PROCUREMENT, CONSTRUCTION AND COMMISSIONING SERVICES FOR ADHI GAS COMPRESSION PROJECT
Supply of Piping bulk material including Piping of different Dia Inches, Isolation Valves, Fittings etc. complete in all
A1.1 respect as per attachment Appendix 7.1 & According to technical requirement set forth in Detailed Engineering Design
Packages ITB Section-4 (Annexure-I / Part-II & Part-V)
A1
Supply, Fabrication, Pre-Commissioning, Commissioning , Installation 05 NOS Vent KO Drum at 05 Different Well Head
location (Adhi-05 / 14 / 15 / 17 & 18) as per technical requirement specified in Vent KO Drum Data Sheets (2390-PRO-
A1.2
DS-0011 / 2390-PRO-DS-0023 / 2390-PRO-DS-0038 / /2390-PRO-DS-0058 / 2390-PRO-DS-0071 ) and Project Technical
Specification ITB Section-4 (Annexure-I / Part-I, Part-II & Part-V)
Supply of Electrical & Instrumentation Items and bulk material as per attachment Appendix 7.2 & according to the
A1.3 requirement set forth in Detailed Engineering Design Documents, Drawings and Project Technical Specifications Refer to
ITB Section-4 (Annexure-I / Part-III).
NOTE: Quantities mentioned in Appended BOQs shall be essentially supplied by Contractor either Installed or Not.
Page 1 of 7
PROCUREMENT, CONSTRUCTION AND COMMISSIONING SERVICES FOR ADHI GAS COMPRESSION PROJECT
S.No DESCRIPTION Unit Quantity Unit Rate Amount Applicable Applicable Total Amount
(Pak Rs.)* inclusive all GST SST In (Pak Rs.)*
taxes & inclusive all
duties applicable
(except GST taxes & duties
& SST)
SUB TOTAL
CONSTRUCTION & INSTALLATION WORKS (LUMP SUM)
Fabrication, Installation, Erection, Testing of Off-Skid and installation, erection, testing of Inter Skid
Piping, Valves, and Fittings etc. for (05) different Nodal Compressor Packages as per Piping Layout
(2390PIP-PL-4802 / 2390-PIP-PL-4812 / 2390-PIP-PL-4822 / 2390-PIP-PL-4832 / 2390-PIP-PL-4842).
Works also include but not limited to Hydro testing, Testing, Radiography, Painting, Coating, Insulation etc.) JOB 05
B1.1
According to the requirement set forth in Detailed Engineering Design documents and drawings (2390-PIP-
ISO-4801~4820 / 2390-PIP-ISO-4831~4841 / 2390-PIP-ISO-4861~4871 / 2390-PIP-ISO-5101~5111 /
2390-PIP-ISO-5131~5147) and project Technical Specifications Refer to ITB Section-4 (Annexure-I /
Part-II & Part-V)
Installation, Erection, Hook Up of Compressor Package (Compressor, with Engine, Cooler, Slug Catcher,
and Blow Case etc.) as depicted in the package GA drawing (KCP101-K520-DWG-0001 / KCP101-
B1
K521DWG-0001 / KCP101-K522-DWG-0001 / KCP102-K523-DWG-0001 / KCP103-K524-DWG-0001).
B1.2 Works shall be carried out in strict compliance with Compressor Vendor advice/requirement and Company JOB 05
Safety
Guidelines and according to technical requirement of detailed Engineering Design Packages Refer to ITB
Section-4 (Annexure-I / Part-II & Part-V) Refer to ITB Section-4 (Annexure-I / Part-II & Part-V)
Installation, Erection & Hook Up of Vent K.O. Drum according to the requirement set forth in Detailed
B1.3 Engineering Design Documents, Drawings, Project Technical Specifications and Company Safety JOB 05
Guidelines Refer to ITB Section-4 (Annexure-I / Part-II & Part-V)
Construction and Installation of Earthing Materials with Earthing Cable, Pits, Bars & Other Accessories as
B1.4 per Earthing Layout (2390-EL-ELO-3402 / 2390-EL-ELO-3412 / 2390-EL-ELO-3422 / 2390-EL-ELO-3432 /
2390-EL-ELO-3442) at 05 Different NODAL Compressor Locations. According to technical requirement of JOB 05
detailed Engineering Design Packages Refer to ITB Section-4 (Annexure-I / Part-III )
Page 2 of 7
Installation, Testing, Glanding of Lighting with Lighting Fixtures, Light Poles, Pole JB, Cabling, Trenches,
Pole Foundation, Power connection & Other Accessories complete in all aspects as covered in lighting
S.No DESCRIPTION Unit Quantity Unit Rate Amount Applicable Applicable Total Amount
(Pak Rs.)* inclusive all GST SST In (Pak Rs.)*
taxes & inclusive all
duties applicable
(except GST taxes & duties
& SST)
Installation, testing and commissioning of Generator set, skid as per manufacturer provided literature
including Electric Control panels and all accessories such as batteries, engine controller, terminal box etc.
B1.6 (Installation include all internal wiring complete in all respect). Intermittent Generator 30 KW Complete in JOB 05
all aspect under Vendor supervision at 05 Different Locations (Wellhead Tk-05, Tk-14, Tk-15, Tk-17, Tk-
18). Please Refer to ITB Section-4 (Annexure-I)
Installation, testing and Commissioning of Solar Panels with Cables, Batteries Connection, Charge
Controllers, Invertors, Structures stand with Battery Room & all other Accessories Complete in all aspect
B1.7 JOB 05
under Vendor supervision at 05 Different NODAL Compressor Locations. Refer to ITB Section-4
(Annexure-I / Part-III)
Installation, testing and Commissioning & Mounting of Lightning Arrestors with cabling and proper
B1.8 Grounding connection & other Accessories Complete in all aspect under Vendor supervision at 05 Different JOB 05
NODAL Compressor Locations. Refer to ITB Section-4 (Annexure-I / Part-III)
Power Cables Installation for Bridle heat tracing, Utilities, Panels & Startup Pumps, this include Cable
laying in trenches, Glanding, Loop & break Testing & all other accessories Complete in all aspect under
B1.9 JOB 05
Vendor supervision at 05 Different NODAL Compressor Locations. Refer to ITB Section-4 (Annexure-I/
Part-III)
Installation, testing and Commissioning of 11KVA UPS System along with Cabling, Terminations all other
B1.10 accessories Complete in all aspect under Vendor supervision at Adhi Plant. Refer to ITB Section-4 JOB 01
(Annexure-I)
Installation, testing and Commissioning of Pressure Gauges 0-2500Psig, Dial size 160 mm St. St Case
Pipes/ Vessels/ Tanks with Manifold Valves & All other Accessories Complete in all aspect at 05 Different
B1.11 Nos 36
NODAL Compressor Locations (Wellhead Tk-05, Tk-14, Tk-15, Tk-17, Tk-18). Refer to ITB Section-4
(Annexure-I / Part-III )
Installation, testing and Commissioning of Temperature Gauges(Ranges Varies), Dial size 160 mm St. St
B1.12 Case on Pipes/ Vessels with All other Accessories Complete in all aspect at 05 Different Locations Nos 18
(Wellhead Tk-05, Tk-14, Tk-15, Tk-17, Tk-18). Refer to ITB Section-4 (Annexure-I / Part-III )
Page 3 of 7
Installation, testing and Commissioning Level gauges on Vessels/ Tanks with All other Accessories
B1.13 Complete in all aspect at 05 Different NODAL Compressor Locations. Refer to ITB Section-4 (Annexure-I Nos 05
/ Part-III )
Installation , checking, Loop checking, testing and Commissioning of Instrument Cables for Digital
B1.14 meter 800
Inputs/Digital Outputs from Compressor station Control System to WHCP 20 Core 2.5mm2
S.No DESCRIPTION Unit Quantity Unit Rate Amount Applicable Applicable Total Amount
(Pak Rs.)* inclusive all GST SST In (Pak Rs.)*
taxes & inclusive all
duties applicable
(except GST taxes & duties
& SST)
Cu/PVC/SWA/PVC Direct Burried along with Suitable Cable glands for both ends at 05 Different NODAL
Compressor Locations. Refer to ITB Section-4 (Annexure-I / Part-III )
Installation , testing and Commissioning of Complete SCADA/Telemetry System with Modem, Antenna,
Pole at wellhead, Antenna at Plant site, EWS and OWS, Printers, Power supplies installation with Software
B1.15 installation, Fiber Optic and Communication cable laying Converters, Cabling, Cable Laying, Trenches & all JOB 05
Other Accessories Complete in all aspect under Vendor supervision at 05 Different NODAL Compressor
Locations. Refer to ITB Section-4 (Annexure-I / Part-III )
Installation, testing and Commissioning of Fire & Gas Detectors with Pole, Testing, Checking & Calibration
B1.16 of Detectors with Cable Laying/Terminations & all other Accessories Complete in all aspect under Vendor
supervision at 05 Different Locations. Refer to ITB Section-4 (Annexure-I / Part-III ) JOB 05
Civil Construction and Steel Structural works for below listed items including supply of outsource soil (for
engineered fill, sand fill, stone solling), cement, aggregates (fine & coarse), fresh water, formworks, steel
B1.17 reinforcement, non-shrinkage EPOXY grout, bitumen for coating, steel embedded parts (lugs,anchor bolts,
hilti bolts, Ms plates, grating, checquered plates), brick masonry, steel structures as per referred drawings.
Installation and construction of structural & civil works including excavation, dewattering, levelling, grading,
laying of filling material(engineered fill, sand fill, stone solling), disposal of excess material, compaction
upto the desired density, formwork fixing, steel reinforcement(cutting, fixing), PCC & RCC works (mixing,
pouring,curing), grouting, fabrication & installation of steel embedded parts, fabrication & installation of
steel structure (lifting, shifting ,painting & erection) at five different wellhead location. All the material &
construction works shall be in compliance with project drawings & technical requirement of detailed
Engineering Design Packages Refer to ITB Section-4 (Annexure-I / Part-IV ).
Following items to be considered
Compressor Package foundation at 05 different well head location (Adhi-05 / 14 / 15 / 17 & 18) as per
B1.17.1 detailed engineering design drawings and Project Technical Specification ITB Section-4 (Annexure-I /
Part IV & Part-V ). JOB 05
Page 4 of 7
Pipe sleepers & Pipe support of Compressor Package Off-skid / Inter-skid piping at 05 Nodal Compressor
B1.17.2 Location (Adhi-05 / 14 / 15 / 17 & 18) as per Pipe Support Off-skid Layouts (2390-CIV-LO-6101 / 2390CIV-
LO-6151 / 2390-CIV-LO-6201 / 2390-CIV-LO-6251 / 2390-CIV-LO-6301) , Pipe Support schedule index
Off-skid (2390-CIV-DT-6101/6102/6151/6152/6201/6202/6251/252/6301/6302) and Project Technical JOB 05
Specification ITB Section-4 (Annexure-I / Part IV & Part-V ).
Construction works with supply of all material for Piping Crossover foundations at 05 different well head Nos 06
B1.17.3
S.No DESCRIPTION Unit Quantity Unit Rate Amount Applicable Applicable Total Amount
(Pak Rs.)* inclusive all GST SST In (Pak Rs.)*
taxes & inclusive all
duties applicable
(except GST taxes & duties
& SST)
location (Adhi-05 / 14 / 15 / 17 & 18) as per drawings (2390-CIV-DT-6103 / 6153/ 6203/ 6253 /6303) and
project technical requirement and specification refer to ITB Section-4 (Annexure-I / Part IV & Part-V ).
Construction works with supply of all material for Light Pole Civil foundations at 05 different well head
B1.17.4 location (Adhi-05 / 14 / 15 / 17 & 18) as per drawings (2390-CIV-DT-6107/6157/6207/6257/6307) and
Nos
project technical requirement and specification refer to ITB Section-4 (Annexure-I / Part IV & Part-V ).
15
Civil foundation of Flare knockout drum at 05 different well head location (Adhi-05 / 14 / 15 / 17 & 18) as
per drawings (2390-CIV-DT-6106 / 2390-CIV-DT-6156 / 2390-CIV-DT-6206 / 2390-CIV-DT-6256 /
B1.17.5 2390CIV-DT-6306) and project technical requirement and specification ITB Section-4 (Annexure-I / Part Nos 05
IV & Part-V ).
Civil construction works associated with the construction of Drain pit at 05 Different Well Head location
(Adhi-05 / 14 / 15 / 17 & 18) as per drawings (2390-CIV-DT-6105 / 2390-CIV-DT-6155 / 2390-CIV-DT6205
B1.17.6
/ 2390-CIV-DT-6255 / 2390-CIV-DT-6305) and project technical requirement and specification refer to ITB Nos 05
Section-4 (Annexure-I / Part IV & Part-V ).
Vent structure foundation at 05 Different Well Head location (Adhi-05 / 14 / 15 / 17 & 18) as per drawings
(2390-CIV-DT-6104 / 2390-CIV-DT-6154 / 2390-CIV-DT-6204 / 2390-CIV-DT-6254 / 2390-CIV-DT-6304)
B1.17.7 and project technical requirement and specification refer to ITB Section-4 (Annexure-I / Part IV & Part-V). Nos 05
Supply, fabrication & installation of steel embedded parts, fabrication & installation of steel structure (lifting,
shifting ,painting & erection) of Compressor package shed with Mechanical Crane at 05 Different Well
B1.17.8 Head location (Adhi-05 / 14 / 15 / 17 & 18) as per drawings (2390-CIV-ST-6101 / 2390-CIV-ST-6151 /
2390-CIV-ST-6201 / 2390-CIV-ST-6251 / 2390-CIV-ST-6301) and project technical requirement and Nos 05
specification refer to ITB Section-4 (Annexure-I / Part IV & Part-V ).
Generator foundation at 05 Different Well Head location (Adhi-05 / 14 / 15 / 17 & 18) as per drawing and
B1.17.9 Project Technical Specification ITB Section-4 (Annexure-I / Part IV & Part-V ). Nos 05
Page 5 of 7
Pre-commissioning & commissioning activities for (05) different NODAL Compressor at (Adhi-05 / 14 / 15 /
17 & 18) , including all operations such as, but not limited to, verification that the installation conforms to
plans, specifications and approved drawings, testing and operation of all equipment, flushing and
hydrotesting of all pipings, nitrogen purging and system leak test with process gas, calibration of
B2 B2.1 instruments, functional testing of instrumentation and control system, electrical equipment and systems,
JOB 05
F&G, etc. according to the requirement set forth in Scope of work “ITB section 4 clause 7.0” & Detailed
Engineering Design Package.
S.No DESCRIPTION Unit Quantity Unit Rate Amount Applicable Applicable Total Amount
(Pak Rs.)* inclusive all GST SST In (Pak Rs.)*
taxes & inclusive all
duties applicable
(except GST taxes & duties
& SST)
B2.2 Total Amount ( B1.1 to B2.1 ) in PKR
NOTES:
1. The cost should include all inter connections between Units / Systems and Tie-ins with existing facilities..
2. The Supply of local equipment and material items on ex project site delivery basis.
3. All payments are subject to deduction of applicable taxes.
4. All contingent and incidental material and works must be included in the relevant item in this Price Table to ensure completeness of the PROJECT. The prices above are deemed to be full and final for the
entire scope of work inclusive of incidental and contingent Works
5. The payment terms, milestone payment schedule and bid price schedule are only for payment and not for the scope of work. Any item needed for completing the facility and not listed in ITB are to be provided
by the CONTRACTOR within the CONTRACT PRICE
6. Price against item B1.1 and B2.1 to be quoted on Lump Sum basis.
7. Quantities may increase OR decrease due to any reason. Payment to contractor shall be made as per Actual work done at site...
Page 6 of 7
PROCUREMENT, CONSTRUCTION AND COMMISSIONING SERVICES FOR ADHI GAS COMPRESSION PROJECT
NOTE: Payment to contractor shall be made as per Actual work done at site
Page 7 of 7
PROJECT: ADHI GAS FIELD COMPRESSION PROJECT
PROJECT NO: 2390
(APPENDIX - 7.1)
UNIT
TOTAL TOTAL
SR # ITEM DESCRIPTION UNIT SPEC RATES REMARKS
Qty. (Pak. Rs.)
(Pak. Rs)
1.0 PIPE:
UNIT
TOTAL TOTAL
SR # ITEM DESCRIPTION UNIT SPEC RATES REMARKS
Qty. (Pak. Rs.)
(Pak. Rs)
6.0 REDUCER :
7.0 WELDOLET:
8.0 SOCKOLET:
UNIT
TOTAL TOTAL
SR # ITEM DESCRIPTION UNIT SPEC RATES REMARKS
Qty. (Pak. Rs.)
(Pak. Rs)
UNIT
TOTAL TOTAL
SR # ITEM DESCRIPTION UNIT SPEC RATES REMARKS
Qty. (Pak. Rs.)
(Pak. Rs)
13.0 FLANGES:
UNIT
TOTAL TOTAL
SR # ITEM DESCRIPTION UNIT SPEC RATES REMARKS
Qty. (Pak. Rs.)
(Pak. Rs)
Flange Blind, 150#, RF, as per ASME B16.5, Material:
13.9 ASTM A-105
14.0 GASKETS:
UNIT
TOTAL TOTAL
SR # ITEM DESCRIPTION UNIT SPEC RATES REMARKS
Qty. (Pak. Rs.)
(Pak. Rs)
15.0 STUDS/NUTS:
i Dia. 3/4"
Nos. - 52
UNIT
TOTAL TOTAL
SR # ITEM DESCRIPTION UNIT SPEC RATES REMARKS
Qty. (Pak. Rs.)
(Pak. Rs)
TOTAL(Pak. Rs.)
NOTE:
1 This BOQ also includes piping detail for Knock Out drum and Drain Pit
2 All material shall comply with NACE MR-0175 requirement.
PROJECT: ADHI GAS FIELD COMPRESSION PROJECT
PROJECT NO: 2390
BILL OF QUANTITES
(APPENDIX - 7.1.1)
1.2 Mechanical bolt up complete in all respect as per flange 150# 300# 600# 900#
rating requirements:
i Dia. 10" m 15
ii Dia. 8" m 75
iv Dia. 4" m 20
v Dia. 3" m 15
vi Dia. 2 1/2" m 5
ix Dia. 1" m 8
x Dia. 3/4" m 13
xi Dia. 1/2" m 5
i Dia. 10" m 15
ii Dia. 8" m 75
iv Dia. 4" m 20
v Dia. 3" m 15
ADHI GAS FIELD COMPRESSION PROJECTS
BILL OF QUANTITIES FOR
Fabrication, Installation & Erection For Additional Mechanical Works
vi Dia. 2 1/2" m 5
ix Dia. 1" m 8
x Dia. 3/4" m 13
xi Dia. 1/2" m 5
Surface to be Paint: Carbon Steel and Low Temperature Refer to Specifiction for
Carbon Steel. Works include supply of all material, Painting.
application of painting system, surface preparation to
S.A. 2.5 and apply of pre-primer coat ,Primer coat &
4.1 Final Coat as per relevant specification & Client
requirement.
TOTAL (PKR)
PROJECT: ADHI GAS FIELD COMPRESSION PROJECT
PROJECT NO: 2390
BILL OF QUANTITES
(APPNEDIX-7.2)
1 ELECTRICAL SUPPLY
Supply of Earthing Materiails with Earthing Cablec, Pits, Bars & Other
Accessories Complete in all aspect.
Refer Dwg #
2390-EL-ELO-3402
2390-EL-ELO-3412 Job 5
2390-EL-ELO-3422
2390-EL-ELO-3432
2390-EL-ELO-3442
Supply of 70 mm² bare stranded Copper conductor. (For Pit to Bar & Light Pole) Mtr. 1500
25
Supply of Cable Crimp Connector ('C' Type) - 70mm² - 70mm². Nos. Approx.
50
Supply of Cable Crimp Connector ('C' Type) - 35mm² - 35mm². Nos. Approx.
75
Supply of Tin Copper Earthing Lugs for 70mm². Nos. Approx
150
Supply of Tin Copper Earthing Lugs for 35mm². Nos. Approx
Supply of 25mm dia 03m length Copper Clad Steel Earth Rod. Nos. 37
Supply of Lighting with Lighting Fixtures, Light Poles, Pole JB, Cabling,
Trenches, Pole Foundation, Power connection & Other Asscessories
Complete in all aspect.
Refer Dwg #
2390-EL-ELO-3403 Job 5
2390-EL-ELO-3413
2390-EL-ELO-3423
2390-EL-ELO-3433
2390-EL-ELO-3443
Supply of Two step lighting pole (1250 mm length , 175mm dia of bottom end
step and 8750mm 120mm dia of fixture end step with 6" x 4" reducer b/w steps Nos. 20
)Steel hot dip galvanized height 10m round pole.
Supply of Explosion Proof Flood Lighting Fixtures type Suitable for Zone 2,
complete with 250W LED & all accessories such as 240V, 50Hz, P.F
Nos. 65
improvement capacitor and all installation material By Crouse-Hinds Australia
or equivalent.
Supply Of Explosion Proof 40A, 550V junction box for pole mounted lighting
fixtures Whitworth Rochdale make GB-5103-1221/2090 or
Nos. 20
equivalent.Enclosure With 12 Nos. Terminals For 2.5 Sq. mm. Cable Cores
Alongwith Standard Earthing Rail.
M25 No. 60
M20 No. 60
3 INSTRUMENTATION SUPPLY
Supply of Level Gauge glass on Vessels/ Tanks with All other Accessories
3.2 No. 5
Complete in all aspect.
NOTES:
CONTRACTOR shall carry out all the tests required for the cables before procurement that shall include, Insulation Tests of all the cables, Continuity check,
1
cable resistance etc. Results of such tests shall be documented and a certificate shall be issued.
PROJECT: ADHI GAS FIELD COMPRESSION PROJECT
PROJECT NO: 2390
(APPNEDIX-7.2.1)
DATE 21/11/2017
ELECTRICAL, INSTRUMENTATION ADDITIONAL WORKS FOR SUPPLY & INSTALLATION (UNIT RATE)
TOTAL
S.NO. DESCRIPTION UNIT QUANTITY UNIT RATE PRICE REMARKS
Supply and Construction of Earthing Pit along with Earthing material as per
3 Typical Drawing # 2390-ELE-DT-3404 Complete in all aspects. No. 5
Laying of Electrical Power cable upto 75 Sq.mm on Cable trays / ladder and
burried complete along with excavation , backfilling, supply of back fill
6 material, supply and application of tiles & markers. Mtr 50
Installation of Earthing Materials with Earthing Cables, Pits, Bars & Other
13 No. 5
Accessories Complete in all aspect under Vendor supervision.
Supply of Flame Detector Pole with all accessories as per Typical Drawing #
3 No. 5
2390-INS-TYP-3421.
Supply of Gas Detector Pole with all accessories as per Typical Drawing #
4 No. 5
2390-INS-TYP-3422.
19 Installation of Cable trays / cable ladder complete with supports 150x 100 mm Mtr 50
Installation of Flame Detector with Pole along with Civil Works Complete in all
20 No. 20
aspects.
Laying, Termination, Glanding, Loop checking of Multi core cable for Fire
detector Burried, complete along with excavation, backfilling, supply of back
21 fill material, supply and application of tiles & markers. Mtr 100
Installation of Gas Detector with Pole along with Civil Works Complete in all
22 No. 60
aspects.
Laying, Termination, Glanding, Loop checking of Multi core cable for Gas
detector Burried cable, complete along with excavation, backfilling, supply of
23 back fill material, supply and application of tiles & markers. Mtr 500
NOTES:
1 All the work shall be in accordance with Installation and Testing Specification.
CONTRACTOR shall carry out all the tests required for the cables that shall include, Insulation Tests of all the cables, Continuity check, cable resistance etc.
2
Results of such tests shall be documented and a certificate shall be issued.
PROJECT: ADHI GAS FIELD COMPRESSION PROJECT
PROJECT NO: 2390
(APPENDIX - 7.3.1)
Site clearance including sub-gade prepration, leveling, grading and compaction to achieve 95%
of maximum dry density (Proctor's value) in accordance with drawings, specification and
300 m2
Engineer's instruction and approval, including tranportation/ disposal of surplus materials.
2.0 EXCAVATION
Excavation for all type of foundations in all kinds of soil, dry or wet, hard or soft, including
dewatering of ground water, if present before or after excavation, using mechanical pumps, and
allowing proper drainage system and disposal of water by proper means of transportation with the
help of water tankers to nearest disposal site, disposal of excavated material ,earth breaking
clods, dressing, watering and consolidating by ramming in layers not exceeding 150mm depth to 220 m3 -
obtain 98% modified AASHTO desnity including lifting, shiting or as per instruction and
specification of the consultant and approval of client (Site Engineer). Contractor will carryout
compaction test as per specification with out any extra cost.
3.0 BACKFILLING
Backfilling from selected excavated materials (witin state limits or from stockpile as designated
place by engineer) lay in layers not exceeding to 150mm, including loading, unloading, spreading
and compaction as per required in specifications, filling to embankments /general any type
160 m3
structural and areas developing filling with suitable excavated material / stockpile , debris etc.
Works complete in all respect, as per drawings specifications and as directed by the Engineer.
Supply & laying Engineered filling to minimize the risk of settlement and improve the ground for
heavily loaded footings, replacement of the top 2 m of weaker material below NGL with an
engineered fill, compacted in layers no greater than 250 mm loose thickness and uniformly
compacted to the minimum dry density of 98% Standard Compaction for cohesive soils and 100%
Standard of granular material is to be used ( i.e. Sand, Crushstone, Gravel ), an additional filling
of 1 to 1.2 m of the same material will be placed on top of 2 m replaced filling to achieve FGL.
100 m3 -
Including loading, unloading, spreading, compaction, watering and consolidation as per required
in specifications. Works complete in all respect, as per drawings specifications and as directed by
the Engineer.Materials should be compacted at a placement moisture content of +/- 2% of
Standard optimum moisture content. Care should be taken not to over compact or place clayey
filling too dry of Standard optimum to minimise the effects of post construction s
Supply and filling earthfill and consolidating by ramming in layers not exceeding 200mm thick to
obtain 95% modified AASHTO density.The filling material shall be coarse sand from approved
source with maximum aggregate size not exceeding 10mm and according to specification, 100 m3 -
including all lead and lift and carrying out field density tests, modified proctor tests as per
instructions and specifications of the Consultant and approval of Client (Site Engineer).
Supply and laying Plain cement concrete of specified strength for blinding work using approved
quality 3/4" max. size graded crushed aggregate & fine aggregate of required properties
including approved Steel formwork & its removal, all operations of vibrating, levelling,
compacting and curing etc. complete as per specification & instruction of the Consultant.
Note:
1. Sulphate resistant cement should be used for all works.
2. Mix design for each type of sample will be provided by the Contractor
6.1 PCC 1:4:8 (1 cement 4 sand and 8 coarse aggregate) 30 m3 -
6.2 PCC 1:3:6 (1 cement 3 sand and 6 coarse aggregate) 30 m3 -
Supply and laying Reinforced cement concrete shall be developed 28 days work cubical strength
of 3000psi, using approved quality 3/4" max. size graded crushed aggregate & fine aggregate
including approved form work & its removal, all operations of vibrating, levelling, compacting and
curing etc complete but excluding the cost of steel as per specification & instruction of the
Consultant.To confirm the desired work cubical strength 3000Psi (minimum) at 28days(3+3
75 m3 -
minimum at 7 and 28 days) cube tests with (6" × 6" × 6") cube size will be carried out by contractor
from approved laboratory.
Note:
1. Sulphate resistant cement should be used for all concrete works.
2. Mix design for each type of sample will be provided by the Contractor
Supply, fabricating and fixing of steel embedded parts in concrete such as M.S plates, Anchor
bolts for all equipment skidsAnchor lugs, MS Rungs, Angles, Bolts with double nuts and washer
1 Tons -
etc. Material for Base Plates, Embedded plates/template shall be ASTM A-36. Complete as per
drawings, specifications and approval of Client (Site Engineer).
Supply & Installation of steel structure for sheds solar panels,pipe racks,cross overs,pipe supports
etc.the scope of work includes Supply,fabrication,painting,erection,surface preparation of steel
25 Ton
structure etc.complete in all respect as per drawing,instruction and specification of the Consultant
and approval of client.
PAKISTAN PETROLEUM LIMITED
ADHI GAS FIELD COMPRESSION PROJECT
Supply & filling of sand for foundations and consolidating by ramming in layers not exceeding
150mm thick to obtain 95% modified AASHTO density.The infilling material with in the RCC ring
wall shall be coarse sand from approved source with maximum aggregate size not exceeding
35 m2 -
10mm and according to specification, including all lead and lift and carrying out field density tests,
modified proctor tests as per instructions and specifications of the Consultant and approval of
Client (Site Engineer).
Supply and laying HDPE geomembrane for foundations and evaporation ponds with polylocks
and extrusion weld as per drawing, instruction and specification of the Consultant and approval 30 m2 -
of Client ( Site Engineer).
Supply & Laying 1200 micron thick 10/20 grade of bitumen for founadtions & buildings after two
coat of primer outside foundation upto finished ground level to sides of footings including cost of
85 m2 -
all material,labour,equipment etc complete as per drawing and specification and as directed by
the Engineer Incharge.
Supply & filling of gravel in foundations and consolidating by ramming in layers not exceeding
150mm thick as per instructions and specifications of the Consultant and approval of Client (Site 60 m3 -
Engineer).
Supply & Fixing 2" dia UPVC pipes for leak detectiion in foundations as per drawing, instruction 30 RM -
and specification of the Consultant and approval of Client ( Site Engineer).
Supply and laying 150mm thick sub base granular aggregate in roads compacted upto max dry
density 98% AASHTO. Complete in all respect as per drawing, instruction and specification of the 500 m2 -
Consultant and approval of Client ( Site Engineer).
Supply and laying 150mm thick crushed stone base course in roads compacted upto max dry
density 98% AASHTO. Complete in all respect as per drawing, instruction and specification of the 500 m2 -
Consultant and approval of Client ( Site Engineer).
19.0 ASPHALT WEARING COURSE
Supply and laying 75mm thick asphalt wearing course in two layer over prime coat layer.
Complete in all respect as per drawing, instruction and specification of the Consultant and 500 m2 -
approval of Client ( Site Engineer).
Supply and laying prime coat over base course. Complete in all respect as per drawing, instruction 500 m2 -
and specification of the Consultant and approval of Client ( Site Engineer).
Supply and laying 1/2in thick seal coat over wearing course. Complete in all respect as per
drawing, instruction and specification of the Consultant and approval of Client ( Site Engineer). 500 m2 -
Supply and laying tack coat on shoulders. Complete in all respect as per drawing, instruction and 500 m2 -
specification of the Consultant and approval of Client ( Site Engineer).
Supply and laying 75mm thick gravel chipping over tack coat on shoulders. Complete in all respect
as per drawing, instruction and specification of the Consultant and approval of Client ( Site 300 m2 -
Engineer).
24.0 PLASTERING
Supply & applying smooth 25mm thk. water proofing pudlo cement plaster to all internal/external
faces of brick masonary, including making champhered edges, corners at junctions recesses &
900 m2 -
racking- out-joints & curing complete i/c cost of scaffolding etc. as per specification & instruction
of the Consultant and approval of Client ( Site Engineer).
Providing and laying stone soling 6" (150 mm) thick of approved quality including hand packing
vertically and filling voids with spawels, consolidating and compacting with mechanical means, as
800 m2 -
per drawings and as per instruction and specification of the Consultant and approval Client (Site
Engineer).
Providing all type of building construction material including construction of grey structure and
finishes work as per specification & instruction of the Consultant and approval of Client ( Site 200 m2
Engineer).
27.0 PAINTS
Providing & applying three coats of vinyl emulsion paint, over a coat of priming to internal/ external
surfaces horizontal/ vertical, rubbing smooth with carborandam stone, filling the depressions with
putty, applying three coats of Deluxe, ICI or Berger of approved shade & colour to the wall, 750 m2
columns, coved, ceiling & projections of slab/chajja etc as per specification & instruction of the
Consultant and approval of Client ( Site Engineer).
28.0 DOORS
Providing, laying and fixing in position 1-1/2" thick solid commercial ply single shutter wooden
flush door with 3/8" thick best quality wooden lipping all around the shutter, providing, making and
fixing 2" thick deodar wooden frame as layed at wall opening with 6 no. hold fasts cement in 1:4
cement mortor . Providing and laying 2" x 1/2" thick architrave / beading in approved quality wood
& design, providing, laying and fixing approved quality hinges, screws, tower bolts, handles, door
lock, door stoper and necessary hardwares complete in all respect as per specification &
instruction of the Consultant and approval of Client ( Site Engineer).
Providing and fixing in position aluminium glazed windows with bronze anodized aluminium
framing as per British standard manufactured by Lucky, Alcop, Krudson, Pakistan Cables and
A.C.P (fixing through their approved fabricators) Box section, double glazed 101.6mm x 44.5 mm
and 2mm thick including the aluminium fittings with all accessories cutting holes etc. fixing and
cost of first class Belgium made 5 mm thick wire mesh glass complete as per drawings, as per
instruction and specification of the Consultant.
29.1 4'-0" X 4'-0" Aluminium glazed window 30 NO
Providing and laying 2" thick cc screed. finished smooth proper straight joints complete in all
respect as per drawings, specification & instruction of the Consultant and approval of Client ( Site 700 m2
Engineer)..
Providing and laying Glazed Ceramic Tiles of approved quality and shades ( Shabbir or Master )
on walls and floors as shown on drawings including preparation and laying of base plaster and
base floor in 1:4 cement sand mortar, over previously constructed walls & floor, complete in all 100 m2
respect as per drawings and as per instruction and specification of the consultant and approval of
client.
Supply and laying 6in thick good quality burnt bricks having standard size set in 1:6 (1 cement
and 6 sand ) cement sand mortor as per instruction and specification of the consultant and
400 m2
approval of
Client (Site Engineer).
Supply and laying 150mm thick stone pitching set in 1:6 cement sand mortar of approved material
including hand packing and filling voids, consolidating and compacting with mechanical means,
600 m2
as per drawings, specification of the Consultant, instruction and approval of Client (site Engineer).
35.0 PAVERS
Supply and laying 80mm thick good quality pavers including joint filling fine sand to fill the gaps
as per drawing, instruction and specification of the Consultant and approval of Client ( Site 600 m2
Engineer).
Supply and fixing MS pipe sleeves with leak proof sealant complete in all respect and to the entire
satisfaction of Engineer incharge. The work includes supply and installation as per drawings,
15 RM
instruction and specification of the Consultant and approval of Client ( Site Engineer).
Supply, Installation ,testing and commissioning of Building electrification items including lighting
fixtures, Air Conditioners, Switch Sockets, JBs, Circuit Breakers, Fuses, internal wiring, PVC
10 No.s
Conduit, PVC Channels, clamps, and all accessories required for complete electrification of
building.
NOTE: