3. LMC Sta. 2+012 3. Silted lined canal and 3. Silts and debris are
– 2+331 no backfill on some recommended to be
portion of the lined removed by the
4. Check with T.O. canal from Sta. 2+012 contractor.
R at LMC Sta – Sta 2+331
1+713 4. Carefully remove form
4. No Structural Backfill lumbers at the grooves of
not removed form the inlet and outlet of the
lumbers at the grooves T.O. to prevent cracks on
of the inlet and outlet the structure
of the turn-out
4 Dam Works Steel gates have no chain 1. Install chain block on both
block installed left and right steel gates.
5 Other issues and The inspectorate team was NIA and contractor to conduct
concerns not able to test run the as-built survey and when
system. However, found insufficient in elevation,
according to IA members rectify canal wall height.
during the exit meeting,
the level of water
overflows at LMC Sta. 0+
000 to Sta. 0+100 before
reaching the further
stations.
FIGURES/PHOTO DOCUMENTATION
Figure 1 Rehabilitation works on the dam piers are done. Figure 2 Rehabilitation works on the dam piers are done.
Figure 3 Towers/sheds for the operating wheel are not yet installed.
INSPECTORATE TEAM
NOTED