PMS Status Overview

Company TW Ship Management Pvt Ltd. User Deepesh Merchant Report Creation Date 11-May-2018

SSL DELHI

Mechanical Equipment / Engine / Propulsion


Class WI Activity Instruction ISM Number Job Interval Interval RH Due Date Department
Crit. Act. / Crit. Pro. MC Label Position Location Tag No. Brand Type Unit / Part Last OH Plan. Date Carried Out By
Overhaul Overhaul of exhaust valve and high-pressure pipe. 12,000 27-Feb-2018 Engine
Please refer also to the attached work instruction and service letter. Department
/ Main Engine Center B&W - Hyundai L70MC6 5 / Exhaust 07-Dec-2015 2nd Engineer
Valve
Overhaul 1. Settings adjustment if necessary 2. Cam adjustment if necessary 3. Top cover 8,000 23-Mar-2018 Engine
overhaul if necessary 4. Barrel assembly replacement if necessary 5. Shock absorber Department
check, overhaul if necessary 6. Lifting gear for roller guide check, overhaul if
necessary 7. Special running overhaul if necessary. Please refer also to the attached
work instruction.
/ Main Engine Center B&W - Hyundai L70MC6 4 / Fuel Pump 11-Oct-2016 2nd Engineer

Overhaul 1. Settings adjustment if necessary 2. Cam adjustment if necessary 3. Top cover 8,000 11-Mar-2018 Engine
overhaul if necessary 4. Barrel assembly replacement if necessary 5. Shock absorber Department
check, overhaul if necessary 6. Lifting gear for roller guide check, overhaul if
necessary 7. Special running overhaul if necessary. Please refer also to the attached
work instruction.
/ Main Engine Center B&W - Hyundai L70MC6 6 / Fuel Pump 21-Sep-2016 2nd Engineer

19-Apr-2011 36335_-1/45d7b850 1 / 1