Sequence of Step Potential Hazards Mitigation Measures
Pre - Work Untrained peoples Ensure all personnel have undergone
Equipment Failure Project HSE Induction training Driving All personnel shall comply with Safety Plan Getting lost in the field for manual handling of Loads (Fog / Sandstorm / Rains) Obtain required permit to work from Inadequate Lighting at Company. work location( Early Conduct Tool Box talk. morning Hour work and Ensure the equipment is in good condition night work) and well suited for the specific work/ activity. Ensure driver of the vehicle have completed Defensive Drive training by the Contractor. Strictly follow Company driving procedures, Traffic regulations. Obtain mark up drawings and clearly identify the day’s scope of work & designated access routes. Do not drive in Foggy/ Dusty/ rainy weather condition in case of poor visibility Provide rain coat to personnel in case of rains For early morning works/ night works, ensure sufficient lighting arrangements/ lighting towers are in place at the work areas as applicable Ensure that the Emergency Numbers are posted at site, and personnel are informed in the TBT once per day. Ensure proper communication means available Mobile Phone - outside Live Plant areas) and in case of any emergency contact details Manual Equipment not safe for the Use the correct equipment meant for the Handling/Transportation of working area/ Environment job as mentioned in the JSA / Permit survey Equipment Back Strain Trips and Falls Ensure that the equipment is in safe working condition and inspected. Be sure that the load is in the safe lifting capability of the person and ensure that the center of gravity is close to him. If required call for assistance. Closely watch the surroundings while performing the activity