Beruflich Dokumente
Kultur Dokumente
Prepared for
Tri City, Inc.
Table of Contents
1.0 Introduction............................................................................................................. 2
Figure 1 – Site Plan ..................................................................................................... 3
Figure 2A – Site Location Map .................................................................................... 4
Figure 2B – Vicinity Map .............................................................................................. 5
2.0 Existing Conditions ................................................................................................ 6
2.1 Inventory ................................................................................................................ 6
2.2 Existing Traffic Volumes ........................................................................................ 6
Figure 3 – Existing Lane Geometry ............................................................................. 7
Figure 4 – 2018 Existing Traffic Volumes .................................................................... 8
3.0 Approved Developments and Committed Improvements ................................... 9
3.1 Approved Developments........................................................................................ 9
3.2 Committed Improvements ...................................................................................... 9
4.0 Methodology ........................................................................................................... 9
4.1 Base Assumptions and Standards ......................................................................... 9
4.2 Trip Generation .................................................................................................... 10
4.3 Trip Distribution .................................................................................................... 10
4.4 2019 Future No Build Traffic ................................................................................ 10
4.5 2019 Future Build Total Traffic ............................................................................. 10
Figure 5 – Trip Distribution ........................................................................................ 11
Figure 6 – 2019 Future No Build Volumes ................................................................. 12
Figure 7 – Site Trips .................................................................................................. 13
Figure 8 – 2019 Future Build Volumes ...................................................................... 14
5.0 Capacity Analysis ................................................................................................. 15
5.1 Level of Service Evaluation Criteria ..................................................................... 15
5.2 Level of Service Results ...................................................................................... 16
6.0 Queue Results ...................................................................................................... 20
Figure 9 – Recommended Improvements .................................................................. 22
7.0 Internal Queueing Summary ................................................................................ 23
8.0 Summary and Conclusion ................................................................................... 25
Appendix ...................................................................................................................... 26
Trip Generation .......................................................................................................... 27
Level of Service Analysis ........................................................................................... 28
Queueing and Blocking Reports ................................................................................ 33
Traffic Volume Data ................................................................................................... 34
Supporting Documentation ........................................................................................ 35
1.0 Introduction
The intersections were analyzed during the AM (7-9 am) and PM (4-6 pm) peaks for the
following conditions:
Site Access 2
Site Access 1
FIGURE 1
SITE PLAN
Market Street
TRAFFIC MOVEMENT
BLACK = EXISTING
AADT 2016
###
VOLUME
49,000
TWLTL
125'
150'
150'
250'
SPEED
250' Middle Sound Loop LIMIT
9,900
Road 35
150'
FULL
350'
900'
TWLTL
53,000
FIGURE 3
EXISTING LANE
GEOMETRY
SPEED
LIMIT
45
OGDEN STARBUCKS DEVELOPMENT
NEW HANOVER COUNTY, NC
TRAFFIC MOVEMENT
BLACK = EXISTING
Market Street
AM / PM PEAKS
1905 / 1525
70 / 107
40 / 59
128 / 121
42 / 54
524 / 293
Middle Sound Loop
Road
42 / 74
32 / 93
209 / 84
141 / 178
1135 / 2146
59 / 167
FIGURE 4
EXISTING TRAFFIC
VOLUMES
Committed Improvements are improvements that are planned by NCDOT, the City, or
a developer in the area, but not yet constructed. There are no committed
improvements in the vicinity of the proposed development to account for in the analysis.
4.0 Methodology
In general, the analysis for this project was conducted utilizing commonly accepted
NCDOT standards. The following table contains a summary of the base assumptions:
Truck percentages 2%
TRAFFIC MOVEMENT
BLACK = EXISTING
30% BLUE = PROPOSED
RIGHT-IN ONLY
DESTINATION
% NODE
45%
Market Street
10%
45% IN
Site
Access 1
45% OUT
35% OUT
35% FIGURE 5
TRIP DISTRIBUTION
TRAFFIC MOVEMENT
Market Street
BLACK = EXISTING
AM / PM PEAKS
1924 / 1556
71 / 109
40 / 60
129 / 123
42 / 55
529 / 299
Middle Sound Loop
Road
42 / 75
32 / 95
211 / 86
142 / 182
1146 / 2189
60 / 170
FIGURE 6
2019 FUTURE NO
BUILD VOLUMES
TRAFFIC MOVEMENT
Market Street
BLACK = EXISTING
BLUE = PROPOSED
RIGHT-IN ONLY
AM / PM PEAKS
51 / 21
0/0
Site
Access 1
49 / 21
0/0
0/0
0/0
0/0
11 / 5
0/0
Middle Sound Loop
Road
49 / 21
11 / 5
38 / 16
0/0
40 / 16
0/0
FIGURE 7
SITE TRIPS
TRAFFIC MOVEMENT
Market Street
BLACK = EXISTING
BLUE = PROPOSED
RIGHT-IN ONLY
2035 / 1725
AM / PM PEAKS
51 / 21
Site
Access 1
1367 / 2409
1924 / 1556
71 / 109
40 / 60
129 / 123
54 / 60
529 / 299 Middle Sound Loop
Road
91 / 97
43 / 100
142 / 182
1146 / 2189
99 / 187
249 / 102
FIGURE 8
2019 FUTURE BUILD
VOLUMES
The Transportation Research Board’s Highway Capacity Manual (HCM) utilizes a term
“level of service” to measure how traffic operates in intersections and on roadway
segments. There are currently six levels of service ranging from A to F. Level of
service “A” represents the best conditions and Level of Service “F” represents the worst.
Synchro Traffic Modeling software was used to determine the level of service for studied
intersections. Note for unsignalized intersection analysis, the level of service noted is
for the worst approach of the intersection. This is typically the left turn movement for
the side street approach, due to the number of opposing movements. All worksheet
reports from the analyses can be found in the Appendix.
A 10 A 10
B 10 and 20 B 10 and 15
C 20 and 35 C 15 and 25
D 35 and 55 D 25 and 35
E 55 and 80 E 35 and 50
F 80 F 50
The results of the level of service analysis are discussed by intersection below.
Market Street at Middle Sound Loop Road
This signalized intersection currently operates at LOS E during the AM and PM peaks.
In 2019 future no build conditions, LOS E is expected in the AM peak and LOS F in the
PM peak. In 2019 future build conditions, it is expected to remain unchanged. It is
recommended to convert the eastbound through lane to an eastbound through/right
lane and perform signal modifications. With recommendations in place, this intersection
is expected to operate at LOS E in the AM and PM peaks.
AM Peak Hour
L T R L T R L T R L T R
E D F F E E D D C A C E A
2018 Existing
(59.2) (54.7) (80.6) (131.8) (76.5) (74.5) (52.3) (42.7) (33.6) (7.3) (20.9) (68.5) (4.5)
F (114.4) E (71.9) C (31.2) E (65.6)
L T R L T R L T R L T R
2019 Future E D F F E E D F C A E E A
No Build (62.7) (54.6) (80.6) (133.8) (76.7) (74.5) (52.3) (86.6) (33.9) (7.3) (65.5) (72.9) (4.5)
E (116.0) E (72.1) C (33.5) E (71.3)
L T R L T R L T R L T R
2019 Future E E F F E F D F C A E E A
Build (67.6) (58.3) (83.1) (175.7) (79.2) (83.2) (54.9) (125.2) (34.1) (7.6) (65.5) (73.7) (4.8)
F (137.5) E (75.1) D (37.9) E (72.0)
L T R L T R L T R L T R
2019 Future
E E F F F F E F C A F E A
Build with
(75.1) (58.1) (165.9) (165.4) (132.4) (83.2) (65.1) (177.1) (28.6) (7.1) (80.5) (75.5) (4.3)
Improvements
F (140.2) F (116.5) D (37.0) E (74.3)
PM Peak Hour
L T R L T R L T R L T R
F
E F F F F F F D A F C A
2018 Existing
(59.2) (131.2) (192.2) (165.1) (172.5) (153.1) (99.7) (45.6) (4.9) (204.5) (24.8) (3.8)
(130.2)
F (153.4) F (162.8) D (46.3) D (35.5)
L T R L T R L T R L T R
2019 Future F F F F F F F F D A F C A
No Build (81.0) (131.3) (194.6) (130.6) (166.6) (172.5) (154.3) (609.0) (49.3) (4.9) (316.9) (25.5) (3.9)
F (154.6) F (164.1) F (83.6) D (43.2)
L T R L T R L T R L T R
2019 Future F F F F F F F F D A F C A
Build (87.1) (138.0) (198.6) (134.5) (166.6) (172.8) (151.1) (699.5) (49.7) (5.0) (316.9) (25.7) (4.0)
F (157.1) F (163.4) F (94.0) D (43.3)
L T R L T R L T R L T R
2019 Future
E F F F F F F F E A F D B
Build with
(78.5) (136.8) (204.0) (204.3) (176.0) (172.8) (136.0) (134.0) (60.2) (6.6) (210.9) (52.4) (12.1)
Improvements
F (182.2) F (165.4) E (61.8) E (61.0)
AM Peak Hour
L T R L T R L T R L T R
B (10.6)
B B A A A A
2018 Existing EB
(10.6) (10.6) (8.1) (0.0) (0.0) (0.0)
Approach
B (10.6) A (5.3) A (0.0)
L T R L T R L T R L T R
B (10.6)
2019 Future B B A A A A
EB
No Build (10.6) (10.6) (8.1) (0.0) (0.0) (0.0)
Approach
B (10.6) A (5.3) A (0.0)
L T R L T R L T R L T R
C (17.9) B B B C C C A A A A A A
2019 Future
WB (11.7) (11.7) (11.7) (17.9) (17.9) (17.9) (8.2) (0.0 (0.0 (7.4) (0.0) (0.0)
Build
Approach C A A
B (11.7)
(17.9) (3.9) (0.1)
PM Peak Hour
L T R L T R L T R L T R
B (10.5) B B A A A A
2018 Existing EB (10.5) (10.5) (7.8) (0.0) (0.0) (0.0)
Approach
B (10.5) A (2.0) A (0.0)
L T R L T R L T R L T R
B (10.5)
2019 Future B B A A A A
EB
No Build (10.5) (10.5) (7.8) (0.0) (0.0) (0.0)
Approach
B (10.5) A (2.0) A (0.0)
L T R L T R L T R L T R
C (15.8) B B B C C C A A A A A A
2019 Future
WB (11.3) (11.3) (11.3) (15.8) (15.8) (15.8) (7.8) (0.0) (0.0) (7.7) (0.0) (0.0)
Build
Approach A A
B (11.3) C (15.8)
(1.9) (0.2)
Table 5.4 – Middle Sound Loop Road at Ogden Business Lane/Site Access 3
Level of Service by Approach
LOS of (Delay in sec/veh)
Scenario Worst
Approach Eastbound Westbound Northbound Southbound
AM Peak Hour
L T R L T R L T R L T R
B (10.1)
B B A A A A
2018 Existing EB
(10.1) (10.1 (7.8) (0.0) (0.0) (0.0)
Approach
B (10.1) A (1.1) A (0.0)
L T R L T R L T R L T R
B (10.1)
2019 Future B B A A A A
EB
No Build (10.1) (10.1) (7.8) (0.0) (0.0) (0.0)
Approach
B (10.1) A (1.0) A (0.0)
L T R L T R L T R L T R
B (11.5)
2019 Future B B B B B B A A A A A A
WB
Build (10.6) (10.6) (10.6) (11.5) (11.5) (11.5) (7.8) (0.0) (0.0) (7.4) (0.0) (0.0)
Approach
B (10.6) B (11.5) A (1.0) A (0.3)
PM Peak Hour
L T R L T R L T R L T R
B (11.5)
B B A A A A
2018 Existing EB
(11.5) (11.5) (7.6) (0.0) (0.0) (0.0)
Approach
B (11.5) A (1.3) A (0.0)
L T R L T R L T R L T R
B (11.6)
2019 Future B B A A A A
EB
No Build (11.6) (11.6) (7.6) (0.0) (0.0) (0.0)
Approach
B (11.6) A (1.3) A (0.0)
L T R L T R L T R L T R
B (12.5) B B B B B B A A A A A A
2019 Future (12.3) (12.3) (0.0) (0.0)
EB (12.5) (12.5) (12.5) (12.3) (7.6) (0.0) (0.0) (7.6)
Build
Approach
B (12.5) B (12.3) A (1.3) A (0.4)
In future build conditions, this site access is anticipated to operate at LOS A during the
AM and PM peaks. The need for auxiliary turn lanes was reviewed based on criteria in
the 2003 NCDOT “Policy on Street and Driveway Access”. Based on a review of
NCDOT turn lane warrants, it is recommended to extend the existing right turn lane with
100 feet storage and appropriate taper for Site Access 1. In addition, this right-in only
site access should be designed according to NCDOT standards. With these
recommendations in place, this intersection is expected to continue operating at LOS A
in the AM and PM peaks. We understand that this improvement will require
coordination with NCDOT for execution of a developer/NCDOT agreement whereas
NCDOT would design/construct the roadway turn lane improvement as part of the U-
4902D project with the developer responsible for the associated costs.
AM Peak Hour
L T R L T R L T R L T R
2019 Future A A A A
Build (0.0) (0.0) (0.0) (0.0)
A A
(0.0) (0.0)
L T R L T R L T R L T R
2019 Future A A A
A
Build with (0.0) (0.0) (0.0)
(0.0)
Improvements A A
(0.0) (0.0)
PM Peak Hour
L T R L T R L T R L T R
2019 Future A A A A
Build (0.0) (0.0) (0.0) (0.0)
A A
(0.0) (0.0)
L T R L T R L T R L T R
2019 Future A A A
A
Build with (0.0) (0.0) (0.0)
(0.0)
Improvements A A
(0.0) (0.0)
*LOS not produced via HCM 2000 or HCM 2010, assumed there would be no conflicts for any available lane uses
Market Street
TRAFFIC MOVEMENT
BLACK = EXISTING
BLUE = PROPOSED
RIGHT-IN ONLY
TWLTL
Signal Modifications
100'
Site
Access 1
FULL TO SITE
ACCESS 1
150'
150'
250'
250' Middle Sound Loop
Road
150'
350'
900'
FULL
TWLTL
FIGURE 9
RECOMMENDED
IMPROVEMENTS
Data was collected on January 10th, 2018 between the hours of 7:00am-9:00am. For
each 15-minute segment, the maximum queue at the pickup window and menu board
were each recorded. It is approximated that each vehicle in queue utilizes 20 feet of
space. The data is summarized below.
07:15 AM 3 5 8 160
07:30 AM 4 4 8 160
07:45 AM 5 4 9 180
08:00 AM 4 5 9 180
08:15 AM 4 5 9 180
08:30 AM 3 4 7 140
08:45 AM 3 5 8 160
Based on trip generation rates and equations published in Trip Generation (Institute of
Transportation Engineers, 9th Edition), this development has a trip generation potential
of 221 trips in the AM peak and 94 trips in the PM peak.
For the Market Street at Middle Sound Loop Road intersection, it is recommended to
convert the eastbound through lane to an eastbound through/right and perform signal
modifications.
For the Market Street at Site Access 1, the need for auxiliary turn lanes was reviewed
based on criteria in the 2003 NCDOT “Policy on Street and Driveway Access”. Based
on a review of NCDOT turn lane warrants, it is recommended to extend the existing
right turn lane with 100 feet storage and appropriate taper for Site Access 1. We
understand that this improvement will require coordination with NCDOT for execution of
a developer/NCDOT agreement whereas NCDOT would design/construct the roadway
turn lane improvement as part of the U-4902D project with the developer responsible for
the associated costs.
In conclusion, this study has reviewed the impacts of both background traffic and this
development traffic. Please note that all accesses to the site should be designed
according to NCDOT standards
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 42 32 209 524 42 128 59 1135 141 70 1905 40
Future Volume (vph) 42 32 209 524 42 128 59 1135 141 70 1905 40
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 150 0 250 150 350 900 150 125
Storage Lanes 1 1 2 1 1 1 1 1
Taper Length (ft) 25 250 25 25
Lane Util. Factor 1.00 1.00 1.00 0.97 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frt 0.850 0.850 0.850 0.850
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1770 1863 1583 3433 1863 1583 1770 3539 1583 1770 3539 1583
Flt Permitted 0.950 0.950 0.052 0.111
Satd. Flow (perm) 1770 1863 1583 3433 1863 1583 97 3539 1583 207 3539 1583
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 35 35 45 45
Link Distance (ft) 324 1429 1489 1145
Travel Time (s) 6.3 27.8 22.6 17.3
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 47 36 232 582 47 142 66 1261 157 78 2117 44
Shared Lane Traffic (%)
Lane Group Flow (vph) 47 36 232 582 47 142 66 1261 157 78 2117 44
Turn Type Prot NA pm+ov Prot NA pm+ov pm+pt NA pm+ov pm+pt NA pm+ov
Protected Phases 7 4 5 3 8 1 5 2 3 1 6 7
Permitted Phases 4 8 2 2 6 6
Detector Phase 7 4 5 3 8 1 5 2 3 1 6 7
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 5.0 12.0 5.0
Minimum Split (s) 10.6 10.8 10.8 10.8 10.8 11.1 10.8 18.1 10.8 11.1 18.1 10.6
Total Split (s) 17.0 17.0 16.0 34.0 34.0 26.0 16.0 79.0 34.0 26.0 89.0 17.0
Total Split (%) 10.9% 10.9% 10.3% 21.8% 21.8% 16.7% 10.3% 50.6% 21.8% 16.7% 57.1% 10.9%
Maximum Green (s) 11.4 11.2 10.2 28.2 28.2 19.9 10.2 72.9 28.2 19.9 82.9 11.4
Yellow Time (s) 3.0 3.8 3.0 3.0 3.8 3.0 3.0 4.5 3.0 3.0 4.5 3.0
All-Red Time (s) 2.6 2.0 2.8 2.8 2.0 3.1 2.8 1.6 2.8 3.1 1.6 2.6
Lost Time Adjust (s) -0.6 -0.8 -0.8 -0.8 -0.8 -1.1 -0.8 -1.1 -0.8 -1.1 -1.1 -0.6
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0
Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 15.0 0.0
Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 0.0 0.0 30.0 0.0
Recall Mode None None None None None None None C-Max None None C-Max None
Act Effct Green (s) 25.1 8.4 22.2 30.1 13.3 39.3 89.7 78.7 113.8 104.7 88.7 117.9
Actuated g/C Ratio 0.16 0.05 0.14 0.19 0.09 0.25 0.58 0.50 0.73 0.67 0.57 0.76
v/c Ratio 0.17 0.36 1.03 0.88 0.30 0.36 0.38 0.71 0.14 0.22 1.05 0.04
Control Delay 54.7 80.6 131.8 76.5 74.5 52.3 42.7 33.6 7.3 20.9 68.5 4.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 54.7 80.6 131.8 76.5 74.5 52.3 42.7 33.6 7.3 20.9 68.5 4.5
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
LOS D F F E E D D C A C E A
Approach Delay 114.4 71.9 31.2 65.6
Approach LOS F E C E
Queue Length 50th (ft) 40 36 238 293 47 124 24 544 46 28 ~1294 9
Queue Length 95th (ft) 81 75 #377 #402 91 189 68 634 77 50 #1423 21
Internal Link Dist (ft) 244 1349 1409 1065
Turn Bay Length (ft) 150 250 150 350 900 150 125
Base Capacity (vph) 299 143 225 673 346 398 173 1786 1150 349 2013 1209
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.16 0.25 1.03 0.86 0.14 0.36 0.38 0.71 0.14 0.22 1.05 0.04
Intersection Summary
Area Type: Other
Cycle Length: 156
Actuated Cycle Length: 156
Offset: 124 (79%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 140
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.05
Intersection Signal Delay: 59.2 Intersection LOS: E
Intersection Capacity Utilization 93.0% ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 100: Market Street & Middle Sound Loop Road
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 42 32 211 529 42 129 60 1146 142 71 1924 40
Future Volume (vph) 42 32 211 529 42 129 60 1146 142 71 1924 40
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 150 0 250 150 350 900 150 125
Storage Lanes 1 1 2 1 1 1 1 1
Taper Length (ft) 25 250 25 25
Lane Util. Factor 1.00 1.00 1.00 0.97 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frt 0.850 0.850 0.850 0.850
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1770 1863 1583 3433 1863 1583 1770 3539 1583 1770 3539 1583
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1770 1863 1583 3433 1863 1583 1770 3539 1583 1770 3539 1583
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 35 35 45 45
Link Distance (ft) 324 1054 1489 619
Travel Time (s) 6.3 20.5 22.6 9.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 47 36 234 588 47 143 67 1273 158 79 2138 44
Shared Lane Traffic (%)
Lane Group Flow (vph) 47 36 234 588 47 143 67 1273 158 79 2138 44
Turn Type Prot NA pm+ov Prot NA pm+ov Prot NA pm+ov Prot NA pm+ov
Protected Phases 7 4 5 3 8 1 5 2 3 1 6 7
Permitted Phases 4 8 2 6
Detector Phase 7 4 5 3 8 1 5 2 3 1 6 7
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 5.0 12.0 5.0
Minimum Split (s) 10.6 10.8 10.8 10.8 10.8 11.1 10.8 18.1 10.8 11.1 18.1 10.6
Total Split (s) 17.0 17.0 16.0 34.0 34.0 26.0 16.0 79.0 34.0 26.0 89.0 17.0
Total Split (%) 10.9% 10.9% 10.3% 21.8% 21.8% 16.7% 10.3% 50.6% 21.8% 16.7% 57.1% 10.9%
Maximum Green (s) 11.4 11.2 10.2 28.2 28.2 19.9 10.2 72.9 28.2 19.9 82.9 11.4
Yellow Time (s) 3.0 3.8 3.0 3.0 3.8 3.0 3.0 4.5 3.0 3.0 4.5 3.0
All-Red Time (s) 2.6 2.0 2.8 2.8 2.0 3.1 2.8 1.6 2.8 3.1 1.6 2.6
Lost Time Adjust (s) -0.6 -0.8 -0.8 -0.8 -0.8 -1.1 -0.8 -1.1 -0.8 -1.1 -1.1 -0.6
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0
Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 15.0 0.0
Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 0.0 0.0 30.0 0.0
Recall Mode None None None None None None None C-Max None None C-Max None
Act Effct Green (s) 25.2 8.4 22.2 30.2 13.4 39.4 11.0 78.6 113.8 21.0 88.6 117.8
Actuated g/C Ratio 0.16 0.05 0.14 0.19 0.09 0.25 0.07 0.50 0.73 0.13 0.57 0.76
v/c Ratio 0.16 0.36 1.04 0.88 0.30 0.36 0.54 0.71 0.14 0.33 1.06 0.04
Control Delay 54.6 80.6 133.8 76.7 74.5 52.3 86.6 33.9 7.3 65.5 72.9 4.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 54.6 80.6 133.8 76.7 74.5 52.3 86.6 33.9 7.3 65.5 72.9 4.5
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
LOS D F F E E D F C A E E A
Approach Delay 116.0 72.1 33.5 71.3
Approach LOS F E C E
Queue Length 50th (ft) 40 36 240 297 47 125 67 552 47 74 ~1317 9
Queue Length 95th (ft) 81 75 #383 #408 91 190 123 643 78 130 #1445 21
Internal Link Dist (ft) 244 974 1409 539
Turn Bay Length (ft) 150 250 150 350 900 150 125
Base Capacity (vph) 300 143 225 675 346 399 124 1782 1149 238 2009 1207
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.16 0.25 1.04 0.87 0.14 0.36 0.54 0.71 0.14 0.33 1.06 0.04
Intersection Summary
Area Type: Other
Cycle Length: 156
Actuated Cycle Length: 156
Offset: 124 (79%), Referenced to phase 2:NBT and 6:SBT, Start of Green
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.06
Intersection Signal Delay: 62.7 Intersection LOS: E
Intersection Capacity Utilization 93.8% ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 100: Market Street & Middle Sound Loop Road
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 91 43 249 529 54 129 99 1146 142 71 1924 40
Future Volume (vph) 91 43 249 529 54 129 99 1146 142 71 1924 40
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 150 0 250 150 350 900 150 0
Storage Lanes 1 1 2 1 1 1 1 1
Taper Length (ft) 25 250 25 25
Lane Util. Factor 1.00 1.00 1.00 0.97 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frt 0.850 0.850 0.850 0.850
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1770 1863 1583 3433 1863 1583 1770 3539 1583 1770 3539 1583
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1770 1863 1583 3433 1863 1583 1770 3539 1583 1770 3539 1583
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 35 35 45 45
Link Distance (ft) 324 1054 1489 159
Travel Time (s) 6.3 20.5 22.6 2.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 101 48 277 588 60 143 110 1273 158 79 2138 44
Shared Lane Traffic (%)
Lane Group Flow (vph) 101 48 277 588 60 143 110 1273 158 79 2138 44
Turn Type Prot NA pm+ov Prot NA pm+ov Prot NA pm+ov Prot NA pm+ov
Protected Phases 7 4 5 3 8 1 5 2 3 1 6 7
Permitted Phases 4 8 2 6
Detector Phase 7 4 5 3 8 1 5 2 3 1 6 7
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 5.0 12.0 5.0
Minimum Split (s) 10.6 10.8 10.8 10.8 10.8 11.1 10.8 18.1 10.8 11.1 18.1 10.6
Total Split (s) 17.0 17.0 16.0 34.0 34.0 26.0 16.0 79.0 34.0 26.0 89.0 17.0
Total Split (%) 10.9% 10.9% 10.3% 21.8% 21.8% 16.7% 10.3% 50.6% 21.8% 16.7% 57.1% 10.9%
Maximum Green (s) 11.4 11.2 10.2 28.2 28.2 19.9 10.2 72.9 28.2 19.9 82.9 11.4
Yellow Time (s) 3.0 3.8 3.0 3.0 3.8 3.0 3.0 4.5 3.0 3.0 4.5 3.0
All-Red Time (s) 2.6 2.0 2.8 2.8 2.0 3.1 2.8 1.6 2.8 3.1 1.6 2.6
Lost Time Adjust (s) -0.6 -0.8 -0.8 -0.8 -0.8 -1.1 -0.8 -1.1 -0.8 -1.1 -1.1 -0.6
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0
Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 15.0 0.0
Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 0.0 0.0 30.0 0.0
Recall Mode None None None None None None None C-Max None None C-Max None
Act Effct Green (s) 28.6 9.1 22.9 29.7 10.2 34.0 11.0 78.4 113.1 21.0 88.4 122.0
Actuated g/C Ratio 0.18 0.06 0.15 0.19 0.07 0.22 0.07 0.50 0.72 0.13 0.57 0.78
v/c Ratio 0.31 0.44 1.19 0.90 0.49 0.42 0.89 0.72 0.14 0.33 1.07 0.04
Control Delay 58.3 83.1 175.7 79.2 83.2 54.9 125.2 34.1 7.6 65.5 73.7 4.8
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 58.3 83.1 175.7 79.2 83.2 54.9 125.2 34.1 7.6 65.5 73.7 4.8
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
LOS E F F E F D F C A E E A
Approach Delay 137.5 75.1 37.9 72.0
Approach LOS F E D E
Queue Length 50th (ft) 89 48 ~315 300 60 124 113 552 48 74 ~1317 9
Queue Length 95th (ft) 153 94 #477 #417 109 188 #236 643 79 130 #1445 22
Internal Link Dist (ft) 244 974 1409 79
Turn Bay Length (ft) 150 250 150 350 900 150
Base Capacity (vph) 324 143 232 663 346 344 124 1778 1142 238 2005 1238
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.31 0.34 1.19 0.89 0.17 0.42 0.89 0.72 0.14 0.33 1.07 0.04
Intersection Summary
Area Type: Other
Cycle Length: 156
Actuated Cycle Length: 156
Offset: 124 (79%), Referenced to phase 2:NBT and 6:SBT, Start of Green
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.19
Intersection Signal Delay: 67.6 Intersection LOS: E
Intersection Capacity Utilization 96.2% ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 100: Market Street & Middle Sound Loop Road
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 91 43 249 529 54 129 99 1146 142 71 1924 40
Future Volume (vph) 91 43 249 529 54 129 99 1146 142 71 1924 40
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 150 0 250 150 350 900 150 0
Storage Lanes 1 1 2 1 1 1 1 1
Taper Length (ft) 25 250 25 25
Lane Util. Factor 1.00 0.95 0.95 0.97 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frt 0.893 0.850 0.850 0.850 0.850
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1770 1580 1504 3433 1863 1583 1770 3539 1583 1770 3539 1583
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1770 1580 1504 3433 1863 1583 1770 3539 1583 1770 3539 1583
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 35 35 45 45
Link Distance (ft) 324 1054 1489 159
Travel Time (s) 6.3 20.5 22.6 2.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 101 48 277 588 60 143 110 1273 158 79 2138 44
Shared Lane Traffic (%) 43%
Lane Group Flow (vph) 101 167 158 588 60 143 110 1273 158 79 2138 44
Turn Type Prot NA Prot Prot NA pm+ov Prot NA pm+ov Prot NA pm+ov
Protected Phases 7 4 4 3 8 1 5 2 3 1 6 7
Permitted Phases 8 2 6
Detector Phase 7 4 4 3 8 1 5 2 3 1 6 7
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 5.0 12.0 5.0
Minimum Split (s) 10.6 10.8 10.8 10.8 10.8 11.1 10.8 18.1 10.8 11.1 18.1 10.6
Total Split (s) 21.4 20.0 20.0 29.0 27.6 18.6 14.0 88.4 29.0 18.6 93.0 21.4
Total Split (%) 13.7% 12.8% 12.8% 18.6% 17.7% 11.9% 9.0% 56.7% 18.6% 11.9% 59.6% 13.7%
Maximum Green (s) 15.8 14.2 14.2 23.2 21.8 12.5 8.2 82.3 23.2 12.5 86.9 15.8
Yellow Time (s) 3.0 3.8 3.8 3.0 3.8 3.0 3.0 4.5 3.0 3.0 4.5 3.0
All-Red Time (s) 2.6 2.0 2.0 2.8 2.0 3.1 2.8 1.6 2.8 3.1 1.6 2.6
Lost Time Adjust (s) -0.6 -0.8 -0.8 -0.8 -0.8 -1.1 -0.8 -1.1 -0.8 -1.1 -1.1 -0.6
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0
Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 15.0 0.0
Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 0.0 0.0 30.0 0.0
Recall Mode None None None None None None None C-Max None None C-Max None
Act Effct Green (s) 31.0 15.0 15.0 24.0 10.2 26.6 9.0 83.4 112.4 13.6 88.0 124.0
Actuated g/C Ratio 0.20 0.10 0.10 0.15 0.07 0.17 0.06 0.53 0.72 0.09 0.56 0.79
v/c Ratio 0.29 1.11 1.10 1.11 0.49 0.53 1.08 0.67 0.14 0.51 1.07 0.03
Control Delay 58.1 165.9 165.4 132.4 83.2 65.1 177.1 28.6 7.1 80.5 75.5 4.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 58.1 165.9 165.4 132.4 83.2 65.1 177.1 28.6 7.1 80.5 75.5 4.3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
LOS E F F F F E F C A F E A
Approach Delay 140.2 116.5 37.0 74.3
Approach LOS F F D E
Queue Length 50th (ft) 90 ~202 ~190 ~352 60 132 ~125 484 46 78 ~1266 9
Queue Length 95th (ft) 155 #369 #352 #476 109 200 #260 564 71 137 #1394 20
Internal Link Dist (ft) 244 974 1409 79
Turn Bay Length (ft) 150 250 150 350 900 150
Base Capacity (vph) 351 151 144 528 269 269 102 1892 1140 154 1996 1258
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.29 1.11 1.10 1.11 0.22 0.53 1.08 0.67 0.14 0.51 1.07 0.03
Intersection Summary
Area Type: Other
Cycle Length: 156
Actuated Cycle Length: 156
Offset: 124 (79%), Referenced to phase 2:NBT and 6:SBT, Start of Green
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.11
Intersection Signal Delay: 75.1 Intersection LOS: E
Intersection Capacity Utilization 97.8% ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 100: Market Street & Middle Sound Loop Road
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 74 93 84 293 54 121 167 2146 178 107 1525 59
Future Volume (vph) 74 93 84 293 54 121 167 2146 178 107 1525 59
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 150 0 250 150 350 900 150 125
Storage Lanes 1 1 2 1 1 1 1 1
Taper Length (ft) 25 250 25 25
Lane Util. Factor 1.00 1.00 1.00 0.97 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frt 0.850 0.850 0.850 0.850
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1770 1863 1583 3433 1863 1583 1770 3539 1583 1770 3539 1583
Flt Permitted 0.950 0.950 0.091 0.018
Satd. Flow (perm) 1770 1863 1583 3433 1863 1583 170 3539 1583 34 3539 1583
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 35 35 45 45
Link Distance (ft) 324 1054 1489 619
Travel Time (s) 6.3 20.5 22.6 9.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 82 103 93 326 60 134 186 2384 198 119 1694 66
Shared Lane Traffic (%)
Lane Group Flow (vph) 82 103 93 326 60 134 186 2384 198 119 1694 66
Turn Type Prot NA pm+ov Prot NA pm+ov pm+pt NA pm+ov pm+pt NA pm+ov
Protected Phases 7 4 5 3 8 1 5 2 3 1 6 7
Permitted Phases 4 8 2 2 6 6
Detector Phase 7 4 5 3 8 1 5 2 3 1 6 7
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 5.0 12.0 5.0
Minimum Split (s) 10.6 10.8 10.8 10.8 10.8 11.1 10.8 18.1 10.8 11.1 18.1 10.6
Total Split (s) 25.0 25.0 20.0 37.0 37.0 20.0 20.0 222.0 37.0 20.0 222.0 25.0
Total Split (%) 8.2% 8.2% 6.6% 12.2% 12.2% 6.6% 6.6% 73.0% 12.2% 6.6% 73.0% 8.2%
Maximum Green (s) 19.4 19.2 14.2 31.2 31.2 13.9 14.2 215.9 31.2 13.9 215.9 19.4
Yellow Time (s) 3.0 3.8 3.0 3.0 3.8 3.0 3.0 4.5 3.0 3.0 4.5 3.0
All-Red Time (s) 2.6 2.0 2.8 2.8 2.0 3.1 2.8 1.6 2.8 3.1 1.6 2.6
Lost Time Adjust (s) -0.6 -0.8 -0.8 -0.8 -0.8 -1.1 -0.8 -1.1 -0.8 -1.1 -1.1 -0.6
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0
Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 15.0 0.0
Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 0.0 0.0 30.0 0.0
Recall Mode None None None None None None None C-Max None None C-Max None
Act Effct Green (s) 35.4 19.2 39.2 31.2 15.0 35.0 233.6 218.6 254.8 233.6 218.6 259.0
Actuated g/C Ratio 0.12 0.06 0.13 0.10 0.05 0.12 0.77 0.72 0.84 0.77 0.72 0.85
v/c Ratio 0.40 0.88 0.46 0.93 0.66 0.74 0.89 0.94 0.15 1.07 0.67 0.05
Control Delay 131.2 192.2 130.2 165.1 172.5 153.1 99.7 45.6 4.9 204.5 24.8 3.8
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 131.2 192.2 130.2 165.1 172.5 153.1 99.7 45.6 4.9 204.5 24.8 3.8
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
LOS F F F F F F F D A F C A
Approach Delay 153.4 162.8 46.3 35.5
Approach LOS F F D D
Queue Length 50th (ft) 156 211 177 343 122 267 122 2163 69 ~212 962 19
Queue Length 95th (ft) 238 #345 260 #438 191 363 #297 2192 91 #397 1006 33
Internal Link Dist (ft) 244 974 1409 539
Turn Bay Length (ft) 150 250 150 350 900 150 125
Base Capacity (vph) 206 122 204 361 196 182 209 2544 1325 111 2544 1348
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.40 0.84 0.46 0.90 0.31 0.74 0.89 0.94 0.15 1.07 0.67 0.05
Intersection Summary
Area Type: Other
Cycle Length: 304
Actuated Cycle Length: 304
Offset: 25 (8%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.07
Intersection Signal Delay: 59.2 Intersection LOS: E
Intersection Capacity Utilization 92.8% ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 100: Market Street & Middle Sound Loop Road
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 75 95 86 299 55 123 170 2189 182 109 1556 60
Future Volume (vph) 75 95 86 299 55 123 170 2189 182 109 1556 60
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 150 0 250 150 350 900 150 125
Storage Lanes 1 1 2 1 1 1 1 1
Taper Length (ft) 25 250 25 25
Lane Util. Factor 1.00 1.00 1.00 0.97 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frt 0.850 0.850 0.850 0.850
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1770 1863 1583 3433 1863 1583 1770 3539 1583 1770 3539 1583
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1770 1863 1583 3433 1863 1583 1770 3539 1583 1770 3539 1583
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 35 35 45 45
Link Distance (ft) 324 1054 1489 619
Travel Time (s) 6.3 20.5 22.6 9.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 83 106 96 332 61 137 189 2432 202 121 1729 67
Shared Lane Traffic (%)
Lane Group Flow (vph) 83 106 96 332 61 137 189 2432 202 121 1729 67
Turn Type Prot NA pm+ov Prot NA pm+ov Prot NA pm+ov Prot NA pm+ov
Protected Phases 7 4 5 3 8 1 5 2 3 1 6 7
Permitted Phases 4 8 2 6
Detector Phase 7 4 5 3 8 1 5 2 3 1 6 7
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 5.0 12.0 5.0
Minimum Split (s) 10.6 10.8 10.8 10.8 10.8 11.1 10.8 18.1 10.8 11.1 18.1 10.6
Total Split (s) 25.0 25.0 20.0 37.0 37.0 20.0 20.0 222.0 37.0 20.0 222.0 25.0
Total Split (%) 8.2% 8.2% 6.6% 12.2% 12.2% 6.6% 6.6% 73.0% 12.2% 6.6% 73.0% 8.2%
Maximum Green (s) 19.4 19.2 14.2 31.2 31.2 13.9 14.2 215.9 31.2 13.9 215.9 19.4
Yellow Time (s) 3.0 3.8 3.0 3.0 3.8 3.0 3.0 4.5 3.0 3.0 4.5 3.0
All-Red Time (s) 2.6 2.0 2.8 2.8 2.0 3.1 2.8 1.6 2.8 3.1 1.6 2.6
Lost Time Adjust (s) -0.6 -0.8 -0.8 -0.8 -0.8 -1.1 -0.8 -1.1 -0.8 -1.1 -1.1 -0.6
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0
Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 15.0 0.0
Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 0.0 0.0 30.0 0.0
Recall Mode None None None None None None None C-Max None None C-Max None
Act Effct Green (s) 35.6 19.4 39.4 31.4 15.2 35.2 15.0 218.2 254.6 15.0 218.2 258.8
Actuated g/C Ratio 0.12 0.06 0.13 0.10 0.05 0.12 0.05 0.72 0.84 0.05 0.72 0.85
v/c Ratio 0.40 0.90 0.47 0.94 0.66 0.75 2.17 0.96 0.15 1.39 0.68 0.05
Control Delay 131.3 194.6 130.6 166.6 172.5 154.3 609.0 49.3 4.9 316.9 25.5 3.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 131.3 194.6 130.6 166.6 172.5 154.3 609.0 49.3 4.9 316.9 25.5 3.9
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
LOS F F F F F F F D A F C A
Approach Delay 154.6 164.1 83.6 43.2
Approach LOS F F F D
Queue Length 50th (ft) 158 217 183 350 124 274 ~606 2302 71 ~322 1001 19
Queue Length 95th (ft) 243 #361 267 #454 193 370 #818 2327 93 #506 1046 34
Internal Link Dist (ft) 244 974 1409 539
Turn Bay Length (ft) 150 250 150 350 900 150 125
Base Capacity (vph) 207 122 205 361 196 183 87 2540 1323 87 2540 1347
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.40 0.87 0.47 0.92 0.31 0.75 2.17 0.96 0.15 1.39 0.68 0.05
Intersection Summary
Area Type: Other
Cycle Length: 304
Actuated Cycle Length: 304
Offset: 25 (8%), Referenced to phase 2:NBT and 6:SBT, Start of Green
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 2.17
Intersection Signal Delay: 81.0 Intersection LOS: F
Intersection Capacity Utilization 94.2% ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 100: Market Street & Middle Sound Loop Road
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 97 100 102 299 60 123 187 2189 182 109 1556 60
Future Volume (vph) 97 100 102 299 60 123 187 2189 182 109 1556 60
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 150 0 250 150 350 900 150 0
Storage Lanes 1 1 2 1 1 1 1 1
Taper Length (ft) 25 250 25 25
Lane Util. Factor 1.00 1.00 1.00 0.97 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frt 0.850 0.850 0.850 0.850
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1770 1863 1583 3433 1863 1583 1770 3539 1583 1770 3539 1583
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1770 1863 1583 3433 1863 1583 1770 3539 1583 1770 3539 1583
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 35 35 45 45
Link Distance (ft) 324 1054 1489 159
Travel Time (s) 6.3 20.5 22.6 2.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 108 111 113 332 67 137 208 2432 202 121 1729 67
Shared Lane Traffic (%)
Lane Group Flow (vph) 108 111 113 332 67 137 208 2432 202 121 1729 67
Turn Type Prot NA pm+ov Prot NA pm+ov Prot NA pm+ov Prot NA pm+ov
Protected Phases 7 4 5 3 8 1 5 2 3 1 6 7
Permitted Phases 4 8 2 6
Detector Phase 7 4 5 3 8 1 5 2 3 1 6 7
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 5.0 12.0 5.0
Minimum Split (s) 10.6 10.8 10.8 10.8 10.8 11.1 10.8 18.1 10.8 11.1 18.1 10.6
Total Split (s) 25.0 25.0 20.0 37.0 37.0 20.0 20.0 222.0 37.0 20.0 222.0 25.0
Total Split (%) 8.2% 8.2% 6.6% 12.2% 12.2% 6.6% 6.6% 73.0% 12.2% 6.6% 73.0% 8.2%
Maximum Green (s) 19.4 19.2 14.2 31.2 31.2 13.9 14.2 215.9 31.2 13.9 215.9 19.4
Yellow Time (s) 3.0 3.8 3.0 3.0 3.8 3.0 3.0 4.5 3.0 3.0 4.5 3.0
All-Red Time (s) 2.6 2.0 2.8 2.8 2.0 3.1 2.8 1.6 2.8 3.1 1.6 2.6
Lost Time Adjust (s) -0.6 -0.8 -0.8 -0.8 -0.8 -1.1 -0.8 -1.1 -0.8 -1.1 -1.1 -0.6
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0
Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 15.0 0.0
Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 0.0 0.0 30.0 0.0
Recall Mode None None None None None None None C-Max None None C-Max None
Act Effct Green (s) 35.0 19.7 39.7 31.4 16.1 36.1 15.0 217.9 254.3 15.0 217.9 257.9
Actuated g/C Ratio 0.12 0.06 0.13 0.10 0.05 0.12 0.05 0.72 0.84 0.05 0.72 0.85
v/c Ratio 0.53 0.93 0.55 0.94 0.68 0.73 2.39 0.96 0.15 1.39 0.68 0.05
Control Delay 138.0 198.6 134.5 166.6 172.8 151.1 699.5 49.7 5.0 316.9 25.7 4.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 138.0 198.6 134.5 166.6 172.8 151.1 699.5 49.7 5.0 316.9 25.7 4.0
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
LOS F F F F F F F D A F C A
Approach Delay 157.1 163.4 94.0 43.3
Approach LOS F F F D
Queue Length 50th (ft) 209 228 218 350 136 273 ~685 2302 71 ~322 1001 20
Queue Length 95th (ft) 305 #386 310 #454 207 368 #906 2327 93 #506 1046 35
Internal Link Dist (ft) 244 974 1409 79
Turn Bay Length (ft) 150 250 150 350 900 150
Base Capacity (vph) 203 122 206 361 196 187 87 2536 1322 87 2536 1342
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.53 0.91 0.55 0.92 0.34 0.73 2.39 0.96 0.15 1.39 0.68 0.05
Intersection Summary
Area Type: Other
Cycle Length: 304
Actuated Cycle Length: 304
Offset: 25 (8%), Referenced to phase 2:NBT and 6:SBT, Start of Green
Natural Cycle: 130
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 2.39
Intersection Signal Delay: 87.1 Intersection LOS: F
Intersection Capacity Utilization 94.2% ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 100: Market Street & Middle Sound Loop Road
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 97 100 102 299 60 123 187 2189 182 109 1556 60
Future Volume (vph) 97 100 102 299 60 123 187 2189 182 109 1556 60
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 150 0 250 150 350 900 150 0
Storage Lanes 1 1 2 1 1 1 1 1
Taper Length (ft) 25 250 25 25
Lane Util. Factor 1.00 0.95 0.95 0.97 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00
Frt 0.986 0.850 0.850 0.850 0.850
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1770 1745 1504 3433 1863 1583 1770 3539 1583 1770 3539 1583
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1770 1745 1504 3433 1863 1583 1770 3539 1583 1770 3539 1583
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 35 35 45 45
Link Distance (ft) 324 1054 1489 159
Travel Time (s) 6.3 20.5 22.6 2.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 108 111 113 332 67 137 208 2432 202 121 1729 67
Shared Lane Traffic (%) 10%
Lane Group Flow (vph) 108 122 102 332 67 137 208 2432 202 121 1729 67
Turn Type Prot NA Prot Prot NA pm+ov Prot NA pm+ov Prot NA pm+ov
Protected Phases 7 4 4 3 8 1 5 2 3 1 6 7
Permitted Phases 8 2 6
Detector Phase 7 4 4 3 8 1 5 2 3 1 6 7
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 5.0 12.0 5.0
Minimum Split (s) 10.6 10.8 10.8 10.8 10.8 11.1 10.8 18.1 10.8 11.1 18.1 10.6
Total Split (s) 34.3 27.0 27.0 35.0 27.7 26.0 55.5 216.0 35.0 26.0 186.5 34.3
Total Split (%) 11.3% 8.9% 8.9% 11.5% 9.1% 8.6% 18.3% 71.1% 11.5% 8.6% 61.3% 11.3%
Maximum Green (s) 28.7 21.2 21.2 29.2 21.9 19.9 49.7 209.9 29.2 19.9 180.4 28.7
Yellow Time (s) 3.0 3.8 3.8 3.0 3.8 3.0 3.0 4.5 3.0 3.0 4.5 3.0
All-Red Time (s) 2.6 2.0 2.0 2.8 2.0 3.1 2.8 1.6 2.8 3.1 1.6 2.6
Lost Time Adjust (s) -0.6 -0.8 -0.8 -0.8 -0.8 -1.1 -0.8 -1.1 -0.8 -1.1 -1.1 -0.6
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lead Lag Lead Lag Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0
Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 15.0 0.0
Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 0.0 0.0 30.0 0.0
Recall Mode None None None None None None None C-Max None None C-Max None
Act Effct Green (s) 35.9 22.0 22.0 30.0 16.1 42.1 50.5 211.0 246.0 21.0 181.5 222.4
Actuated g/C Ratio 0.12 0.07 0.07 0.10 0.05 0.14 0.17 0.69 0.81 0.07 0.60 0.73
v/c Ratio 0.52 0.97 0.94 0.98 0.68 0.63 0.71 0.99 0.16 0.99 0.82 0.06
Control Delay 136.8 204.0 204.3 176.0 172.8 136.0 134.0 60.2 6.6 210.9 52.4 12.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 136.8 204.0 204.3 176.0 172.8 136.0 134.0 60.2 6.6 210.9 52.4 12.1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
LOS F F F F F F F E A F D B
Approach Delay 182.2 165.4 61.8 61.0
Approach LOS F F E E
Queue Length 50th (ft) 209 264 221 352 136 267 405 2473 84 250 1440 37
Queue Length 95th (ft) 305 #455 #388 #478 207 359 526 2499 109 #433 1504 62
Internal Link Dist (ft) 244 974 1409 79
Turn Bay Length (ft) 150 250 150 350 900 150
Base Capacity (vph) 208 126 108 338 139 219 294 2456 1280 122 2112 1158
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.52 0.97 0.94 0.98 0.48 0.63 0.71 0.99 0.16 0.99 0.82 0.06
Intersection Summary
Area Type: Other
Cycle Length: 304
Actuated Cycle Length: 304
Offset: 25 (8%), Referenced to phase 2:NBT and 6:SBT, Start of Green
Natural Cycle: 140
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.99
Intersection Signal Delay: 78.5 Intersection LOS: E
Intersection Capacity Utilization 99.1% ICU Level of Service F
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 100: Market Street & Middle Sound Loop Road
Intersection
Int Delay, s/veh 2.7
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 34 90 47 229 30
Future Vol, veh/h 7 34 90 47 229 30
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 50 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 8 38 100 52 254 33
Approach EB NB SB
HCM Control Delay, s 10.6 5.3 0
HCM LOS B
Intersection
Int Delay, s/veh 2.7
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 35 92 48 234 31
Future Vol, veh/h 7 35 92 48 234 31
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 50 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 8 39 102 53 260 34
Approach EB NB SB
HCM Control Delay, s 10.6 5.3 0
HCM LOS B
Intersection
Int Delay, s/veh 4.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 4 35 65 4 4 92 48 51 4 266 31
Future Vol, veh/h 7 4 35 65 4 4 92 48 51 4 266 31
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - 50 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 8 4 39 72 4 4 102 53 57 4 296 34
Approach EB WB NB SB
HCM Control Delay, s 11.7 17.9 3.9 0.1
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1229 - - 590 360 1480 - -
HCM Lane V/C Ratio 0.083 - - 0.087 0.225 0.003 - -
HCM Control Delay (s) 8.2 - - 11.7 17.9 7.4 0 -
HCM Lane LOS A - - B C A A -
HCM 95th %tile Q(veh) 0.3 - - 0.3 0.9 0 - -
Intersection
Int Delay, s/veh 4.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 4 35 65 4 4 92 48 51 4 266 31
Future Vol, veh/h 7 4 35 65 4 4 92 48 51 4 266 31
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - 50 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 8 4 39 72 4 4 102 53 57 4 296 34
Approach EB WB NB SB
HCM Control Delay, s 11.7 17.9 3.9 0.1
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1229 - - 590 360 1480 - -
HCM Lane V/C Ratio 0.083 - - 0.087 0.225 0.003 - -
HCM Control Delay (s) 8.2 - - 11.7 17.9 7.4 0 -
HCM Lane LOS A - - B C A A -
HCM 95th %tile Q(veh) 0.3 - - 0.3 0.9 0 - -
Intersection
Int Delay, s/veh 2.5
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 14 56 67 190 159 20
Future Vol, veh/h 14 56 67 190 159 20
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 50 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 16 62 74 211 177 22
Approach EB NB SB
HCM Control Delay, s 10.5 2 0
HCM LOS B
Intersection
Int Delay, s/veh 2.5
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 14 57 68 194 162 20
Future Vol, veh/h 14 57 68 194 162 20
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 50 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 16 63 76 216 180 22
Approach EB NB SB
HCM Control Delay, s 10.5 2 0
HCM LOS B
Intersection
Int Delay, s/veh 3.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 14 4 57 28 4 4 68 194 21 4 176 20
Future Vol, veh/h 14 4 57 28 4 4 68 194 21 4 176 20
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - 50 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 16 4 63 31 4 4 76 216 23 4 196 22
Approach EB WB NB SB
HCM Control Delay, s 11.3 15.8 1.9 0.2
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1352 - - 654 374 1328 - -
HCM Lane V/C Ratio 0.056 - - 0.127 0.107 0.003 - -
HCM Control Delay (s) 7.8 - - 11.3 15.8 7.7 0 -
HCM Lane LOS A - - B C A A -
HCM 95th %tile Q(veh) 0.2 - - 0.4 0.4 0 - -
Intersection
Int Delay, s/veh 3.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 14 4 57 28 4 4 68 194 21 4 176 20
Future Vol, veh/h 14 4 57 28 4 4 68 194 21 4 176 20
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - 50 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 16 4 63 31 4 4 76 216 23 4 196 22
Approach EB WB NB SB
HCM Control Delay, s 11.3 15.8 1.9 0.2
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1352 - - 654 374 1328 - -
HCM Lane V/C Ratio 0.056 - - 0.127 0.107 0.003 - -
HCM Control Delay (s) 7.8 - - 11.3 15.8 7.7 0 -
HCM Lane LOS A - - B C A A -
HCM 95th %tile Q(veh) 0.2 - - 0.4 0.4 0 - -
Intersection
Int Delay, s/veh 1.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 9 29 8 51 225 15
Future Vol, veh/h 9 29 8 51 225 15
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 10 32 9 57 250 17
Approach EB NB SB
HCM Control Delay, s 10.1 1.1 0
HCM LOS B
Intersection
Int Delay, s/veh 1.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 9 30 8 52 230 15
Future Vol, veh/h 9 30 8 52 230 15
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 10 33 9 58 256 17
Approach EB NB SB
HCM Control Delay, s 10.2 1 0
HCM LOS B
Intersection
Int Delay, s/veh 2.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 9 4 30 32 4 11 8 52 4 11 230 15
Future Vol, veh/h 9 4 30 32 4 11 8 52 4 11 230 15
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 10 4 33 36 4 12 9 58 4 12 256 17
Approach EB WB NB SB
HCM Control Delay, s 10.6 11.5 1 0.3
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1291 - - 695 605 1541 - -
HCM Lane V/C Ratio 0.007 - - 0.069 0.086 0.008 - -
HCM Control Delay (s) 7.8 0 - 10.6 11.5 7.4 0 -
HCM Lane LOS A A - B B A A -
HCM 95th %tile Q(veh) 0 - - 0.2 0.3 0 - -
Intersection
Int Delay, s/veh 2.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 9 4 30 32 4 11 8 52 4 11 230 15
Future Vol, veh/h 9 4 30 32 4 11 8 52 4 11 230 15
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 10 4 33 36 4 12 9 58 4 12 256 17
Approach EB WB NB SB
HCM Control Delay, s 10.6 11.5 1 0.3
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1291 - - 695 605 1541 - -
HCM Lane V/C Ratio 0.007 - - 0.069 0.086 0.008 - -
HCM Control Delay (s) 7.8 0 - 10.6 11.5 7.4 0 -
HCM Lane LOS A A - B B A A -
HCM 95th %tile Q(veh) 0 - - 0.2 0.3 0 - -
Intersection
Int Delay, s/veh 3.8
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 73 59 34 162 119 14
Future Vol, veh/h 73 59 34 162 119 14
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 81 66 38 180 132 16
Approach EB NB SB
HCM Control Delay, s 11.5 1.3 0
HCM LOS B
Intersection
Int Delay, s/veh 3.9
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 74 60 35 165 121 14
Future Vol, veh/h 74 60 35 165 121 14
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 82 67 39 183 134 16
Approach EB NB SB
HCM Control Delay, s 11.6 1.3 0
HCM LOS B
Intersection
Int Delay, s/veh 4.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 74 4 60 14 4 5 35 165 4 8 121 14
Future Vol, veh/h 74 4 60 14 4 5 35 165 4 8 121 14
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 82 4 67 16 4 6 39 183 4 9 134 16
Approach EB WB NB SB
HCM Control Delay, s 12.5 12.3 1.3 0.4
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1431 - - 633 518 1386 - -
HCM Lane V/C Ratio 0.027 - - 0.242 0.049 0.006 - -
HCM Control Delay (s) 7.6 0 - 12.5 12.3 7.6 0 -
HCM Lane LOS A A - B B A A -
HCM 95th %tile Q(veh) 0.1 - - 0.9 0.2 0 - -
Intersection
Int Delay, s/veh 4.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 74 4 60 14 4 5 35 165 4 8 121 14
Future Vol, veh/h 74 4 60 14 4 5 35 165 4 8 121 14
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 82 4 67 16 4 6 39 183 4 9 134 16
Approach EB WB NB SB
HCM Control Delay, s 12.5 12.3 1.3 0.4
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1431 - - 633 518 1386 - -
HCM Lane V/C Ratio 0.027 - - 0.242 0.049 0.006 - -
HCM Control Delay (s) 7.6 0 - 12.5 12.3 7.6 0 -
HCM Lane LOS A A - B B A A -
HCM 95th %tile Q(veh) 0.1 - - 0.9 0.2 0 - -
Intersection: 400: Middle Sound Loop Road & Ogden Business Lane
Movement EB NB SB
Directions Served LR LT TR
Maximum Queue (ft) 70 31 205
Average Queue (ft) 24 1 50
95th Queue (ft) 52 10 174
Link Distance (ft) 661 234 190
Upstream Blk Time (%) 9
Queuing Penalty (veh) 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 235
Intersection: 400: Middle Sound Loop Road & Ogden Business Lane
Movement EB NB SB
Directions Served LR LT TR
Maximum Queue (ft) 200 55 205
Average Queue (ft) 51 4 86
95th Queue (ft) 137 24 227
Link Distance (ft) 661 234 190
Upstream Blk Time (%) 18
Queuing Penalty (veh) 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 265
Intersection: 300: Middle Sound Loop Road & Bojangles Driveway/Site Access 2
Movement EB WB NB NB SB
Directions Served LTR LTR L TR LTR
Maximum Queue (ft) 505 154 97 106 292
Average Queue (ft) 179 135 49 9 221
95th Queue (ft) 468 195 98 52 364
Link Distance (ft) 625 139 237 266
Upstream Blk Time (%) 86 45
Queuing Penalty (veh) 0 130
Storage Bay Dist (ft) 50
Storage Blk Time (%) 9 0
Queuing Penalty (veh) 9 0
Intersection: 400: Middle Sound Loop Road & Ogden Business Lane/Site Acces 3
Movement EB WB NB SB
Directions Served LTR LTR LTR LTR
Maximum Queue (ft) 394 160 41 199
Average Queue (ft) 137 75 2 109
95th Queue (ft) 353 172 15 243
Link Distance (ft) 659 130 266 184
Upstream Blk Time (%) 33 13
Queuing Penalty (veh) 0 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 946
Intersection: 300: Middle Sound Loop Road & Bojangles Driveway/Site Access 2
Movement EB WB NB SB
Directions Served LTR LTR L LTR
Maximum Queue (ft) 71 140 70 256
Average Queue (ft) 28 49 26 83
95th Queue (ft) 63 106 67 220
Link Distance (ft) 625 139 266
Upstream Blk Time (%) 2 0
Queuing Penalty (veh) 0 0
Storage Bay Dist (ft) 50
Storage Blk Time (%) 4
Queuing Penalty (veh) 4
Intersection: 400: Middle Sound Loop Road & Ogden Business Lane/Site Acces 3
Movement EB WB NB SB
Directions Served LTR LTR LTR LTR
Maximum Queue (ft) 49 74 20 24
Average Queue (ft) 19 29 1 1
95th Queue (ft) 43 55 7 8
Link Distance (ft) 659 130 266 184
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 1039
Intersection: 400: Middle Sound Loop Road & Ogden Business Lane
Movement EB NB
Directions Served LR LT
Maximum Queue (ft) 74 165
Average Queue (ft) 36 6
95th Queue (ft) 58 56
Link Distance (ft) 661 234
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 863
Intersection: 400: Middle Sound Loop Road & Ogden Business Lane
Movement EB NB
Directions Served LR LT
Maximum Queue (ft) 98 31
Average Queue (ft) 37 1
95th Queue (ft) 62 10
Link Distance (ft) 661 234
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 2130
Intersection: 300: Middle Sound Loop Road & Bojangles Driveway/Site Access 2
Movement EB WB NB SB
Directions Served LTR LTR L LTR
Maximum Queue (ft) 640 154 69 277
Average Queue (ft) 485 123 5 237
95th Queue (ft) 838 195 32 347
Link Distance (ft) 625 139 266
Upstream Blk Time (%) 60 80 44
Queuing Penalty (veh) 0 0 86
Storage Bay Dist (ft) 50
Storage Blk Time (%) 2
Queuing Penalty (veh) 4
Intersection: 400: Middle Sound Loop Road & Ogden Business Lane/Site Acces 3
Movement EB WB NB SB
Directions Served LTR LTR LTR LTR
Maximum Queue (ft) 330 72 45 199
Average Queue (ft) 95 25 3 77
95th Queue (ft) 224 61 19 183
Link Distance (ft) 659 130 266 184
Upstream Blk Time (%) 2
Queuing Penalty (veh) 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 2761
Intersection: 300: Middle Sound Loop Road & Bojangles Driveway/Site Access 2
Movement EB WB NB SB
Directions Served LTR LTR L LTR
Maximum Queue (ft) 221 95 71 270
Average Queue (ft) 56 26 14 63
95th Queue (ft) 138 61 49 204
Link Distance (ft) 625 139 266
Upstream Blk Time (%) 3
Queuing Penalty (veh) 7
Storage Bay Dist (ft) 50
Storage Blk Time (%) 1
Queuing Penalty (veh) 2
Intersection: 400: Middle Sound Loop Road & Ogden Business Lane/Site Acces 3
Movement EB WB NB SB
Directions Served LTR LTR LTR LTR
Maximum Queue (ft) 90 51 44 110
Average Queue (ft) 42 17 3 5
95th Queue (ft) 69 42 18 40
Link Distance (ft) 659 130 266 184
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 1407
AM PEAK HOUR, VR
PM PEAK HOUR, VR
Volumes
Peak Hour
Opposing Lefts
200 200
Market Street at Site Access 1 Market Street at Site Access 1
2019 2019
2018 2018 2019 Appd Retail Site Passby Future 2018 2018 2019 Appd Retail Site Passby Future
AM Peak Balancing Future No Site Trips PM Peak Balancing Future No Site Trips
TMC Base Projected Dev Trips Trips Build TMC Base Projected Dev Trips Trips Build
Build Build
EBL 0 EBL 0
EBT 0 EBT 0
EBR 0 EBR 0
WBL 0 WBL 0
WBT 0 WBT 0
WBR 0 WBR 0
NBL 0 NBL 0
NBT 49 49 NBT 21 21
NBR 0 NBR 0
SBL 0 SBL 0
SBT 2035 2035 SBT 1725 1725
SBR 51 51 SBR 21 21
Total 0 0 0 0 0 2035 99 0 0 2135 Total 0 0 0 0 0 1725 42 0 0 1767
300 300
Middle Sound Loop Road Extension at Site Access 2 Middle Sound Loop Road Extension at Site Access 2
2019 2019
2018 2018 2019 Appd Retail Site Passby Future 2018 2018 2019 Appd Retail Site Passby Future
AM Peak Balancing Future No Site Trips PM Peak Balancing Future No Site Trips
TMC Base Projected Dev Trips Trips Build TMC Base Projected Dev Trips Trips Build
Build Build
EBL 7 7 7 7 7 EBL 14 14 14 14 14
EBT 0 0 0 0 0 EBT 0 0 0 0 0
EBR 34 34 35 35 35 EBR 56 56 57 57 57
WBL 0 0 0 0 65 65 WBL 0 0 0 0 28 28
WBT 0 0 0 0 0 WBT 0 0 0 0 0
WBR 0 0 0 0 0 WBR 0 0 0 0 0
NBL 90 90 92 92 92 NBL 67 67 68 68 68
NBT 47 47 48 48 48 NBT 190 190 194 194 194
NBR 0 0 0 0 51 51 NBR 0 0 0 0 21 21
SBL 0 0 0 0 0 SBL 0 0 0 0 0
SBT 229 229 234 234 32 266 SBT 159 159 162 162 14 176
SBR 30 30 31 31 31 SBR 20 20 20 20 20
Total 437 0 437 446 0 446 148 0 595 Total 506 0 506 516 0 516 63 0 578
400 400
Middle Sound Loop Road Extension at Site Access 3 Middle Sound Loop Road Extension at Site Access 3
2019 2019
2018 2018 2019 Appd Retail Site Passby Future 2018 2018 2019 Appd Retail Site Passby Future
AM Peak Balancing Future No Site Trips PM Peak Balancing Future No Site Trips
TMC Base Projected Dev Trips Trips Build TMC Base Projected Dev Trips Trips Build
Build Build
EBL 9 9 9 9 9 EBL 73 73 74 74 74
EBT 0 0 0 0 0 EBT 0 0 0 0 0
EBR 29 29 30 30 30 EBR 59 59 60 60 60
WBL 0 0 0 0 32 32 WBL 0 0 0 0 14 14
WBT 0 0 0 0 0 WBT 0 0 0 0 0
WBR 0 0 0 0 11 11 WBR 0 0 0 0 5 5
NBL 8 8 8 8 8 NBL 34 34 35 35 35
NBT 51 51 52 52 52 NBT 162 162 165 165 165
NBR 0 0 0 0 0 NBR 0 0 0 0 0
SBL 0 0 0 0 11 11 SBL 3 3 3 3 5 8
SBT 225 225 230 230 230 SBT 119 119 121 121 121
SBR 15 15 15 15 15 SBR 14 14 14 14 14
Total 337 0 337 344 0 344 55 0 398 Total 464 0 464 473 0 473 24 0 496
DAVENPORT
119 Brookstown Ave., Suite PH1,
Winston Salem NC, 27101
Ph:(336)744-1636
Counted by: N. Baskett File Name : 1 Market Street at Middle Sound Loop Road
Site Code : 00170257
Start Date : 1/10/2018
Page No :1
Groups Printed- Cars - Buses and Trucks - Bikes on Road
US 17 Business (Market US 17 Business (Market
Middle Sound Loop Road Middle Sound Loop Road
Street) Street)
Westbound Eastbound
Southbound Northbound
Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Exclu. Total Inclu. Total Int. Total
Grand Total 180 6620 345 0 7145 481 208 1419 2 2108 663 6202 417 18 7282 509 183 219 2 911 22 17446 17468
Apprch % 2.5 92.7 4.8 22.89.9 67.3 9.1 85.2 5.7 55.9 20.1 24
Total % 1 37.9 2 41 2.8 1.2 8.1 12.1 3.8 35.5 2.4 41.7 2.9 1 1.3 5.2 0.1 99.9
Cars 180 6574 338 7092 476 208 1403 2089 652 6147 415 7214 506 183 219 910 0 0 17305
% Cars 100 99.3 98 0 99.3 99 100 98.9 100 99 98.3 99.1 99.5 0 98.8 99.4 100 100 100 99.7 0 0 99.1
Buses and Trucks 0 46 7 53 5 0 16 21 11 54 2 67 3 0 0 3 0 0 144
% Buses and Trucks 0 0.7 2 0 0.7 1 0 1.1 0 1 1.7 0.9 0.5 0 0.9 0.6 0 0 0 0.3 0 0 0.8
Bikes on Road 0 0 0 0 0 0 0 0 0 1 0 19 0 0 0 0 0 0 19
% Bikes on Road 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0.3 0 0 0 0 0 0 0 0.1
DAVENPORT
119 Brookstown Ave., Suite PH1,
Winston Salem NC, 27101
Ph:(336)744-1636
1716
5
0
Total
Middle Sound Loop Road
1173
Out
219
219
0
0
Right Thru
18
Left
481
476
0
North
0
5
1/10/2018 07:00 AM
908
3
0
911
183
183
0
0
Right Thru
In
1/10/2018 05:45 PM
2108
2087
In
208
208
21
0
0
0
Cars
506
509
3
0
1419
1403
Left
803
805
2
0
Total
16
Bikes on Road
3299
3260
0
39
0
40 1898 68
0 7 2
0 0 0
40 1905 70
Right Thru Left
236
42
42
0
0
Right Thru
Left
128
125
0
7
North
0
3
Peak Hour Begins at 07:15 AM
281
2
0
283
32
32
0
0
Right Thru
In
In
694
682
42
42
12
Cars 0
0
0
Buses and Trucks
207
209
2
0
Left
141
141
0
0
Bikes on Road
524
515
Out
Total
0
9
937
918
19
0
59 1514 107
0 11 0
0 0 0
59 1525 107
Right Thru Left
531
3
0
Total
Middle Sound Loop Road
377
74
74
0
0
Right Thru
Left
121
121
0
1
North
0
0
250
251
1
0
93
0
0
Right Thru
In
In
468
468
54
54
Cars
0
0
0
0
84
1
0
Left
278
280
2
0
Bikes on Road
293
293
Out
Total
0
0
846
845
0
1
Counted By: B. Cumbo File Name : 2 Middle Sound Loop Road at Bojangles Driveway
Site Code : 00170257
Start Date : 1/10/2018
Page No :1
Groups Printed- Cars - Buses and Trucks - Bikes on Road
Middle Sound Loop Road T-Intersection Middle Sound Loop Road Bojangles Driveway
Southbound Westbound Northbound Eastbound
Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Exclu. Total Inclu. Total Int. Total
07:00 AM 2 55 0 0 57 0 0 0 0 0 0 9 18 0 27 2 0 0 0 2 0 86 86
07:15 AM 5 55 0 0 60 0 0 0 0 0 0 13 24 0 37 6 0 3 0 9 0 106 106
07:30 AM 8 61 0 0 69 0 0 0 0 0 0 14 12 0 26 4 0 0 0 4 0 99 99
07:45 AM 9 61 0 0 70 0 0 0 0 0 0 10 24 0 34 5 0 1 0 6 0 110 110
Total 24 232 0 0 256 0 0 0 0 0 0 46 78 0 124 17 0 4 0 21 0 401 401
04:00 PM 2 27 0 0 29 0 0 0 0 0 0 29 12 0 41 17 0 3 0 20 0 90 90
04:15 PM 3 28 0 0 31 0 0 0 0 0 0 22 9 0 31 8 0 1 0 9 0 71 71
04:30 PM 3 32 0 0 35 0 0 0 0 0 0 22 17 0 39 10 0 2 0 12 0 86 86
04:45 PM 4 41 0 0 45 0 0 0 0 0 0 32 25 0 57 10 0 5 0 15 0 117 117
Total 12 128 0 0 140 0 0 0 0 0 0 105 63 0 168 45 0 11 0 56 0 364 364
Grand Total 76 694 0 0 770 0 0 0 0 0 0 385 310 0 695 173 0 40 0 213 0 1678 1678
Apprch % 9.9 90.1 0 0 0 0 0 55.4 44.6 81.2 0 18.8
Total % 4.5 41.4 0 45.9 0 0 0 0 0 22.9 18.5 41.4 10.3 0 2.4 12.7 0 100
Cars 74 687 0 761 0 0 0 0 0 381 310 691 171 0 40 211 0 0 1663
% Cars 97.4 99 0 0 98.8 0 0 0 0 0 0 99 100 0 99.4 98.8 0 100 0 99.1 0 0 99.1
Buses and Trucks 2 7 0 9 0 0 0 0 0 4 0 4 2 0 0 2 0 0 15
% Buses and Trucks 2.6 1 0 0 1.2 0 0 0 0 0 0 1 0 0 0.6 1.2 0 0 0 0.9 0 0 0.9
Bikes on Road 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bikes on Road 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
DAVENPORT
119 Brookstown Ave., Suite PH1,
Winston Salem NC, 27101
Ph:(336)744-1636
74 687 0
2 7 0
0 0 0
76 694 0
Right Thru Left
595
599
4
0
Total
Out
40
40
0
0
Right Thru
Bojangles Driveway
Left
0
0
0
0
North
T-Intersection
0
0
0
0
211
213
2
0
1/10/2018 07:00 AM
0
0
0
0
Right Thru
In
1/10/2018 05:45 PM
In
0
0
0
0
0
0
0
0
Cars
171
173
2
0
Left
384
386
2
0
Total
Bikes on Road
0
0
0
0
0
0
0
0
Middle Sound Loop Road T-Intersection Middle Sound Loop Road Bojangles Driveway
Southbound Westbound Northbound Eastbound
Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 11:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM
07:30 AM 8 61 0 69 0 0 0 0 0 14 12 26 4 0 0 4 99
07:45 AM 9 61 0 70 0 0 0 0 0 10 24 34 5 0 1 6 110
08:00 AM 7 57 0 64 0 0 0 0 0 11 25 36 11 0 4 15 115
08:15 AM 6 50 0 56 0 0 0 0 0 12 29 41 14 0 2 16 113
Total Volume 30 229 0 259 0 0 0 0 0 47 90 137 34 0 7 41 437
% App. Total 11.6 88.4 0 0 0 0 0 34.3 65.7 82.9 0 17.1
PHF .833 .939 .000 .925 .000 .000 .000 .000 .000 .839 .776 .835 .607 .000 .438 .641 .950
Cars 29 225 0 254 0 0 0 0 0 47 90 137 33 0 7 40 431
% Cars 96.7 98.3 0 98.1 0 0 0 0 0 100 100 100 97.1 0 100 97.6 98.6
Buses and Trucks 1 4 0 5 0 0 0 0 0 0 0 0 1 0 0 1 6
% Buses and Trucks 3.3 1.7 0 1.9 0 0 0 0 0 0 0 0 2.9 0 0 2.4 1.4
Bikes on Road 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bikes on Road 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
DAVENPORT
119 Brookstown Ave., Suite PH1,
Winston Salem NC, 27101
Ph:(336)744-1636
29 225 0
1 4 0
0 0 0
30 229 0
Right Thru Left
161
2
0
Total
Out
7
0
0
7
Right Thru
Bojangles Driveway
Left
0
0
0
0
North
T-Intersection
0
0
0
0
40
41
1
0
In
Cars
0
0
0
0
0
0
0
0
Buses and Trucks
33
34
1
0
Left
119
120
1
0
Bikes on Road
Out
Total
0
0
0
0
0
0
0
0
20 158 0
0 1 0
0 0 0
20 159 0
Right Thru Left
157
0
0
Total
Out
14
14
0
0
Right Thru
Bojangles Driveway
Left
0
0
0
0
North
T-Intersection
0
0
0
0
70
70
0
0
In
Cars
0
0
0
0
0
0
0
0
56
0
0
Left
87
87
0
0
Bikes on Road
Out
Total
0
0
0
0
0
0
0
0
Counted By: Braden Cumbo File Name : 3 Middle Sound Extension at Ogden Business Lane
Site Code : 00170257
Start Date : 1/10/2018
Page No :1
Groups Printed- Cars - Buses and Trucks - Bikes on Road
Middle Sound Loop Road Middle Sound Loop Road Ogden Business Lane
Southbound Westbound Northbound Eastbound
Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Exclu. Total Inclu. Total Int. Total
07:00 AM 1 47 0 0 48 0 0 0 0 0 0 8 0 0 8 6 0 3 0 9 0 65 65
07:15 AM 2 59 0 0 61 0 0 0 0 0 0 15 1 0 16 2 0 2 0 4 0 81 81
07:30 AM 2 59 0 0 61 0 0 0 0 0 0 10 3 0 13 14 0 4 0 18 0 92 92
07:45 AM 5 54 0 0 59 0 0 0 0 0 0 11 1 0 12 5 0 2 0 7 0 78 78
Total 10 219 0 0 229 0 0 0 0 0 0 44 5 0 49 27 0 11 0 38 0 316 316
08:00 AM 6 53 0 0 59 0 0 0 0 0 0 15 3 0 18 8 0 1 0 9 0 86 86
08:15 AM 5 47 0 0 52 0 0 0 0 0 0 12 2 0 14 9 0 0 0 9 0 75 75
08:30 AM 0 29 0 0 29 0 0 0 0 0 0 13 2 0 15 7 0 1 0 8 0 52 52
08:45 AM 2 29 0 0 31 0 0 0 0 0 0 10 1 0 11 6 0 1 0 7 0 49 49
Total 13 158 0 0 171 0 0 0 0 0 0 50 8 0 58 30 0 3 0 33 0 262 262
04:00 PM 4 14 0 0 18 0 0 0 0 0 0 23 4 0 27 12 0 6 1 18 1 63 64
04:15 PM 7 21 0 0 28 0 0 0 0 0 0 20 5 0 25 12 0 5 0 17 0 70 70
04:30 PM 1 26 0 0 27 0 0 0 0 0 0 22 3 0 25 6 0 9 2 15 2 67 69
04:45 PM 1 34 0 0 35 0 0 0 0 0 0 32 1 0 33 7 0 19 0 26 0 94 94
Total 13 95 0 0 108 0 0 0 0 0 0 97 13 0 110 37 0 39 3 76 3 294 297
Grand Total 50 591 3 0 644 0 0 0 0 0 0 353 60 0 413 153 0 126 3 279 3 1336 1339
Apprch % 7.8 91.8 0.5 0 0 0 0 85.5 14.5 54.8 0 45.2
Total % 3.7 44.2 0.2 48.2 0 0 0 0 0 26.4 4.5 30.9 11.5 0 9.4 20.9 0.2 99.8
Cars 48 587 3 638 0 0 0 0 0 350 59 409 147 0 126 276 0 0 1323
% Cars 96 99.3 100 0 99.1 0 0 0 0 0 0 99.2 98.3 0 99 96.1 0 100 100 97.9 0 0 98.8
Buses and Trucks 2 4 0 6 0 0 0 0 0 3 1 4 6 0 0 6 0 0 16
% Buses and Trucks 4 0.7 0 0 0.9 0 0 0 0 0 0 0.8 1.7 0 1 3.9 0 0 0 2.1 0 0 1.2
Bikes on Road 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bikes on Road 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
DAVENPORT
119 Brookstown Ave., Suite PH1,
Winston Salem NC, 27101
Ph:(336)744-1636
48 587 3
2 4 0
0 0 0
50 591 3
Right Thru Left
380
389
9
0
Total
Out
Ogden Business Lane
126
0
0
126
Right Thru
Left
3
0
0
3
North
0
0
0
0
273
279
6
0
1/10/2018 07:00 AM
0
0
0
0
Right Thru
In
1/10/2018 05:45 PM
In
0
0
0
0
0
0
0
0
Cars
147
153
6
0
Left
107
110
3
0
Total
Bikes on Road
0
0
0
0
3
0
0
3
Middle Sound Loop Road Middle Sound Loop Road Ogden Business Lane
Southbound Westbound Northbound Eastbound
Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 11:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:15 AM
07:15 AM 2 59 0 61 0 0 0 0 0 15 1 16 2 0 2 4 81
07:30 AM 2 59 0 61 0 0 0 0 0 10 3 13 14 0 4 18 92
07:45 AM 5 54 0 59 0 0 0 0 0 11 1 12 5 0 2 7 78
08:00 AM 6 53 0 59 0 0 0 0 0 15 3 18 8 0 1 9 86
Total Volume 15 225 0 240 0 0 0 0 0 51 8 59 29 0 9 38 337
% App. Total 6.2 93.8 0 0 0 0 0 86.4 13.6 76.3 0 23.7
PHF .625 .953 .000 .984 .000 .000 .000 .000 .000 .850 .667 .819 .518 .000 .563 .528 .916
Cars 13 223 0 236 0 0 0 0 0 51 8 59 26 0 9 35 330
% Cars 86.7 99.1 0 98.3 0 0 0 0 0 100 100 100 89.7 0 100 92.1 97.9
Buses and Trucks 2 2 0 4 0 0 0 0 0 0 0 0 3 0 0 3 7
% Buses and Trucks 13.3 0.9 0 1.7 0 0 0 0 0 0 0 0 10.3 0 0 7.9 2.1
Bikes on Road 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bikes on Road 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
DAVENPORT
119 Brookstown Ave., Suite PH1,
Winston Salem NC, 27101
Ph:(336)744-1636
13 223 0
2 2 0
0 0 0
15 225 0
Right Thru Left
61
5
0
Total
Out
Ogden Business Lane
9
0
0
9
Right Thru
Left
0
0
0
0
North
0
0
0
0
35
38
3
0
In
Cars
0
0
0
0
0
0
0
0
Buses and Trucks
26
29
3
0
Left
21
23
2
0
Bikes on Road
Out
Total
0
0
0
0
0
0
0
0
249 59 308
5 0 5
0 0 0
254 59 313
Out In Total
Middle Sound Loop Road
DAVENPORT
119 Brookstown Ave., Suite PH1,
Winston Salem NC, 27101
Ph:(336)744-1636
14 119 3
0 0 0
0 0 0
14 119 3
Right Thru Left
180
1
0
Total
Out
Ogden Business Lane
73
73
0
0
Right Thru
Left
3
0
0
3
North
0
0
0
0
131
132
1
0
In
Cars
0
0
0
0
0
0
0
0
59
1
0
Left
48
48
0
0
Bikes on Road
Out
Total
0
0
0
0
3
0
0
3
AM PEAK
WINDOW TO MENU Longest Length
7:00‐7:15 5 cars
7:15‐7:30 5 cars
7:30‐7:45 4 cars
7:45‐8:00 4 cars
8:00‐8:15 5 cars
8:15‐8:30 5 cars
8:30‐8:45 4 cars
8:45‐9:00 5 cars
MENU TO LINE Longest Length
7:00‐7:15 4 cars
7:15‐7:30 3 cars
7:30‐7:45 4 cars
7:45‐8:00 5 cars
8:00‐8:15 4 cars
8:15‐8:30 4 cars
8:30‐8:45 3 cars
8:45‐9:00 3 cars
DocuSign Envelope ID: 0B16D0B7-D68A-4B3C-9D16-6AEF9ABFF3EB
M E DELAY
LO O P
Fully Actuated
LO O P
CARD
DISTANCE
ON
NG
PHASE PHASE
EXTEN SI
SIZE FROM
CALLI
STRETCH DELAY
LOOP TURNS PHASE Wilmington Signal System
SYSTEM
FULL TI
F F (FT) STOPBAR TIME TIME
N EW
N EW
SIGNAL 0 0 0 0 0 0 0 0 SIGNAL 0 0 0 0 0 0 0 0
L L (FT)
1 1 2 2 3 3 4 4 1 1 2 2 3 3 4 4
FACE A FACE A
+ + + + + + + + + + + + + + + + NOTES
S S 1 Y Y - - *10 - Y
5 6 5 6 7 8 7 8 H 5 6 5 6 7 8 7 8 H 1A 6X40 0 2-4-2 Y
02+6 03+7 02+6 03+7
F F 6** Y Y Y - 3 - Y 1. Refer to "Roadway Standard Drawings NCDOT" dated January
11 R R R R Y 11 R R R R R R R
Y Y 2012, "Standard Specifications for Roads and Structures"
1B 6X40 0 2-4-2 Y 1 Y Y - - 15 - Y
21 R R G G R R R R Y 21 R R G G R R R R Y dated January 2012, and all applicable sections of the
2A 6X6 300 4 Y 2 Y Y - - - - Y
22 R R G G R R R R Y 22 R R G G R R R R Y latest version of the generic Project Special Provisions.
2B 6X6 300 4 Y 2 Y Y - - - - Y
The PSP can be accessed at the following website:
31,32 R R R R R R R 31,32 R R R R R R R
3A 6X40 0 2-4-2 Y 3 Y Y - - 3 - Y "http://connect.ncdot.gov/resources/safety/pages/
0% Grade
* Reduce Delay During Alternative Phasing Operation to 3
operation only. Coordinated
secs.
5B 4A 7A
R R R R
Y 12" Y Y 12"
12" Y Y
45 Mph 0% Grade F 12"
US 17 BUSINESS (MARKET STREET) G
ex Y
G
21
31 32 81 82 31,32
41 22
71
62 61
11 42
51 81 62
61 6B
82
6A
5A 11 51 1A
2A
21
2B
22
41
71
US 17 BUSINESS (MARKET STREET)
LEGEND
42 ex
PROPOSED EXISTING
45 Mph 0% Grade
Traffic Signal Head
Modified Signal Head N/A
3A 3B 8A 1B
Sign
Extension 1 * 2.0 6.0 2.0 2.0 2.0 6.0 2.0 2.0 25' N/A Right of Way
Proposed Wood
Max Green 1 * 15 100 15 25 15 100 15 25 Existing Directional Arrow
OP R
Pole #1
Stopbar
Yellow Clearance 3.0 4.5 3.0 3.8 3.0 4.5 3.0 3.8 Project #: 14-236
NC Dept of Transportation
403
D LO
Red Clearance 3.1 1.6 2.8 2.0 2.8 1.6 2.6 2.0
19' Proposed ex Division of Highways
DAVENPORT
SR 1
SOUN
Walk 1 * - - - - - - - - Stopbar
rade
Final Drawing Date: HOME OFFICE
20'
NCDOTPEDATE
WINSTON-SALEM, NC 27101
DLE
0% G
336.744.1636 www.davenportworld.com
ITS & Signals Unit NCBELS FIRM LICENSE NO. C-2522
(MID
obl
it
iyand
SEAL
M Sa
Minimum Gap - 3.0 - - - 3.0 - - on NORTH C fe
25' ti F A
US 17 Business (Market St)
ta
ty
O R
or
E
D
O
sp
T
H CAROL
ex
LI
i
A
Recall Mode - MIN RECALL - - - MIN RECALL - -
vi
Tran
RT
ST
N
21'
at I
si
A
32'
on
Existing Wood O
N
SSI
N
D E PA
IO N
E O
A
Vehicle Call Memory - YELLOW - - - YELLOW - - OF N
Pole #3 SR 1403 (Middle Sound Loop Rd)
PR
AT
AL
R
SEAL
T
Dual Entry - - - - - - - - Proposed Wood
R
M
E
O
Proposed N P
S
ig T O
n
Pole #4 48' na F TR A N
S
o Division 3 New Hanover County Wilmington 31533
Simultaneous Gap ON ON ON ON ON ON ON ON ti
Stopbar lD ec
esignS PLAN DATE: March 2016 REVIEWED BY: E
NG R
O INEE N
D
J
* These values may be field adjusted. Do not adjust Min Green and Extension times for phases 2 and 6 lower than what is shown. Min Green for all 750 N. Greenfield Pkwy, Garner, NC 27529 PREPARED BY: HN SE
J. Townsend REVIEWED BY:
G. TOWN
other phases should not be lower than 4 seconds. PROPOSED STOP BAR AND POLE LOCATION DIAGRAM SCALE REVISIONS INIT. DATE
NOT TO SCALE 0 30
PESIG PEDATE
SIGNATURE DATE