Sie sind auf Seite 1von 1

PRODUCTION RISK ASSESSMENT FILM

LOCATION: DATE: 1st AD:

Pre Control Post Control

What could cause WHO may be harmed RISK CONTROL MEASURES RISK
HARM? and HOW?
LOW 1 – 5 HIGH What measures have been LOW 1 – 5 HIGH
(List identified (Give consideration to implemented to reduce the
HAZARDS) people with special Risks Identified?

Risk Rating

Risk Rating
Likelihood

Likelihood
Severity

Severity
(L/M/H)

(L/M/H)
needs)

(1-5)

(1-5)

(1-5)

(1-5)
M Check Weather
Rain

Continue on 2nd sheet if necessary…

Das könnte Ihnen auch gefallen