Excavation :
• Excavation competent person should lead the excavation
activities at all times.
• Competent person shall maintain daily checklist and shall lead
the excavation works.
• Prior starting work STARRT card meeting shall be conducted.
• Barricades minimum 1.8 mts from edge
• Sloping to angle of repose.
• Prior to dig, shall obtain a permit to dig permit.
• Shall ensure to check for underground or buried services.
• Continuous supervision shall be provided.
Chipping and breaking of concrete and loading / transportation of
debris_:
2
25252-000-GPP-GAM-00162 Construction ES&H Manual
required.
• Daily checklist is to be maintained.
• Appropriate PPE should be worn
• Ear muffs, dust mask, face shield are mandatory.
• Equipment should be operated by only trained operators.
• Regular training is required,
• Spill tray is to be provided for air compressor.
• Grounding to be given.
• “HIGH NOISE AREA “,” KEEP AWAY” Sign boards should
be placed.
• Regular intervals for operators.
• Rest shelter and cold water is to be provided.
• Hose should be properly connected, no air leakages.
• Capping exposed rebar.
• The dead concrete is to be transported in WHEEL BARROW
and dump in a temporary debris storage area.
• Daily the debris is to be cleared off from site through dump
truck and dump in the landfill area.
• To dump in landfill, land fill permit is required.
• Dump truck is to be inspected and regularly maintained.
• Pre task briefing and STARRT card to be addressed prior start of
job.
• Proper training is to be given to the operator.
• No overload of debris in wheel barrow.
• While chipping and breaking posture is to be maintained in safe
way.
• Tool box talk on topic “chipping hazards and safety precautions”
to be regularly conducted.
• The copy of waste disposal permit should be displayed in safety
office and one copy to be given to dump truck operator.
Saw cut for with exposing rebar 50 mm and saw cut for without exposing
rebar 25mm :
• Prior to start the job, STARRT card is to be maintained.
• Saw cutting equipment is to be inspected and colour coded.
Until and unless it is efficient for the job, should not use for job.
• Until and unless proper training is provided, no one is authorised
to run the saw cut machine.
• Set the blade depth of the circular saw
• Begin cutting at the edge of the concrete and slowly follow the
line marked.
_______ • Appropriate PPE must be worn. __________________________
• Never use defective tools and equipment.
• Spill tray is to be provided for all equipment using fuel.
• Engine turned off while refilling.
• The workers are segregated from live traffic with hard
barricades.
Rebar fixing:
• Provide adequate and suitable PPE.
• Bar bending is not allowed at site.
• Provide proper work platform
• Provide proper access.
3
25252-000-GPP-GAM-00162 Construction ES&H Manual
• Capping rebar to prevent impalement
• Prior to work STARRT card is maintained.
• All tools are regularly inspected and colour coded.
Form work :
• All the tools are regularly inspected.
• Conduct training on proper handling and lifting procedures
• Consider manual handling of when detailing size and length of
formwork.
• Seek assistance of awkward lifting.
• Area should be b arri caded.
• While making shuttering, make sure that no piece of wood is left
on the ground before leaving the site
• Nails should be removed from plywood immediately after
completing the job.
• After finishing the job, make sure that form material is collected
and stored in storage area.
• Use appropriate tools as blade guarded saws, guided saw line
table.
• Wear dust mask while cutting or furnishing wood.
• Wood dust is the hazardous to health.
Grout mixing:
• All tools and equipment are regularly inspected.
• Actually for less than 1sqmts area, grout mixing will be done by
power hand tool.
• The power hand tool must be operated by properly trained
worker.
• Appropriate PPE to be worn.
• There should be no spillage on the ground.
• The mixing proportion is to be checked thoroughly by the
supervisor.
• The grout material should not be overloaded in the bucket.
• Dust mask, face shield and disposal coverall must be worn.
• The power hand tool checklist is to be maintained on
__________ daily basis. _________________________________________
• While handling grout material or grout powder, rubber gloves,
dust mask and full handed coverall to be worn.
• There should be No spillage of grout.
• In STARRT card meeting, supervisor should address about the
hazards associated while grouting and the eye wash location.
• Spill kits are to be placed in storage areas.
• For more than 1sqmts area, mixer machine is used to mix the
grout.
• Properly trained operator should operate the mixer machine.
• While pouring grout powder inside the mixer machine, the
mixer machine should not be overloaded.
• On regular basis discuss about “ safe work practises while Grout
mixing “ in Tool box meeting
• Eye wash is to be installed.
• MSDS of grout powder is to be maintained in the worksite, a
copy in first aid room and one in safety office for reference.
4
25252-000-GPP-GAM-00162 Construction ES&H Manual
• Post signage and educate workers about chemical safety.
• After mixing the grout, the bags are to be collected and disposed
in the land fill dumping area, on daily basis.
Surface preparation :
5
25252-000-GPP-GAM-00162 Construction ES&H Manual
• Chemicals shall be stored separately with spill trays.
• Spill kit shall be kept on site.
Backfilling:
• Proper PPE shall be used.
• Restricted barriers or high visible line shall be marked from the
edge of the excavation.
• Area should be b arri caded.
• Nails should be removed from plywood immediately after
completing the job.
Operator training
requirements All tools and equipment inspected and colour coded with appropriate tag.
TUV certified boom truck operator.
Red man green man training to be conducted.
Risk assessments
applicable
yes
Emergency First aider and ambulance continuously rounding during working duration.
procedures Emergency contact numbers displayed.
Emergency equipment shall be made available on site.