Beruflich Dokumente
Kultur Dokumente
JOB No.:
PROJECT:
21/4 0 0.00-0.20 D1
14:40 Greyish brown CLAY with traces of
1 root
1.50
15:12 1.50-1.609 P1/D2 18,7/3 50/31 50/31 4/10.9
Hard medium grey SILT with traces of
2
gravel
2.50
3
16:37 3.00-3.161 P2/D3 16,9/7,41,9/4 50/79 10/16.1
6.50-8.00 C2 TCR=100%,
7 RQD=50%
10:52
9.50-11.00 C4 TCR=100%,
10 RQD=47%
15:22
11.00
11
12
13
14
15
16
17
18
19
20
Final Water Level= 2.30m
Water sample taken on 21/4/2018 at 08:10am