MFL Full tank floor 1. Submit full report scanning along with with 40% loss and Hand scan. above. Mark the Wherever MFL is not suspected covered shall be locations after the covered with inspection for UT Conventional UT verification. around the tank 2. Include three page diameter. report along with item 1 which contains cover page, tank layout with full MFL and UT Readings and suspected plates summary table LRUT Full pipeline 1. Submit full LRUT inspection with report with LRUT. As LRUT findings and cross having some check with UT limitations Alhoty 2. Include separate has to do report table for UT Conventional UT inspection which is either side of the not covered (either weld. side of the weld) with LRUT.