Sie sind auf Seite 1von 4

Test data#

Scenarios 1. To test whether the job completes successfully without any issues

2. To test whether system date and tesco calendar date are set back to previous 6th day to
pull the rejected data from sr and mj

3. To test whether system date and tesco calendar date are set to current day for processing
wastage data

Date file#

Date file below has the combination of system date + tesco calendar date

Rejection data file#

Rejection data shown below has rejects falling on different dates


Successful completion of job

Sysout of job#
It is evident from test results that rejections falling beyond last 6th day (20170330) are not extracted for
recycling

Data written in SR rejects file#

if the wastage type code is 1 or 3 then such records are extracted to SR rejects file

Data written in MJ rejects file#

if the wastage type code is 2 then such records are extracted to MJ rejects file

Date file updation

From below snapshot it is inferred that system date and tesco calendar date are set to current day
Date setting functionality from huron transaction# ml360,ml365 running in ML005 job

Before execution of transaction below is the date set in MLK table

After execution of transaction below is the date set in MLK table (set as previous 6th day)

After extracting rejected records from mj and sr ML365 updates the date to current day as shown
below

Das könnte Ihnen auch gefallen