Beruflich Dokumente
Kultur Dokumente
FRICE List
Use
Use this accelerator to register all the deltas that are required for your project
Forms
All forms require a certain level of customization to suit the customer’s needs.
Reports
All reports required to meet customer’s needs and agreed during Delta Requirements Sessions in Evaluation cycle. Cores
Documents should be available
Interfaces
All the required Interfaces that have ben agreed during the Delta Requirements Sessions during Evaluation cycle. This inc
interfaces with third party systems that can be used on a regular basis during productive operation (eg interface between a
and general legder to be used once every period) or interfaces with legacy systems that will be used once (eg interface be
inventory management system and SAP Inventory mangement to uload initial inventory quantities once the new system go
Enhancements
As enhancements can be considered either additional business scenarios or business processes that require extra configu
also included in the the Business Process Master list, or user exits to enhance funcionality of existing business scenarios
highly recommneded to stay as much closer to the initial scope as possible.
Preconfigured
SmartForm
available
Preconfigured
SmartForm
available
Preconfigured
SmartForm
available
Preconfigured
SmartForm
available
FRICE List
Reports
Solution
ID Prio Report Method Responsible
Materials Management
Show type of
procurement on
purchase orders report
to be sent to SPB
Updated on
FRICE List
Interfaces
Connecting
Legacy Business
ID Prio Interface System Object Solution Method
Development Development
Responsible Description Comments Object Class Request ID
Due on Updated on
FRICE List
Interfaces
Materials Requirement
Planning notification when
stock levels are low.
Request ID Due on Updated on