01x11kV O/G Panel+01x11kV O/G


Black Gold Industries KZ A0568 3000363899 11/14/2005 11/18/2005 11/18/2005 NR 11/21/2005
VCB Trolley - WAPDA
Lucky Cement Ltd. - KHI Project RA A0569 3000354588 02x6.3kV I/C / O/G Panels 11/14/2005 11/23/2005 12/13/2005 12/14/2005 App drgs recd on 16-01

01x11kV I/C & O/G Panel - 8BD4 + 30-11-05


Nestle Pakistan Ltd., Sheikhupura KR A0570 3000370942 11/24/2005 11/30/2005 11/28/2005 11/30/2005 Revised drgs for existing Panel pending
Loose Components email

27-12-05
CL rel on 07-12 / Additional Indent
01xWIP + 01xI/C+02xO/G 11kV 30-11-05 02-12-05 06-01-06
Qaim Automative (Mfg) Pvt. Ltd. KR/MAB A0571 3000373634 12/12/2005 3/15/2006 received on 02-02/FIT Report Received
Panels + 01x I/C Panel 06-02-06 08-02-06 email
19.06.06
13-03-06
01x15kV KESC Grid O/G + 16-12-05
Bolan Casting Ltd. KR/RA A0572 3000377286 03xKESC Jr + 01x 11kV I/C/O/G - 12/1/2005 12/9/2005 12/9/2005 Letter 12/12/2005 CL rel on 02-12
SA2 Panels 03-01-06
11kV Switchgear (14x8BD+01xBPT)
Azgard Nine Ltd. KZ A0573 3000378126 + 12/2/2005 12/12/2005 12/19/2005 1/16/2006 12/26/2005 CL rel on 06-12 rev. 08-12
Loose Components
01x3-Way RMU (WAPDA Specs. Formal indent & S.O. # recd on 27-12 /
M/s Khayaban Enterprises KR A0574 3000388845 12/7/2005 12/9/2005 1/23/2006 12/14/2005
DDS-46:90) CL rel on 09-12
01xWIP + 01x11kV I/C/O/G Panel - 20-12-05
M/s Riffino Rice Mills Pvt. Ltd. KR/MAB A0575 3000380597 12/9/2005 12/13/2005 12/14/2005 12/14/2005 CL rel on 09-12
8BD4 email
01x6.3kV, 1250A, 31.5kA VCB 16-12-05 03-01-06
Fauji Cement Company Ltd. KR/MAB A0576 3000379552 12/8/2005 12/10/2005 2/15/2006 CL rel on 16-12
trolley + Fixed contacts 05-01-06 05-01-06
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

3.3kV Switchgear - 26-12-05


06xI/C+09xO/G+01xCO+01xI/C/O/G 15-12-05 email
+01xBC+05xContactor Panels + 14-12-05 16-12-05 06-01-06 CL rel on 15-12 rev. 16-12 / Changes in
M/s Honda Atlas Cars Extension Project KR/RA A0577 3000380721 12/22/2005 2/3/2006
05x60kVAr Capacitor Bank + 04-01-06 03-01-06 email App / Add indent
Modifications in existing panels of 06-01-06 27-01-06
SS-1 + 01x I/C / O/G Panel email

02x11kV FLBS Panels with CC Box


M/s Coca Cola Beverages Pakistan Ltd. RA A0578 3000381961 12/15/2005 12/23/2005 12/26/2005 1/17/2006 1/20/2006 CL rel on 26-12
& Loose CTs
(20+20)x 11kV WAPDA O/G VCB 03-01-06
M/s Perfect Electromek Pakistan RFQ A0579 3000386861 12/19/2005 12/22/2005 12/23/2005 1/3/2006 Add indent
Trolleys 21-03-06
07x KESC Jr Panels + 01xKESC Jr 26-12-05
M/s Highland Traders KR/MAB A0580 3000388647 12/28/2005 1/18/2006 NR 1/18/2006 CLs rel 0n 21-12, 05-01 & 06-01
+ 01x15kV KESC Grid Panels 29-12-05
07-04-06 CL rel on 27-12, 30-12, revised 02-01/PT
Clariant Pakistan KR/MAB A0581 3000387324 01x11kV Panel-8BD4 12/26/2005 12/29/2005 1/3/2006 Email 20-04- 4/7/2006 mounting arrangement provided by SB-
2006 D
01xWIP + 01x 11kV I/C / O/G Panel- 19-01-06
M/s Super Tech Feeds KR/MAB A0582 3000390122 12/29/2005 1/2/2006 12/30/2005 12/30/2005 CL rel on 28-12, revised 29-12
8BD4 email
11kV Switchgear - 06xSA2+01xBPT 06-01-06 19-01-06 CT ratio changed in App from 400/5/5 to
M/s Suraj Cotton Mills Ltd. KR/MAB A0583 3000391920 1/4/2006 1/6/2006 1/27/2006
Panels 27-01-06 email 300/5/5 in 02xO/Gs

Dewan Cement MR/SJA A0584 3000389045 6.3kV VCB Trolley Contact Arms 12/27/2005 12/30/2005 12/30/2005 Handled by SB-D/Site visit on 15-16/02

04x Mounting of Earthing Switches


British High Commision SJA A0585 3000393131 1/2/2006 1/25/2006 1/25/2006 Site Modification Work
in existing Switchgear

CL rel on 06-01 / Resubmitted / CT


01xI/C / O/G Panel with Outdoor 18-01-06 17-02-06
PARCO RFQ A0586 3000393145 1/3/2006 1/18/2006 3/13/2006 approved with 300/5/5/5A , 5P10/PT re-
Housing ?? 24-03-06
ordered
Platinum Pharmaceuticals (Pvt.) Ltd. KR/MAB A0587 3000394366 03x KESC Jr Panels 1/5/2006 1/17/2006 1/18/2006 1/18/2006 CL rel on 06-01
01x11kV I/C Panel-8BD4 +
Blessed Textile Mills KZ A0588 3000390206 Accessories for mofifications in 1/6/2006 * 1/31/2006 2/22/2006 2/24/2006
existing panels

18-04-06
07x5-Way (Sch. 82)+01x3-Way (MDS)
18-01-2006 24.03.06 Meeting with Consultant on 21-03 / CLs
K.E.P.Z. / Phase II SJA/RFQ A0589 3000394334 (Sch. 32) RMUs + 02x11kV Panels 1/4/2006 * 26-04-06
17-04-06 25-04-06 (Partial) rel on 24-03 / SS6 deleted
(KESC Grid Design) 27-04-06
FLBS, RMUs

01x11kV I/C (8BD4) + 01xBPT


Bhanero Textile Mills MAB A0590 3000390102 Panels + Accessories for 1/6/2006 2/6/2006 2/20/2006 Assembly, LT Comptt, WL to be made
mofifications in existing panels

Rahimbux Group of Cos. - Arain Mills Ltd. (PTD SE) RFQ A0591 3000396628 01x11kV O/G Panel - 8BD4 1/16/2006 1/19/2006 1/27/2006 3/10/2006 3/13/2006

Gadoon Textile Mills RA A0592 3000401019 01x11kV CO Panel - 8BD4 1/20/2006 1/25/2006 1/27/2006 2/15/2006 2/15/2006 CL rel on 27-01

01x24kV, 800A I/C / O/G Panel


07-02-06
Siemens Afghanistan / Gardez Province RFQ A0593 3000394277 (SA4) + 1/20/2006 2/2/2006 2/22/2006 3/13/2006 C/L on 03.02.06
01-03-06
24kV Pole-mounted FLBS (Loose)

M/s Hussain Mills Ltd. RFQ A0594 3000403721 01x11kV I/C / O/G Panel - 8BD4 1/25/2006 1/31/2006 1/27/2006 2/27/2006 3/13/2006 CL rel on 27-01
Highland Traders KR A0595 3000403725 06x KESC Jr. Panels 1/26/2006 1/31/2006 1/30/2006 1/30/2006
Rating Plate approval awaited / Formal
03-02-2006
IESCO SJA A0596 3000418118 50x4-WAY RMUs + 13x4-WAY 2/1/2006 4/6/2006 indent & S.O. # on 21-02 / Additonal
15-08-06
Indent
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

9xI/C+1xBC+1xBPT+1xCab.Con. 23-02-06 20-03-06 CL rel on 21-02 rev 15-03 / Drgs


Colony Textile Mills KR/RA A0597 3000409827 2/10/2006 2/20/2006 3/20/2006
+16xC/O+1xC/OAT+2xAux. Trafo 15-03-06 email resubmitted against rev indent

01-03-2006
Rafique Spinning mills RFQ/KZ A0598 3000412072 1xLBS+2xOG VCB + 1xI/CO/G LBS 2/13/2006 2/17/2006 2/21/2006 3/20/2006
Letter
02 KESC Grid O/G + 27-02-06
Highland Traders-Naval Housing Project KR/MAB A0599 3000412156 2/13/2006 2/17/2006 6/30/2006 Jrs. Dispatched; Grid panels remain
26x8BD4(600mm) SLD, FV
Dewan Salman Fiber Ltd. MAB A0600 3000410001 05xGen I/C+02xO/G+1xBC 2/10/2006 2/21/2006 3/8/2006 3/15/2006 3/23/2006
29-03-06 CT ratios recd on 24-02 / CL rel on 01-
16-02-06 01-03-06
Lucky Energy SJA/RA A0601 3000418226 03xGen I/C+ 03xO/G 2/23/2006 29-05-06 4/10/2006 03 / Add indent / Meeting with customer
13-03-06 20-03-06
09-06-06 on 05-05
Perfect Electromek RFQ A0602 3000418523 01xI/C & O/G VCB Panel 2/20/2006 2/20/2006 2/22/2006
01xWIP + 01x11kV I/C/O/G Panel -
Citropak Ltd. / Unit-II KZ/RA A0603 3000423546 3/1/2006 3/7/2006 3/31/2006 3/7/2006 CL rel on 02-03
8BD4
M/s. Gulshan Spinning Mills Ltd. - 1 KZ/RA A0604 3000423564 01xWIP 3/1/2006 3/5/2006 3/7/2006 3/7/2006 CL rel on 02-03
03xKESC Jr + 01x15kV KESC Grid
Highland Traders-Diamond Metal Industries KR/MAB A0605 3000412158 2/20/2006 2/28/2006 3/9/2006 3/9/2006
Panel
03xKESC Jr + 01x15kV KESC Grid
Highland Traders MAB/KR A0606 3000416975 2/20/2006 2/28/2006 3/9/2006 3/9/2006
Panel

Ordering done by SB S / Resubmitted


100x11kV, 450kVAr Capacitor 28-02-06
KESC MR/SJA A0607 3000419185 2/20/2006 2/27/2006 3/20/2006 3/21/2006 based on fresh inputs from SB S & site
Racks 15-03-06
visit on 08-03

02 KESC Jr With Metering + 08 W/o 21-02-06


KESC KR/MAB A0608 3000420033 2/21/2006 2/24/2006 2/21/2006 CLs rel on 21-02 & 23-02
M 27-02-06
CT ratio changed in App from 50/5/5 to
Paramount Spinning Mills RFQ A0609 3000411852 01xWIP+01x11kV Owner's Panel 2/23/2006 2/27/2006 2/23/2006 2/24/2006 2/27/2006
100/5/5 in Owner's Panel
15-03-06
Hasan Spinning Mills (Pvt.) Ltd. KZ A0610 3000421051 01x11kV Owner's Panel 2/27/2006 2/28/2006 2/28/2006 3/13/2006
email
M/s. Gulistan Spinning Mills Ltd. - 2 RA A0611 3000423607 01xWIP 3/1/2006 3/5/2006 3/7/2006 3/7/2006 CL rel on 02-03
04-05-06
M/s. Sitara Hamza (Pvt.) Ltd. SJA A0612 3000425986 01x3-Way + 01x4-Way RMUs 3/6/2006 3/7/2006 3/10/2006 5/4/2006
Fax

M/s Independent Newspapers Corp. (Pvt.) CL rel on 22-03, 05-04 / Order put on-
RFQ A0613 3000430110 01x KESC Jr+ 01xI/C / O/G Panels 3/8/2006 3/16/2006 4/5/2006
Ltd. / Jang Building, I. I. Chundigar Road (EC) hold on 10-04

M/s J & S Enterprises (Pvt.) Ltd. / Jang Press, CL rel on 22-03 / Order put on-hold on
RFQ A0614 3000430115 01x KESC Jr+ 01xI/C / O/G Panels 3/8/2006 3/16/2006 4/4/2006
Sultanabad (EC) 10-04
05-04-06
20-04-06
Chashma Sugar Mills - D. I. Khan SJA/MAB A0615 3000430049 6.6kV Switchgear - 06xSA2+BPT 3/14/2006 3/22/2006 21-04-06 5/3/2006
10-05-06
Schematics
Perfect Electro Mek / M/s. Khalid Shafique
RFQ A0616 3000436427 01xWCP 3/24/2006 3/20/2006 3/30/2006
Spinning Mills Ltd.

01x11kV WAPDA Ring Main Panel


Zaver PC Hotel Gwadar (EC) SJA A0617 3000435737 3/21/2006 3/29/2006 4/4/2006 4/10/2006 4/20/2006
(P44:96)+01x11kV I/C / O/G Panel

S.O. # on 03-04 / App vide NTDC letter


11kV Switchgear - 09xI/C + 33xO/G 22-03-06 06-04-06
NTDC-WAPDA / STG-6-26 (LOT-I) SJA/RFQ A0618 3000446558 NR NR 4/10/2006 dtd 04-04 / CL rel on 13-04 / Rev indent -
+ 03xCoupler Panels 26-06-06 email
Qty of I/C & O/G changed

Bahria Town Rawalpindi RFQ A0619 3000436465 03x11kV O/G Panels - WAPDA 3/22/2006 3/31/2006 4/3/2006 4/13/2006 4/17/2006

03-04-06
01x11kV VCB Capacitor O/G
VCB Panels Cap make, ES confirmation recd on 29-
Bahria Town Rawalpindi SJA/MR/RFQ A0620 3000436481 Panel+ 3/22/2006 4/7/2006 6/26/2006 6/29/2006
29-05-06 05 from SB S / CL rel on 02-06
01x11kV, 4800kVAr Capacitor Bank
Cap Bank
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

04x63+04x100+05x200+34x400+
M/s. Technical Associates Pakistan (Pvt.) Ltd. /
SHA A0621 3000435675 01x630kVA PMTs+03x3-Way+ 3/22/2006 3/29/2006 4/25/2006
Sukh Chayn Gardens
06x4-Way RMUs

29-03-06 04-04-06 07-04-06


11kV Switchgear-
Item 4-6 Item 4-6 Item 4-6 CL for items 1-3 rel on 12-04/SA
Sunlight Wood Industries KR/RA A0622 3000435774 04xI/C+03xO/G+01xBPT+03xI/C / 3/24/2006 4/4/2006
12-04-06 26-05-06 24-05-06 arrangement revised
O/G Panels
Item 1-3 Item 1-3 Item 1-3

Drawings released in production


01xI/C + 01xO/G VCB Trolleys for
BOC (PTD SE) RFQ A0623 3000444016 3/31/2006 4/5/2006 4/28/2006 8/4/2006 considering the production. Delivery
KESC Grid
required as per Indent
Cambridge School-Islamabad MR A0624 3000443999 01x630kVA PMT 3/31/2006 NR 4/27/2006 4/27/2006 As per approved prototype

Medipharm (Pvt.) Ltd. SJA/MAB A0625 3000437228 01xWIP+01x11kV Owner's Panel 3/30/2006 4/4/2006 4/13/2006 4/7/2006

Kay & Emms (Pvt.) Ltd. RA A0626 300044441 01xWIP+01x11kV Owner's Panel 3/30/2006 4/5/2006 4/13/2006 4/17/2006

Brookes Pharmaceutical Laboratories


KR A0627 3000439054 01xKESC Jr with P&M 3/31/2006 4/6/2006 NR NR 4/3/2006
(Pakistan) Ltd.
Contech International (Pvt.) Ltd. RFQ A0628 3000447413 01xWCP + 01x3-Way RMU 4/4/2006 4/7/2006 4/6/2006 5/16/2006 5/17/2006 CL rel on 06-04
M. Ashiq SHA A0629 3000448785 01x400kVA PMT 4/6/2006 NR 4/25/2006
27-04-06
(Consumer)
01xWCP+(11x200+01x100)PMTs+0
Green City RFQ/SHA A0630 3000447858 4/5/2006 4/26/2006 28- NR 6/27/2006 Former order Glamour developers A
2x4Way RMUs
04-2006
(PMTs)
17-04-06
Punjab Industrial Estate/Sunder MR/SHA A0631 3000477583 05x500+45x750+10x1250 kVA PMTs 5/16/2006 5/11/2006 Drgs rel based on Design indent
16-05-06
11kV Switchgear-01xI/C+04xO/G- CL rel on 26-04 / Heater revised to 01no.
M/s Service Industries Ltd. KZ/RA A0632 3000451501 4/17/2006 4/20/2006 4/26/2006 5/10/2006 5/11/2006
8BD4 as per SB-Lhr email
03xI/C+06xO/G VCB Trolleys +
K.E.S.C. (PTD SE) RFQ A0633 3000417800 4/20/2006 4/21/2006 4/21/2006 NR 4/21/2006
Finger Contacts
19-04-06
Bahria Town, Rawalpindi SHA A0634 3000454750 22x4-Way RMUs NR 5/12/2006 Add indent for 08Nos.
18-05-06
15-05-06
Gulshan Weaving Mills Ltd. - 2 RFQ A0635 3000453930 01xWIP 4/26/2006 5/12/2006 5/12/2006 CL rel on 11-05
email

Grey Builders KR/RA A0636 3000460706 03xKESC Jr. Panels w/o Metering 5/2/2006 5/3/2006 5/3/2006 5/3/2006

02xO/G + 01xI/C / O/G 11kV Panels


Umar Spinning Mills RA A0637 3000464309 5/4/2006 5/11/2006 5/22/2006 6/5/2006 6/6/2006 CL rel on 11-05
- 8BD4
30-05-06 CL rel on 10-05 / CT ratio for I/C changed
Pakistan Tobacco Company (MES) SJA/MAB A0638 3000464188 11kV Switchgear - 01xI/C+03xO/G 5/4/2006 5/11/2006 5/15/2006 6/19/2006
email to 300/5/5A in App
22-05-06
M/s Sapphire Power Generation - Unit 1 RA A0639 3000464296 01xI/C + 01xAdapter 11kV Panels 5/5/2006 5/11/2006 5/16/2006 6/13/2006 App with comments
email
Pakistan Navy (PTD SE) KZ/KR A0640 3000464745 01x 11kV I/C / O/G Panel 5/4/2006 5/15/2006 6/8/2006 7/18/2006

Pakistan Cement (OLM) SJA/MAB A0641 3000469372 02x6.3kV LBS Panels 5/16/2006 5/16/2006 5/19/2006 5/22/2006 6/2/2006 Changes as per App and resubmitted

Babar Islam & Co. RA A0642 3000474344 01x11kV I/C / O/G Panel - 8BD4 5/22/2006 5/31/2006 6/22/2006
11kV Switchgear - 04xI/C + 40xO/G
IESCO RFQ A0643 3000565152 5/23/2006 NR 7/1/2006 7/26/2006 S.O. # awaited
+ 02xCoupler Panels
KESC (PTD SE) KR A0644 3000478610 22xVCB Trolleys (Jr) 5/26/2006 7/5/2006 7/7/2006
Highland Traders KR/MAB A0645 3000473669 07xKESC Jr. Panels 5/30/2006 6/2/2006 6/2/2006 6/2/2006
Prelim Trafo Drgs recd on 09-06 / CL rel
31-05-06 19-06-06 21-06-06
Technical Associates, Abu Dhabi Palace RFQ/SHA/SJA/SMY
A0646 3000485471 15xKiosk Substations 6/27/2006 on 14-06 rev 21-06 / Add indent - Qty inc
15-06-06 20-06-06 04-07-06
from 11 to 15
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

11kV Switchgear - 01x VCB Manual


31-05-06 02-06-06 CL rel on 02-06 / Order put on-hold on
M/s Sapphire Textile Mills Ltd. (Weaving Unit) KR/RA A0647 3000480079 CO + 01xCC + 01xLBS CO Panels - 6/2/2006 8/2/2006
06-07-06 13-07-06 29-06 / Rev indent
8BD4
01x11kV I/C (Gen) + 19-06-06
M/s Prosperity Weaving Mills Ltd. KR/RA A0648 3000480258 5/31/2006 6/7/2006 6/8/2006 6/9/2006 Go-ahead for rel in prod on 09-06
01x Adapter Panels email
6.3kV Switchgear + Trafo Changes in App & on 17-07, Site visit
Army Welfare Trust/Nizampur Cement (PWT) KR A0649 3000482465 5/31/2006 6/8/2006 6/16/2006 7/14/2006 7/18/2006
Protection & Metering Panel reqd
11kV (03) & 6.6kV(28) Switchgear -
M/s Etihad Sugar Mills MAB/RFQ A0650 3000481616 6/7/2006 6/8/2006 6/16/2006 6/30/2006 7/24/2006 Prelim indent on 31-05 / CL rel on 16-06
31 Panels

Sitara Hamza SHA A0651 3000496296 1x100kVA PMT + 1x400kVA PMT 6/12/2006 7/6/2006 7/5/2006 CL rel on 06-07-06

FESCO SHA A0652 3000484330 07x200kVA PMT Alternate III 6/15/2006 6/20/2006
IESCO RFQ A0653 02x200kVA PMT 6/15/2006 NR CL rel on 23-06
Lakson Tobacco Company RFQ A0654 3000493560 01x11kV O/G Panel 6/20/2006 6/23/2006 6/29/2006 7/13/2006 7/14/2006 CL rel on 29-06
6.3kV, 40kA Switchgear - 21-11-06
Maple Leaf Cement KR A0655 3000501466 7/12/2006 7/19/2006 8/3/2006 8/23/2006
01xI/C+02xO/G (8BK20) 27-12-06

02xI/C+08xO/G 11kV VCB Trolleys


MEPCO (PTD SE) RFQ A0656 3000494276 6/21/2006 6/26/2006 7/4/2006 7/26/2006
as per WAPDA Specs. P44:96

01x13.8kV I/C Panel - 8BD4


M/s Ittehad Chemicals Ltd. SJA/TAK A0657 3000494486 (WAPDA) w/o VCB Trolley + 6/22/2006 6/28/2006 7/11/2006 7/25/2006 7/11/2006 CL rel on 29-06
01xNGR
Maple Leaf Cement Factory Ltd. (OLM) KR A0658 3000495971 01x5.5kV I/C / O/G Panel 6/22/2006 6/27/2006 7/11/2006 8/2/2006 8/2/2006

Faisal Spinning Mills Ltd. - 2 RFQ A0659 3000499040 01x11kV I/C / O/G Panel 6/30/2006 6/27/2006 6/26/2006 Drgs rel on prior info recd on 26-06

11kV Switchgear - 01xI/C+02xO/G


CPC, DG Khan SJA/TAK A0660 3000276806 6/28/2006 7/3/2006 7/10/2006 8/28/2006
(8BD4)
03-07-2006
Faisal Spinning Mills Ltd. - Nooriabad KR/RFQ A0661 3000499100 01x11kV FLBS Panel 6/29/2006 7/5/2006 7/10/2006 7/5/2006 CDG-31 relay wiring diagram awaited
13-07-06
05-07-06
Indus Motor Co. Ltd. KR A0662 3000506779 02x11kV O/G Panels 7/12/2006 7/12/2006 7/24/2006 7/12/2006 Rev indent - 8BD4 O/G Panels reqd
11-07-06
01xWIP + 01x11kV I/C + 01x11kV
Hoosen Cotton Industries & Oil Mills RFQ A0663 3000500540 7/4/2006 7/12/2006 7/25/2006 8/1/2006 8/1/2006 CDG-31 relay wiring diagram awaited
FLBS Panels - 8BD4
01xWIP+01x11kV Owner's Panel -
M/s Pace Pakistan Ltd. SJA/TAK A0664 3000505905 7/6/2006 7/12/2006 7/13/2006 7/18/2006 7/17/2006 App recd on offer drgs / CL rel on 13-07
8BD4
01xWIP+11kV Switchgear - Indent rel against SB Stores, S.O. #
SB-Stores - Tahir Rafiq SJA/TAK A0665 7/4/2006 7/13/2006 7/18/2006 11/22/2006
01xI/C+02xO/G awaited / CL rel on 17-07
Star Paper Mills TAK A0666 3000505372 01xWIP 7/12/2006 7/25/2006 7/25/2006 8/1/2006 7/25/2006 CT ratio awaited from SB-Sales
11kV Switchgear - 01xI/C+03xO/G
Rafi Group (Defence Shopping Mall) RA A0667 3000509409 7/17/2006 7/21/2006 7/28/2006
(FLBS)
Gelcaps (Pakistan) Ltd. TAK A0668 3000511179 01x11kV I/C / O/G Panel 7/18/2006 7/21/2006 8/2/2006 8/3/2006

Baluchistan Wheels Ltd. SJA/TAK A0669 3000514729 11kV Switchgear - 01xI/C+01xO/G 7/20/2006 7/25/2006 7/25/2006 8/7/2006 8/7/2006

01x11kV I/C O/G Panel + 11kV


Dewan Automobiles Engg. Ltd. KR A0670 3000516051 7/24/2006 8/2/2006 8/2/2006
Switchboard - 01xI/C + 03xO/G
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

Advance ordering to be
Bulleh Shah paper Mills Ltd. (Packages Ltd.) KR A0671 3000518196 02xMV Motor Starters 8/1/2006 8/9/2006 8/24/2006 9/4/2006 9/11/2006
done/Clarifications from S'AG Awaited

PPW RA A0672 3000516016 7.2kV Switchgear 7/27/2006 8/3/2006 8/4/2006 11/27/2006

11kV Switchgear - 11-08-06


Sialkot International Airport RA A0673 30005173487 7/28/2006 8/9/2006 11/16/2006
2xI/C+6xO/G+1xBC+1x315kVA PMT 21-08-06

Power Professionals & Engineers (Bahria 02x Add Panels reqd as per App, indent
RFQ A0674 3000519756 02x11kV I/C & O/G Panel 7/31/2006 8/3/2006 8/3/2006 8/28/2006 8/29/2006
Complex III) requested

Hussain Builders TAK A0675 3000521768 03xKESC Jr. Panels w/o Metering 8/1/2006 8/3/2006 8/4/2006 NR 8/4/2006

04-08-06
EPN/Upgradation of Electrical Network RFQ A0676 3000523164 01x11kV I/C & O/G Panel - 8BD4 8/2/2006 8/4/2006 NR 8/4/2006
24-08-06
Diamond Fabrics Limited RFQ A0677 3000524043 01x11kV I/C & O/G Panel - 8BD4 8/4/2006 8/8/2006 8/11/2006 8/21/2006 8/29/2006
Kidney Foundation TAK A0678 3000526221 01x11kV I/C & O/G Panel - 8BD4 8/8/2006 8/10/2006 8/9/2006 8/18/2006 8/22/2006
01xI/C & O/G, 02xTrafo O/G +
Idrees Textile Mills Ltd. SJA/TAK A0679 3000527956 01xI/C + 01xBus PT / Cable 8/15/2006 8/25/2006 8/23/2006 11/3/2006
Connection Panel
6.36kV Switchgear - 02xI/C +
Maple Leaf Cement (Upgradation Job) KR A0680 3000525337 8/15/2006 01.09.06 Drgs. Received from PTSI
01xO/G
03xKESC Jr. Panels with Metering
Highland Traders RFQ A0681 3000525337 8/23/2006 8/25/2006 8/25/2006 8/25/2006 CT Ratios awaited
+ 06x w/o Metering

Babar Islam & Company TAK A0682 3000536774 02x11kV I/C & O/G Panels -8BD4 8/30/2006

Sarfaraz Textile Mills (Pvt.) Ltd. TAK A0683 3000538341 01XWAPDA


01xI/C + 08xO/G - Finger
K.E.S.C. (PTD SE) FB A0684 3000539527 Contacts+Contact Arms + Fixed 8/30/2006
Contacts
01XWAPDA + 01x11kV I/C & O/G -
Shahtaj Sugar Mills LTd. TAK A0685 3000540136 9/4/2006
8BD4

Bulleh Shah Paper Mill Project-Packages RA/KR A0686 3000541789 02x11kV I/C + 12X11kV O/G 9/4/2006 9/5/2006 9/5/2006 9/8/2006

16x3-Way RMUs (Scheme 32) as


K.E.S.C. TAK A0687 3000562602 8/29/2006 11/28/2006
per KESC Specs. 78
Highland Traders / Naval Housing RA/KR A0688 3000543166 01X15kV KESC Grid O/G Panel 9/6/2006 9/11/2006 10/5/2006 10/9/2006
Maple Leaf Cement Factory ltd. / Upgradation 04X6.3kV , 31.5 kA Switchgear -
SJA A0689 3000540075 9/6/2006
Job NXPLUS C Design
Tritex Cotton Mills RFQ A0690 3000545203 01xWAPDA Consumer Panel 9/13/2006 9/17/2006 9/18/2006 10/2/2006 10/2/2006

International Construction Services/SUPARCO RFQ A0691 3000550675 01x250kVA KIOSK 9/20/2006 10/11/2006 10/13/2006 12/11/2006 App comments to be clarified

66x3-Way RMUs (Scheme 32) as


K.E.S.C. TAK A0692 3000562609 9/27/2006
per KESC Specs. 78
01xKESC Jr. with Protection W/O
Millac Food RJ A0693 3000529373 10/4/2006 NR 10/2/2006
Metering
03x11kV I/C Panels - 8BD +
Din Textile Mills Ltd, Patoki KR A0694 3000567349 10/4/2006 10/15/2006 11/1/2006 11/23/2006
02xDummy Panels
Coca Cola Beverages Pakistan Ltd., 02x11kV LBS + 01X11kV VCB
TAK A0695 3000561709 10/5/2006 10/10/2006 11/1/2006
Gujranwala Panels
01xWIP + 02x11kV O/G + 01xBPT
NMC-1, D.G. Khan TAK A0696 3000564083 10/10/2006 10/15/2006 11/27/2006 11/30/2006
Panel - 8BD4
Sheraton Hotel TAK A0697 11/22/2006
Ittehad Chemicals Ltd. TAK A0698 3000567626 03xVCBs 10/19/2006 10/21/2006
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

01xWIP+01x11kV I/C / O/G Panel -


Punjab Beverages Co. Ltd. RFQ A0699 3000573695 10/18/2006 10/19/2006 10/20/2006 11/8/2006
8BD4
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

M/s Bahria Town, Lahore RJ A0700 3000568400 01x4-Way RMU-WAPDASpecs. 10/19/2006 10/30/2006 11/3/2006 11/14/2006 11/3/2006
01xWIP+
Sitara Per Oxide TAK A0701 3000587675 11kV Switchgear-01xI/C+02xO/G 11/1/2006 11/7/2006 11/16/2006 Formal indent & S.O. # recd on 08-11
01x6.6kV I/C / O/G Panel - 8BD4

11kV Switchgear-WAPDA
GEPCO (TD)/Wazirababad Road, 132/11kV
RFQ A0702 3000584675 02xI/C+16xO/G+01xBC Panels + 11/3/2006 11/20/2006 11/22/2006
Cantt. G/S - Gujranwala
01x200kVA PMT

Zafar & Company/SUPARCO TAK/KR A0703 3000587492 11kV Switchgear-01xI/C+02xO/G 11/7/2006 11/11/2006 11/13/2006 11/22/2006 11/27/2006
18xVCB Trolleys (06xI/C+12xO/G) -
LESCO (PTD SE) RJ A0704 3000589166 11/10/2006 11/14/2006 11/17/2006 1/3/2007 1/5/2007
WAPDA
HESCO (PTD SE) RJ A0705 3000589170 14xO/G VCB Trolleys - WAPDA 11/10/2006 11/14/2006 11/17/2006 12/8/2006

Javedan Cement TAK A0706 3000594854 01No. 11kV Outgoing Panel - SA2 11/20/2006 11/22/2006

DHA Karachi (HSS)/DHA Phase VIII G/S No.1 KR A0707 3000581497 17.5kV Switchgear
Bahria Town RFQ A0708 3000595808 02x200kVA PMT 11/20/2006 11/22/2006 11/29/2006 12/14/2006
FESCO Tender SJA A0709 3000601627 7.2MVAr Capacitor bank 11/27/2006 12/26/2006
Gadoon Textile Mills Ltd. TAK A0710 3000601665 01xChangeover Panels 11/28/2006 12/1/2006
Unicol Ltd. KR/RJ A0711 3000603543 02xI/C / O/G Panel - SA2 11/28/2006 11/30/2006
01xWIP + 01xi/C & O/G Panel - 28-11-06
Fast Feed (Pvt.) Ltd. KR/RJ A0712 300061184 1/4/2007 Formal indent & S.O. # recd on 07-12
8BD4 email
Prime Crete (Pvt.) Ltd. TAK A0713 3000607827 01x11kV I/C / O/G Panel - 8BD4 12/1/2006 12/5/2006 12/5/2006 12/12/2006 12/6/2006
11kV Switchgear - WAPDA Specs.
Prelim Indent based on LOI recd on 01-
MEPCO / 6th STG Project, Tender No. 28 RFQ A0714 3000623538 P44:96 1/8/2007
12

Abdullah Gardens RFQ A0715 3000568170 02x3-Way RMUs 12/5/2006 12/6/2006 NR 12/6/2006

PECT Engineering RJ A0716 3000611667 01xI/C & O/G Panel - 8BD4 12/8/2006 1/18/2007 U/V relay reqd as per App comments

KESC/LPO/FIP/313/06 KR/SJA A0717 3000621821 201 KESC Jr Panels 12/20/2006 1/3/2007


Gulshan Weaving Mills Ltd. RFQ A0718 3000618720 01xI/C / O/G Panel - 8BD4 12/20/2006 12/28/2006 1/12/2007
12x11kV O/G VCB trolleys with
Perfect Electro Mek SJA A0719 3000618315 12/21/2006 12/28/2006
Plug Sockets & Contact Arms
27-12-06
06x1000kVA Kiosks + 04x750kVA
KESC SJA/RFQ A0720 3000624816 12/22/2006 1/24/2007 D01
PMTs
04-01-07
Hussain Mills Ltd. RFQ A0721 3000624407 01xI/C & O/G VCB Panel - SA2 1/4/2007 1/5/2007
PSO-Chukpirana (Schon Engineering) TAK A0722 3000623045 01xWIP 12/26/2006 1/15/2007 1/16/2007
Technical Associates / Sukh Chayn Gardens
RJ A0723 3000634352 01xWIP 12/29/2006 1/4/2007 S.O. # changed on 17-01
Housing Estate
IESCO TAK A0724 3000635336 35x63kVA PMTs 1/19/2007 NR
IESCO TAK A0725 3000635338 18x100kVA PMTs 1/19/2007 NR
IESCO TAK A0726 3000635339 18x200kVA PMTs 1/19/2007 NR
Pakistan Cables Ltd. KR A0727 3000628267 11kV Switchgear + 08xSA2 1/4/2007
01x4-Way RMU+30x3-Way
Punjab Industrial Estate/Sunder industrial
RFQ/RJ A0728 3000628380 RMU+02x11kV Panels (WIPs + 1/4/2007
Estate
Owner's Panels)
Century Paper & Boards Mills Ltd. KR A0729
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

M. Talib Enterprises/Container Control 01xKESC Jr with metering with


RFQ A0730 3000632485 1/10/2007 1/24/2007 1/17/2007
Program at Port Qasim protection
Kohinoor Soap & Detergents (Pvt) Ltd. RJ A0731 3000632433 01x11kV I/C O/G Panel - SA2 1/10/2007 1/24/2007

Ch. Mubarak Ali Contractors RJ A0732 3000639222 01x11kV I/C O/G Panel - 8BD4 1/12/2007 Formal indent & S.O. # recd on 18-01
11kV Switchgear -
Naubahar Bottling Co. Ltd. TAK A0733 3000636438 1xWCP+1xWIP+1xI/C&O/G+1xI/C+2 1/18/2007
xO/G
19xVCB Trolleys (04xI/C+15xO/G) -
FESCO (PTD SE) RJ A0734 3000637480 1/18/2007
WAPDA
12xVCB Trolleys (04xI/C+08xO/G) -
GEPCO (PTD SE) RJ A0735 3000637488 1/18/2007
WAPDA
M/s Riaz-ul-Jannah Housing Scheme, 01x3-Way + 02x4-Way RMUs
A0736 3000636171 1/19/2007
Faisalabad (WAPDA Specs. DDS-46:90)
M/s Gulshan-e-Madina Housing Scheme, 01x3-Way RMU (WAPDA Specs.
A0737 3000636184 1/19/2007
Faisalabad DDS-46:90)
HMA Building & Maintenance Co. A0738 3000640937 01x 11kV I/C / O/G Panel - SA2 1/23/2007
03xVCBs-3AH5214-1MF50-2KF2-Z
Ittehad Chemicals Ltd. A0739 3000567626 1/24/2007 NR
F20

TOTAL MV HOURS ###


LV Switchboards
Pak Arab Fertilizer SMY A5239 4800012190 MCC (8PU.011) 7/5/2002 16-09-02 16-05-03 09-07-03 Inspected on 28-06
WASO - Mianwali ( TD ) SJA A5379 5100002364 AC/DC Switchgear 6/20/2003 07-07-03 26-04-04 15-10-03 Inspected on 28/29-07
Trafo Control Panels - 02x10/13
WASO - Mianwali ( TR ) RJ A5386 5100002399 7/15/2003 25-07-03 26-04-04 27-04-04 CL rel on 20-08
MVA, 132/6.6 KV
Trafo Control Panels-
WAPDA ( KF - 541 ) RJ A5389 5100002546 7/21/2003 19-08-03 03-09-03 17-10-03 Indent on 15-10/CL rel on 09-10
15x20/26MVA,132/11.5KV
Add Indent on 07-05/SB D detail on 21-
PAPCO MA A5390 5100002428 Relay and Control Panels 7/24/2003 NR NR 23-12-03
07
K.E.S.C.( TR ) RJ A5403 5100002545 Fan Control Panel-5x31.5/40MVA Tra 9/3/2003 19-09-03 03-11-03 06-11-03
02xProtection Panel, 02xControl
WASO - Mianwali ( TD ) MA A5412 5100002364 10/9/2003 NR NR 12-12-03 Inspected on 28/29-07
Panel, 02xTLCC's
1No.CP20,1No.RP3,1No.AC/DC
WAPDA ADP 25 MA A5415 5150002564 10/7/2003 NR NR 30-10-03
Aux.Panel
220/132kV GIS S/S Islamabad University MA A5416 5100002544 06xCP50+06xRP4 Relay & Control P 10/15/2003 NR NR 30-10-03
Bahria Town - Rawalpindi FRQ A5418 4800016903 AC/DC Auxiliary Supply Panel 10/16/2003 19-11-03 12-01-04 13-01-04
White Oil Pipeline Project RJ A5422 5100002679 Trafo Control Panel - 04x10/13 MVA 10/29/2003 23-12-03 08-01-04 26-01-04 Customer Change rel on 06-04
MDB (1xS1+7xL1+3xC) +
23-01-04 18-
CEMAG - Askari Cement Ltd. FRQ A5424 5100002610 MCC(8xS1) - 8PU.011 + BTD + PLC 11/20/2003 18-12-03 05-01-04 BTD App recd on 31-03
03-04
Panels
WAPDA RJ A5426 5100002594 02xTrafo Fan Control Panel-20/26M 11/11/2003 11-12-03 NR 11-02-04
Sialkot Int'l Airport Ltd. ( EC ) SMY A5435 5100002643 LT Switchgear 12/10/2003 09-01-04 12-02-04 03-03-04 Reinspected on 23-11-04
LT Switchgear for Siemens Power
BU EPN TAM A5436 5100002647 4/2/2004 09-04-04 09-04-04 Add Indent on 14-06/Drgs rel on22/24-06
House
Pakistan PTA Ltd. FRQ/TAM A5439 4800018549 02xMCCs 12/17/2003 24-12-03 10-02-04 12-02-04 Inspection on17-06
01xFan Control Panel For 10/13
WAPDA - Colony Textile Mills (TR) RJ A5444 5100002712 1/8/2004 15-01-04 11-02-04 11-02-04 Indent on 22-01
MVA Power Trafo
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

02xRP3+01xRP4+02xCP30+01xCP
Bahria Town - Rawalpindi MA A5448 510002716 2/11/2004 NR NR 30-04-04 Front Plate details 07-06
50 Relay & Control Panels

KESC (TR) RJ A5449 510002749


01xFan Control Panel For
2/12/2004 03-03-04 08-03-04 08-03-04 ###
30/37.5MVA Power Trafo
Relay & Control Panels dispatched/
WAPDA ADP25 MA A5450 510002564 256x Relay, Control & AC/DC Aux. P 2/17/2004 26-02-04 18-03-04 08-03-04
Inspected on 05-10
Bestway Cement Ltd. FRQ A5451 4800019169 02x Starter Module Withdrawable 2/13/2004 25-03-04 20-04-04 25-03-04
5000A LT Switchgear with BTD/Layout App recd on 16-04/Cu size
Nishat Chunian Ltd.(Weaving) SMY A5453 4800019386 3/3/2004 15-03-04 25-03-04 26-03-04
1400kVAr PFIP changed
MCR - PARCO TAM A5454 4800019400 02x45kW MCC Modules 3/3/2004 NR NR 18-03-04

Indent recd 16-04 / Supporting docs. for


MCBs sent to SB S / Go-ahead to Prod
19-05-04
IESCO FRQ A5455 4800019830 07X AC / DC Panels 3/15/2004 22-04-04 6/23/2004 on 09-03 / Resubmitted for App to
09-08-05
WAPDA as per SB S email dtd 04-08 /
Inspected on 25&26-08

ICI Soda Ash Business SMY A5456 4800019715 02 x MCCs 3/26/2004 25-03-04 16-04-04 20-04-04
Masood Textile Mills FRQ A5458 4800019596 LT Swithgear with 500kVAr PFIP 3/25/2004 4/1/2004 4/1/2004 15-04-04 19-04-04
30x Relay & Control Panels for
WAPDA ADP32 (TD) SHA A5459 5100002807 3/29/2004 NR NR 06-05-04 Inspected on 04-10
Capacitors
42x Sivacon 8PT Panels in CKD
Scientechnic Dubai TM/FRQ A5460 4900000316 4/6/2004 NR NR 12/13/23-04 Add Indent for 09x ccs2 panels on 28-05
Condition
Decon Germany - Rehabilitation of the 110/15(20 FRQ A5461 4900000306 AC/DC Panels 4/12/2004 25-04-04 17-05-04 15-06-04 15-06-04 Add Indent for 01 x DB on 30-09
Sitara Chemical Industries SMY A5462 4800020056 LT Switchgear with 300kVAr PFIP 4/20/2004 26-04-04 13-05-04 13-05-04
18-05-04 CL rel on 28-04/MLT/PFIPs for prod on
Ibrahim Fibers (AATML) SMY A5464 4800020147 MLT + PFIP + BTD+DBs 4/27/2004 5/4/2004 21-05-04 28-05-04
DBs 19-05/Ist App DBs 13-05
19-05-04
Ibrahim Fibers (ITM) SMY A5465 4800020148 MLT + PFIP + BTD+DBs 4/27/2004 5/4/2004 24-05-04 6/1/2004 Inspected on 26-08
PFIPs
Auto Load Transfer Switch
Seven Star Company FRQ A5466 4800020227 5/4/2004 18-05-04 21-05-04 6/23/2004 7/13/2004
250kVA/400kVA
02x Trafo Control Panel for 16/25
Decon Germany/Afghanistan(TR) RJ A5467 5100002896 4/30/2004 5/10/2004 7/26/2004 NR 8/31/2004 Go ahead on 30-08
MVA Power Trafo
17-05-04 26.05.04 MLT 03-06-04MLT
LT Switchgear (LT Panel, MCCs
Olympia Chemicals Ltd. TAM A5468 4800020254 4/30/2004 5/12/2004 30.06.04MCC 22-07-04MCC MLT/BTDs/PFIP dispatched
F1,600KVArPFIP,3200A BTD etc) 15.07.04 Layout -
28-05-04
DAELIM Ind. for KOC Kuwait(TR) RJ A5469 Not Availabel 14x Temp Control Panels for Trafo 5/11/2004 14-05-04 App awaited
WAPDA / NTDC (TR) RJ A5470 5100002899 01x Control panels for 20/26 MVA Tr 5/13/2004 6/24/2004 7/19/2004 NR 7/19/2004 CL rel on 25-05
22-06-04DBs 22-06-04DBs
Apollo Textile Mills Ltd. TAM A5471 4800020595 LT Switchgear 5/31/2004 6/11/2004 27-07- 01 x DB added 17-08
04MLT 05-08-04 MLT
Enar Petrotech TAM A5472 4800020565 02x 55KW Withdrawable Starter Mod 6/3/2004 6/21/2004 6/30/2004 7/6/2004
POF Wah RJ A5473 5100002919 01x Fan Control Panel for 10/13 MVA 6/16/2004 7/5/2004 8/3/2004 NR 8/31/2004 Go ahead on 30-08
Sanaullah Textile Mills TAM A5474 5100002963 02x 250 KVAr PFIPs 6/30/2004 7/6/2004 7/2/2004 7/21/2004 7/2/2004
Ghazi Fabrics International SMY A5475 4800021130 LT Switchgear with 500kVAr PFIP 7/2/2004 7/13/2004 7/20/2004 7/21/2004
Decon Germany MA A5476 5100002676 Relay & Control Panels 7/2/2004 NR NR 8/5/2004 Add indent on 22-07
Engineering Services SMY A5477 4800021157 COS Panel for Phase Changeover 7/2/2004 7/12/2004 7/13/2004 App. Awaited
PARCO TAM A5478 4800021187 01 X 15kW Withdrawable Starter Mo 9/7/2007 7/19/2004 7/28/2004 7/27/2004 App awaited
07-09-04
04-08-04 const. CL rel on 29-07/Changes in
PressonDescon International TM/SMY A5479 4800021289 02 x MCCs- SIVACON 8PT 15-07-04 8/2/2004 8/30/2004
14-09-04 Drgs. App/Inspection on 19-11
14-09-04
Blessed Textile Mills Ltd. TAM A5480 4800021316 02x DBs + Loose MCCB 7/26/2004 7/29/2004 7/29/2004 App awaited
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

06-08-04
27.08.04
Changes on 30-09/Add Indent on 11-
Gadoon Textile Mills Ltd. FRQ A5481 4800021476 01x MCC (Fixed, Compartmental) 7/27/2004 8/3/2004 8/20/2004 13-
15- 10/Changes on 18-10
10-04
10-04
Taj Textile Mills Ltd. TAM A5482 4800021455 01 x 400kVAr PFIP 8/2/2004 8/8/2004 8/18/2004 8/24/2004
BP Pakistan TAM A5483 5100003010 01 x PDP , 60Hz 8/5/2004 8/12/2004 8/25/2004 9/14/2004 ###
06-09-04
Colony Textile Mills Ltd. MYS A5484 4800021612 LT Switchgear , 1200kVAr PFIP 8/6/2004 8/20/2004 9/6/2004 CL rel on 20-08
email
01xPanel added 18-08/03x Panels added
Scientechnic Dubai TM/SMY A5485 4900000328 48 x Sivacon 8PT Panels in CKD con 8/6/2004 NR NR 8/16/2004
23-09/01xPanel added on 18-11
07-09-04
Add Indent for BTD on 01-11/Changes in
Faisal Spinning Mills Ltd. MYS/TAM A5486 4800021762 LTO,Main LT,2No PFIPs,PDBS,LDBS 8/19/2004 8/20/2004 8/20/2004
DBs on 25-10
22-09-04
03-11-04
21-12-
10-09-04 04
17-08-04 04-10-2004 CL rel on 14-10 / Add Indents for
Maple Leaf Cement SMY/HJ A5487 5100003131 LT Switchgear(8PU.011 & 8PU.003) 14-02-05 02-03-05
15-04-05 12-05-05 PFIPs/DB/MCCs / CL rel on 26-04
03-05-05 Item 21
13-05-05
Item 23
CL rel on 30-08/Clar & Layout recd on
Nishat Mills Ltd. TAM A5488 4800021251 01x4000A ACB I/C Panel 8/23/2004 11/19/2004 23-11-04 12/6/2004 23-11-04
04-11/App vide email
CL rel on 09-09/Layout changed/ Schematics
Ghazi Fabrics International MYS A5489 4800021793 01 x MCC 8/23/2004 9/20/2004 9/20/2004 9/28/2004 10/12/2004 pending
Haleeb Foods TAM A5490 4800021812 LT Switchgear 8/24/2004 9/1/2004 10/6/2004 10/15/2004 10/18/2004
13-09-04
13-09-04 Latest WAPDA specs recd 25-05, Al BB
11-02-05 29-09-04 changed to 40x10, Prototype
29-
Service 24-02-05 inspection/testing of SB on 12-07,
10-04
Box 03-08-05SB released for mass production / SLCP rel
LT Connection boxes,Street 02-11-04
Habib Rafique Pvt. Ltd. SMY A5491 4800021842 8/24/2004 9/2/2004 14-07-05 29-08-05 for Prototype on 02-11, Inspected on 28-
Lighting Control Panel 29-
21-07-05 SLCP 29/04, Changes, Drgs rel for Prototype
12-04
SLCP 09-12-05 based on App, resubmitted, inspected
07-04-05
04-10-05 SLCP on 30-11, resubmitted with inspection
02-09-05
14-12-05 points
SLCP proto
01-12-05
Sapphire Textile Mills Ltd. RJ A5492 4800021900 01 x DB + Loose MCCB 8/31/2004 9/2/2004 9/2/2004 9/16/2004 9/17/2004
24-09-04
West Port Malaysia (TR) RJ A5493 02x Trafo Control Panels 9/3/2004 9/20/2004 21- 10/25/2004 22-11-04 Changes
10-04
05-10-04 04.10.04
23-09-04
Paramount Stitching Mills Ltd. RJ A5494 4800021891 LT Switchgear incl. 350 kVAr PFIP 9/6/2004 9/22/2004 07- 15- Items 01-03/DBs/FCDB
30-09-04
10-04 10-04
LT Switchgear incl. 900 kVAr
Naveena Exports Pvt. Ltd. TAM A5495 4800022171 9/15/2004 9/17/2004 9/17/2004 10/4/2004 9/17/2004 Items 04-06 / Bal rel on 22-09
PFIP+Loose Components
BTD rel on 26-11 / Add box for BTD, etc
Gulshan Weaving Mills TAM A5496 4800022111 LT Switchgear incl. 1000 kVAr PFIP 9/15/2004 9/24/2004 10/22/2004 12/15/2004 23-11-04
28-02
29-10-04
11.10.04
11-11-04
Yusuf Textile Mills Ltd. TAM A5497 4800022138 LT Switchgear incl. 2x500 kVAr PFIP 9/16/2004 9/30/2004 11/3/2004 Changes in PDB-8
31-
29-10-04
12-04
07-12-04Item
3
08-12-04 15-12-04
LT Switchgear incl.1x400+1x600
Abbot Laboratories Pakistan Ltd. AM A5498 5100003137 9/17/2004 9/29/2004 9/28/2004 Item 1&2 / Items 01&02 S.O. on 14-10 / Inspected 0n 29-04
kVAr PFIPs
4&5 20-12-04
Item
04&05
Abdul Majeed & Company AM A5499 4800022490 24 x DBs 10/21/2004 10/21/2004 ###
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

11-11-04DBs
11-11-04
01-11-04 23-11-
01-12-04 MLT/DBs/PFIPs/MCC dispatched / Add
08-11-04 04
Dewan Farooque Spinning Mills Ltd. SMY A5500 3000192068 LT Switchgear incl. 1000 kVAr PFIPs 10/20/2004 16/17- indent for BTD on 04-01 / SB D Details
31- 15-12-04
12-04 for BTDs on 17-02/ Inspection on 16-03
12-04 27-12-
08-02-05
04
31-01-05 12-11-04
10-11-04 30-11-04
22-11-04 16-12-04
17-12- 05-
29-12-04
04 01-05
LT Switchgear & MCCs+400&600 CL rel on 04-11 (Consolidated) / Latest
Matol Distillery (MES) MYS A5501 5100003150 10/25/2004 11/10/2004 Schematics 31-01-05
KVAr PFIPs Schematics changes on 31-01 / Inspected on 28-02
04-02-05
31-01-05
28-01-05
LVDB&MCC-1
10-02-05 09-02-05
MCC-3
03-12-
22-12-04DBs 04SDBs
03-12-04
LT Switchgear incl. 03 x 600 kVAr Layout 03-12-04LT CL rel on 05-11 / Change in MLT / App
Rahman Cotton Mills Ltd. SMY A5502 10/29/2004 11/18/2004 10-01-
PFIPs 10-12-04 Drgs on 12-01
05e-mail
14-12-04 31-01-
05
24-12-04 27-12-04
27-12-04 12-01-05(22) 30-12- S.O.# recd on 03-11/Meeting with
LT Switchgear Fixed / 30-12-04 17-01- 04 Customer 09-14/12 / App drgs of Areas
Dewan Saadi Cement TAM/HJ A5503 5100003155 10/29/2004 11/25/2004
withdrawable 8PU.011 (22) 07-01- 05(32) 25-01-05 22&32 on 17-01/Changes in App / Last
05(32) 17- 26-01-05(42) 04-02-05 dispatch by 17-03
01-05(42) 25-02-05
27-12-04
23-11-04 13-12-04 06-01-05 13-12-04 Details & Go-ahead for MCC on 04-02 /
Blessed Textile Mills Ltd. SMY A5504 4800022822 LT Switchgear & MCCs+Loose ACB 11/2/2004
09-02-05 14-02-05 02-03-05 CL for Loose supply 18-03
schematics
03-01-05
Layouts
08-03-05 CL rel on 28-12 / Clar on Trafo dim drg
ESS ESS Associates (EC) SMY A5505 3000188690 LT Switchgear 18-11-04 12/6/2004 10-01-05 3/3/2005
10-08-05 reqd
26-05-05

Sapphire Fiber Ltd. RJ A5506 3000195025 01x PDB 30-11-04 NR 12/1/2004


08-12-04
17-12-04
MCB Tower Project (EC) SMY A5507 3000183765 02 x Feeder Pillar (Indoor type) 30-11-04 20- 12/8/2004
22-12-04
12-04
01 x LV DB + 04 x PLC/Screen + 01 14-02-05
03-12-04
KW&SB-Dhabeji Pumping Station(KIII Project) SMY/AAH/ x Instrument Panels + 13JBs + 01 04-02-05 MCC PLC Panels details on 24-01, 02-02, 23-
A5508 3000187496 15-12-04 12/22/2004 1/14/2005
(MES) MR x LCB + Outdoor Housing for MOM 25-02-05 02 / Add Indent
28-04-05
Screen Panels MCC
28-12-04
CL rel on 17-12/Changes in MCC App /
KW&SB-NEK Pumping Station (KIII Project) SMY/AAH/ 01 x LV DB+02 x PLC + 01 x 03-12-04 04-02-05
A5509 3000187502 12/22/2004 06-01-05 14-02-05 MCC PLC Panels details on 24-01, 02-02, 23-
(MES) MR Instrument Panels + 07JBs 15-12-04 MOM
14- 02 / MCC Inspected on 13-04
02-05
LT Switchgear incl. 02 x 800 kVAr 22-12-04 PFIP CL rel on 13-12/Meters changed /
Bismillah Textile Mills Ltd. SMY/KZ A5510 3000196666 12/7/2004 12/16/2004 12/16/2004 12/23/2004
PFIPs email Inspection on 28-03
Change on 21-12 (25 kVAr stage +
Marmonyx Pvt. Ltd. AAH A5511 3000200884 LT Panel + 150 kVAr PFIP 12/14/2004 12/16/2004 12/17/2004
Exhaast Fan)
08-02- 02-02-
31-01-
05LOT1 05LOT1
05LOT1 As per Design Plan dtd 15-04 / CL Lot 1
20 x MCCs+10xPFIPs 8PU.003 23-02- 01-03-05LOT2
Pioneer Cement HJ A5512 3000200950 12/16/2004 15-02-05LOT2 on 28-01/Change of MCCBs 07-02,
Fixed 05LOT2 15-03-
05PFIP 25- Revised CLs 07-02 / Trip SS on 09-02
25-02-
11-03-
05LOT3 03-05LOT3
05LOT3
Indent recd on 27-12 / BTD Details rel on
Bahria University SMY A5513 3000204975 1600 ACB Panel + BTD 12/21/2004 12/22/2004 1/14/2005 12/29/2004
27-01
27-01-05
KSB (Pak Arab Fertilizer) KZ A5514 3000201240 LT Switchgear + 3200A BTD 12/22/2004 1/5/2005 1/5/2005 1/26/2005
25-02-05 BTD
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

01x Control Panels for 20/26 MVA 28-01-05


Al-Hamd (TR) AAH/RJ A5515 3000204197 12/22/2004 1/5/2005 1/17/2005 1/28/2005 CL rel on 05-01
PT email
01x Control Panels for 10/13 MVA
Maple Leaf Cement AAH/RJ A5516 3000204198 12/22/2004 1/5/2005 1/11/2005 18-02-05email 2/22/2005 CL rel on 05-01
PT
18-03-05email
11-01-05
Kidney Center Peshawar KZ A5517 3000205185 LT Switchgear 12/27/2004 1/7/2005 7/28/2005 CL rel on 06-01
03-08-05 31-03-05
01xControl Panels for 30/36 MVA 01-02-05 08-03-05 CL rel on 01-02 &11-02 / Change from 12
Pioneer Cement AAH/RJ A5518 3000208202 1/7/2005 1/19/2005 3/14/2005
PT 11-02-05 email Fans to 08 on 07-02
Faisal Spinning Mills Ltd. RJ A5519 3000208036 02x PDBs 1/10/2005 1/17/2005 1/19/2005 2/4/2005 2/15/2005 Changes in App
Apollo Textile Mills Ltd. KZ A5520 3000192113 01x DB 1/19/2005 1/25/2005 2/24/2005
Pakistan Air Force KZ A5521 3000216361 MLT + DBs 2/3/2005 2/16/2005 2/18/2005 3/31/2005 4/4/2005 CL rel on 09-02
11-02-05email
Gadoon Textile Mills Ltd. SMY A5522 3000214924 01x PDB 1/31/2005 2/8/2005 2/11/2005 CL rel on 09-02

WAPDA-NTDC (TR) RJ A5523 3000218389 15x FCPs & ACPs - 20/26 MVA PT 2/8/2005 2/16/2005 2/25/2005 2/28/2005 3/9/2005

Modification Works + COS & UPS 01-04-05


MCB Tower (EC) KZ A5524 3000219844 2/11/2005 2/17/2005 3/8/2005 3/11/2005 CL rel on 18-03
DBs Items 3&5

16-02-05
15-02-05 15-03-05
10-03-05
14-03-05 14-03-05
15-03-05 PDBs&LDBs
15-02-05 CL rel on 15-02 / Add indent / PFIP CL on
Indus Dyeing KZ/SMY/AM A5525 3000218399 Modification Work + LT Switchgear 3/7/2005 16-03- 04-04-05
22-02-05 PDBs&LDBs 10-03
05MLT-A PFIP&LTO
27-04-05 31-03-
05-
Layout 05
04-05 LT
11-05-05BTD

15-03-05 06-04-05
08-03-05 Inspected on 25-04,
Bhanero Textile Mills Ltd. AM A5526 3000217322 LT Switchgear 2/17/2005 3/4/2005 12-04-05
22-03-05 Inspection Points
21-04-05 BTD
24-03-05
Const
CL rel on 10-03 / Meeting on 18-03 / ACB
List
Cherat Cement SMY A5527 3000215827 MCC in 8PT (withdrawable) Design 2/18/2005 3/7/2005 3/18/2005 4/1/2005 Changed to 2500A 19-04 / Rev Const
07-04-05
List on 05-05 / Meeting on 17-05, 30-05
PFIP
13-04-05
06-04-05
Pioneer Cement SAH A5528 3000200950 01x Protection & Metering Panel 2/22/2005 NR
31-05-05
06-04-05
Maple Leaf Cement SAH A5529 3000222459 01x Protection & Metering Panel 2/22/2005 NR
31-05-05
Nestle Milkpak Ltd. TAM A5530 3000221409 1600A ACB Panel + BTD 2/22/2005 3/8/2005 3/11/2005 3/28/2005 3/28/2005 Cl rel on 10-03
Loose Supply of 4000A ACB + Aux
DS Textile Ltd. KZ/SHA A5531 3000215568 2/22/2005 3/8/2005 2/28/2005 17-03-05email 5/4/2005 CL rel on 25-02
Comp. & Factory Material
Loose Supply of 2500A ACB + Aux
DS Industries (Pvt.) Ltd. KZ/SHA A5532 3000216345 2/22/2005 3/8/2005 2/28/2005 17-03-05email 4/21/2005 CL rel on 25-02
Comp. & Factory Material
KCI Chashma ( EC ) KR A5533 3000222828 07 x 110VDC Panels 2/23/2005 3/7/2005 3/28/2005 4/14/2005 6/10/2005
Abdul Majeed & Company RJ A5534 3000223632 03 x DBs 2/28/2005 3/7/2005 3/14/2005 4/7/2005 4/8/2005

16-03-05
27-04-05 30-03-05 27-04-05 Site visit on 24-05 / Changes in Panels
Karachi Export Processing Zone TAM A5535 3000222933 LV Switchgear & Loose Supply 3/2/2005 3/16/2005
10-05-05 09-05-05 10-05-05 dim in App / Layout resub for App
31-05-05

14-03-05 17-03-05
Technical Associates Pakistan HJ A5536 3000225691 MLT + DB + 400kVAr PFIP 3/17/2005 3/25/2005 3/25/2005 Cl rel on 17-03/Add indent
24-03-05 25-03-05
21-03-05
29-03- Adv info on 11-03 / CL rel on 14-03 /
Babri cotton Mills Ltd-Kohat TAM A5537 3000231350 LT Switchgear incl. 6300A ACB 3/16/2005 3/18/2005 4/8/2005
05 Inspected on 18/05
13-04-05
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

05-04-05
Comments by MES on 06-04 / Meeting
Thatta Cement SMY A5538 3000222460 MCC in 8PT Withdrawable Design 3/18/2005 3/30/2005 08-04- 4/12/2005 4/14/2005
on 17-05
05

Indent ret to SB S on 04-04 / Clar & go-


25-05-05 ahead recd on 18-05 / CL rel on 24-05 /
DHA Lahore Phase VI SMY A5539 3000231988 08x Street Lighting Control Panels 3/18/2005 5/23/2005 6/15/2005 7/22/2005
22-07-05 Changes in App, Go-ahead recd from SB
S on 22-07 / Rev CL on 22-07

American Embassy-Islamabad KZ A5540 3000232952 600A MCCB Panel 3/18/2005 3/24/2005 3/29/2005 4/1/2005 Change - I/C from top on 29-03

11-04-
05MCC CL rel on 28-03 rev 07-04 (LT) & 29-03
12-04-05LT rev 07-04 (MCC) / Changes in App / Site
22-03-05 06-04-05 13-05-05LTO
Nishat Chunian Ltd.(Dyeing Power) TAM/HJ A5541 3000231559 LT Switchgear 4/1/2005 4/8/2005 visit 12-05 / Add indent for
29-06-05 30-05-05 07-07-05 01xBTD+01xLTO / Changes in BTDs as
27-07-05BTDs
05-09-05 per email dtd 29-08 app recd 01-09
Rev BTDs

CL rel on 29-03 rev 07-04 / Changes in


Nishat Chunian Ltd.-I(Power) HJ A5542 3000231561 MCC in 8PU.003 Fixed Design 3/22/2005 3/29/2005 4/7/2005 4/8/2005 4/11/2005
App
Janana De Malucho Textile TAM A5543 3000234193 LT Switchgear 3/25/2005 3/30/2005 3/31/2005 NR 4/4/2005
Atlas Battery Ltd. KZ A5544 3000235343 LT Switchgear 3/25/2005 4/1/2005 4/11/2005 4/19/2005 4/20/2005 CL rel on 31-03
Gadoon Textile Mills Ltd. TAM A5545 3000235628 CO Panel 3/29/2005 4/4/2005 4/12/2005 4/18/2005 5/19/2005 CL rel on 12-04
Umar Spinning Mills (Pvt.) Ltd. RJ A5546 3000233661 01xPDB + Loose Components 3/30/2005 5/10/2005 4/6/2005
19-04-05
Items 02-
21-04-05 28-04-05
Nishat Mills Ltd. HJ A5547 3000237733 LT Switchgear 4/4/2005 4/20/2005 05 27- CL rel on 14-04/Changes in App
02-05-05 Items 02-05
04-05 Item
01
14x Control Panels (Fan & Aux) for 05-04-05 Formal Indent on 12-04 /
WAPDA/NTDC RJ A5548 3000239181 4/6/2005 5/27/2005 7/6/2005
31.5/40MVA Trafo 07-06-05 Rev indent - qty inc to 14

R&C Panels for NTDC- 12-10-05


RP Const Drgs
NTDC-WAPDA (TD) MA A5549 3000352934 KESC500/220kV Interconnection 4/8/2005 Formal Indent, S.O. No. recd on 19-10
15-11-05
Project CP Const Drgs

Formal Indent / S.O. No.


recd on 21-07 / Drgs resubmitted based
23-08-05 22-11-05
on conceptual SLD vide email dtd 15-09
NTDC-WAPDA (TD) TAM A5550 3000305528 400VAC Switchgear 4/12/2005 8/2/2005 20-10-05 11/2/2005 05-12-05
& meeting on 13-10 / Changes in App /
17-11-05 SB D
Fresh changes on 10-11/ CL rel on 17-
11 / Minor SB D Details

CL rel on 15-04 / Meeting with


Karachi Golf Club KZ A5551 3000253969 02xMCCs-8PU.003 Fixed Design 4/13/2005 4/18/2005 4/18/2005 5/12/2005 5/11/2005
Consultants on 25-04
26-04-05
26-05-05 Indent on 16-06 / Changes in App /
Attock Cement RJ A5552 3000284635 Control Panels for 25MVATrafo 4/13/2005 4/19/2005 29-04-05 6/22/2005
22-06-05 Resubmittal
07-06-05

19-04-05
LDBs 21-04-05
26-04-05 20-04-05 LDBs CL for LT/PFIP / LDBs rel on 15-04 rev
Alam Cotton Mills SMY/TAM A5553 3000236665 LT Switchgear 4/14/2005 4/20/2005
LT+PFIP LDBs 06-05-05 28-04 / 19-04
26-04-05 PFIP & LT
DBs
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

27-04-05 29-04-05
11-05-05
Items 04-13 Items 04-13
Azgard Nine Ltd. HJ A5554 3000256591 LT Switchgear 4/21/2005 4/29/2005 23-05-05 CL (Items 04-13) rel on 27-04
11-05-05 11-05-05
BTDs
Items 01-02 items 01-02

12-05-05 PDBs,
12-05-05
06-05-05 PDBs, Items 06-18, CL LT on 18-05 /
Bhanero Textile Mills Ltd. HJ/KZ A5555 3000257527 LT Switchgear, DBs 4/28/2005 5/13/2005 LDBs & MLDB
LDBs & MLDB
25-05-05
31-05-05 Item 01-02 MCC & LCBs put-on-hold
LT, PFIP, MCC on 030605

27-05-05
Gadoon Textile Mills Ltd. KZ A5556 3000257609 01xLDB+02xPDBs 4/28/2005 5/3/2005 31-05-05 5/31/2005

06-05-05
Telenor (A&D) MR A5557 3000264459 25x GT2 Housings for AMF/MOR Pan 5/5/2005 NR Partial Formal Indent recd on 09-05
11-05-05

17-05-05
14-07-05
Loose Supply - ACB & 11-05-05
Bismillah Textile Mills Ltd. KZ A5558 3000264770 5/13/2005 5/13/2005 6/27/2005 BTD1 Rev Indent - 02xBTDs added
Accessories, etc. + 02x BTDs 07-06-05
18-07-05
BTD2

Site visit on 25-05 / Exhaust fan added in


PARCO / PS1 Korangi MHF A5559 3000268318 02x 400 + 01x 300 kVAr PFIPs 5/13/2005 5/20/2005 5/20/2005 7/1/2005 7/5/2005
App

31-05-05
17-05-05 DBs, PFIP
DBs, PFIP 30-05-05 20-06-05 Interlocking & S/S layout details recd on
Ghazi Fabrics International TAM A5560 3000267850 LT Switchgear 5/16/2005 5/20/2005
02-06-05 17-06-05 LT 30-05 / LT CL rel on 31-05
LT 27-06-05
BTD

Cherat Cement SMY A5561 3000272735 01x 3kW + 06x 15kW Starter Module 5/23/2005 5/26/2005 6/27/2005 6/27/2005 7/1/2005
01x 6M W/D module for 200A, 4P
New Progressive Builders (PARCO) TAM A5562 3000276064 6/9/2005 6/10/2005 6/13/2005 6/21/2005 6/9/2005 Refer A1355
MCCB Feeder
03-08-05
112x Service boxes as per WAPDA
Glamour Developers (Pvt.) Ltd. SMY / HJ A5563 3000240107 6/8/2005 6/10/2005 15-08-05 9/15/2005 9/7/2005 Order put On-Hold on 04-10
specs. P92:75
31-08-05
Control scheme same as Gadoon order
Khadim Husain Slatch & Co. TAM A5564 3000284242 250kVA Changeover Panel 6/20/2005 6/21/2005 6/24/2005 4/24/2006 A5545 / Resubmitted as per letter recd
03-04

CL rel on 20-06 / Resubmitted / App


comments incorporated / Change of
17-06-05 07-10-05
Pak & Jinnah Park Projects TAM A5565 3000284763/8 LT Power Panel No.1 & No.2 14-06-05- 6/17/2005 9/28/2005 Cable entries on 12-10, confirmation
01-09-05 02-12-05
recd on 01-12 for Gen panel / Pak Park
dispatched

Major Zuberi COS Panel RJ A5566 3000284356 COS Panel for Phase Changeover 6/14/2005 6/14/2005
45Nos RP-3 & 15Nos RP-4
NTDC-WAPDA(TD-Lahore) ADP 59(LOT III) MA A5567 3000285449 6/16/2005 NR 7/5/2005
protection panels
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

15-07-05
CHF LV
18-07-05 03-08- Meeting with Consultants & EC on 30-06
CHF DBs 05CHF / CL for CHF on 10-08(DBs) & 11-08(LT) /
10-08-05DBs
01-09-05 11-10-05 Changes in App / Add indent for 01xLV
12-10-05
PB DBs Add indent Panel 8PU.011 Fixed design alignment
21-06-05 Add indent
12-09-05 01-12-05 with existing board / SB D Details /
Glaxo Smith Kline TAM/KZ A5568 3000288055 LT Switchgear 29-09-05 7/8/2005 17-11-05
Item 1 PB PB LT Comments on PB DBs on 14-11 / Major
24-03-06 DBs
20-09-05 13-12-05 changes in PB LT app / Site visit on 22-
27-02-06
Items 04-05PB PB DBs 12 / CL for PB DBs on 21-12, LT on 16-12
SB D LT
04-10-05 25-01-06 & 21-12, Item 51 PDB ?? deleted / Rev
Items 06-09PB LDB/DBs indent
03-10-05
Add indent

Sapphire Fibres Ltd. - No. 3 KZ A5569 3000285015 01xPDB + 02xLDBs 6/22/2005 6/23/2005 6/22/2005 7/13/2005 7/13/2005
20-09-05
06xRelay Panels+02xMarshalling
NTDC-WAPDA Shikarpur & Sibbi Grids (TD) MA A5570 3000288505 6/22/2005 NR 15-11-05
Kiosks
MCs

27-07-05
RP,CP
M/s Rousing Engg Services / 01-07-05
MA A5571 3000286501 01xCP50+01xRP4+01xAC/DC Panels 6/22/2005 23-08-05 TD drgs recd on 22-08 for RP/CP
M/s A. A. Spinning Mills Ltd. AC/DC
26-08-05
AC/DC

Victor Pipe Industries - Afghanistan HJ A5572 3000292427 01xLT Panel 6/29/2005 7/1/2005 7/12/2005 30-08-05email 9/7/2005 Clar recd on 11-07 / CL rel on 12-07
Mr. Rahim Dawood - F&C HJ A5573 3000294427 01xCO DB 6/30/2005 NR 7/1/2005
Honda Atlas Ltd. (TR) RJ A5574 01xFCP for 2/2.5MVA Trafo 6/24/2005 7/1/2005 7/4/2005 Formal indent, S.O. # awaited

16-08-05 13-09-05 22-09-05


220VDC 220V 220V
NTDC-WAPDA HJ A5575 3000293276 220V & 48VDC DBs 6/29/2005 7/7/2005 Clarified on 02-08 / CL rel on 22-09
25-08-05 29-09-05 04-10-05
48VDC 48V 48V
18-07-05 CL rel on 08-07, rev 22-07 / Changes in
M/s FFC Ltd. MHF A5576 3000288778 LT Switchgear 7/4/2005 7/8/2005 8/9/2005 8/24/2005
22-07-05 app

13-07-05
19-07-05
DBs/PFIPs 20-07-05
08-07-05 26-07-05DBs
20-07-05 DBs/PFIPs
05-07-05 DBs, LDBs 29-07-05LT CL rel on 07-07 / Add indent for 01xDB /
Blessed Textile Mills Ltd. - Unit No. 3 KZ A5577 3000289586 LT Switchgear DBs resub 02-08-05LT
11-07-05 15-07-05 08-08-05 Changes in App
22-07-05LT 08-08-05
LT, etc. Add indent
03-08-05 BTDs
Layout

11-07-05
15-07-05
MCC 15-07-05 CL rel on 11-07 / meeting with customer
Lucky Textile Mills RJ A5578 3000292953 02xDBs, 01xMCC - 8HKO 7/5/2005 7/8/2005 7/18/2005
20-07-05 DBs 21-07, changes
Schematics
22-07-05

Fazal Textile Mills MHF A5579 3000291548 01x LT Panel 7/13/2005 7/18/2005 7/22/2005 8/16/2005 8/19/2005 CL rel on 20-07
28-07-05 CL rel on 25-07 / SLD, FV&Disp in Ist
Allied Engg Services Ltd./Lucky Cement Ltd. TAM A5580 3000302473 5000A LT Switchgear 7/18/2005 7/29/2005 8/24/2005 8/29/2005
02-08-05 submittal

02-08-05LT 16-08-05DBs
D. S. Industries Ltd. MHF A5581 3000302535 LT Switchgear 7/19/2005 8/1/2005 18-08-05LT CL rel on 28-07(LT) & 08-08(DBs)
08-08-05DBs 22-08-05LT

DHA Lahor/Electrification Works of DHA Phase RJ A5582 3000303414 01xStreet Lighting Control Panel 7/27/2005 NR 7/29/2005
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

10-08-05
17-11-05
26-09-05 13-09-05
PAEC / NMC-1 MHF A5583 3000309035 LT Switchgear 7/28/2005 8/10/2005 15-12-05 CL rel on 11-08
27-09-05 16-11-05
BTD
Layout

06-10-05
S. O. # on 14-11 / As per Design Plan /
Items 1-4,
Lot 1 & 2 drgs approved during meeting
14-19
with customer 05-09 to 09-09 / CLs of
06-10-05 to
02-09-05 Lot 1 rel on 14-09, Lot 2 CLs on 30-09,
SP&EW SMY/HJ A5584 LT Switchgear, DC DBs 8/17/2005
21-09-05
12-10-05
Lot 3 on 10-10 & 11-10 / Schematics
Part Lists
finalised with customer, formal app
14-10-05
pending / Network study report-SINCAL
to 18-10-05
rel on 25-11
Items 5-12

02-09-05 15-09-05 21-09-05


07-09-05 LTO+DB LTO/LDB CL rel on 02-09, 06-09 / Resubmitted
Hussain Mills Ltd. MHF A5585 3000311980 LT Switchgear incl. 02x1000kVAr PF 8/17/2005 9/6/2005
MCC 22-09-05 04-10-05 based on App comments
04-10-05 MCC+LDB Items 1-5
Technical Associates Pakistan / Abu Dhabi 26-08-05 12-09-05 03-10-05 CL rel on 12-08 / Changes in App
TAM A5586 3000315161 LT Switchgear 8/16/2005 8/24/2005
Palace Rahimyar Khan 06-10-05 17-10-05 17-10-05 clarified on 03-10

CL rel on 25-08, rev 12-10, rev 28-10


25-08-05 based on SB S inputs on 25-10 /
08-11-05 28-10-05
Siddiqsons Tin Plate Ltd. MHF A5587 3000297394 6000A & 3200A LT Switchgear 8/16/2005 8/24/2005 28-10-05 Meeting with Consultants on 08-11, App
08-12-05 15-11-05
24-11-05 with comments, Go-ahead for changes
on 18-11, Resubmitted

S. O. # on 15-08, Formal indent on 16-


M/s Muhammad Aslam MHF A5588 3000317305 LT Switchgear 8/1/2005 8/19/2005 8/19/2005 19-08-05email 8/24/2005
08 / CL rel on 17-08
23-08-05
Maple Leaf Cement RJ A5589 3000318704 01xFCP+01xACP for 20/26MVA PT 8/17/2005 8/19/2005 12/6/2005 Resubmitted as per comments/changes
13-09-05
18-11-05
NTDC-WAPDA (TD) MA A5590 3000319145 02x Marshalling Kiosks 8/17/2005 NR 13-12-05
TD Drgs

15-09-05
02-09-05 Item 3, 4 CL rel on 07-09 / Comments in App /
Items 1,3,5 16-09-05 Feeder Pillars Put-on-Hold by SB Lhr
Olympia Chemicals Ltd. SMY A5591 3000316684 LT Switchgear 8/17/2005 9/1/2005 06-09-05 13-09-05email
LT+PFIP+Layout
Items 2, 6 vide email 22-09 / LCBs reqd in local
07-09-05 24-10-05 design vide email dtd 19-10
LCBs

08-09-05
15-09-05email 19-09-05 CL rel for App 30-08, App recd 02-09, rel
Gulistan Textile Mills Ltd. - Unit 4 TAM A5592 3000327455 LT Switchgear 8/24/2005 9/9/2005 14-09-05 29-09-05 21-10-05 for proc 02-09
layout
08-09-05
15-09-05email 19-09-05 CL rel for App 30-08, App recd 02-09, rel
Gulshan Weaving Mills Ltd. - Unit 2 TAM A5593 3000326254 LT Switchgear 8/24/2005 9/8/2005 14-09-05 29-09-05 21-10-05 for proc 02-09
layout
International Knitwear Ltd MHF A5594 3000194869 01x100 + 01x50kVAr PFIP stages 8/26/2005 8/29/2005 NR 9/29/2005 Site visit on 28-09 for clarification
15-09-05email 20-09-05
Gulistan Spinning Mills Ltd. TAM/MHF A5595 3000326183 LT Switchgear & Loose supplies 8/29/2005 9/13/2005 9/12/2005 29-09-05 CL rel on 07-09
24-10-05
15-09-05email 20-09-05
Gulshan Spinning Mills Ltd. - Unit 2 TAM/MHF A5596 3000326152 LT Switchgear & Loose supplies 8/29/2005 9/13/2005 9/12/2005 29-09-05 CL rel on 07-09
24-10-05
CL rel on 14-09 / App comment, UVT
14-09-05 21-09-05 reqd / Changes reqd during inspection
Masood Textile Mills Ltd. MHF A5597 3000326457 LT Switchgear 9/5/2005 9/9/2005 9/26/2005
23-09-05 24-03-06 in item 03 - PDBs (06Nos.), Go-ahead on
08-12

Gharibwal Cement Ltd. MHF A5598 3000328590 01x LT Panel 9/6/2005 9/9/2005 9/19/2005 10/18/2005 10/24/2005 CL rel on 19-09 / Minor changes in App
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

Dost Steel RJ A5599 3000308554 01xFCP+01xACP for 20/26MVA PT 9/8/2005 9/15/2005 9/14/2005 20-09-05email 9/29/2005 CL rel on 14-09
Lucky Cement Ltd. MHF A5600 3000330522 02x PDBs 9/8/2005 9/14/2005 9/16/2005 10/3/2005 10/5/2005 CL rel on 16-09

05-10-05
PDBs
26-10-05
21-09-05 04-10-05
PFIP/LDBs CLs rel on 21-09 (PDBs), 27-09 (bal) / LT,
PDBs PDBs
27-10-05 PDB 10, Compressor Panel, Layout
04-10-05 24-10-05
08-09-05 LTO/MCC revised & PDB 8 deleted in App /
Naveena Exports (Pvt.) Ltd. - Weaving Unit SMY A5601 3000331514 LT Switchgear 9/19/2005 LT LT
15-11-05 15-11-05 Revised indent, Resubmittal of LT /
15-11-05 29-11-05
LT Layout issue resolved in meeting with
LT LT
17-11-05 consultants on 09-01, Resubmitted
09-01-06 20-01-06
BTDs
16-01-06
SB D

24-10-05
30-09-05
PFIP CL rel on 27-09 / Layout resubmiited on
07-10-05
10-10-05 02-11-05 17-10 as per revised customer layout
Dewan Hattar Cement TAM A5602 3000331543 LT Switchgear - 8PU.011 9/8/2005 9/27/2005 Schematics
24-10-05 GDB, MCC vide email dtd 12-10 in back-back
11-10-05
18-11-05 arrangement, revised 21-10 with BTD
Layout
BTD

25-10-05
PDB/PFIP
24-11-05 CL rel on 27-09 / Upgrade of BTD/BB
12-09-05 23-09-05 29-09-05 24-10-05
Umar Spinning Mills (Pvt.) Ltd. RJ A5603 3000332848 LT Switchgear LT ratings & other changes vide revised
20-02-06 24-02-06 24-02-06 02-03-06
02-12-05 indent
BTD
24-02-06

Meeting with customer on 22-09 /


20-10-05 07-11-05
PARCO SMY A5604 3000327376 01xMCC - 8PU.011 + 01xBTD 1250A 9/21/2005 10/21/2005 12/8/2005 Changes in App / Rev CL on 07-12 /
17-11-05 05-12-05
Revd layout recd on 21-12

TD drgs for RP, CP recd on 21-11 /


Maple Leaf Cement MA A5605 3000339739 02xRP4+02xCP50 + 02xAC/DC Panel 9/23/2005 10/5/2005 10/11/2005 12/14/2005 Comments on AC/DC recd, replied by
SB S Ex, Drgs released as per Go-ahead

Formal indent recd on 10-10, Revised


12-10-05 SLD on 11-10 / DBs resent from site,
30-09-05 17-10-05
11-10-05 09-01-06 11-10-05 Revised indent - qty changed from
General Syed Absar Hussain MHF A5606 3000347671 08xDBs 05-01-06 18-01-06
09-01-06 18-01-06 23-01-06 03Nos. to 02Nos. / CL of items 1&2 rel
24-01-06 23-01-06
27-01-06 on 30-01 / Revised indent - qty/scope
change

17-10-05
SL/Clar recd on 17-10 / Entries changed
U. S. Embassy, Islamabad MHF A5607 3000346832 01xLT Panel 10/10/2005 10/17/2005 10/18/2005 24-10-05 12/8/2005
to top in App
07-12-05
17-10-05
SL/Clar recd on 17-10 / Entries changed
U. S. Embassy, Islamabad MHF A5608 3000346848 01xLT Panel + 01xDB 10/10/2005 10/17/2005 10/18/2005 24-10-05 12/8/2005
to top in App
07-12-05

19-10-05 Formal indent, S. O. # recd on 18-10 /


Carriage Factory Pakistan Railway RJ A5609 3000351055 04x LT Panels 10/17/2005 10/19/2005 11/2/2005
02-11-05 Resubmitted with changes reqd by S'Isb

25-11-05
WAPDA / 220kV Sialkot S/S (TD) MA A5610 3000352797 01xR3 + 01xR4 Protection Panels 10/19/2005 NR
07-12-05
Sitara Chemical Industries (TD) MA A5611 3000354686 01xRP4+01xCP50 + 01xAC/DC Panel 10/24/2005 11/1/2005 11/1/2005
31-10-05 Changes reqd as per ED/A5589 on 14-
Sitara Chemical Industries (TR) RJ A5612 3000354712 01xFCP+01xACP for 20/26MVA PT 10/28/2005 10/31/2005
28-12-05 12, Resubmitted / App awaited
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

M/s Rousing Engg Services /


MA A5613 3000354680 01xRP4+01xCP50 + 01xAC/DC Panel 10/28/2005 11/8/2005 11/14/2005 TD drgs for RP, CP recd on 22-11
M/s Dost Steel (Pvt.) Ltd.

14-11-05 17-11-05
PDBs PDBs
Orient Textile Mills SMY A5614 3000357577 LT Switchgear 10/31/2005 11/11/2005 12/8/2005 CL rel on 01-11
24-11-05 12-12-05
LT LT

08-11-05
LT 08-11-05
15-11-05
10-11-05 LT CL rel on 01-11(LT) / Change in some
Lucky Cotton Mills TAM/MHF A5615 3000358331 LT Switchgear 10/31/2005 11/11/2005 DBs
DBs 10-11-05 DBs, resubmitted & approved
24-11-05
15-11-05 DBs
DBs

Pak Arab Fertilizers (Pvt.) Ltd. MHF A5616 3000350447 LT Panel 11/7/2005 11/11/2005 11/11/2005 11/28/2005 12/1/2005

15-11-05
01-12-05 CL rel on 11-11 / Site visit on 12-12 /
14-12-05 21-11-05
03xGenerator Power (2000A)+ SB D Schematics revised based on customer
Allied Engg Services Ltd./FTC management Co. TAM A5617 3000363990 11/10/2005 11/15/2005 Schematics 03-01-06
02xLTO Panels 09-01-06 drg. recd on 13-12 / CCPs revised to
16-12-05 email
SB D LTOs - thru BTDs (not in scope)
Layout

04xGenerator Power(4000A)+
10-11-05 16-11-05
Al-Karam Textile Mills MHF A5618 3000363970 03xCable Termination(6000A) 11/15/2005 2/16/2006 CL rel on 11-11 / Revised indent
26-12-05 30-12-05
Panels
02xGenerator Power(2000A) CL rel on 21-11, rev 05-12 as per
MHF A5619 3000363976 11/15/2005 11/18/2005 11/22/2005 11/29/2005 12/5/2005
Usman Ltd. LTOs+01xMCC+01xLDB customer comments
NTDC-WAPDA (TD) MA A5620 3000364882 01xDCS Marshalling Kiosk 11/14/2005 TD drgs recd on 18-05 by email

21-11-05 21-12-05
16-11-05
23-11-05 Items 7-8 Items 7&8 21-12-05 CL of items 7-8 on 16-11, bal. on 06-01 /
Philips Electrical Industries of Pakistan Ltd. TAM A5621 3000364875 LT Switchgear 04-01-06
09-01-06 15-12-05 04-01-06 Items 7&8 Revised & Add indents
05-01-06
Items 3-4 Bal.
01xSoft Starter Panel for
BP Pakistan MHF A5622 3000390256 12/26/2005 12/30/2005 1/3/2006 2/10/2006 CL rel on 30-12
75HP/56kW, 480V, 60Hz motor
08-12-05 17-01-06
Novatex Ltd. MHF A5623 3000371920 LT Switchgear 11/23/2005 12/1/2005 1/23/2006 CL rel oh 01-12
15-12-05 Schematics
CL rel on 01-12 / App comment for PES
Punjab Industrial Estate SMY A5624 3000348705 27xSteet Lighting Control Panels 11/24/2005 11/30/2005 12/1/2005 12/15/2005 12/21/2005
clarified on 19-12
24-11-05 02-12-05 02-12-05 15-12-05 06-12-05
Sun Rays Textile Mills Ltd. MHF A5625 3000371221 LT Switchgear CL rel on 02-12
20-01-06 25-01-06 31-01-06 28-02-06 08-03-06
Maple Leaf Cement (OLM) TAM A5626 3000371274 LT Switchgear 11/24/2005 12/9/2005 12/9/2005 12/30/2005 12/28/2005 CL rel on 09-12
14-12-05
Azgard Nine Ltd. SMY A5627 3000378126 LT Switchgear 12/2/2005 12/8/2005 09.12.05 12/19/2005
email
NTDC-WAPDA - 500kV Rawat-Lahore 07xRelay + 02xMetering & Control
MA A5628 3000379723 12/9/2005 NR TD drgs (partial) recd on 26-07
Extension S/S Project Panels
RP14 & CP4 dwgs. Awaited (for Front
NTDC-WAPDA - 500kV & 220kV Sahiwal S/S 15x500kV+05x220kV Relay +
MA A5629 3000379796 12/9/2005 NR Plate), Bottom Cutouts for RP & CPs and
Project 05xMetering & Control Panels
Mimic for CPs
01xMCC - 8PU.011 for alignment
Enar Petrotech Refining Facility (EC) TAM A5630 3000383940 12/15/2005 12/22/2005 12/20/2005 12/30/2005 12/28/2005 CL rel on 20-12
with existing MCC

27-01-06
LT Switchgear - LT Boards-F1 + 05-01-06 email *As per Design Plan dtd. 05-01 /
Honda Atlas Cars Pakistan Ltd. HJ A5631 3000380721 12/20/2005 * 1/30/2006
MCCs & DBs-8HKO Lot 1 15-02-06 Changes in App
email
22-12-05
K.E.S.C. (TR) RJ A5632 3000416783 05x FCP+TCP for 40MVA PT 12/20/2005 2/10/2006 3/24/2006 Formal indent, S. O. # on 16-02
19-01-06
28-12-05 Resubmitted as per changes reqd by SB
Siemens Afghanistan / Gardez Province MHF A5633 3000388920 01x LT Panel 12/26/2005 12/28/2005 2/22/2006 2/22/2006
02-02-06 S dtd 01-02
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

01xLT Panel + 01xMCC (8HKO) + 06-01-06


29-12-05 04-01-06 20-01-06
Lucky Tex TAM A5634 3000391409 200kVAr detuned PFIP stage 23-01-06 1/23/2006 Rev indent, CL rel on 14-06
30-05-06 05-06-06 02-08-06
connected with existing PFIP 14-06-06
19-01-06
M/s Suraj Cotton Mills Ltd. MHF A5635 3000391920 01xMCC (8PU.003) + 01xDB 12/30/2005 1/5/2006 1/9/2006 1/23/2006 CL rel on 09-01
email
31-01-06
LDBs
K.E.P.Z. / Phase II SMY A5636 3000394334 LT Switchgear 1/5/2006 27-01-06* 4/25/2006 * Design inputs recd on 20-01
28-02-06
Layout

02-02-06
LTO
23-01-06
LT Switchgear + Loose ACBs & 06-01-06 06-02-06 Revised indent - 4000A ACB reqd in
Bhanero Textile Mills Ltd. TAM A5637 3000390102 1/20/2006 25-01-06 2/20/2006
accessories 25-01-06 MCC Panel
21-02-06
SP

Rahimbux Group of Cos. - Arain Mills Ltd.


TAM A5638 3000396628 LT Switchgear 1/16/2006 1/24/2006 1/27/2006 3/10/2006 3/14/2006
(PTD SE)

K.E.S.C. (TR-TD/Areva) RJ A5639 3000486629 08x FCP+TCP for 40MVA PT 6/7/2006 7/13/2006 Drgs rel on pre indent / CL rel on 14-07

20-02-06 17-03-06
Siemens Afghanistan / Shindand project TAM A5640 3000394277 LT Switchgear 1/25/2006 2/6/2006 2/15/2006 Revised specs. recd on 07-02
14-03-06 17-04-06
31-01-06 CL rel on 26-01 / Panels position
Sandal Dyestuff Industries Ltd. SMY A5641 3000396759 LT Switchgear 1/20/2006 1/31/2006 1/31/2006 NR
24-02-06 changed on 22-02
27-01-06
NTDC-WAPDA / Sahiwal 500/220/132kV S/S HJ A5642 3000389030 01xDC Auxiliary Services Panel 1/23/2006 2/4/2006 5/30/2006 SB D Details
30-03-06
01x FCP+ACP+TCP for 160MVA
WAPDA / ADP-63 RJ A5643 1/23/2006 1/26/2006
Auto Trafo

06-06-06
S/S P1&P2
Site visit & meeting with Customer on
12-06-06
15-02-06 16-17/03 / CL rel to SB S on 31-03, rev
KCI / Chashma Barrage Colony ( EC ) MHF A5644 3000393133 LT Switchgear 1/24/2006 2/10/2006 4/20/2006 S/S P3&P4,
25-04-06 10-04, rev 25-04 / Meeting with customer
DBs
on 20-04
27-06-06
BTDs

27-02-06 13-03-06
CL rel on 06-02 / MBB rating changed in
M/s Hussain Mills Ltd. MHF A5645 3000403721 LT Switchgear 1/25/2006 2/6/2006 2/6/2006 14-03-06 15-03-06
App
DBs DBs
01 Inner door received, 10 awaited for
NTDC-WAPDA / 500kV Yousuf Wala S/S-Sahiwal MA A5646 3000403443 11x Kiosk Interface Panels 1/25/2006 4/20/2006 front view dwg. Pending from TD,
Bottom Cutouts & Mimic
NTDC-WAPDA / 500kV Rawat S/S Ext. (Lot-1) (T MA A5647 3000403445 03x Kiosk Interface Panels 1/25/2006 SB D Details
23-02-06 20-03-06 BTD layout changed in App drgs recd on
Colony Textile Mills Ltd. TAM A5648 3000409827 LT Switchgear 2/10/2006 2/17/2006 3/20/2006
15-03-06 email 21-03

* Order on-hold due to pending design


04-04-06 24-04-06 inputs, resolved on 27-03 / CL rel after
OGDC / Chanda Gas Field (EC) TAM A5649 3000412163 LT Switchgear 2/13/2006 27-02-06* 5/26/2006
26-04-06 10-05-06 app on 26-05 / Resubmitted as per App
comments / Ammeters added in App

13-04-06
24-02-06
14-02-06 01-03-06 Item 34 * As per Design Plan / CL for add indent
Zahra Textile Mills SMY A5650 3000412832 LT Switchgear * 14-03-06
07-04-06 Lot II 25-04-06 on 12-04
30-03-06
Items 35-37
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

Lot I-68 Panels (bottom cutouts), Lot II-


02-08-06 67 Panels / TD drgs for 54xR&C Panels
NTDC-WAPDA / WOR-11 Lot III (TD) MHF/MA A5651 3000403485 143x Relay & Control + AC + DC Pan 2/13/2006
AC-DC recd on 24-02 / CLs for AC, DC rel on 18-
05 after App, rev CL on 19-07
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

SOP of FPB 2/2.1 missing / CL rel on 09-


Highland Traders (Naval Housing Scheme) MHF A5652 3000412156 LT Switchgear 2/20/2006 3/1/2006 3/2/2006
03 as per SB S go-ahead
MD Siemens Pakistan A5653 Phase CO DB 2/17/2006 NR 2/20/2006
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

NTDC-WAPDA / 500/220/132kV S/S-Sahiwal


MA A5654 3000420275 02x Kiosk Interface Panels 2/22/2006 NR 3/10/2006 Bottom Plate Cutout
(TD)
Maple Leaf Cement MA A5655 3000422849 02x Marshalling Kiosks 2/27/2006 NR Order cancelled on 26-05

15-03-06
01-03-06
email
Hasan Spinning Mills (Pvt.) Ltd. TAM A5656 3000421051 LT Switchgear 2/27/2006 3/6/2006 08-03-06 3/16/2006
24-03-06
Layout
Layout

13-03-06
Al-Karam Textile Mills MHF A5657 3000424575 O/G Feeder Panels 2/28/2006 3/6/2006 3/8/2006 3/17/2006 Alignment with A5618 / CL rel on 06-03
13-04-06
2xLT panels, 7xDBs, 3xMCCs, 06-03-06 10-03-06
CWO / SUPARCO TAM/HJ A5658 3000422017 3/3/2006 4/13/2006 5/17/2006 CL rel on 05-04
6xLockable Mushroom boxes 09-03-06 05-04-06

M/s Independent Newspapers Corp. (Pvt.) Clarifications reqd for some items and
SMY A5659 3000430110 LV Panel, DBs, BTD 3/8/2006 3/24/2006
Ltd. / Jang Building, I. I. Chundigar Road (EC) BTD layout / Order put on-hold on 10-04

Clarifications reqd for LVP and BTD


M/s J & S Enterprises (Pvt.) Ltd. / Jang Press,
SMY A5660 3000430115 LV Panel, 2Nos BTDs 3/8/2006 3/31/2006 layouts L248 / Order put on-hold on 10-
Sultanabad (EC)
04

K. E. S. C. (TR) RJ A5661 3000499948 01xFCP for 22/30MVA PT 3/2/2006 3/14/2006 3/14/2006 Formal indent & S.O. # recd on 29-06

Gadoon Textile Mills Ltd. SMY A5662 3000430530 01xPDB 3/13/2006 3/20/2006 3/21/2006 3/27/2006 CL rel on 21-03
28-04-06 CL rel on 21-03 / Changes, go-ahead on
BU TR / New Trafo Hall MHF A5663 3000420320 01xLT Panel 3/13/2006 3/20/2006 3/21/2006 5/29/2006
26-05-06 08-05 / Resubmitted
Pakistan Oil Fields Ltd. MHF A5664 3000433261 LT Switchgear 3/14/2006 3/30/2006 4/10/2006 4/19/2006 5/24/2006 CL rel on 10-04
22-03-06 CL rel on 21-03 / Analogue meters reqd
Nishat Dyeing, Finishing & Spinning - Unit 29 HJ A5665 3000433319 01x2000A ACB I/C / O/G Panel 3/15/2006 3/21/2006 3/27/2006
email instead of Digital in App

M/s British Deputy High Commission (OLM) SMY A5666 3000433859 01xLT Panel 3/15/2006 3/22/2006 22.03.06 4/3/2006 3/31/2006 CL rel on 24-03

01x0.25kW DOL Starter module 21-04-06 CL rel on 20-03 , revd 24-04 as per App
New Progressive Builders (PARCO) TAM A5667 3000433142 3/20/2006 3/20/2006 3/21/2006 3/21/2006
(KS type - 8PU.011) 08-05-06 comments
M/s. Technical Associates Pakistan (Pvt.) Ltd. / Delayed due to late response to Order
SMY A5668 3000435675 429xService Boxes 3/22/2006 3/28/2006 4/4/2006 7/4/2006
Sukh Chayn Gardens review

Complete scope dispatched, only SS3


24-03-06
Sunlight Wood Industries MHF A5669 3000435774 LT Switchgear 3/29/2006 3/29/2006 5/8/2006 5/15/2006 BTD to be designed after reciept of SS 3
22-05-06
layout from customer

Medipharm (Pvt.) Ltd. HJ A5670 3000437228 500kVAr PFIP - 1800mm High Panel 3/30/2006 4/3/2006 4/7/2006 5/26/2006 CL rel on 07-04

Pak Arab Fertilizers (Pvt.) Ltd. HJ A5671 3000442087 01x1600A ACB I/C / O/G Panel 3/31/2006 4/4/2006 4/4/2006 5/29/2006 5/30/2006 CL rel on 05-04

24-04-06 Scope changed in App, Instead of


AGE (Navy) Mehran MHF A5672 3000446498 09xPFIPs (4x50,1x125,4x175kVAr) 4/7/2006 4/13/2006 5/8/2006 5/19/2006
16-05-06 25kVAr, additional 50kVAr unit reqd

British High Commission HJ A5673 3000450144 FLBS units for 8PU.011 S1-Panels 4/13/2006 4/26/2006 4/26/2006 5/8/2006 5/12/2006 CL rel on 26-04 / SB D Details

Hussain Mills Ltd. HJ A5674 3000449951 LT Switchgear, PFIP & DBs 4/19/2006 NR 5/5/2006 CL rel on 28-04 / Changes in inspection

19xFCPs+19xACPs for 20/26MVA


NTDC-WAPDA RA A5675 3000612276 4/19/2006 4/26/2006 4/28/2006 13.12.06 15.12.06 Formal indent & S.O. # recd on 13-12
PT

Drgs rel based on preliminary info / CLs


26-04-06
Zaver PC Hotel Gwadar (EC) SMY A5676 3000435737 LT Switchgear 4/28/2006 4/21/2006 for bal items rel on 17-05. Additional
26-07-06
indent for 03x DBs received on 26/07/06.

CFO Siemens TAM A5677 IFO-1210 DB for CFO House 4/19/2006 NR 4/21/2006
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

29-05-06
Item 2
Bolan Castings Ltd. HJ A5678 3000457847 LT Switchgear 4/24/2006 5/8/2006 5/12/2006 5/17/2006 CL rel on 04-05 / Changes in App
30-05-06
Items 3-15
12-05-06
Gulshan Spinning Mills TAM A5679 3000456207 LT Switchgear 4/24/2006 5/5/2006 5/8/2006 CL rel on 08-05
email
06-06-06
Deewan Pakland Cement (MES) SMY/TAM A5680 3000459148 LT Switchgear - 8PU.011+8PU.003 4/28/2006 * As per Design Plan
08-06-06
Umar Spinning Mills (Pvt.) Ltd. MHF A5681 3000464309 LT Switchgear 5/4/2006 5/11/2006 5/16/2006 5/30/2006 5/31/2006 CL rel on 09-05
Attock Cement RJ A5682 3000426789 01x400kVAr PFIP 5/9/2006 5/11/2006 5/11/2006 5/23/2006 5/24/2006 CL rel on 11-05
19-05-06
Rauf & Co. HJ A5683 3000467254 LT Panel 5/9/2006 5/15/2006 5/16/2006 5/22/2006 CL rel on 11-05
email
Pakistan Cement (OLM) HJ A5684 3000469372 LT Switchgear 5/16/2006 5/19/2006 5/22/2006 5/24/2006
05-06-06 Resubmitted based on info recd from
PPL (BU OLM) MHF A5685 3000472842 LT Panel 5/18/2006 5/23/2006 6/8/2006 6/19/2006
15-06-06 customer
26-06-06
Areva / KESC (TR) RJ A5686 3000534493 01xACP for 31.5/40MVA PT 5/23/2006 6/2/2006 8/7/2006 8/24/2006 Formal indent & S.O. # recd on 23-08
14-07-06
02xFCPs+02xACPs for 20/26MVA
WAPDA 20/26MVA PT RJ A5687 3000479443 5/25/2006 6/5/2006
PT
Pakistan Navy (PTD-Isb / TR) RJ A5688 3000516029 1xAVR Panel for 4MVA PT 5/26/2006 6/7/2006 7/3/2006 8/7/2006 8/11/2006
Meaple Leaf Cement Factory Ltd. (OLM) MHF A5689 3000476672 2x15KW DOL starters 5/26/2006 6/1/2006 6/9/2006 CL rel on 09-06
CL (on-hold pending App) rel on 20-06 /
13-06-06
M/s Engro Chemicals Pakistan Ltd. MHF A5690 3000481085 6x30kW MCU 5/29/2006 6/8/2006 6/8/2006 6/20/2006 Qty inc from 01 to 06 on 09-06 / Changes
email
in App
M/s Technical Associates Pakistan (Pvt.) Ltd. / 01x630A MCCB+01x2000A ACB
MHF A5691 3000485471 5/30/2006 6/2/2006 6/2/2006 7/17/2006
Abu Dhabi Palace, RYK Panels - 8PU.003

M/s Sapphire Textile Mills Ltd. (Weaving Unit) HJ A5692 3000480079 LT Switchgear 6/1/2006 6/9/2006 6/9/2006 7/5/2006 7/7/2006 CL rel on 09-06

Main indent Main


01xMCC (F1 Design) + ACB trolley Indent:
BHP Billiton / Zamzama Phase-2 Development + spares + Remote Switching 16-06-06 16-06-06 25-08-06
SMY/ MHF A5693 3000483225 6/2/2006
(EC) Panel Add. 20-06-06 Item 01
Add indent: Indent:
03xLT Panels (F1 Design) 19-06-06

NTDC-WAPDA / STG-6-26 (LOT-IV) MA A5694 3000483283 07xRP3+27xRP4 Relay Panels 5/31/2006 NR 6/12/2006
DHA CO-GEN (TD) TAM A5695 3000489033 AC & DC Panels 6/12/2006 6/21/2006 6/30/2006 7/21/2006 CL rel on 13-07
Jang Group Lahore (OLM) MHF A5696 3000488405 01x300kVAr PFIP 6/14/2006 6/20/2006 7/5/2006 7/25/2006
56xRTUs + 88xInterfacing +
KESC (TD) / LDC MA A5697 3000488903 6/15/2006 NR 6/20/2006 6/21/2006 CL rel on 20-06
11xEnergy Meter Panels
Pakistan Railway Carriage Factory SMY A5698 3000494509 03x300kVAR PFIPs 6/21/2006 6/30/2006 7/3/2006 CL rel on 04-07

28-06-06
04xLTOs + Loose ACB supply & LTOs
installtion at site + MCC + LDB-1 + 14-07-06 13-07-06
Faisal Spinning Mills Ltd 2, Power House TAM/MHF A5699 3000499040 6/30/2006 7/6/2006 CL rel on 28-06(LTOs), 05-07(bal)
BTD 6000A + Cable termination BTD MCC, LDB
Panel 18-07-06
BTD

01x2500A ACB Panel to be aligned


Faisal Spinning Mills Ltd, Nooriabad MHF A5700 3000499100 6/29/2006 7/3/2006 7/11/2006 CL rel on 05-07
with existing Siemens Panel

DHA Karachi (TR) / 132kV Creek City Grid


RJ A5701 3000505379 01xFCP + 01xTCP for 40MVA PT 7/5/2006 7/6/2006 7/6/2006
Station
M/s Khalid & Brothers MHF A5702 3000502316 LV DBs 7/4/2006 7/7/2006 7/7/2006 7/12/2006 7/17/2006 CL rel on 17-07
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

02-08-06
Lucky Cement Ltd. SMY A5703 3000503418 01xLT Panel 7/4/2006 * 02days - sub to clarification
28-08-06
Indus Motor Co. Ltd. HJ A5704 3000506779 02xLT Switchgears + 02xBTDs 7/5/2006 7/11/2006 7/24/2006 Changes in App
Green City Housing Scheme SMY A5705 3000447858 148x Service Boxes 7/17/2006 * *01day - sub to clarification
01xFCPs+01xACPs for Fesco,
Fesco, Areva & Nizampur RJ/MAB A5706 3000543142 Areva & Nizampur 20/26 MVA PT 7/18/2006 7/19/2006 7/19/2006 9/10/2006 9/15/2006
respectively.
04xFCPs+04xACPs for 4Nos
Fesco RJ / HJ / MABA5707 3000546366 7/10/2006 7/24/2006 7/24/2006 9/18/2006 9/20/2006
10/13MVA PT

Delta Climate Control Engg. Ltd TAM/HJ A5708 3000517256 01xSML-1+13xLDBs+03xPDBs 7/20/2006 7/25/2006 7/26/2006 8/2/2006 Main Indent with S.O. # recd on 25-07

01xMLT Panel+02x400kVAr CL rel on 28-07 / Drgs to be rel for prod


Dewan Automotive Engg. Ltd HJ A5709 3000516051 7/25/2006 8/1/2006 8/4/2006 8/10/2006
PFIPs+02xBTDs on SB S go-ahead
TR / PT Hall Extension HJ A5710 3000511934 02xGT3 DBs 7/25/2006 8/9/2006 8/8/2006 8/23/2006 24-0/8-06 Specs recd on 07-08
KESC (TD) / KESC-02 TAM A5711 3000517233 03xLVDC + 03xLVAC Panels 7/25/2006 11/13/2006 11/2/2006

PPW SJA/RA A5712 3000516016 01xDC+01xAC Distribution Panels 7/26/2006 8/3/2006 11/27/2006

39xRelay+29xControl+
KESC (TD) / Tender 2480-02 MA A5713 3000483204 07xDUPLEX+04xSynch+06xMet+08 7/26/2006
xIF Panels

01xCOP + Upgradation of the MBB


Indent with clarifications awaited from
BU-EPN TAM A5714 3000523164 from 3200A to 5000A of 3Nos LT 8/2/2006 8/9/2006
SB-Exec
panels.
6xLT boards (MDP-D,L,1,3,4,5), 25-08-06 MDP-D have 70KA MCCBs to be
Baluchistan Wheels Ltd. SMY / TAM A5715 3000514726 8/3/2006 8/8/2006
2xLDBs(1 &2), 4000A BTD Item 02 ordered by 04/08/06
1x LV Board,1x PFIP 400 KVAR, 1x
CL rel on 08-08 / Formal indent duly
Diamond Fabrics Limited. HJ A5716 3000524043 BTD 3200A (7 meters), 2x PDB, 1x 8/2/2006 8/11/2006 8/16/2006 8/22/2006 8/24/2006
signed recd on 07-08
LDB.
NTDC - WAPDA (TD) 220/132kV GIS MA A5717 3000524805 01x Metrosil Box 8/4/2006 NR 8/25/2006
13-11-06
SIAL / NESPAK (EC) /SIAL Package III A-4 TAM A5718 3000517348 LT Switchgear 8/4/2006 11/15/2006 App comments to be clarified
PFIP
18x FCPs + 18x TCPs for
KESC (TR) / Capacity Enhancement RJ / MAB A5719 3000525381 8/7/2006 8/9/2006 8/9/2006 8/25/2006 8/25/2006
31.5/40MVA Power Trafos
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

DB & Components for PT Hall 09-08-06 23-08-06


BU TR HJ A5720 3000525387 8/8/2006 8/9/2006 9/6/2006 Change in App
Extension 24-08-06 05-09-06
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

01xProtection & Metering Panel for


Army Welfare Trust (PWT) / Nizampur Cement SHA A5721 3000482465 5/31/2006
PT
KESC (TR) / Capacity Enhancement MAB A5722 3000565712 01xFCP for 30/37.5 MVA PT 7/25/2006 8/17/2006 10/12/2006 10/12/2006
Pakistan Railways MAB A5723 3000545583 01x TCP for 7.5MVA PT 7/27/2006 8/21/2006 9/14/2006 9/15/2006
DHA CO-GEN (TD) MA A5724 3000528782 03xLCC Panels 8/15/2006 NR
03xLCPs+02xLPPs+01xTCP+
DHA CO-GEN (TD) MA A5725 3000528724 8/15/2006 NR
01xTPP+01xMP+01xBBPP

Pakistan Railways (TS) MA A5726 3000526801 17x Relay Group Housings 8/15/2006 NR Drgs recd from TS released for manuf

2x Independent (standalone) S- 28-08-06 05-09-06


PTD SE - for PARCO HJ A5727 3000529527 8/16/2006 8/24/2006 9/20/2006 CL rel on 28-08
Panels _ 8PU.011 06-09-06 19-09-06
M/s Treet Corporation Ltd. Lahore MHF A5728 3000533274 LT Switchgear 8/23/2006 8/30/2006
Dow University of health and Sciences SMY A5729 3000535559 LT Switchgear 8/23/2006 8/29/2006
KESC (TD) / KESC-02 HJ A5730 3000555449 04x250V DC Panels 8/23/2006 9/29/2006 11/1/2006 11/23/2006 11/23/2006 Cable Glands / Cutouts
Sample Relay Panel-132kV BB
International Media Zone, U.A.E. MR A5731 IFO 1213
Protection, SIVACON 8PT
MEPCO (TD) / Tender No. 20 MA A5732 3000562509 08xRP3 + 07xRP4 Relay Panel 10/4/2006 NR Drgs recd from TD
01xRP + 01xCP + 01xLCC For
Dewan Cement (TD) MA A5733 3000562529 10/13/2006 NR Drgs recd from TD
Trafo.
M. Talib Enterprises / Container Control
MHF A5734 3000574438 01xLT Panel+DBs 10/30/2006 11/10/2006 12/7/2006 App with comments
Program at Port Qasim
Attock Cement Ltd. HJ A5735 3000565413 01x400kVAr PFIP 10/11/2006 11/20/2006 11/21/2006 Same as A5682
DHA (TD)/132kV G/S No. 1, DHA Phase VIII,
MHF A5736 3000581497 01xAC+01xDC Distribution Panel 10/31/2006
Karachi
Impact Design Studio, Islamabad HJ A5737 3000584183 01xLT Panel 11/2/2006 11/3/2006 11/14/2006 11/8/2006
M/s Maple leaf Cement MHF A5738 3000581410 10xDBs 11/3/2006 11/15/2006 11/14/2006

GEPCO (TD)/Wazirababad Road, 132/11kV 01xCP20+01xCP30+02xCP50+02xR


MA A5739 3000584675 11/3/2006 CP/RP Drgs not recd from TD
Cantt. G/S - Gujranwala P3+02xRP4+01xAC/DC Panels

Zafar & Company/SUPARCO SMY A5740 3000587492 01x400kVAr PFIP 11/7/2006 11/22/2006 11/24/2006
LT Switchgear-SIVACON 8PT 28-11-06 30-11-06 05-12-06
27-11-06
Sitara Per Oxide HJ/TAM A5741 3000587675 Withdrawable (MCC+PFIP+ATS 11/8/2006 01-12-06 15-12-06 14-12-06
29-11-06
Panel) 08-12-06 23-12-06 19-12-06

DHA Karachi (TR)/DHA Phase VIII G/S No.1 MAB/RA A5742 01xFCP+01xTCP for 31.5/40MVA PT 11/8/2006 Formal Indent & S.O. # awaited

DHA Karachi (HSS)/DHA Phase VIII G/S No.1 A5743 3000541803 01xRemote Control Panel 11/20/2006

05xRelay Panels + 03xMarshalling


NTDC-WAPDA / WOR-11 Lot III (TD) MR A5744 3000601763 11/27/2006
Kiosks
DEWA PROJECT SMY/MHF A5745 IFO-1213 02xSample 8PT Panels 12/1/2006 NR 12/11/2006

AREVA (TR) / Faisalabad Industrial Estate RA A5746 3000602668 01xFCP+01xACP for 20/26MVA PT 11/27/2006 NA NA NA 12/5/2006 App already recd at offer stage
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

Prime Crete (Pvt.) Ltd MHF A5747 3000607827 02xDBs 12/1/2006 12/6/2006 12/8/2006 12/29/2006
SIEMENS Pakistan
BU Switchboards
SB - E & D
Engineering & Design Plan Printout Date:05/14/2018

Indus Motor Co. Ltd. HJ A5748 3000612090 02x400kVAr PFIPs 12/8/2006 12/13/2006 12/14/2006 12/14/2006
Gulshan Weaving Mills Ltd. TAM A5749 3000618720 Main LT+BTD+DBs 12/20/2006 12/20/2006 12/20/2006 1/3/2007 12/27/2006 App drgs recd on 15-01

QESCO (TR) RA A5750 3000612278 01xFCP+01xACP for 20/26MVA PT 12/13/2006 12/18/2006 12/21/2006 12/21/2006

GEPCO(TR) RA A5751 3000612279 01xFCP+01xACP for 20/26MVA PT 12/13/2006 12/18/2006

Gulistan Textile Mills 4. TAM A5752 3000618711 Main LT+BTD+DBs+PFIP 12/20/2006 12/29/2006 1/11/2007
DHA Karachi (TR)/DHA Phase VIII G/S No.1 RA A5753 3000581497 01xACP for 31.5/40MVA PT 12/21/2006
05xFCPs+05xACPs for 10/13MVA
NTDC-WAPDA(TR)/STG-621 RA A5754 3000626684 1/3/2007
PT
Century Paper Mills HJ A5755 LT Switchgear Indent & S.O. # awaited
BU SS / Siemens Pakistan HO Building, Block
MHF A5756 3000523164 03xDBs 1/9/2007 1/10/2007
'D'
Gadoon Textile Mills Ltd. A5757 3000640923 01xMCC - 8HKO 1/24/2007 1/31/2007

TOTAL LV HOURS ###


S. Customer DE E&D S.B.No. Description Start

MV Switchgears
1 Umar Spinning Mills (Pvt.) Ltd. KR A0551 3000332848 01xWIP+01xI/C&O/G SA2 Panel 9/12/2005

11kV Switchgear - 01xWIP +


2 FFC MYS/RA A0519 3000288778 7/4/2005
08xSA2 + Loose Components

3 FFC SJA/RA A0552 3000347560 01xI/C+03xO/G 9/16/2005

62x4-Way+29x3-Way RMUs +
4 Punjab Industrial Estate KR A0554 T-010 9/21/2005
01xWIP + 01xWCP

01xI/C+04xO/G+2xB/C WAPDA
5 Sitara Chemical Industries RA A0560 3000346424 10/12/2005
Grid Panels

LV Switchgears

1 ESS ESS Associates (EC) SMY A5505 3000188690 LT Switchgear 18-11-04

2 Bhanero Textile Mills Ltd. HJ/KZ A5555 3000257527 LT Switchgear, DBs 4/28/2005

112x Service boxes as per


3 Glamour Developers (Pvt.) Ltd. SMY / HJ A5563 3000240107 6/8/2005
WAPDA specs. P92:75

4 Khadim Husain Slatch & Co. TAM A5564 3000284242 250kVA Changeover Panel 6/20/2005

5 Pak & Jinnah Park Projects TAM A5565 3000284763/8 LT Power Panel No.1 & No.2 14-06-05-
21-06-05
6 Glaxo Smith Kline TAM/KZ A5568 3000288055 LT Switchgear
29-09-05

7 PAEC / NMC-1 MHF A5583 3000309035 LT Switchgear 7/28/2005

8 Maple Leaf Cement RJ A5589 3000318704 01xFCP+01xACP for 20/26MVA PT 8/17/2005

9 Olympia Chemicals Ltd. SMY A5591 3000316684 LT Switchgear 8/17/2005

10 Naveena Exports (Pvt.) Ltd. - W SMY A5601 3000331514 LT Switchgear 9/8/2005

11 Maple Leaf Cement MA A5605 3000339739 02xRP4+02xCP50 + 02xAC/DC Pan 9/23/2005

12 U. S. Embassy, Islamabad MHF A5607 3000346832 01xLT Panel 10/10/2005

13 U. S. Embassy, Islamabad MHF A5608 3000346848 01xLT Panel + 01xDB 10/10/2005


ForApp. ForApp.
By ON Projected
App. Rec. For Prod. Remarks Hours
Planned

9/16/2005 9/16/2005 App awaited

Customer comments recd on 22-08


clarified on 22-08, Go-ahead for release
in prod / Schematics for changes in
29-07-05
existing panel reqd / 01xO/G to be
12-08-05
7/20/2005 9/1/2005 9/1/2005 aligned with 6.3kV switchgear, S. O. No.
02-09-05
3-347560 - A0552 with new CT ratio /
Schematics
Relay changed to CDG61 from P124 yet
to be confirmed/Informal Meeting @ SB
with customer dt. 2.11.05

9/21/2005 9/23/2005 App awaited

Qty of RMUs revised by EC on 24-09 /


23-09-05 App comments to be clarified for
9/27/2005 10/28/2005
02-11-05 RMUs / WCP to be clarified/Reamining
scope released on 2.11.05

SLD/FV/Assembly/FP submitted to TD
10/14/2005 10/19/2005
on 14-10

03-01-05
CL rel on 28-12 / Clar on Trafo dim drg
Layouts
08-03-05 reqd / Meeting with EC on 23-05 / Resub
12/6/2004 10-01-05 3/3/2005
10-08-05 with changes dtd 24-05 / Go-ahead from
26-05-05
SB PL Ex on 08-08

12-05-05 PDBs,
12-05-05
06-05-05 PDBs, Items 06-18, CL LT on 18-05 /
LDBs & MLDB
5/13/2005 LDBs & MLDB
25-05-05
31-05-05 Item 01-02 MCC & LCBs on hold
LT, PFIP, MCC on 030605

03-08-05
6/10/2005 15-08-05 9/15/2005 9/7/2005 Order put On-Hold on 04-10
31-08-05
Control scheme same as Gadoon order
6/21/2005 6/24/2005
A5545 / App awaited

CL rel on 20-06 / Resubmitted / App


17-06-05 comments incorporated / Change of
6/17/2005 9/28/2005 10/7/2005
01-09-05 Cable entries on 12-10, confirmation
reqd for Gen panel / SB D Details
15-07-05
CHF LV
18-07-05
CHF DBs
01-09-05 Meeting with Consultants & EC on 30-06
PB DBs 03-08- 10-08-
/ CL for CHF on 10-08(DBs) & 11-08(LT) /
12-09-05 05CHF 05DBs
7/8/2005 Changes in App / Add indent for 01xLV
Item 1 PB 11-10-05 12-10-05
Panel 8PU.011 Fixed design alignment
20-09-05 Add indent Add indent
with existing board / SB D Details
Items 04-05PB
04-10-05
Items 06-09PB
03-10-05
Add indent

10-08-05
26-09-05 CL rel on 11-08 / Changes in App /
8/10/2005 9/13/2005
27-09-05 Resubmitted, App awaited
Layout
23-08-05 Resubmitted as per comments/changes
8/19/2005 9/7/2005
13-09-05 / App awaited

15-09-05 CL rel on 07-09 / Comments in App /


02-09-05 Item 3, 4 Partial mtg plates pending / SB D
Items 1,3,5 16-09-05 Details for O/D Feeder Pillars & BTD /
9/1/2005 06-09-05 13-09-05email
LT+PFIP+Layout
Items 2, 6 Feeder Pillars Put-on-Hold by SB Lhr
07-09-05 24-10-05 vide email 22-09 / LCBs reqd in local
LCBs design vide email dtd 19-10

05-10-05 CLs rel on 21-09 (PDBs), 27-09 (bal) /


21-09-05 04-10-05 PDBs PDB 10 put On-Hold 04-10 / PDBs 7&8
PDBs PDBs 26-10-05 also put On-Hold 06-10 / LT, PDB 10,
9/19/2005
04-10-05 24-10-05 PFIP/LDBs Compressor Panel, Layout revised &
LT LT 27-10-05 PDB 8 deleted in App /
LTO/MCC SB D Details

10/5/2005 10/11/2005 App awaited

10/17/2005 10/18/2005 SL/Clar recd on 17-10 / App awaited

10/17/2005 10/18/2005 SL/Clar recd on 17-10 / App awaited


Changes/
Total 10/04 Oct. Nov Dec Jan Feb Mar Apr
Additions

0
Work in
May Jun Jul Aug Sep Total Balance
Hand Status GP

90 -90

36 33 21 Running

MV