Sheet 1 of 1

JOB No.:

PROJECT:

Boring Dia.: 76mm Coring Dia.: 52mm

CLIENT: Rotary Boring Rig: YWE-D45

CONSULTING ENGINEER: Existing G.L.

18/4 0 0.00-0.20 D1
10:42 Medium brown SILT with traces of
1 gravel
1.50
11:37 1.50-1.766 P1/D2 4,12,18,32/41 50/116 7/26.6
2 Hard medium grey SILT
2.50
2.50-4.00 C1 TCR=100%,
3 RQD=10%
14:20

4
4.00-5.50 C2 TCR=100%,
RQD=NIL
15:37
5
Very weak to weak medium grey
5.50-7.00 C3 TCR=100%, highly weathered MUDSTONE
19/4 6 RQD=9%
08:42

7
7.00-8.50 C4 TCR=100%,
RQD=18%
09:50
8
8.50

10

11

12

13

14

15

16

17

18

19

20
Final Water Level= 1.70m
Water sample taken on 19/4/2018 at 08:10am

Driller: Azawan Logged by: Asala Checked by Geologist: Sylvia Hunyang


Sheet 1 of 1

JOB No.:

PROJECT:

Boring Dia.: 76mm Coring Dia.: 52mm

CLIENT: Rotary Boring Rig: YWE-D45

CONSULTING ENGINEER: Existing G.L.

12/4 0 0.00-0.20 D1 0.20 Brownish grey sandy CLAY with


09:40 traces of gravel
1

10:37 1.50-1.95 P1/D2 1,0,1,1,1,1 4 16/45 Soft to firm medium brown sandy
2 CLAY
2.50

3
14:20 3.00 3.00-3.45 P2/D3 1,1,1,2,2,4 9 21/45 Stiff greyish brown CLAY

4.00
4

15:32 4.50-4.69 P3/D4 14,11/32,37,13/8 50/83 20/19 Hard medium grey sandy CLAY
5
5.50

6
16:43 6.00 6.00-6.184 P4/D5 12,13/23,34,16/11 50/86 15/18.4

Hard medium grey CLAY


7

17:03 7.50-7.675 P5/D6 15,10/16,36,14/9 50/84 4/17.5


8.00
8
8.00-9.50 C1 TCR=100%,
13/4 RQD=13%
10:40 9

9.50-11.00 C2 TCR=100%,
14/4 10 RQD=23%
09:10
Weak medium grey moderately
11
11.00-12.50 C3 TCR=100%, weathered MUDSTONE
RQD=15%
11:20
12

12.50-14.00 C4 TCR=100%,
13 RQD=59%
15:20

14.00
14

15

16

17

18

19

20
Final Water Level= 1.80m
Water sample taken on 14/4/2018 at 08:50am

Driller: Azawan Logged by: Asala Checked by Geologist: Sylvia Hunyang