Sie sind auf Seite 1von 14

इंटरनेट मानक

Disclosure to Promote the Right To Information


Whereas the Parliament of India has set out to provide a practical regime of right to
information for citizens to secure access to information under the control of public authorities,
in order to promote transparency and accountability in the working of every public authority,
and whereas the attached publication of the Bureau of Indian Standards is of particular interest
to the public, particularly disadvantaged communities and those engaged in the pursuit of
education and knowledge, the attached public safety standard is made available to promote the
timely dissemination of this information in an accurate manner to the public.

“जान1 का अ+धकार, जी1 का अ+धकार” “प0रा1 को छोड न' 5 तरफ”


Mazdoor Kisan Shakti Sangathan Jawaharlal Nehru
“The Right to Information, The Right to Live” “Step Out From the Old to the New”

IS 11209 (1985): mould assembly for determination of


permeability of soils [CED 43: Soil and Foundation
Engineering]

“!ान $ एक न' भारत का +नम-ण”


Satyanarayan Gangaram Pitroda
“Invent a New India Using Knowledge”

“!ान एक ऐसा खजाना > जो कभी च0राया नहB जा सकता ह”


है”

Bhartṛhari—Nītiśatakam
“Knowledge is such a treasure which cannot be stolen”
( Reaffirmed 2006 )
IS:11209 - 198!5

Indian Standard
SPECIFICATION FOR
MOULD ASSEMBLY FOR DETERMINATION OF
PERMEABILITY OF SOILS

Soil Engineering Sectional Committee, BDC 23

RePresenting
Ccntrd Building Research Institute ( CSIR ),
Roox kee

University of Jodhpur, Jodhpur


Engineering Research Laboratories, Government
of Andhra Pradesh, Hydcrabad
Irription Ikpartmcnt, Government of Punjab,
Chandigarh
DIr,ECTOK ( L)AM ) ( iih,Z&? )
SIIJtr c. s. DAItKE: Howe ( India ) Pvt Ltd, New Delhi
SJIIII G. V. MCILTIIY ( il~ternntc)
Sll1{1 A. (;. I),\S’J’IJ>AK In pcrsouxl capacity ( 5 liun,prford Court, 12/l,
Hwpfird Street, Calcutta )
Dlic~cwoi~ ( D&QPC ) Public Works I)epartment, Government of Uttar
Pradesh, Lucknow
DI~YIITY DII:X~~OIL ( B&SD ) ( Mer,,afe )
l)rltncwJlc, 11~1 Irrigation Department, Government of Uttar
Pradesh, Roorkre
Su~tr A. II. DIVAN.IT &ia Foundations and Construction ( I’) Ltd,
Bombay
SJCJ~IA. N. JAKGLIC ( &~ertza~e)
DIILICLTOIL Central Soil & Materials Research Station,
New Delhi
hPUTY 111 ,lJ!X:T”,(. ( rih,lnte )
Dn Gora~ RAN.TAN University of Roorkce, Roorkey; and Institute of
I*;nginecvs ( India ), Calcutta
SJillI S. SUIT,, Ccmindia Company I.imited, Bombay
SIIItI N. v. I~)JC-Sum.4 ( fll/ernUtc )
SHIIT M. II-ENQAI(. Enginrcrs India Limited, New Delhi
SttJL1 ASJlOli l<.,jAIN G. S. Jain and .4ssociatrs, New Delhi
SJrJtr VIJAY I<. JOIN ( Allernu~e)

6 Copyright 198.5
INDIAN STANDARDS INS’IT’IYJ’IlON
T!lir inlblication is protected under the Ir.ffian Co&righ/ rlcl ! XIV of 1!)57 ) and
reproduction in whulc or in part by any nl(~ls cxcc’pt with writtrln permissiun of the
publisher shall be dcemr,d to bc an iuiiing:cmcnt of copyright under the said Act.
I$ : 11209 - 1985

( Continued from page 11


Members Representing
JOINT DlRECWR RESEARCH Ministry of Railways
( GE )-I, RDSO
JOINT DII~ECTOR RESEARCII
( GE )-II RDSO ( Alternnte )
SIIRI A. V. S. R. MUXTY Indian Geotechnical Society, New Delhi
SHRI D. R. NAXAHARJ Cent;o~r~e;ilding Research Institute ( CSIR ),

SHRI T. K. NATI~AJAN Central Road Rcsearcb Institute ( CSIR ),


New Delhi
SHXI RANJIT SINOH Ministry of Dcfence ( R&D
)
S~rrr V. B. GHORPADE ( Alternate 1
\
Dn G. V. RAO indian Institute of Technology, New Delhi
Dn 1~. K. GUPTA ( Alternate )
RIWEARCII OFFICER ( B&RRL ) Public Works Department, Government of
Punjab, Chandigarh
SICCRICTARY Central Board of Irrigation and Power, New Delhi
DIIIEOTOII ( C ) ( Bhrrrate )
S~ttr N. SIVAUUI~LJ Roads Wing ( Ministry of Shipping and Trans-
port ), New Delhi
SIII~I I.J. TAYAR~DI f Alternate j
National Buildings Organization, New Delhi

Jadavpur University. Calcutta


Karnataka Engineering Research Station, Krish-
narajasagar
Ministry of Dcfcncc ( Engineer-iI1-Chief’s Branch )

Public Works Department, Government of Tamil


Nadu, Madras

( Allentale )
SHRI 11. c. VEIiMA All India Instrument Manufacturers’ and Dealers
Association, Bombay
SJTILIII. K. GUIIA ( Allemote)
SHIZI G. RAMAN, Director General, IS1 ( Ex-oS;cio i\lember )
Director ( Civ Engg )

SHRI K. M. MATHVR
Senior Deputy Director ( Civ Engg), IS1

Soil Testing Instruments and Equipment Subcommiltce, UDC 23 :6

Associated Instrument Manufacturers ( I ) Pvt


Ltd, New Delhi

Smtr M. D. NAII~ ( Alternate to


Shri H. C. Vcrma )
SIII:J ARII.:I) KXISHNA Saraswati Engineering Agrncy, Roorkce
SIIILI RAI~~YJI Gosh ( Alternate )
( Continued on pap !I )

2
Its:11209-1985

Indian Standard
SPECJFICATION FOR
MOULD ASSEMBLY FOR DETERMINATION OF
PERMEABILITY OF SOILS

O.l?OREWORD

0.1 This Indian Standard was adopted by the Indian Standards Institu-
tion on 25 January 1985 after the draft finalized by the Soil Engineering
Sectional Committee had been approved by the Civil Engineering
Division Council.
0.2 The institution has already published a series of Indian Standards
on methods of testing soils. It has been recognized that reliable anti
intercomparable test results can be obtained only with standard testing
equipment capable of giving the desired level of accuracy. The concerned
Committee has, therefore, decided to bring out a series of specifications
covering thr. requircmcnts of equipment used for testing soils in order to
encourage their development and manufacture in the country. The cquip-
mcnt covered in this standard is used for determination of corihcient of
pcrmed)ility of soils as covered in IS : 2720 ( Part 17 ).
0.3 In reporting the result of a test or analysis made in accordance with
this standard, if the final value, observed or calculatrd, is to be rounded
off, it shall br: done in accordance with IS : 2 - 19X*.

1. SCOPE
1.1 This standard covers the details of mould, drainage basca, drainage
cap, extension collar, metal ring and rod used as the mould assembly for
laboratory determination of the coeffkient of permeability of soils.
2. DIMENSIONS
2.1 Dimensions with tolerances of different component parts of the equip-
ment shall be as given in Fig. 1 to 6. Except where tolerances are
specially rnentionecl against the dimensions, all dimensions shall be taken
as nominal and tolerances as given in IS : 2102 ( Part 1 )-lWC_t of mc,dium
cLV3s shall apply.
*R111rxs [or rolmding oirnurncrical values ( reaiserl ).
tl:cnr!ral tolerauce$for dimensions and form and position : Part 1 Gvncral tolcrzrncvs
for linear and angular dimensions ( serordriai~iorr).

3
IS : 11209 - 1985

3. MATERIALS

3.1 The materials for construction of the various equipmrnt parts shall be
as given in Table 1.

TABLE 1 METERIALS FOR CONSTRUCTION OF


DIFFERENT EQUIPMENT PARTS

SL EQUIPMENT SPECIAL RELEV.<FI


NO. RRQUIIWXMENTS INl)IAN S1’ANI)Altl)

9 Mould Brass/ IS : 2Y2-1Yu3*


Gun Metal IS : 31U-lY:llt
ii) Drainage base BIXSS/ IS : 292-1961*
Gun Metal 1s : 318-IYOlt
iii) DrainaRc cap Brass/ IS : 2Y2-1961*
Gun Metal IS : 31n-1w1+
iv) Metal ring Brass/ IS : 2!)2-1961*
Gun Metal IS : 3l8-lwlt
VI ‘Tie rod and Mild Steel Nickel/ 1s : 4361-lYG71:
fly nut chromoplated

vi) Extension collar Brass/


Gun Metal

*Sprcification for leaded brass ingots and castings ( secordreoivhz 1.


tSpecification for leaded tin bronze ingots and castings ( .secortd reui.tio~r
11.
fSpecification for alloy and tool steel forgings for industrial use.

4. CONSTRUCTION

4.1 The mould, drainage base and cap, metal ring, tie rod, extension
collar shall be constructed as per details given in Fig. 1 to 7. The
complete assembly shall be leakproof and tested for an internal hydraulic
pressure of 100 kPa.

5. MARKING

5.1 The following information shall be clearly and indelibly marked on


each equipment:

a) Name of the manufacturer or his registered trade-mark or both,

b) Date of manuI’acture, and

“) ‘l’ype of material.
LS:11209-1985

5.1.1 The equipment may also be mnrkcrl with the IS1 Certification
Mark.

NOTE - Thv use of the IS1 Certification Mark is governed by thr proviGons of
the Indian Standards Institution ( Crwification Marks ) Art and the Rr~les and
Regulations made therrunder. The IS1 h4ark on products covered by an Indian
Standard ronvrys the assurance that they havr twcn prodr~ccd to comply with the
requirements of that standard under a well-defined aystcm of inspection, testing and
quality control which is devised and supervised by IS1 and operated by the
producer. IS1 marked products are also continuously checked by ISI for conformity
to that standard as a further safeguard. Details of conditions, under which a lirt~nce
for the 11s~ of the IS1 Certification Mark may hc granted to manrlfxturvrs or
procwors, may be obtained from the Indian Standards Institution.

FLY NV7

9 _/-DRAINAGE
CAP

IV
MOUL D

TIE ROD

1
METAL RING

-DRAINAGE
!3ASE~

FIG. 1 PERMEABILITY CELL ASSEMISLY


3 HOLES.911
AT 12O’TO
S,@‘ll AT EACHOTHER
E ACHOTHER

$112
q?175+1
e

SEGTION AA

All dimensions in millimetres. All dimensions in millimetres.

FIG. 4 DR.~INAGE (2.4~ FIG. 5 METAL RING


iS : 11209 - 1985

- --- ---
c.E- -- - I
I
%!I

All dimensions in millimctres.


FIG. 6 TIE Kou
IS : 11209 - 1985

( Continued from page 2 )

Members Representing
DEPUTY DII~IWTOR RW~ARVH Ministry of Railways
(GE)-111
JOINT DIRWZTOR RESEAI:C.H (GE)-11
( Alfernafe )
DII~ECWII. ( CSMRS ) Central Soil & Materials Research Station,

G. S. ,Jain As<ociatps, New Delhi


Central Road Research Institute ( CSIR ), Nrw
Delhi
Ii. N. Dadina Foundation Enginerrs, Calcutta
Ministry of Defence

Indian Institute of Technology, Delhi


Hydraulic & Enginecring Instruments Company,
New Drlhi
S~rnr J~\I~~)F:IL SIN~H (Alternate )
S,Il<Is. VENKATWSAN Crrltral Building Rcscarch Jnstitutc ( CSIK ),
INTERNATIONAL SYSTEM OF UNITS CSI UNITS)
Base Units

Quantity Unil Symbol

Lsnqth metre m
Mass kilogram kQ
Time second 8
Electric current ampere A
Thermodynamic kelvin K
tampcrature
Luminous intensity candela cd
Amount ot substance mole moj

Supplementary Units

Quantity Unif Symbol

Plane angle radian rad


Solid angle steradlan St

Derived Units

Quantity Unit Symbol

Force newton N 1 N = 1 hg.m/sn


Energy loule J 1 J = 1 N.m
Power watt w 1 w = 1 J/s
FIux weber Wb t Wb = 1 V.s
Flux density tesla T f T = 1 Wb/ma
f rcquoilc y hertz Hz 1 Hz = 1 c/s (s-1)
Electric conductance siemens S 1 S = 1 A/V
Electromotive force volt V 1 v - 1 W/A
Pressure, stress uascal Pa I Pa = 1 N/ma