Beruflich Dokumente
Kultur Dokumente
What could cause WHO may be harmed RISK CONTROL MEASURES RISK
HARM? and HOW?
LOW 1 – 5 HIGH What measures have been LOW 1 – 5 HIGH
(List identified (Give consideration to implemented to reduce the
HAZARDS) people with special Risks Identified?
Risk Rating
Risk Rating
Likelihood
Likelihood
Severity
Severity
(L/M/H)
(L/M/H)
needs)
(1-5)
(1-5)
(1-5)
(1-5)
M Check Weather
Rain