Sequence of Step Potential Hazards Mitigation Measures

Pre - Work  Untrained peoples  Ensure all personnel have undergone


 Equipment Failure Project HSE Induction training
 Driving  All personnel shall comply with Safety Plan
 Getting lost in the field for manual handling of Loads
(Fog / Sandstorm / Rains)  Obtain required permit to work from
 Inadequate Lighting at Company.
work location( Early  Conduct Tool Box talk.
morning Hour work and  Ensure the equipment is in good condition
night work) and well suited for the specific work/ activity.
 Ensure driver of the vehicle have completed
Defensive Drive training by the Contractor.
 Strictly follow Company driving procedures,
Traffic regulations.
 Obtain mark up drawings and clearly
identify the day’s scope of work &
designated access routes.
 Do not drive in Foggy/ Dusty/ rainy weather
condition in case of poor visibility
 Provide rain coat to personnel in case of
rains
 For early morning works/ night works,
ensure sufficient lighting
arrangements/ lighting towers are in
place at the work areas as applicable
 Ensure that the Emergency Numbers are
posted at site, and personnel are informed
in the TBT once per day.
 Ensure proper communication means
available Mobile Phone - outside Live Plant
areas) and
in case of any emergency contact details
Manual Equipment not safe for the  Use the correct equipment meant for the
Handling/Transportation of working area/ Environment job as mentioned in the JSA / Permit
survey Equipment
Back Strain Trips and Falls  Ensure that the equipment is in safe
working condition and inspected.
 Be sure that the load is in the safe lifting
capability of the person and ensure that the
center of gravity is close to him. If required
call for assistance.
 Closely watch the surroundings while
performing the activity