Beruflich Dokumente
Kultur Dokumente
REVISION HISTORY
01 01/11/2012 37 Re-issued
TABLE OF CONTENTS
1. INTRODUCTION........................................................................................................................................ 5
2. PURPOSE.................................................................................................................................................. 6
3. GENERAL .................................................................................................................................................. 6
3.1 ABBREVIATIONS ................................................................................................................................................... 6
3.2 DEFINITION ......................................................................................................................................................... 7
3.3 PROJECT UNITS .................................................................................................................................................... 7
3.4 DESIGN LIFE ........................................................................................................................................................ 9
3.5 LANGUAGE .......................................................................................................................................................... 9
3.6 HAZOP AND SIL .................................................................................................................................................. 9
4. REFERENCE DOCUMENTS ......................................................................................................................... 9
4.1 PROJECT SPECIFICATIONS AND STANDARDS ................................................................................................................ 9
4.2 COMPANY STANDARDS ........................................................................................................................................ 10
5. GENERAL TECHNICAL ............................................................................................................................. 11
5.1 SCOPE .............................................................................................................................................................. 11
5.2 EXCLUSIONS ...................................................................................................................................................... 12
5.3 BASIC DESIGN REQUIREMENTS ............................................................................................................................. 12
5.4 AMBIENT CONDITIONS ......................................................................................................................................... 13
5.5 UTILITIES .......................................................................................................................................................... 13
5.6 SPECIFICATIONS, CODES, STANDARDS AND REGULATIONS ........................................................................................... 13
6. PACKAGE EQUIPMENT ........................................................................................................................... 19
6.1 BASE PLATE / SKIDS: ........................................................................................................................................... 19
7. INSTRUMENTATION ............................................................................................................................... 20
7.1 PACKAGE TYPE ................................................................................................................................................... 20
7.2 INSTRUMENT OVERVIEW ...................................................................................................................................... 21
7.3 INSTALLATION AND TERMINATION.......................................................................................................................... 22
8. ELECTRICAL ............................................................................................................................................ 22
8.1 GENERAL .......................................................................................................................................................... 22
8.2 AREA CLASSIFICATIONS AND ENCLOSURE OF ELECTRICAL EQUIPMENT............................................................................ 23
8.3 OTHER IMPORTANT REQUIREMENTS....................................................................................................................... 23
9. PIPING ................................................................................................................................................... 23
10. HSE ........................................................................................................................................................ 24
10.1 NOISE .............................................................................................................................................................. 24
11. STRUCTURES AND APPURTENANCES...................................................................................................... 24
12. MATERIAL SPECIFICATION...................................................................................................................... 25
12.1 MATERIAL SELECTION .......................................................................................................................................... 25
13. WELDING ............................................................................................................................................... 25
14. SHOP FABRICATION AND FIELD ERECTION ............................................................................................. 26
15. INSPECTION & TESTING .......................................................................................................................... 26
15.1 INSPECTION ....................................................................................................................................................... 26
15.2 FACTORY TESTING............................................................................................................................................... 27
This document is property of eni Iraq B.V.
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Logo and business name of Company Document Owner Document Revision Index Sheet of
Document owner Identification Identification Sheets
Validity
Rev.
00250621DVSH00011 Status 4 / 34
eni iraq b.v. EX-DE 02
1. Introduction
ENI has been awarded the Zubair project for the development of the Zubair Oil Field in a joint
venture with Occidental, Korea Gas and Missan Oil Company (as the state partner), with ENI as the
operator.
The Zubair Oil Field is located in the southern area of Iraq, 20 km from Basra city (see Figure
below). The structure of the Zubair Field is a relatively gentle anticline oriented NNW - SSE,
approximately 60 km long and 10 to15 km wide.
New facilities are required at the Zubair Oil Field to increase the oil production capacity by an
additional 300,000 BOPD, and it is planned to achieve this by installing six (6) crude processing
trains, each sized to process and deliver 50,000 BOPD of stabilized crude to the export pipeline,
plus associated gas and treated produced water.
Four (4) of the crude processing trains, with common associated gas compression, produced water
treatment and utility systems shall be located at the new Hammar Initial Production Facility (IPF)
site. One (1) crude processing train with associated gas compression, produced water treatment
and utility systems shall be located at each of the new Zubair IPF site and Rafidiya IPF site. These
This document is property of eni Iraq B.V.
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Logo and business name of Company Document Owner Document Revision Index Sheet of
Document owner Identification Identification Sheets
Validity
Rev.
00250621DVSH00011 Status 6 / 34
eni iraq b.v. EX-DE 02
new IPFs shall be installed near to the existing DGS at Hammar, Zubair and Rafidiya respectively
2. Purpose
The purpose of this specification is to provide a detailed requirement of the Packages (static and
rotating) required for the Hammar, Zubair and Rafidiya IPFs. This specification, together with the
documents and standards referenced herein define the minimum requirements for the design,
manufacture, fabrication, construction, assembly, supply, inspection, testing, Mechanical
guarantees, Process guarantees, surface treatment and painting, preservation, preparation for
shipment, packing, documentation and delivery for the Package and skids (Rotating and Static).
The compliance with the requirements of this document does not relieve the Vendor of furnishing
the equipment of proper design, meeting all the specified rated operating and service conditions.
The design of the package shall employ an inherently safe approach, e.g. equipment and controls
shall be simplified, corrosion resistant materials shall be adopted where appropriate, leak paths and
ignition potential shall be minimized. The need for personnel intervention shall be minimized.
3. General
3.1 Abbreviations
3.2 Definition
Company: Eni-Iraq
Supplier / Vendor: Any company who receives the Purchase Order from the Contractor.
Purchase Order: The Purchase Order placed on the Supply by the Contractor which
shall incorporate Terms and Conditions of Purchase, the Material
Requisition, drawings, specification, and other documents referred to
in the purchase Order.
Construction Contractor Any Contractor in contract with Contractor for the construction and
commissioning of the Zubair Oil Field Development
As a general rule SI units shall be used, with the major exception of pressure which will use “bar”.
However, for some main parameters such as flow rate and pressure, both SI units and field units
may be used (field units in brackets will follow the SI units).
Useful Conversions:
• 1 m³ = 6.290 bbls / 1 bbl = 0.159 m³
• 1 m³/h = 150.95 BPD / 1,000 BPD = 6.625 m³/h
• 1 bar = 14.50 psi / 1 psi = 68.95 mbar
• 1 in = 25.4 mm / 1 m = 39.37 in
It is a specific requirement for each IPF unit to have an expected design life of 25 years with
suitable material selection.
3.5 Language
All drawings, instructions, data sheets, design calculations, correspondence and any other written
information for the WORK shall be in the English language. Safety signs and indications (label,
tags, etc.) at site must be both in the English and Arabic language.
The Vendor shall have overall responsibility for the proper design and safety of the supplied
equipment. When specified, the Vendor shall be required to participate in Hazard and operability
study (HAZOP) and Safety Integrity Level study (SIL) to be conducted by the CONTRACTOR to 2
review Vendor’s P&ID’s and other relevant documents for verification that operational safety and
integrity of the plant will be maintained, and that the new equipment will fully integrate and operate
with the rest of the plant. Any additional items identified as a result of the HAZOP and SIL actions
shall be fully implemented by the Vendor at the Vendor’s cost. The Vendor shall ensure the relevant
personnel are available during the course of the HAZOP and SIL sessions.
4. Reference Documents
5. General Technical
5.1 Scope
This specification provides the minimum requirements for the design, material, fabrication, assembly,
testing, painting and supply of packaged skidded equipment for Zubair Oil Field development Project
and associated processing facilities.
This specification does not dictate detailed design of the equipment or assembly of components, it is
intended that those responsibilities shall be retained fully by Vendor so that all equipment and process
warranties remain unmitigated.
The scope of supply for each package shall include, but not necessarily be limited to the following:
• Foundation Templates.
• Reactions to foundations
• Inspection, Non-Destructive Examination (NDE), heat treatment(s) and pressure testing in
accordance with the Company approved Inspection and Test Plan.
• Applicable site and shop acceptance tests.
• Pickling and passivation on Stainless Steel (All Internal surfaces, Weld area and HAZ), wherever
applicable.
• Surface preparation and painting (primer, intermediate and finish coat).
• Spare paint quantity for touch-up at site.
• Guarantee for Process design, mechanical design, materials, workmanship and performance.
• Export packing and Preservation and preparation for shipment including temporary shipping
saddles (steel), supports or bracing as required and wooden blanks for nozzles.
• Delivery and transport documentation.
• Duly completed Technical Documentation
• Drawings and documentation in accordance with the SDRL
• SUB-CONTRACTOR and SUB-VENDOR material certification.
• Certified Lifting Beams(if required), slings, shackles, etc.
Vendor shall have total responsibility for the performance of all equipment and materials supplied
under this specification. Vendor’s warranty shall be extended to cover the design and operating
parameters specified in this specification.
5.2 Exclusions
Design and equipment provision and installation, as well as the supply of components, will be in
accordance with the applicable international codes and standards. Vendor shall be solely
responsible for the equipment being supplied to work properly, according to the
COMPANY/CONTRACTOR requirements. 2
All the equipment and auxiliary shall be new, comprise all instrumentation, piping and valves.
The minimum turndown for the facilities is 25%. This shall include all equipment and
instrumentation.
Double PSV arrangement shall be provided for all trains with the exception of thermal expansion
valves (TSV).
All process cooling will be prepared by means of forced air draft, not water.
Although design minimum ambient air temperature is specified as -5°C, this is assumed not to be a
sustained temperature and winterization shall not be considered.
5.5 Utilities
Frequency 50Hz
The WORK shall be in accordance with all codes, standards and applicable regulations, latest
revision at the date of the offer.
VENDOR shall use as a minimum current international Codes and Standards as well as proper
and/or Sub-VENDOR's methodologies, technologies and manufacturing Standards, referenced and
consolidated by VENDOR, if not in conflict with laws and regulations of the Republic of Iraq and
those detailed herein. VENDOR shall submit for review a complete list of the applicable standards.
On exceptional cases, VENDOR shall submit proposed Vendor deviations to COMPANY /
CONTRACTOR for prior approval on a case by case basis.
Any design conflict or contradiction between these documents shall be submitted by VENDOR to
CONTRACTOR.
a. CONTRACT
This document is property of eni Iraq B.V.
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Logo and business name of Company Document Owner Document Revision Index Sheet of
Document owner Identification Identification Sheets
Validity
Rev.
00250621DVSH00011 Status 14 / 34
eni iraq b.v. EX-DE 02
Company will reserve the right to select the most stringent option in particular when the matter
refers to safety.
EN European Norm
• PFDs
• P&IDs
• Vessel datasheets
• Vessel GA drawings
• PSV sizing (including rated flow rates based on a maximum ATM flare back pressure of 0.3
barg)
• Package Control Philosophy
• Completed Pump Data sheets
• Pump GA drawings
• Pump Performance curve
• Mechanical seal data sheet
• List of Utilities
• Pressure Relief Valve Datasheet
• Operating Philosophy
6. Package Equipment
The Packaged Equipment shall normally be mounted on skids consistent with sizes of the individual
equipment items and the required access space as detailed in Specification. Each skid shall be
fully piped, instrumented and electrically wired including junction boxes to permit direct site hook-
ups. All necessary ladders and platforms shall be assembled and pre-installed. The Vendor shall
supply interconnecting pipework between skids. Every termination point on each skid shall have an
isolation valve so that the skid can be isolated and blanked off.
All equipment shall be specified for unsheltered outdoor installation and shall be suitable for the
climatic conditions specified in Site Condition section 5.3 and for the hazardous area clarifications
specified in this document.
The Vendor/ shall provide all equipment including pressure vessels and pumps etc within the
package to the applicable codes, standards and General Engineering Specifications listed in this
specification.
• Base plates shall have sufficient strength for transportation and lifting without any permanent
base frame deformation and to transit equipment generated forces and moments to the
Purchasers structures.
• Provisions for shims shall be made where alignments are critical. Shims shall be made of a
non-corrosive material such as stainless steel. Provisions shall be made for sufficient field
vertical alignment. Shimming shall not exceed 6mm in total thickness.
• Each base plate support shall be supplied with the necessary sub plates, shims and levelling
jackscrews to allow satisfactory levelling.
• Base plate shall be of sloped drain rim type with full non-skid type steel cover, including driver
provided with grouting holes. All the auxiliaries with valves shall be within the base plate as
required by API base plate. All base frames shall be constructed to allow ease of access for
maintenance and operational activities. Skid shall where possible include lifting facilities above
pump and motor to aid maintenance at remote location of site.
• Calculations for Holding down systems shall be done using concrete strength as 20 N/mm2.
7. Instrumentation
Package type applicable for the skid to be selected based on Section-9 of Package Instrument
Specification (Doc No. 00250600DISG00003) for more details.
Junction Box
/ Interface (if applicable)
Package Control
System (PLC)
Vendor Package
Central Distributed
Control System
(DCS)
Note: For packages with complex control, the SUPPLIER’s package shall include PLC based
control system mounted inside the UCP. The PLC system shall have dual power supplies, dual
CPUs, simplex I/O (dual I/O is required for critical loops, to be determined by the SIL studies).
SUPPLIER’s package shall interface to the CONTRACTOR’s ESD system by hardwired and the
CONTRACTOR’s DCS via dual redundant MODBUS TCP/IP communication or equivalent reliable 2
high speed serial communications.
Emergency
Vendor’s Junction Box Shutdown
Equipment / Interface
System (ESD)
Junction Box
/ Interface
Vendor Package
Distributed Control
System (DCS)
Instruments to be Smart type transmitters 4-20mA output 24v d.c. with Hart protocol. The use of
pressure, temperature, flow and level switches shall be avoided.
Suitable for IEC Zone 1, Group IIB, T3. Intrinsically Safe (EEx ‘i’) instrument shall be use based on
the following cases:
- In hazardous area where concentrations mixture of flammable gases (or vapour) and air are
presents frequently for operational or maintenance activity.
- When EEx-d is not available.
- When EEx-d is not applicable.
If required, EEx ‘i’ cables shall not share the same cable trays/ladders with non EEx ‘i’ cable
trays/ladders. For small quantity (less than 2) cables, the same tray/ladder can be used with a
mechanical barrier.
A minimum of 12mm OD, 1mm thickness, 316SSL impulse lines to be used unless Monel is
specified.
Swagelok fittings with double ferrules. Mixing of fittings and/or Swagelok equivalent is not
acceptable.
Level transmitters to be displacer type or differential pressure type unless used for oil/water
interface in which case guided wave radar level is to be used.
SDV/BDV shall be full bore and fire rated as per API STD 6FA.
Solenoid valve shall be SIL2 capable as a minimum, 3 port changeover type direct acting with push
button mechanical reset.
Junction boxes shall be 316SS, IEC or GRP, IP65 rated & IEC EEx e rated with a breather. All
blanking plugs shall be IEC EEx rated.
Vendor to use only project approved Vendor list. Yokogawa, Emerson, Rosemount, Fischer.
Supplier’s scope of WORK shall include the complete control and instrumentation system
requirements for the safe and reliable operation of the Skid. All control facilities shall be installed in
the Local Equipment Room (LER) or on skid, which shall be provided at each IPF site or on the
skid, and shall use PLCs for supervision and management of the operation of all equipment at the
IPF.
The instrumentation and control of the Skids shall be in accordance with the applicable international
codes and rules, as listed in section 4.1 of this specification and with the minimum requirements
indicated in the Doc. No. 00250600BISG50001, “Instrumentation and Control Philosophy” and in
the Doc.No.00250621DISG00003, “Package Instrumentation Specification”.
The PLCs shall have the capability for redundancy. For CPU, Power supplies. I/O redundancy
requirement will be determined by SIL study.
A SIL study shall be conducted and SUPPLIER shall be responsible for incorporating safety related
findings. All ESD or other safety-related signals shall be connected to the CONTRACTOR’s main
plant safety system. 2
Instruments shall be pre-installed and wired to a 316 SS, IEC EEx ‘e’, IP 65 suitably rated junction
boxes or directly to the ATEX certified UCP.
Powers supplies for instrumentation functions shall be 24VDC.For long cable distances, the Vendor
/ Supplier shall carry out voltage drop calculations to ensure correct sized cables are used.
Vendor to provide junction and UCP termination diagrams required for the connection to the ICSS.
Care will be taken to keep electrical and instrumentation cabling, with a minimum distance of
600mm apart, to eliminate any risk of interference of signals. In general, electrical equipment in the
hazardous area shall be certified EEx d. Where suitable EEx d equipment is not available,
consideration will be given to the use of intrinsically safe (EEx’i’) equipment with CONTRACTOR
approval. 2
8. Electrical
8.1 General
• Engineering & Design including but not limited to Electrical supplies, operations, functions,
systems, on skid wiring and tie-ins at battery limit of skid. All tie-ins shall be agreed in detailed
engineering.
• Equipment including but not limited to Motors, Push button & Junction boxes & structure
grounding provisions as required.
• Engineering interface & inputs for client’s equipment tie-ins & engineering including but not
limited to electrical loads, power utilities (normal, emergency), power& control cabling,
grounding system, cable trays and routes, cathodic protection system.
This document is property of eni Iraq B.V.
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Logo and business name of Company Document Owner Document Revision Index Sheet of
Document owner Identification Identification Sheets
Validity
Rev.
00250621DVSH00011 Status 23 / 34
eni iraq b.v. EX-DE 02
• MCCs including associated power and control cables up to package electrical loads shall be
supplied and installed by the purchaser. SUB-CONTRACTOR’s equipment shall accept and
terminate the cables sized by purchaser.
• The Zone, gas group and temperature class shall be as per purchaser’s hazard list and area
classification layouts.
• Every motor shall be provided with Start/Stop control station in-line with Operation and Control
Philosophy and P&ID and for further information refer “Electrical System Design Basis”.
• AC or DC UPS power supply, if required, shall be generated using purchaser’s normal and
emergency & distributed within the package, by SUB-CONTRACTOR.
• All electrical &instrumentation equipment on each skid shall be wired up to individual earth
bars installed at skid //civil foundation by SUB-CONTRACTOR. All mechanical equipment and
structures shall be ensured for electrical continuity. SUB-CONTRACTOR shall provide earth
bosses at diagonally opposite ends of each skid. Every electrical equipment shall be earthed
using suitably sized yellow/green earth cable. Skid, Electrical and instrumentation PE earth
bars shall be connected to main plant earth grid by purchaser. Grounding equipment and
installation shall be as per purchaser’s specifications.
• On skid task lighting & convenience outlet, if required, shall be supplied and installed by SUB-
CONTRACTOR.
• Electrical equipment shall be provided with color shade as per project specification.
9. Piping
• Inlet and outlet nozzle connections shall be flanged in accordance with ASME B 16.5. The
quantity, types, sizes and pressure classes of all nozzles are to be stated in the bid.
• Nozzle loading criteria shall be in accordance with applicable API STD. Nozzles with NPS 2-
½, 3-½, and 5 inch shall not be used.
• All non-metallic gaskets shall conform to ASME B16.21 and spiral wound gaskets to ASME
B16.20. Gasket material shall be asbestos-free. 2
This document is property of eni Iraq B.V.
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Logo and business name of Company Document Owner Document Revision Index Sheet of
Document owner Identification Identification Sheets
Validity
Rev.
00250621DVSH00011 Status 24 / 34
eni iraq b.v. EX-DE 02
• The Vendor shall supply fabricate and install all piping and piping component according to
project design requirement. All manual valves shall also be supplied and installed according to
project specification.
• The Vendor shall terminate the piping connections with a flange and a blind flange at the skid
edge unless otherwise specified.
• All associated piping hook-up spool in between skid shall be supplied by the Vendor. This will
be shipped loose as part of the unit package.
• The piping inside the skid should be supported accordingly and reflected in as-built GA
drawing as this is required during stress analysis outside skid.
• Pipe sizes shall be as indicated on referenced P&ID drawings for the subject skid. Pipe, valve
and fitting materials shall be as specified in Datasheets for valves and specification for piping
and valve materials (Doc No. 00250621DTST00005).
• Piping design shall conform to referenced Specification for Piping Design (Doc No.
00250621DTSH00001)
• Vendor shall provide all service platforms and Ladders as required for access to the
equipment, valves and instruments for safe operation and maintenance of the Equipment
inside the skid.
10. HSE
10.1 Noise
The sound pressure levels within the Plant shall be in accordance with the latest OSHA regulations.
Noise levels for individual equipment items will typically be less than 85 dB (A) at a distance of one
meter from the equipment/ item.
See section 19.3 of the Loss prevention and Environmental Philosophy (Doc No.
00250600BFRB85001)
Vendor shall provide Noise data sheets indicating Sound Pressure level details.
During emergency, noise levels for individual equipment items will typically be less than 115 dB (A)
at a distance of one meter from the equipment/ item.
The site design conditions are specified in Project Specification, "Overall Basis of Design Minimum
design loads for wind and earthquake shall conform to ASCE 7, Latest Edition.
The Vendor shall select the materials of construction to his engineering experience for the specified
design service conditions. The materials selected shall conform to the specifications given in
Section II of the ASME boiler and pressure vessel code or other governing codes. Materials of
construction are subject to approval by the CONTRACTOR. 2
All materials of construction shall be specified on the data sheet and comply with ASME Code
Section II together with the following requirements, unless otherwise specified in the request for
quotation.
The Vendor shall specify the materials of construction and the corrosion allowance for each
process item along with its associated piping.
The drawing titled the Material Selection Guide shall be submitted by the Vendor for
CONTRACTOR approval prior to commitment of materials for purchase. The drawing shall identify 2
the material of construction of each item of equipment and piping placed alongside the applicable
item on the process flow diagram (PFD).
All materials shall be new and unused. Sacrificial anodes shall be installed for protection of vessels
where required. All materials used in the pressure parts shall have available test certificates of
chemical analysis and physical properties.
Stainless steel and non-ferrous tubes shall be seamless. Carbon steel tubes shall be either
seamless or electric resistance welded type. Welded tubes shall be tested by means of ultrasonic
or eddy current examinations.
The Vendor shall specify the materials of construction and the corrosion allowance for each
process item along with its associated piping, based on the data provided in this document. The
Vendor shall be wholly responsible for their selection of materials,
The materials of construction for pressure and non-pressure components shall be based on the
design temperature; maximum and minimum design metal temperature and service in accordance
with reference specifications. Use of other materials shall require approval by CONTRACTOR. 2
13. Welding
All welding shall conform to ASME code requirements. Pressure holding seams, nozzle
attachments and similar joints shall be full penetration butt joints. Welds attaching other non-
pressure attachments (such as lugs or structural steel supports) shall be continuous. Welds
attaching insulation support rings need not be continuous. No welding or other mechanical work is
permitted after Post Weld Heat Treatment.
Defects shall be removed and re-welded using qualified welding procedures. Then repair weld shall
again be post weld heat treated, if originally required, and then examined by the original method for
freedom from defects. If correction involves serious modifications, the approval of the
CONTRACTOR shall be obtained before proceeding with such corrections. 2
Welding procedure specifications and procedure qualifications records shall be submitted by the
This document is property of eni Iraq B.V.
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Logo and business name of Company Document Owner Document Revision Index Sheet of
Document owner Identification Identification Sheets
Validity
Rev.
00250621DVSH00011 Status 26 / 34
eni iraq b.v. EX-DE 02
Vendor for CONTRACTOR's review, and approval prior to the start of fabrication. Welder’s
performance qualification records shall be made available for CONTRACTOR's review, upon 2
request. Connections that are bevelled for welding shall be suitably covered to protect the bevel
from damage.
15.1 Inspection
All items of the packaged unit shall be subject to witness inspection by the CONTRACTOR,
Company or nominated agency (Third party).
2
The Vendor is to furnish the CONTRACTOR's Inspector(s) or nominated agency with all
reasonable facilities, to satisfy them that the equipment is fabricated and tested in accordance with
the relevant code, requisition and this specification.
All inspection activities to be performed, including any special requirements, shall be agreed with
the CONTRACTOR and shall be incorporated within the agreed Quality Control Plan provided by
the Vendor. The Vendor shall submit procedures for all applicable NDT techniques for approval by
the CONTRACTOR before production commences. 2
Pre-Inspection Meeting shall be held at the Vendor’s location and his major Sub-Suppliers. The
Pre-Inspection Meeting shall be held prior to the start of fabrication.
Vendor shall give a minimum of thirty-five (35) days’ notice and agree with CONTRACTOR on the 2
date of commencement of tests for witness or Hold points inspections on the equipment covered by
the Supply Specification.
Vendor shall be responsible for coordinating the inspection and testing of sub-supplier supplied
equipment, and for ensuring that CONTRACTOR and Company representatives are given 2
adequate warning of and necessary access for inspection and witness tests.
All materials for which testing is required shall be tested in accordance with Manufacturer’s
standard procedures and International codes at his premises. Supplier shall provide all certificates
and test reports relevant to all components.
All major components/wetted parts Material Test Certificates shall be at least in EN 10204 3.1
CONTRACTOR and its Inspection Authority shall inspect the equipment for compliance with: 2
Electrical equipment tests and inspection shall be as per OEM standards and in accordance with
project specifications and IEC standards.
The CONTRACTOR their nominated inspector shall carry out such inspection and witness tests as 2
agreed for the fabrication of the equipment for the Package. The Vendor shall provide access and
facilities for such inspection and tests.
The FAT procedures shall be submitted to the Company at least 8 weeks prior to the date of the
tests.
A performance test of complete Package unit shall be carried out at site by the Vendor in the
presence of the CONTRACTOR’s representative.
2
The requirements of the performance test shall be agreed with the Company / CONTRACTOR and
incorporated within the Quality Control Plan provided by the Vendor.
As a minimum, the performance test shall verify that the Package unit is capable of delivering in full
accordance with the process guarantee and that the unit is functioning in compliance with the
chemical and utility consumptions and turn down capacity predicted on the Data Sheets.
All surfaces to be painted shall be dry and free from burrs, weld spatter, flux, dirt, grease, oil, rust,
loose mill-scale and other matter before any paint is applied.
All exposed machined contact surfaces shall be coated with removable rust preventive and
protected against mechanical damage by suitable covers.
All surfaces requiring painting shall be painted in accordance with project paint specification. No
equipment surface shall be painted until all inspection and testing is completed.
Vendor shall provide commissioning spare parts for the whole equipment supplied, including all
auxiliaries. Vendor shall specify all spares required for pre-Commissioning, test run and
commissioning for inclusion in the main Purchase Order.
Spare Parts for Subsequent Two Years of Operation. Vendor shall provide a priced list of
recommended spare parts for the subsequent two years of Operation. All spare parts shall be listed
on a Spare Parts and Interchangeability Requirements (SPIR). The price list shall be considered as
an option.
Vendor shall provide a priced list of recommended Insurance spare parts. All spare parts shall be
listed on a Spare Parts and Interchangeability Requirements (SPIR). The price list shall be
considered as an option.
All associated design documentation including calculations, drawings and specifications necessary
to complete the work shall be produced by the Vendor for approval by the CONTRACTOR.
2
The Vendor shall provide data sheets and fabrication drawings for approval by the CONTRACTOR
prior to shop fabrication.
The P&ID diagram shall show pipe sizes, pressure and temperature ratings and material of
construction. Any items shown in the diagram not supplied by the Vendor shall be clearly marked.
Instrumentation, valves and other auxiliary equipment shall also be detailed as far as possible,
including material selection.
PFD’s with information about stream operating flow rates, pressures and temperatures to be
supplied in proposal stage.
Name plates shall be legible, in English language, and include as a minimum the following
information:
• Service
• Manufacturer’s name and place of manufacture
• Manufacturer’s serial number
• Purchase Order/Contract No
• Design code
• Design pressure.
• Design temperature.
• Minimum design metal temperature (MDMT)
• Test pressure
• Date Tested.
• Weight of the equipment
• Equipment size
This document is property of eni Iraq B.V.
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Logo and business name of Company Document Owner Document Revision Index Sheet of
Document owner Identification Identification Sheets
Validity
Rev.
00250621DVSH00011 Status 29 / 34
eni iraq b.v. EX-DE 02
• Year built.
• Any additional information required by the CONTRACTOR 2
Vendor shall submit with its bid valid Accreditation Certificates verifying ISO 9001 compliance from 2
an internationally recognized certification authority for each of its proposed manufacturing locations
and for each of its proposed Sub-Supplier's locations.
CONTRACTOR,, or its appointed representative, reserves the right to carry out Quality Audits at
Vendor’s / Sub-supplier's office and works, to verify adherence to the Quality System.
2
CONTRACTOR, or its appointed representative, shall call for the Vendor to provide a schedule of
Vendor Quality Audits, appropriate to Vendor / Sub-supplier activities, and for Vendor to provide
reports on such audits.
Vendor Quality Plan shall show the planned activities, resources and events serving to implement
and record the execution of Vendor Quality System relevant to the goods in accordance with ISO
9001: 2008. The Quality Plan shall list documentation and design reviews. 2
For each item of equipment or Sub-Supplier item, the principal manufacturing steps, type of
inspection and test, the Controlling Procedure, and the acceptance standard shall be defined in an
Inspection and Test Plan (ITP). The ITP shall include space for CONTRACTOR and Company to
advice inspection Hold and Witness points, whether by CONTRACTOR, CONTRACTOR Third 2
Party, or Company. Vendor shall indicate on the ITP all surveillance that Vendor will carry out of
Sub-Supplier's goods.
The Quality Plan and ITPs will be discussed with the Vendor during the Kick-Off and Pre-Inspection
Meetings at the Vendor's works. The agreed ITPs shall be held by the Vendor and initialled
progressively by the Vendor's inspector, CONTRACTOR's inspector, and any other authorized 2
inspectors to demonstrate successful completion of each inspection activity.
Vendor may use its standard format ITP. As a minimum, each ITP shall include the following
information:
• Process description
• Quality control requirements
• Notification for inspection requirements for Vendor inspection witness and hold points (minimum
35 working days notification)
• Responsibilities
• Applicable procedures
• Acceptance criteria
• Verifying documents
• Inspection points ( For ENI and Weatherford as well)
• Hold points
21. Sub-Suppliers
Vendor shall control, coordinate, expedite and resolve all problems with its Sub-Supplier in order to
meet the requirements of this Supply Specification. Vendor shall guarantee and be responsible for
the design and performances of all Sub-Supplied items. Vendor shall ensure that the relevant
information, reference documents and documentation requirements are passed on to any Sub-
Supplier.
Vendor shall provide a list of all Sub-Supplier proposed for the supply of equipment and materials
for CONTRACTOR's approval.
Vendor shall, as part of the detail design documentation, provide a copy of all Sub-Supplier un- 2
priced Purchase Orders for CONTRACTOR's information.
All Sub-Supplier testing certificates, datasheets, performance data and inspection records shall be
included in Manufacturing Data Book.
22. Documentation
22.1 Introduction
The Vendor shall furnish all drawings, design details, operation and maintenance manuals and
other information necessary for the design assessment, erection, operation and maintenance of the
installation, in line with the project VDRL.
22.2 Schedules/Reports
The Vendor shall submit with his tender, a Quality Control Plan.
The Vendor shall supply a schedule showing the documents for review and approval, proposed
sub-suppliers, material procurement and a production / fabrication program.
After Purchase Order/Contract award Vendor shall send the CONTRACTOR. Monthly progress 2
reports covering process design, mechanical design, Purchasing and fabrication of the Package.
The Vendor shall provide the Data Book containing all the relevant engineering and fabrication data
for the Package.
The following outlines the minimum documentation which shall be submitted with the tender
documentation:
instrumentation, alarms and shutdown devices, shown in the format of a piping and instrument
drawing (P&ID)
• Performance guarantee/assurance calculations.
• Supplier’s document list.
• MRB Index
The following outlines the minimum documentation which shall be submitted for review and
approval following selection of the Vendor:
22.4 Drawings
Review and approval of drawings shall be according to the commercial section of the Purchase
Order/Contract.
Final technical documents shall be furnished complete with the following references: Company’s
name, CONTRACTOR's name, Vendor's name, CONTRACTOR's Purchase Order / Contract
reference, CONTRACTOR's identification code, title of documents. 2
General arrangement drawings shall be provided to show the relative location and main dimensions
of all components.
22.5 Manuals
The installation, operating and maintenance manuals shall be provided by the Vendor after
fabrication, inspection and painting
The operating and maintenance manuals shall include, but not limited to the following:
• Manufacturer’s data sheets include ASME requirements including U-1 vessel compliance.
• Operating and maintenance instructions for each piece of Package equipment operating as a
This document is property of eni Iraq B.V.
It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Logo and business name of Company Document Owner Document Revision Index Sheet of
Document owner Identification Identification Sheets
Validity
Rev.
00250621DVSH00011 Status 32 / 34
eni iraq b.v. EX-DE 02
unit
• Normal plant start-up and normal shutdown procedure
• Emergency procedure in the event of instrument air or other failure
• All the documents listed in material requisition
23. Training
Vendor shall make provision for suitably experienced and qualified personnel to be available to train
Company's personnel in commissioning, operation and maintenance.
Training shall be carried out at Site and/or Vendor's / Sub-Supplier's training facility and shall
include the provision of appropriate support documentation.
Training will be the subject of a separate Purchase Order and shall be quoted as an optional price.
24. Guarantees
The Vendor shall guarantee all equipment of his supply to be free from all defects in design,
workmanship and/or materials and shall replace, at his own expense, including any or all
transportation and labour costs free to the job site, any part of the equipment of the Package
proving defective within one year after commissioning, or two years from the date of delivery,
whichever is the shorter period, or such period stipulation in the Purchase Order/Contract.
All components shall be constructed to the highest standards of good fabrication practice.
`
Should any item be found defective, the Vendor shall be responsible for all costs associated with
restoring the equipment to the standard specified by the Purchase Order/Contract.
• Pressure Vessels and Heat Exchangers shall be manufactured in accordance with ASME Sec.
VIII Div. 1. Application of ASME Sec. VIII Div. 2 is not allowed. All mechanical equipment like
pressure vessels and heat exchangers shall be provided with Certification Mark. If the design
pressure is greater than 100kPa, the equipment shall have a U-Stamp. Any Piping components
located inside the package that are outside the jurisdiction of ASME VIII Div. 1 shall be designed
in accordance with ASME B31.3.
2
• Hot Tap tie-ins of IPF’s to existing in-field pipelines may be required based on CONTRACTOR’s
line size requirement.
• Where the margin between the NPSHA and NPSHR is less than 1m, witnessed NPSH test has
to be included in the Pump Inspection test plan.
• Performance test, Mechanical Run Test and Hydrostatic testing of all pressurized components
shall be witnessed.
• Metering pumps for chemical injection shall be designed in line with API 675, Latest edition.
Chemical injection packages shall be skidded, complete with pump, motor, piping, control,
instrumentation and valves.
• Equipment (pump, electric motor) shall be provided with adequate fully certified lifting points and
all necessary lifting arrangement like spreader beams to enable single point lifts.
• The design shall be such as to facilitate maintenance and in particular readily accessible for
replacement with minimal disturbance to pipe work /insulation and equipment
• All gaskets shall be non-asbestos and shall be selected for complete safety for the pumped fluid.
Viton ‘O’ rings may not be used.
• The skid base shall have sufficient mass and structural rigidity to avoid natural frequencies
resulting in resonance, and to ensure that only residual vibration levels occur under normal
operation conditions. Skids shall have permanently fixed engraved stainless steel name tags
that shall include skid name, tag number, purchase order number, date of manufacture, Plant
Code and Train.
• All vents and drains connections including (casing, seals, etc.) shall be provided with valves and
plugs. In case where either drain or vent connection needs to be extended to out of the base
plate, the termination shall be flanged. All termination points shall be clearly identified by
permanently fixed durable labels.
• ALL termination points on skid shall be listed on a schedule that will give location of terminal
point in space, relative to a fixed reference point on skid.
• Because of the elevation of skid safe access and egress points on to the skid from grade are
required.
• Because of the elevation of skid, safe maintenance work areas need to be considered.
• All skids shall be sealed at their bases, to contain leaks and spills. The base shall be sloped to
allow drainage and also have sufficient access for periodic cleaning of the drainage area.
• Vessels and piping whose surface temperatures exceeding 65 deg C, suitable insulation
shall be provided. Thermal insulation shall be in accordance with Doc No.
00250621DVSG00002 “Specification for Insulation.”
• Heat exchangers including fuel gas heaters shall be manufactured as per ASME + TEMA
standards.
27. CEMS
If applicable to the package, ports for Continuous Emission Monitoring System shall be provided in
accordance with Iraq Law (2009) “Emission Limit of Air Pollutants” and IFC Guideline 2007. A
single hand held device shall be provided.