EN CONSIDERACION:
TUBERIAS EN SIFONAMIENTO RECOMDACION COLOCAR TUBERIA C-10
SIFON
UTILIZAR C-10
COTA DIAMETRO
TOTAL DE LONGITUDES
ALTURA PARCIAL CLASE MATERIAL mm pulgadas
50 C-5 PVC 300 12 C-5 2596.95
75 C-7.5 PVC 300 12 C-7.5 3827.71
100 C-10 PVC 300 12 C-10 1818.08
75 C-7.5 PVC 300 12 8242.74
100 C-10 PVC 300 12
ZONA C7.5
FON
TILIZAR C-10
DIAMETRO
N° DESCRIPCION COTA PROGRESIVA
mm pulgadas
1 VALVULA DE AIRE 1001.624 0+004 50 2
2 VALVULA DE AIRE 989.889 0+760 50 2
3 VALVULA DE AIRE 982.877 1+180 50 2
4 VALVULA DE AIRE 978.000 1+600 50 2
5 VALVULA DE AIRE 968.000 1+960 50 2
6 VALVULA DE AIRE 946.126 2+960 50 2
7 VALVULA DE AIRE 941.000 3+640 50 2
8 VALVULA DE AIRE 938.764 4+040 50 2
9 VALVULA DE AIRE 935.223 4+260 50 2
10 VALVULA DE AIRE 930.000 4+920 50 2
11 VALVULA DE AIRE 922.000 5+200 50 2
12 VALVULA DE AIRE 912.712 5+720 50 2
13 VALVULA DE AIRE 908.000 5+810 50 2
14 VALVULA DE AIRE 931.500 6+300 50 2
15 VALVULA DE AIRE 938.265 6+500 50 2
16 VALVULA DE AIRE 937.324 6+600 50 2
17 VALVULA DE AIRE 934.000 6+920 50 2
18 VALVULA DE AIRE 933.222 7+120 50 2
19 VALVULA DE AIRE 934.445 7+300 50 2
20 VALVULA DE AIRE 927.145 7+704 50 2
21 VALVULA DE AIRE 927.126 7+880 50 2
22 VALVULA DE AIRE 924.988 8+242 50 2
MATERIAL TIPO
TOTAL DE VALVULAS DE AIRE
PVC II
PVC III TIPO I 1
PVC III TIPO II 2
PVC III TIPO III 19
PVC III
PVC I
PVC III
PVC III
PVC III DIAMETRO DE LA
PVC III VALVULA DE AIRE
PVC III
PVC III D=300mm D/8= 37.5
PVC III D/12= 25
PVC III PROM= 31.25
PVC III
PVC III D valvula de aire= 2"= 50 mm
PVC III
PVC III
PVC III
PVC III
PVC III
PVC II
DIAMETRO
Nº DESCRIPCION COTA PROGRESIVA MATERIAL
PULG mm
1 VAL. DE PURGA 998.487 0+100 FºFº 3.00 75.00
2 VAL. DE PURGA 992.000 0+540 FºFº 3.00 75.00
3 VAL. DE PURGA 984.813 1+000 FºFº 3.00 75.00
4 VAL. DE PURGA 979.364 1+280 FºFº 3.00 75.00
5 VAL. DE PURGA 973.489 1+680 FºFº 3.00 75.00
6 VAL. DE PURGA 960.000 2+200 FºFº 3.00 75.00
7 VAL. DE PURGA 938.959 3+360 FºFº 3.00 75.00
8 VAL. DE PURGA 939.098 3+920 FºFº 3.00 75.00
9 VAL. DE PURGA 930.891 4+440 FºFº 3.00 75.00
10 VAL. DE PURGA 922.809 5+000 FºFº 3.00 75.00
11 VAL. DE PURGA 908.100 5+775.40 FºFº 3.00 75.00
12 VAL. DE PURGA 905.113 5+820 FºFº 3.00 75.00
13 VAL. DE PURGA 905.474 5+920 FºFº 3.00 75.00
14 VAL. DE PURGA 931.400 6+700 FºFº 3.00 75.00
15 VAL. DE PURGA 928.157 6+800 FºFº 3.00 75.00
16 VAL. DE PURGA 928.518 6+840 FºFº 3.00 75.00
17 VAL. DE PURGA 930.481 7+180 FºFº 3.00 75.00
18 VAL. DE PURGA 928.000 7+520 FºFº 3.00 75.00
19 VAL. DE PURGA 916.000 7+780 FºFº 3.00 75.00
20 VAL. DE PURGA 916.000 7+840 FºFº 3.00 75.00
21 VAL. DE PURGA 918.635 8+120 FºFº 3.00 75.00
DIAMETRO DE LA
VALVULA DE PURGA
D=300mm D/4= 75
D/6= 50
PROM= 62.5
DIAMETRO
Nº DESCRIPCION COTA PROGRESIVA MATERIAL
PULG
1 VALVULA DE COMPUERTA 1001.570 0+003 F°F° 12.00
DIAMETRO
mm
300.00
VALVULA DE PASO
DIAMETRO
Nº DESCRIPCION COTA PROGRESIVA MATERIAL
PULG
1 TAPON 924.791 8+242.74 PVC 12.00
DIAMETRO
mm
300.00
VALVULA REDUCTORAS DE PRESION (DE 100 A 0)
DIAMETRO
Nº DESCRIPCION COTA PROGRESIVA MATERIAL
PULG
NO NECESITA ESTE TIPO DE VALVULAS PORQUE NINGUN TRAMO DE LA TUBERIA BAJA DE LOS 100 M
DIAMETRO
mm
A BAJA DE LOS 100 M
MEDIDOR
MEDIDOR
VALVULA REGULADORAS DE PRESION
EN ESTE PROYECTO NO SE UTILIZARAN VALVULAS REGULADORAS DE PRESION SEGÚN ESPECIFICAION DEL PROYEC
DIAMETRO
PULG mm
SEGÚN ESPECIFICAION DEL PROYECTISTA
PLANTA
CUADRO DE CODOS
DIAMETRO
N° PROGESIVA ANGULO TIPO MATERIAL
58 PULGADAS MILIMETROS
C-1 0+286 14°40'48'' 12.5° 12.00 300.00 PVC
C-2 1+653 210+125.00 12.5°+12.5° 12.00 300.00 PVC
C-3 1+727 132+232.00 12.5° 12.00 300.00 PVC
C-4 3+414 131+819.00 12.5° 12.00 300.00 PVC
C-5 3+431 240+656.00 12.5°+12.5° 12.00 300.00 PVC
C-6 3+684 270+120.00 30° 12.00 300.00 PVC
C-7 3+753 264+553.00 30° 12.00 300.00 PVC
C-8 3+886 ### 90° 12.00 300.00 PVC
C-9 3+915 750+302.00 30°+45° 12.00 300.00 PVC
C-10 3+976 732+614.00 30°+45° 12.00 300.00 PVC
C-11 4+144 212+758.00 12.5°+12.5° 12.00 300.00 PVC
C-12 4+179 191+222.00 12.5°+12.5° 12.00 300.00 PVC
C-13 4+256 280+021.00 30° 12.00 300.00 PVC
C-14 4+487 334+637.00 30° 12.00 300.00 PVC
C-15 4+689 124+612.00 12.5° 12.00 300.00 PVC
C-16 4+810 140+352.00 12.5° 12.00 300.00 PVC
C-17 4+831 164+222.00 12.5°+12.5° 12.00 300.00 PVC
C-18 4+878 201+505.00 12.5°+12.5° 12.00 300.00 PVC
C-19 4+902 203+010.00 12.5°+12.5° 12.00 300.00 PVC
C-20 4+980 160+130.00 12.5°+12.5° 12.00 300.00 PVC
C-21 5+004 124+137.00 12.5° 12.00 300.00 PVC
C-22 5+071 163+631.00 12.5°+12.5° 12.00 300.00 PVC
C-23 5+286 154+320.00 12.5°+12.5° 12.00 300.00
C-24 5+507 150+901.00 12.5° 12.00 300.00 PVC
C-25 5+561 385+634.00 45° 12.00 300.00 PVC
C-26 5+580 173+728.00 12.5°+12.5° 12.00 300.00 PVC
C-27 5+665 181+939.00 12.5°+12.5° 12.00 300.00 PVC
C-28 5+827 164+941.00 12.5°+12.5° 12.00 300.00 PVC
C-29 6+043 333+806.00 45° 12.00 300.00 PVC
C-30 6+082 280+836.00 30° 12.00 300.00 PVC
C-31 6+116 165+226.00 12.5°+12.5° 12.00 300.00 PVC
C-32 6+148 302+253.00 30° 12.00 300.00 PVC
C-33 6+169 572+256.00 30°+45° 12.00 300.00 PVC
C-34 6+188 470+809.00 45° 12.00 300.00 PVC
C-35 6+231 233+346.00 12.5°+12.5° 12.00 300.00 PVC
C-36 6+260 284+040.00 30° 12.00 300.00 PVC
C-37 6+307 175+932.00 12.5°+12.5° 12.00 300.00 PVC
C-38 6+334 154+347.00 12.5°+12.5° 12.00 300.00 PVC
C-39 6+420 173+123.00 12.5°+12.5° 12.00 300.00 PVC
C-40 6+447 124+706.00 12.5° 12.00 300.00 PVC
C-41 6+601 352+754.00 45° 12.00 300.00 PVC
C-42 6+674 321+052.00 12.5°+30° 12.00 300.00 PVC
C-43 6+714 201+350.00 12.5°+12.5° 12.00 300.00 PVC
C-44 6+742 280+431.00 30° 12.00 300.00 PVC
C-45 6+764 205+739.00 12.5°+12.5° 12.00 300.00 PVC
C-46 6+792 432+609.00 45° 12.00 300.00 PVC
C-47 6+809 640+015.00 30°+45° 12.00 300.00 PVC
C-48 6+834 301+830.00 30° 12.00 300.00 PVC
C-49 6+874 191+523.00 12.5°+12.5° 12.00 300.00 PVC
C-50 6+905 423+637.00 45° 12.00 300.00 PVC
C-51 6+995 255+258.00 30° 12.00 300.00 PVC
C-52 7+121 165+158.00 12.5°+12.5° 12.00 300.00 PVC
C-53 7+200 232+458.00 12.5°+12.5° 12.00 300.00 PVC
C-54 7+247 152+159.00 12.5°+12.5° 12.00 300.00 PVC
C-55 7+302 24+150.00 12.5°+12.5° 12.00 300.00 PVC
C-56 7+908 184+035.00 12.5°+12.5° 12.00 300.00 PVC
C-57 8+089 511+620.00 30°+45° 12.00 300.00 PVC
C-58 8+193 132+053.00 12.5° 12.00 300.00
TOTALES DE ACCESORIOS
COTA RASANTE
DESCRIPCION Longitud (m) Pendiente (%) Caudal (m3/s) Ø (mm) Desnivel (m) VEL. (m/s)
INICIAL FINAL
TRAMO 1 100.00 -3.270 0.05 300 1001.755 998.485 3.27 0.689
TRAMO 2 439.98 -1.470 0.05 300 998.485 992.000 6.49 0.689
TRAMO 3 219.98 -1.050 0.05 300 992.000 989.692 2.31 0.689
TRAMO 4 239.98 -2.030 0.05 300 989.692 984.813 4.88 0.689
TRAMO 5 179.98 -1.120 0.05 300 984.813 982.801 2.01 0.689
TRAMO 6 100.02 -3.440 0.05 300 982.801 979.279 3.52 0.689
TRAMO 7 320.00 -0.430 0.05 300 979.279 978.000 1.28 0.689
TRAMO 8 80.02 -5.640 0.05 300 978.000 973.489 4.51 0.689
TRAMO 9 279.98 -1.960 0.05 300 973.489 968.000 5.49 0.689
TRAMO 10 239.98 -3.330 0.05 300 968.000 960.000 8.00 0.689
TRAMO 11 380.00 -2.110 0.05 300 960.000 952.000 8.00 0.689
TRAMO 12 460.02 -1.550 0.05 300 952.000 944.890 7.11 0.689
TRAMO 13 320.02 -1.850 0.05 300 944.890 938.959 5.93 0.689
TRAMO 14 280.00 0.750 0.05 300 938.959 941.046 -2.09 0.689
TRAMO 15 280.00 -0.700 0.05 300 941.046 939.098 1.95 0.689
TRAMO 16 120.00 -0.300 0.05 300 939.098 938.740 0.36 0.689
TRAMO 17 220.00 -1.650 0.05 300 938.740 935.119 3.62 0.689
TRAMO 18 179.98 -2.350 0.05 300 935.119 930.891 4.23 0.689
TRAMO 19 480 -0.190 0.05 300 930.891 930.000 0.89 0.689
TRAMO 20 80.00 -8.990 0.05 300 930.000 922.809 7.19 0.689
TRAMO 21 200.00 -0.400 0.05 300 922.809 922.000 0.81 0.689
TRAMO 22 59.98 -2.930 0.05 300 922.000 920.242 1.76 0.689
TRAMO 23 360.00 -1.810 0.05 300 920.242 913.709 6.53 0.689
TRAMO 24 100.02 -1.000 0.05 300 913.709 912.706 1.00 0.689
TRAMO 25 55.35 -8.500 0.05 300 912.706 908.000 4.71 0.689
TRAMO 26 35.42 0.000 0.05 300 908.000 908.000 0.00 0.689
TRAMO 27 9.26 -31.170 0.05 300 908.000 905.113 2.89 0.689
TRAMO 28 100.00 0.360 0.05 300 905.113 905.474 -0.36 0.689
TRAMO 29 120.00 5.000 0.05 300 905.474 911.473 -6.00 0.689
TRAMO 30 260.00 7.610 0.05 300 911.473 931.266 -19.79 0.689
TRAMO 31 200.02 3.540 0.05 300 931.266 938.343 -7.08 0.689
TRAMO 32 99.98 -1.030 0.05 300 938.343 937.312 1.03 0.689
TRAMO 33 100.00 -7.310 0.05 300 937.312 930.000 7.31 0.689
TRAMO 34 99.98 -1.840 0.05 300 930.000 928.157 1.84 0.689
TRAMO 35 39.98 0.900 0.05 300 928.157 928.518 -0.36 0.689
TRAMO 36 80.02 6.850 0.05 300 928.518 934.000 -5.48 0.689
TRAMO 37 80.02 2.000 0.05 300 934.000 935.601 -1.60 0.689
TRAMO 38 60.02 -3.460 0.05 300 935.601 933.527 2.07 0.689
TRAMO 39 60.00 -0.600 0.05 300 933.527 933.169 0.36 0.689
TRAMO 40 60.00 -3.880 0.05 300 933.169 930.841 2.33 0.689
TRAMO 41 40.00 0.000 0.05 300 930.841 930.841 0.00 0.689
TRAMO 42 80.00 4.550 0.05 300 930.841 934.482 -3.64 0.689
TRAMO 43 110.22 0.200 0.05 300 934.482 934.702 -0.22 0.689
TRAMO 44 109.79 -6.100 0.05 300 934.702 928.000 6.70 0.689
TRAMO 45 185.59 -0.460 0.05 300 928.000 927.149 0.85 0.689
TRAMO 46 74.41 -14.980 0.05 300 927.149 916.000 11.15 0.689
TRAMO 47 60.00 0.000 0.05 300 916.000 916.000 0.00 0.689
TRAMO 48 40.00 7.240 0.05 300 916.000 918.897 -2.90 0.689
TRAMO 49 240.00 -0.110 0.05 300 918.897 918.635 0.26 0.689
TRAMO 50 122.74 5.020 0.05 300 918.635 924.653 -6.02 0.689
8242.74
PASOS
RESPUESTA
cambiar
AUOMATICA
previo calculo
x= 48.6979521
x= 0.0486979521
Q= 0.0486979521
Q= 0.0486979521
L= 480.00
C= 140
Hf= 0.891
D= 0.29 m
D= 287.00 mm
D= 12.00 "
TUBERIAS
N COTA INICIAL COTA FINAL ΔH
1 1001.755 941.755 60
2 941.755 921.755 20
3 921.755 921.755 0
4 921.755 921.755 0
5 921.755 921.755 0
6 921.755 924.653 2.898
N⁰ DE
CLASE LONGITUD TOTAL TUBERIAS
C-6 5208.36 m 447
C-8 2973.85 m 255
C-10 57.79 m 5
TOTAL DE TUBERIAS 707
TUBERIAS
PROGESIVA INICIAL PROGRESIVA FINAL L PARCIAL DIAMETRO CLASE MATERIAL
0+000 3+209.15 3209.15 300 mm C-6 HDPE
3+209.15 5+208.36 1999.21 300 mm C-8 HDPE
5+208.36 6+175.05 966.69 300 mm C-10 HDPE
6+175.05 7+741.60 1566.55 300 mm C-8 HDPE
7+741.60 8+182.21 440.61 300 mm C-10 HDPE
8+182.21 8+240 57.79 300 mm C-8 HDPE
8240.00
DESCRIPCION
Nº DE
ITEM ESPECIFICACION UND
VECES
01.00.00 OBRAS PROVISIONALES
01.01.00 CAMPAMENTO Y CASETA PROVISIONAL DE OBRA m2
Almacen de Obra 1.00
Campamento - Vestuario 1.00
Caseta de Guardiania 1.00
01.02.00 OFICINA DE RESIDENCIA Y SUPERVISIÒN m2 1.00
01.03.00 SERVICIOS HIGIENICOS m2 1.00
01.04.00 DESAGUE DEL CAMPAMENTO Glob 1.00
01.05.00 AGUA PARA EL CAMPAMENTO Glob 1.00
01.06.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 4.80 M X 2.40 M Unid 1.00
08.00.00 TUBERIAS
08.01.00 INSTALACION DE TUBERIA PVC
08.01.01 Tuberia PVC C-5 de 300mm m 01
08.01.02 Tuberia PVC C-7.5 de 300mm m 01
08.01.03 Tuberia PVC C-10 de 300mm m 01
09.00.00 ACCESORIOS
09.01.00 INSTALACION DE ACCESORIOS
09.01.01 CODO 12.5 Und.
09.01.02 CODO 30 Und.
09.01.03 CODO 45 Und. 96
Und. 119
12.00.00 VARIOS
12.01.00 CRUCE DE VIAS DE GRAN TRANSITO Unid 2.00
RIEGO DE LA ZONA DE TRABAJO POR CONTAMINACION DEL AIRE
12.02.00 km 1.00
(POLVO)
12.03.00 LIMPIEZA FINAL DE OBRA m2 1.00
OS ESPEJOS
DEPART : MOQUEGUA
PROV. : MARISCAL NIETO
DISTR. : MOQUEGUA
MEDIDAS
PARCIAL TOTAL
LARGO ANCHO ALTURA
156.00
8.00 5.00 40.00 40.00
14.00 8.00 112.00 112.00
2.00 2.00 4.00 4.00
12.00 2.40 28.80 28.80
1.20 24.00 28.80 28.80
1.00 1.00
1.00 1.00
1.00 1.00
5.89
0.90 0.90 0.30 0.24 0.24
0.90 0.90 0.20 4.86 4.86
AREA 0.05 0.30 0.78 0.78
33.21 33.21
1.05 0.15 1.50 28.35
1.20 1.20 0.15 6.48
0.60 0.60 0.15 -1.62
270.00 270.00
1.20 1.20 172.80
0.90 0.90 97.20
1,412.84
97.20
172.80
- - - 96.00 96.00
- - - 119.00 119.00
1.00 1.00
1.00 1.00
8.00 8.00
1.00 1.00
2.00 2.00
19.00 19.00
21.00 21.00
0.00 0.00
2.00 2.00
3/8=0.56