Beruflich Dokumente
Kultur Dokumente
JOB No.:
PROJECT:
18/4 0 0.00-0.20 D1
10:42 Medium brown SILT with traces of
1 gravel
1.50
11:37 1.50-1.766 P1/D2 4,12,18,32/41 50/116 7/26.6
2 Hard medium grey SILT
2.50
2.50-4.00 C1 TCR=100%,
3 RQD=10%
14:20
4
4.00-5.50 C2 TCR=100%,
RQD=NIL
15:37
5
Very weak to weak medium grey
5.50-7.00 C3 TCR=100%, highly weathered MUDSTONE
19/4 6 RQD=9%
08:42
7
7.00-8.50 C4 TCR=100%,
RQD=18%
09:50
8
8.50
10
11
12
13
14
15
16
17
18
19
20
Final Water Level= 1.70m
Water sample taken on 19/4/2018 at 08:10am
JOB No.:
PROJECT:
10:37 1.50-1.95 P1/D2 1,0,1,1,1,1 4 16/45 Soft to firm medium brown sandy
2 CLAY
2.50
3
14:20 3.00 3.00-3.45 P2/D3 1,1,1,2,2,4 9 21/45 Stiff greyish brown CLAY
4.00
4
15:32 4.50-4.69 P3/D4 14,11/32,37,13/8 50/83 20/19 Hard medium grey sandy CLAY
5
5.50
6
16:43 6.00 6.00-6.184 P4/D5 12,13/23,34,16/11 50/86 15/18.4
9.50-11.00 C2 TCR=100%,
14/4 10 RQD=23%
09:10
Weak medium grey moderately
11
11.00-12.50 C3 TCR=100%, weathered MUDSTONE
RQD=15%
11:20
12
12.50-14.00 C4 TCR=100%,
13 RQD=59%
15:20
14.00
14
15
16
17
18
19
20
Final Water Level= 1.80m
Water sample taken on 14/4/2018 at 08:50am